CHAPTER 19
1946 Guide
Two or more chimneys, either large or small, should never be connected together especially near the bottom. Hot gases in an inverted U-tube thus formed will be in unstable equilibrium. Cold air will descend through one such chimney, from the top, and drive the hot gases out of the other and thus annul the draft.
More than one device can be served by one chimney. Batteries of boilers are commonly connected to a single chimney in power plants. However, if two or more chimneys are used, each chimney should be used separately for part of the boilers, and not connected in manifold with another chimney, in order to avoid the difficulty described previously.
In domestic installations it is sometimes necessary to serve a space heater or cooking stove and a water heater with the same chimney flue. This is not desirable; especially for low chimneys, since doors left open on one device while it is un-fired will tend to annul the draft on another device. Gas burning devices, with their draft hoods and lack of draft dampers, are especially bad in this respect. The traditional method of avoiding this with brick chimneys has been to construct multiple-flue chimneys, so that each fuel-burning device could be served by a separate opening. If two devices must be served by one flue-opening in a chimney, their connections to the chimneys should not be located opposite each other. The connection from the larger device should be reasonably low down and that from the smaller, up near the ceiling, so that each device can be serviced as well as possible, regardless of the treatment of the other.
Excessive height in a chimney does no harm but means for controlling the draft are more than ordinarily essential if the chimney is too large in capacity. Coal-burning devices often have air leaks around the fire-box and the draft doors sometimes, fit poorly so that tKe fire cannot be con trolled at a low rate. Perhaps the simplest remedy for such cases is the barometric damper which admits air into the flue pipe and thus reduces the draft.
Directions for building chimneys for fireplaces are contained in Depart ment ot Agriculture Farmers' Bulletin No. 1230.
It is considered bad practice,to connect any heating device to a fireplace flue unless the fireplace is effectively sealed.
REFERENCES
l--Notes on Power Plant Design, by E. F. Miller and James Holt (Massachusetts Institute of Technology,
1930).
,
*--A.S.H.V.E. Research Report No. 1105--Frictional Resistance to the Flow of Air in Straight Ducts, by F. C. Houghten. J. B. Schmieler, J. A. Zalovdk and N. Ivanovic (A.S.H.V.E. Transactions. Vol. 45,1939, p. 35) and for more complete discussion see Flow of Fluids in:Closed Conduits, by R. J. S. Pigott (.Mechanical Engineering, August, 1933).
*--Observed Performance of Some Experimental Chimneys, by R. S. -DU1. P. R. Achenbach and J. T. Duck (A.S.H.V.E. Transactions, Vol. 48. 1942, p. 351).
*--National Bureau of Standards Commercial Standards: CS101-43 Oil-Burning Space Heaters Equipped With Vaporizing Pot-Type Burners, CS75-42 Automatic Mechanical Oil Burners Designed for Domestic Installations CS(E) 104-43 Warm Air Furnaces Equipped With Vaporizing Pot-Type Burners; and Trade Standards: TS3536a Solid-Fuel Burning Forced Air Furnaces, TS3518 Oil-Burning Floor Furnaces Equip ped With Vaporizing Pot-Type Burners.
Comfort Heating. 1938. p. 71 (American Gas Association).
6--Comfort Heating. 1938, p. 74 (American Gas Association).
7~Chimneys and Draft (Chapter 32 in Winter Air Conditioning, by S. Konzo, published by National Warm Air Heating and Air Conditioning Association, 1939).
CHAPTER 20
Cilimatina
Consumption
3or Space SJeatinfy
Fuel Consumption Records, Calculated Heat Loss Estimation
Method, Degree-Day Method, Unit Fuel Consumption per
Degree-Day, Degree-Day as an Operating Unit, Maximum
Demands and Load Factors
MANY methods are in use for estimating in advance of actual oper ation the anticipated heat or fuel consumption of heating plants over long or short periods. With suitable modification in procedure these same general methods are frequently useful in checking the degree of effectiveness with which heat or fuel is utilized during plant operation.
In applying any of these estimating methods to the consumption of a particular building plant it should be noted that (a) reliable records of past heat or fuel consumptions of the building under consideration will ' usually produce more trustworthy estimates of future consumptions than will any data obtained by averages or from other similar buildings; (b) where no past records exist useful data can sometimes be obtained from records of similar buildings with similar plants in the same locality; (c) records of consumption, .which are averages from many types of plants in many types of buildings in various localities, can produce no better than an average estimate which may be far from accurate; (d) estimates based on computed heat losses without the benefit of operating data are wholly dependent on how well the computation represents the actual facts.
Estimates based on computed heat losses alone are frequently the only ones possible to obtain, especially where new equipment is put into unusual buildings and there is a scarcity of records and an absence of experience data. Such estimates also have to be made where direct information is not obtainable as, for example, if a survey is being made without the assistance or knowledge of the building operator and thus ' without information as to the actual consumption. Estimates of this kind are also useful in some cases where a relative standard of performance is desired to serve as a base of comparisons in a campaign of fuel utili zation.
In interpreting and evaluating heat or fuel consumption estimates as well as in their preparation, it is well to realize that any estimating method used will produce a more reliable result over a long period operation than over a short period. Nearly all of the methods in common use will give trustworthy results over a full annual heating season, and in some cases such estimates will prove consistent within themselves for monthly periods. As the period of the estimate is shortened there is more chance that some factor not allowed for in the estimating method will become controlling and thus give discrepant and even ridiculous results.
Of the various estimating methods in use attention is directed in this discussion to but two as they are illustrative of all, viz: (1) calculated heat loss method, and (2) degree-day method.
CALCULATED HEAT LOSS METHOD
This method is theoretical and assumes constant temperatures for very definite hours each day throughout the entire heating season. It does not
375