Document g2kLmq22XOeLMY7q4YXNrpjmJ

GRACE To: J. W. Wolter From: R. E. Schneider cc: R. C. Abernathy F. W. Eaton H. A. Eschenbach R. T. Frohlich CONFIDENTIAL WRG 000654 1020208 Conilruction Products Division Date: Kay 19, 1933 PLAINTIFF'S : EXHIBIT RG-762: i" Subject: Asbestos Abatement at Travelers Rest and Enoree, SC On may 11 and 12 I and along with Mr. Ken Nash of W. W. Nash & Sons, Inc. evaluated the work and costs associated with asbestos abatement in the three buildings containing the experimental coatings. According to R. T. Frohlich, W. W. Nash & Sons, Inc. of Richmond, VA are eminently qualified to pursue this activity. I found Mr. Nash to be knowledgeable and capable. In order to assemble costs, I have assumed that disposal of the waste material may be accomplished on site at the Enoree facility. If this is not possible or desired, the expected costs for waste disposal at the nearest approved land fill site are in the S12-15M range based upon an assumed 10001100 cu. ft. volume. (Distributed costs in the following estimation are S6.0M.) The expected costs for each building may be described as follows: Expense ($000) Capital ($000) 1) Machine Shop & Office area of Fabrication Shop - Travelers Rest (96-035) 49.2 (96-036) 14.6 2) Mill Maintenance Building Enoree (08-558) 20.9 / 3) Mine Maintenance Building - Enoree (08-558) 40.3 . - In all instances some preparatory work is necessary prior to removal of the asbestos laden material. Also, additional work is required in all instances to prepare the buildings for use as originally intended after the abatement work is complete. At Travelers Rest the insulation will be replaced, while at Enoree any insulation value attributed to the coating will not be replaced or recovered. The only capital involved, by R. Abernathy's / J. W. WoUer -2- May 19, 1983 1020209 analysis, will be at Travelers Rest. All of the insulation on the shop ceiling and walls and the insulation and ceiling material in the office area will be destroyed and removed. In all instances, it will be advisable and necessary to repaint the metal immediately. Another assumption I have made is that the air sampling and monitoring to be done during the removal operations will be provided by the ICG Health/ Safety group. Additional unknown costs should be scheduled if this is done by outside laboratories and monitors. The work will require completely relinquishing che buildings to the contractor. It is suggested that an August time frame is most acceptable to our operations and to the contractor. An elapsed time table for the three buildings may be presented as follows: Buildinq Preparation Calendar Days Cleaning Calendar Days Restoration Calendar Days Total TR - Machine Shop & Office 4 7 17 28 Enoree - Mill Maint. 2 5 3 10 Enoree - Mine Maint. 1 10 2 13 If the purchasing policy being currently promulgated is to be followed, it will be necessary to develop two additional quotes for the abatement work. R. T. Frohlich has indicated that perhaps other qualified contractors can be asked to quote on the work. Shop order numbers have ben assigned for this work but have not been prepared pending your decision on procedure. RES/al Vj R. E. Schneider CONSTRUCTION PRODUCTS - DIVISION ................ 1020210 , PAGE 1 REQUEST FOR TECHNICAL SERVICE REPORT: 69876 ` r ~ " GROUP: BPD Manufacturing DATE: 14 April 1983 CHARGE NO.: 1174 REQUESTOR: Paul M. Connor ' MARKETING OR MANUFACTURING AP. NAME: T. E. Hamilton______ _ APPROVED: ___________________ PROBLEM TITLE: `Environmental Ealuation ~ Bulk Sample -- Fibrous Materials SIGNIFICANCE: The evaluation of workplace environment is necessary to comply . with federal regulations. SPECIFIC OBJECTIVE: Determine asbestos content of bulk sample. SUGGESTED APPROACH: X-ray OEADLINE (Last day information will be of value): 2 weeks DETAILS OF PROBLEM: Please evaluate BS-1 (Bulk Sample) of spray coating material from the Traveler's Rest machine shop wall. t.cW :.j3 2T683 rO[). ACCEPTED BY RESEARCH DEPT.: ASSIGNED TO: j7pt^e^///gV DATE : *//&} ADDITIONAL COPIES: Original totClBEgEVft J. H. Wolter, H. C. Duecker, P. M.Conno F. W. Eaton REQUEST POR TECHNICAL SERVICE PAGE 2 NUMBER: 69876^------------ 8~~-- GROUP:BPD Manufacturing ACTUAL COST: $60 REPORTING DATE: April 26, 1983 SUMMARY AKD COKCLUSION: 1020211 The bulk sample vas examined and found Co contain chrysotile asbestos fibers by x-ray diffraction method and microscopic examination. The major components were expanded vermiculite and other amorphous binder material; a trace of quartz sand was also found to be present. EXPERIMENTAL: - (1) XRD Major: Vermiculite and amorphous binder. Intermediate-Minor: Chrysotile asbestos fiber. Trace: o^-quartz. (2) Microscopic Examination The bulk sample had chrysotile asbestos fibers well-distributed through out with length up to a few millimeters. The amorphous binder was extremely fine-grained Imbedded with some vermiculite particles. REFERENCE: MISC-405. / JCY:da PAGE 1 REQUEST FOR TECHNICAL SERVICE :fr*-iSs--F-,. *. m^.r|r- -Vfc- # i it ill uJtr 1020212 REPORT: ________ 69875 - GROUP: OATE: BPD Manufacturing 14 April 1983 CHARGE NO.: 1174 REQUESTOR: Paul M. Connor MARKETING OR MANUFACTURING APPROVA NAME: Thomas E. Hamilton APPROVED: __________________ PROBLEM TITLE: Environmental Evaluation - Air - Fibrous Materials. SIGNIFICANCE: The evaluation of workplace air on a periodic basis is necessary to comply with the air sampling section of the OSHA Asbestos Standard. SPECIFIC OBJECTIVE: Determine fiber counts for filter media. SUGGESTED APPROACH: Phase contrast microscopy. DEADLINE (Last day information will be of value): 2 weeks. DETAILS OF PROBLEM: Please evaluate Engineering samples from Travelers Rest Sample numbers: TR-1 through TR-3 products and ores involved: none ACCEPTED BY RESEARCH DEPT.: 7^^' ASSIGNED TO: ^^ 0ATE; ADDITIONAL COPIES: Original to Library. ; J. W. Wolter, H. C. Duecker, P. M. Connor F. W. Eaton REQUEST FOR TECHNICAL SERVICE PAGE 2 i HUMBER: 69875 GROUP: BPD Manufacturing ACTUAL COST: $gO REPORTING DATE: 4/22/83 lor0213 SUMMARY: Three samples were received from Traveler's Rest and were evaluated for their fiber content. RESULTS: The results are as shown on the attached Air Sampling Record Sheet. JHS:da Attachment 4fc r$ if ' T :`| 0 " -BS > iC fl? *& 4- a -. * `$&a ^ J-+IlP . #* * -n *' w'CS <U '< U- Z Z UJ H* S*#0 j'?. ui a. > H* 2i^ i/) ca m & ce x- a. x Ui U Z 3 O- X " OL .' .M'-.. '.i* '-4, 4% ' -*" 0.0 -- Cso *, ? */* -'V to * At'-. \ 't* !?,, .: r> # .... ir `I