PEP Sump Material Recovery TA.
BACKGROUND
Currently waste
material
from
the
FEP
simp
is
landfilled
at
the
Iietart
Landfill. The FEP suinp material contains 200-400 ppm C-8. This amount
of C-8 makes the waste material hazardous based on DuPont classifications ( C-8 ie not a RCRA hazardous waste). Consequently
this
material is not able to be landftiled at the site's Dry Run Landfill or
at any low cost non hazardous landfill.
laboratory
procedures have contained
demonstrated the in the wet waste
ability to remove most
FEP material by drying
of the
material
the C-B in an inerts purged dryer.
Sale of
this
material
could be possible
if
C~8 environmental risks were minimal (below the community Exposure
Guideline for C-8).
Xnitial
test
work
has
been
conducted
with Ohio Valley B6B to determine
be demonstrated on a commercial basis.
if adequate C-8 removal could
This test work has not successfully
demonstrated
scale-up
of
the
loapbeorraatitnogry cdoantdai.tioAndsdi(t%ionmaolistteusret wanodrk inisertraequfliorwedratotese)statoblmisahximdriyzeer
C-B removal.
TECHNICAL BASIS
C-8
from FEP waste material has been demonstrated in the drying material that contains 20-50S moisture in
laboratory by a tray dryer for
48
hpprms.. CC--88 lreemveolvsalhafrvoembteheen wreadsutceedmafrtoemriaalpopcrcouxrismadtueelyto300theppmswteoep1in-1g0
action Qf the vaporizing water in the drying step.
Similar rdersieudltsinartehenoFtEePd TionrutsheDiFsEcP dprlyaenrts.whTehries PdBrPyinflgufsfteips rreoduuctienselCy-8 levels
to 0-10 ppm-
Both of these drying operations involve the use of an inerts purge to
facilitate both water and C-8 removal.
TEST GOALS
To establish an operating procedure to enable the processing of waste
PTEhPe mcuartreerniat l CwEGithofm4inmimicarlogrriasmksopf eCr -8daeyxpoof seuxrepotsourtehewielnl vbireonumaeednta. s
the determinant of success -
EID937605
": .. ^
. '
TEST PROCEDURES
1) The FEP plant; wi-11 packout up to 6000 pounds of waste FEP in plastic lined black drums for release to Ohio Valley BSB.
2) Test material is to be sampled for moisture and C-8 content.
till 3) Ohio Valley B&B will dry the material at 150 oC in an hot
recirculating oven
the material ia dry.
4) Final product will be sampled for C-B content.
5) C-B airborne levels will be monitored at Ohio Valley BKB.
6) Determination will be made of the environmental exposure to 0-8 due to this procedure. This will be done based upon the results of steps 4
and 5 above.
7) Final waste handling procedures will be established based upon the results of this test work.
PRODUCT PACKAGING AMD RELEASE
This TA documents the release of the first 6000 pounds of this material. Product release will be done under the control of IMA
95-002. Material w.ill be packaged into black drums with a plastic liner. The material is to be labeled as TE- 9294.