Document g2km36LNLZa4DZpD11K63m853

R & D REPORT one coot DOW CHEMICAL U.S.A. RESTRICTED: hr within Th 0#w Chaicl C*Mny nty. nMrrEuHu2i.r1-18-1(1) i tmAropjrRrisl: nr i HER Industrial Hygiene 1281 9060000039 s EVALUATION OF ASBESTOS EXPOSURES TO THE ASSISTANT OPERATORS, CHLORINE ;! II PLANT, 47 BUILDING, DOW CHEMICAL OF CANADA LIMITED, SARNIA DIVISION uC3 iUTwai nr rraiUTUMni!11 k M. F. Stevenson H. R. Hoyle OISCRIRTIVI SUMMARY WITH CONCLUSIONS: JL^ Him /7S----(IncM* ii(nkfhldi* n4 fvkllcatitnit) 4t r*lt*4- Asbestos exposure to the Assistant Operators was evaluated while "dumping" asbestos, "drawing" the cells and "pulping/souping". Time-weighted average (TWA) exposures to asbestos fibers > 5 l microns were acceptable. " I i. i i ? i ST0003372 i DISTRIBUTION: R. T. Boldt, Dow Chemical of Canada Limited, Sarnia J. M. Hay, Dow Chemical of Canada Limited, Sarnia G. D. Sweeney, Dow Chemical of Canada Limited, Sarnia D. B. Cattran/E. C. Doctor, Safety & Loss Prev., Sarnia H. B. Wallis, M.D., Medical Department, Sarnia N. Murray (2), Industrial Hygiene, Sarnia E. H. Blair, Health & Environmental Research, 2020 Dow Center H. R. Hoyle, Industrial Hygiene, 1707 Building D. J, Kostash, Dow Chemical of Canada Limited, Sarnia, Chlorine II J, M. Coleman, Dow Chemical of Canada Limited, Sarnia, Chlorine II Central Report Index (5), 566 Building Industrial Hygiene Contacts (10) PROBLEM The Industrie! Hygiene Laboratory of Health and Environmental Research was asked to re-evaluate asbestos dust exposures to the Assistant Operators during the preparation and "drawing" of cells and while "pulping/souping" the cells in series. ' CONCLUSIONS AND RECOMMENDATIONS 1. Atmospheric concentrations of asbestos fibers were found to be below the acceptable time-weighted average (TW%A) exposure for the Assistant Operators when drawing, pulping, . chipping and cutting. 2. The use of "bunny suits" or throw-away coveralls and respi ratory protection is good practice and should be continued. 3. Although the TWA was below 2 fibers per ml while pulping or souping, further engineering controls are encouraged to reduce peak exposures. 4. The asbestos containers located on top of the cells in the cell house could be located in a central control area similar to the "penthouse" at Chlor Alkali 1, Sarnia Division.. A ventilating system should be considered in such an instance. In the meantime, the asbestos materials < in the hold container should be wet down each day souping ' DOW 00647 3 is necessary. 5* The use of "mouth bit respirators" or "sucker masks" are designed for escape purposes only. These masks should not be used in place of the recommended dust and organic vapor type respirators (for use in the cell area). 6. The practice of "cutting asbestos rope" for the new cells does not appear to present an immediate hazard to health under the use conditions measured, however, the employees ahould continue to be encouraged to wear all protective clothing and respirators supplied as fibers were noticeable as the rope was unrolled. 7. "Chipping" does not present a hazard to health from asbestos as measured under work conditions. 8. The vented hopper helps to contain fibers, during "dumping" of dry asbestos. 9. Good housekeeping is essential in reducing exposures to asbestos fibers. The areas surveyed at the Chlorine! 21 complex, appear to be adhering to this policy. DOW 00648 4 10. For those individuals working in areas where dry asbestos is handled long hair should be either covered or the individual should be encouraged to shorten the.hair. Showers should also be encouraged and careful examination should insure that no asbestos fibers are transported to the home. PROCESS Drawing of the cells is dependent in part on the use of asbestos and caustic. The two materials are combined to form a slurry in which the cells are lowered and coated by suction. The slurry was prepared by adding two bags of GAF-H No. 2 asbestos, (short fibers) into a ventilated hopper. Glove covered hands were used in adding the contents of the bags.. Once inside, a small rake was used to break up the larger pieces of asbestos. A caustic solution was then added and mixed. From this point it is transferred to the draw tank. For a given period of time suction is applied to this cell which enables the slurry close contact with the screens and pockets of the cells (cathode side). The cells are then wiped (smoothed) and checked for potentially leaky areas (visually). The cells are then baked or cured. DOW 00649 ST0003375 * ** v. 6i a. The' substance shall be isolated. b. Adequate ventilation shall be provided. c. Personnel protective clothing or equipment shall be worn. Section 80? Where a person may be exposed to concentrations o lead* benzol . or asbestos, likely to endanger his health, a notice stating the dangers Involved and the precautions necessary for the protection ..against svch.dangers shall be posted in a conspicuous place. Section 81: Where a container Is used to hold any substance which contains lead, mercury, asbestos, isocyanates, silica, enzymes, fluoride, benzol or other toxic liquid, solid or gas, the container shall be marked or labelled in dear legible type so as to identify the presence of the toxic material and its principal hazards. Disposable "bunny suits" or coveralls and proper respiratory protection was used while dumping asbestos and cutting asbestos rope. . All time-weighted average exposures based on current Ontario Law of 2 fibers per ml were within acceptable limits. It is encouraged however, that the protective equipment now being used continue to be issued and worn as good work practice. DOW 00650 ' --' o <T\ s* ! I [ : "Chipping1* Is generally done by the same workers that "draw the cells'*. This operation involves a small hand held motorized hammer which they use to remove the worn seals and asbestos rope from the cells. "Rope cutting" is another function which the same operators may or may not be involved. Asbestos rope (generally in 30-pound boxes) is unrolled to about 30 foot length, cut and re-rolled. Asbestos fibers could be seen as the material was unrolled. "Pulping or souping" was done by two men, also classed as Assistant Operators, however, these men were not involved in the* preparation and drawing of cells. They have as part of their responsibility the job of plugging leaks in the operating, cells. This is done by preparing a mixture of asbestos, water or brine in an open bucket. This mixture was poured through a funnel leading to the effected cell area. The number of buckets needed is dependent on the severity of the leak. ' DISCUSSION The Industrial Safety Act, 1971, of the Ontario Regulation No. 259/72 Section 79, 80 and 81 states that "all measures . necessary to prevent exposure to any toxic substance by inhalation . . . shall be taken . . where any toxic substance is used or produced". DOW 00651 c > <i < < <> 8 * i : .i 7 The bunny suits are also worn while souping and in most cases the proper respiratory protection is worn. Levels approaching Che 10 fibers per ml ceiling limit for asbestos was measured when the operators transferred asbestos into open buckets (6 to 8 fibers per ml were noted). Two types of asbestos were used concurrently while pulping or souping. . 1. GAF-H No. 1 (long fiber asbestos) 2. J&M 7M asbestos (very fine grain) One of the operators was wearing approved respiratory protection good for both dust and organic acid gases. The other was using a mouth bit respirator or sucker mask generally used for emergency escape purposes only. This practice is not recommended. Threshold Limit Values (TLV's) or time-weighted averages (TWA) are defined as being those concentrations that an individual can be exposed throughout an 8-hour work day without adverse effects on their health. The current Threshold Limit.Value for asbestos is 2 fibers per ml (cc) for an 8-hour period of time, 10 fibers per cc celling limit, Ontario Law. Ceiling exposure guidelines simply mean that a worker under no circumstances should be subjected to exposures above that level regardless of duration of exposure. DOW 00652 : s t 0003370 3 Exposure* above the accepted TWA but below the ceiling must be offset by exposures below the TWA. SAMPLING AND ANALYSIS General and breathing zone samples were taken in the cell maintenance and cell house area of 47 Building, Chlorine II Plant on February 25, 1975. Fifteen samples In all were obtained. Three types of pumps were used to pull the sampled air through filter paper. A Mine Safety Appliance 8-hour pump and a Bendix Uuico were used for personnel samples. A high volume RAC pump was used to obtain specific short-term breathing zone samples and long-term breathing zone area samples. Air samples were obtained by drawing a known volume of air through a 37 os millipore filter cassett or .47 mm diameter millipore open face filter. (Calibration data is included in original data file.) WO 0 * S When sampling was complete, a wedge shaped portion of the filter was removed and placed dust side up on a drop of mounting solution and a cover , slip placed on top of the specimen. The sample was * examined using a binocular phase contrast microscope equipped, with 450 X magnification. A porton reticle eye piece was used DOW 00653 4 ii* -'.&;SZ3.W .-* . Ii" . 4 9 to define the counting field and to assist in making length judgment. Only those fibers with at least a 3 to 1 aspect ratio and greater than or equal to 5 microns in length were counted for the 20 fields. Analysis methodology used is as follows: nRCCQOOlS i 4 i; i : i; !i i I. i !1 i. ;! 5 a. Effective Area of 47 am filter 961 sq. mm Effective Area of 37 nan filter - 855 sq. mm b. Forton Reticle * 5y x lOOu " 5000 sq. u The number of fields counted " 20 The area of 20 fields 0.1 sq. mm c. (Count) Area of filter----- ,, totai fibers/sample Area of 20 fields d. Total fibers/sample . Fiber/ml ml air. sampled PRESENTATION OF DATA Table 1 indicates all areas sampled in the cell house and cell maintenance area of the Chlorine IX Plant. Also included in this data are the actual number of fibers counted and the resulting fibers per ml. .j Figure 1 is an overview of the above 2 areas covered with the. . . sampling sites (number 1 through 15) corresponding to Table 1. DOOWU 00654 ' ..** 'r ..... w f Table 2 represents the Assistant Operator's dai^y exposure when dumping, drawing, and cutting rope. Table 5 represents that same operator's potential dally exposure when chipping only Is l done. Table 3 shows peak exposure concentrations to asbestos t [ while carrying out specific job duties by an Assistant Operator. Table 4 includes chipping, cutting, drawing and dumping operations } as done by the Assistant Operator on a monthly basis. Tables 6 through .8 show daily, weekly, and peak exposures for the 1 Assistant Operator's responsible for pulping/souping in the ( cell house of the Chlorine II Plant. U \ 1 C/> O O O CO CO CO 4.%\ D< OOfc&& w. t BREATHING ZONE ASBESTOS SAMPLES FOR THE ASSISTANT OPERATORS IN CHLORINE I I ,6 u o CM l/" p* vO 00 oo vO CM r 3 0 .O O o o o - <o o o vO i fa 3 * 3 fa Mfa Hfa <H 30 3W 4J O H 1 | o CM | o CO ton CO CO 11 1 r- o\ Ov | 1 m o VO CM . Oo o io 1 CO Ov 1 i-4 vO O r* uo .0*3 *4 0) fa r3 O o *o CO O O O to ov CM i uO Ov 3 CM ^4 fr*a 0 -o Oo m CM CM . CO CM 00 o o oo O oo co o o o <-4 r> ofa O' CM ' fa o o 'o o oH m CM <o CO oto CM CM H 8 CO t? ao. I1 % o *3 0 43r>J 3O 3 fa-4 t4 H fa 3 3 N CO CM i*N faCQ O'-' CO U ON fa CO O'-" |*N QSCVO m H H --4 fa vO Si uu MM i** II fa MM flO N fa fa O ' CO i r........................... -'V M---P- ---- f=rr?r! 06S< ; ,r *4 .. ' ' `? .V ..? \ ST0003383 BZ SHORT TERM SAMPLES TO DETERMINE PEAK. EXPOSURES FOR SPECIFIC OPERATIONS Job Dumping asbestos & breaking it up Filling "draw tank" with slurry Taking off loose wet asbestos from cell Unwinding rope, cutting & rewinding (Min) Sample Time 4 Flbers/ml 3.85 0.46 DOW 00659 B Ax B (Min) A Atfg. Daily Job Sample Time **T/480 Fibers/ml TWA Cell Maint. 7 & 19 0.75 0.415 0.31 **(T) Expected work time (minutes) * 480 minutes (8 hr vork/day) ST 00 03387 DOW 00661 TABLE 6 WEEKLY TWA BASED OK BZ PERSONNEL SAMPLES WHILE PULPING AND/OR SOUPING Job/area Sample Time (min) A *T/2400 B Avg. Fibers /ml Ax B TWA Top of cell series 30 .075 1.6 0.12 *(T) Expected work time (minutes) * 2400 minutes (8 hr/day, 5 days/week). ST0003388 TABLE 7 DAILY TWA BASED ON BZ PERSONNEL SAMPLES WHILE PULPING/ SOUPING . Job/area Sample Time (min) A **T/480 B Avg. Flbers/ml AxB TWA Top of cell series 30 0.125 1.6 0.2 **(T) Expected work time (minutes) * 480 minutes (8 hr vork/day) DOU 00662 ST0003389 V FIGURE 1 . SAMPLING SITES IN THE CELL MAINTENANCE AREA AND CELL HOUSE OF 47 BUILDING, CHLORINE II PLANT XO 12 9 11 Cell House Cell Maintenance 15 umo 0 co 6CO0 *0.0 co < o U 0 IIC4OM4 (3*0 iH ,pnclosed i hopper ICDunoina^ 13 14 Rope Cutting Area i.. -; ; DRAWING NOT TO SCALE DOW 00066^ ST000339U