To: M. P. Neff
CELANESE CHEMICAL COMPANY Chemcel Plant Bishop, Texas
UNITERM COPY
From: J. M. Jackson
JMJ-20-78
January 19, 1978
r At* ^Hiss/py
iany
0SftA
'
Ll/97B
Work area air samples for routine OSHA compliance have been completed. These samples were taken In October. Results are In Table I.
I
A visual Inspection of the handling procedure was made during the blending operation in the Celanex area. The following observations were made:
A dust problem may exist where Decarbromodiphenyl oxide, PBT chips and Thermo Guard (antimony oxide) are added to the blend hopper.
An excessive amount of airborne dust was also evident during the cleanup of the area after blend preparation was completed. This problem was caused by dry sweeping of the area.
Plans are to monitor for airborne particulates in the Celanex blending area during the next routine asbestos sampling period.
JMJ/mb Attachment cc: C. A. Amond - Bishop
W. C. Beyer G. D. Boyd J. L. Merian W. H. Meyer P. M. Sykes C. D. Barrett - CCCTC W. T. McNair
J. M. Ramey - NYO
rt-rz
Uniterms: OSHA monitoring Asbestos sar ig
File: 259.0
000538
* JMJ-20-78
2 January 19, 1978
Trble I
Airborne Asbestos Levels in the Plastics Area During Celanex Production
Sample Identification Asbestos Filler Blending Area
Rate 10-14-77
2 Fibers/ceP >5 m in length
0.34
Celanex Bldg. General
10.17-77
0.0*
Comments
Sampled Operator Helper during blending operation, (peak exposure
measurement)
Sampled Operator Helper during routine work assignment. (8 hour TWA)
2( ) National Loss Control Service Corporation, Environmental Science Laboratory
Long Grove, 111. 60049 : November 11, 1977 Request No. 04140.
..ireshold Limit Value (TLV) American Conference of Governmental Industrial Hygienist.