Document g2kJ7Rv2K0Okpke44n9rvkrBQ

To: G. D. Bevis Subject: Monthly Report October, 1979 From: Located at: Date: LJLJw V%-\ J. C. Palinsky Leominster, Mass. November 30. 1979 HIGHLIGHTS: 1. The Bendix Area Monitoring System shutdown completely four (4) times during October for unknown reasons. Since a voltage upset was suspected as a possible cause of the mal function, a recorder is being used to monitor the power supply. 2. Ihe gas chromatograph for TCE and VAM monitoring will be put to other uses in the future. The failure of the system to function as predicted and a greatly reduced need for the monitoring lead to the decision to abandon the GC for copolymer monitoring. 3. The FPA Coordinator will attend Century OVA training sessions on Dec ember 10th and 11th. Equipment ''on-site" repairs remain high. Two units were returned to the manufacturer for complete overhaul. 4. The annual fire equipment testing and repair has been completed. 5. Hnu maintenance retrained high, but all problems were resolved at the plant and all units are operational. 6. VCM area monitoring levels were up somewhat during October with several 0SI1A points averaging over l.Oppm but less than 2.0ppm for the month. Several problems including VCM in the cooling water return sump outside Bldg. 1-W, overflow at Bldg. 7, reactor Weir boxes 7-E, leaking manhole covers, poor seal on slurrry transfer strainers all contributed to the increase in low level alarms. 7. EPA perimeter and off-site monitoring continued to be excellent with no levels exceeding l.Oppm VCM and most readings were non-detectable. 8. Reactor Opening Loss still failed to read 100C? compliance, but an inprovement was made through vacuum pump efficiency upgrading and higher temp erature test levels (150F). 9. The new EPA Technician hired to replace the vacancy left by the promotion of D. Picard and the subsequent personnel realignment is still pending. This is creating several problems in operational continuity within the department. VINYL CHLORIDE CONTROL: I. Monitoring Stannaries (Personnel) A. Monthly Monitoring Tests 1. Personnel on Regulated Roster 2. Personnel Tested 3. Personnel Tests 4. Invalid Tests 5. Repeat Tests 6. Total Tests October 189 150 165 6 15 165 BOR 013S46 G. D. Bevis Monthly Report October, 1979 November 30, 1979 Page 2 VINYL amIDE CONTROL: I. Monitoring Sumraries (Personnel) B. Monthly Average by General Job Categories 1. PVC Operators 2. PVC Helpers 3. Dryer Building 4. PVC Supervisors and Engineers 5. Polyco 6. Shipping 7. Maintenance S. Development 9. Operations and Administration 10. Total Site October 0.8 1.6 0.1 0.3 0.4 0.1 0.3 0.7 0.4 0.7 11. MAC Room Status A. Bendix Monitoring System 1. System #1, monitoring 16 points was in alarm 6.0% of the time. 2. System #2, monitoring 16 points was in alarm 2.19 of the time. 3. System A3, monitoring 9 points was in alarm 0.6% of the time. 4. Total alarm duration in minutes 60,387 5. % of time all points were in alarm 3.3 B. Bendix Monitoring Equipment Downtime 1. System 1 2. System 2 3. System 3 4. Total 5. % Time Down 8 hours 8 hours 8 hours 24 hours 0.05% C. Hnu Units Status 1. All units operational D. Monitoring Equipment Expenses 1. October - Approximately $538.00 E. Air Intake Monitoring (Testing Continuously) 1. Monthly Average - 0.22ppm F. Special Monitoring 1. No of tests (Sipin pumps in down reactors) 2. Range-ppm October 0 0 BOR 013547 G. D. Bevis Monthly Report October, 1979 November 30, 1979 Page 3 ITOISE CONTROL: I. Monitoring Summaries A. Monthly Monitoring Tests 1. Personnel Tested B. Monthly Average Plantwide (8 hour TWA) 1. No. Invalid Tests 2. No. Tests 3. Range dBA II. Area Monitoring A. Monthly Monitoring Tests 1. Areas Tested 2. Area Tests October 14 4 14 6-S6% of 90dBA 1 1 B. frtonthly Average by Work Area (Sound Level Meter) 1, Bldg. 1-W Upper 2. Bldg. 1-W Lower 3. Bldg. 1-E Upper 4. Bldg. 1-E Lower 5. Bldg. 7-E Upper 6. Bldg. 7-E Lower 7. Bldg. 7-W Upper 8. Bldg. 7-W Lower 9. Bldg. 3 10. Bldg. 2 11. New Recovery Bldg. dBA Range 90% of 90dBA No Work Done No Work Done No Work Done No Work Done No Work Done No Work Done No Work Done No Work Done No Work Done No Work Done FUTURE PROJECTS: I. Projects A. Vinyl Chloride Exposure 1. Special area testing will resume as manpower permits. 2. A conplete fire protection system audit took place. A report was issued by the insurance company. A reply will be made as soon as the report is received by the Safety Engineer. 3. A dust monitoring program was studied. Corporate assistance and more sophisticated testing will be done in January. B. Noise Surveys 1. Dosimeter monitoring will continue on a limited basis in Noverrtoer. Full scale monitoring will begin when equipment is in full repair and nanpower requirements are satisfied. C. Housekeeping 1. General advice and emphasis will continue through the safety tour ob servations regarding housekeeping. BOR 013548 G. D. Bevis Monthly Report October, 1979 Navetrber 30, 1979 Page 4 ilflURE PROJECTS: l. Projects D. Fork Truck Training 1. A determination of need for Fork Truck Training was made by the Safety Engineer. A new series of sessions Will be set up for next spring with the Internation Safety Academy. E. The EPA Coordinator will attend Century training school on Decentier 10 and 11, 1979. F. The EPA Coordinator will visit the Illiopolis works and observe reactor opening loss procedures on December 13, 1979. I. Portions of the data contained in this report is extracted from reports by R. A. Slocumb, C. Snyder, and K. Landry to J. C. Fhlinsky and were only stn>marized for convenience. JCP/kml cc: N. M. Blackman J. C. Palinsky6 Safety Engineer BOR 013549