Document g9DM4aj8Ng0m17m2bBmDgRKL

DownloadRandom document
> ^ AR226-2150 ^M^UfA^JSV.^UA'A.VAn^WAMsp~'f-a S-wliw.^. V^' A. ;. s ? : fJ"'",^^ Roger J.ZipTel I./ 10/14/99 11:56PM To: CG: Subject: PEP Sump Material Recovery TA. BACKGROUND Currently waste material from the FEP simp is landfilled at the Iietart Landfill. The FEP suinp material contains 200-400 ppm C-8. This amount of C-8 makes the waste material hazardous based on DuPont classifications ( C-8 ie not a RCRA hazardous waste). Consequently this material is not able to be landftiled at the site's Dry Run Landfill or at any low cost non hazardous landfill. laboratory procedures have contained demonstrated the in the wet waste ability to remove most FEP material by drying of the material the C-B in an inerts purged dryer. Sale of this material could be possible if C~8 environmental risks were minimal (below the community Exposure Guideline for C-8). Xnitial test work has been conducted with Ohio Valley B6B to determine be demonstrated on a commercial basis. if adequate C-8 removal could This test work has not successfully demonstrated scale-up of the loapbeorraatitnogry cdoantdai.tioAndsdi(t%ionmaolistteusret wanodrk inisertraequfliorwedratotese)statoblmisahximdriyzeer C-B removal. TECHNICAL BASIS C-8 from FEP waste material has been demonstrated in the drying material that contains 20-50S moisture in laboratory by a tray dryer for 48 hpprms.. CC--88 lreemveolvsalhafrvoembteheen wreadsutceedmafrtoemriaalpopcrcouxrismadtueelyto300theppmswteoep1in-1g0 action Qf the vaporizing water in the drying step. Similar rdersieudltsinartehenoFtEePd TionrutsheDiFsEcP dprlyaenrts.whTehries PdBrPyinflgufsfteips rreoduuctienselCy-8 levels to 0-10 ppm- Both of these drying operations involve the use of an inerts purge to facilitate both water and C-8 removal. TEST GOALS To establish an operating procedure to enable the processing of waste PTEhPe mcuartreerniat l CwEGithofm4inmimicarlogrriasmksopf eCr -8daeyxpoof seuxrepotsourtehewielnl vbireonumaeednta. s the determinant of success - EID937605 ": .. ^ . ' TEST PROCEDURES 1) The FEP plant; wi-11 packout up to 6000 pounds of waste FEP in plastic lined black drums for release to Ohio Valley BSB. 2) Test material is to be sampled for moisture and C-8 content. till 3) Ohio Valley B&B will dry the material at 150 oC in an hot recirculating oven the material ia dry. 4) Final product will be sampled for C-B content. 5) C-B airborne levels will be monitored at Ohio Valley BKB. 6) Determination will be made of the environmental exposure to 0-8 due to this procedure. This will be done based upon the results of steps 4 and 5 above. 7) Final waste handling procedures will be established based upon the results of this test work. PRODUCT PACKAGING AMD RELEASE This TA documents the release of the first 6000 pounds of this material. Product release will be done under the control of IMA 95-002. Material w.ill be packaged into black drums with a plastic liner. The material is to be labeled as TE- 9294. EID937606