^ PIGMENT COLOR RESEARCH REPORT
. GOLDEN "AFFLAIR" - NF-128-D \i.
Period Covered October, 1965 - December, 1966
FILE: 218 DATE, 1/18/67
N33689
NJ 28626
r et ur n t o
jACKCOfl LABORATORY FILE ROOM
KN-67-2 Copy No.
1. Numerical File 2. Research Office File No. 218 3. Library File No. 218 4. M. Hunt/E. Gonick, Pigments, Wilm. 5. N. G. Fisher, Central Research, Wilm. 6. P, J. Monahan (X File) 7. W. S. Struve/A. A. Brizzolara/Library 8. H. R. Linton,Newark 9. E. F. Klenke,Newark 10. R. B. Wetzel/H. H. Gyorgy, Pigts., Newport 11. Extra 12. Extra 13. Extra 14. Extra 15. Extra 16. Extra
NEWARK PLANT PIGMENT COLOR RESEARCH REPORT TITLE: GOLDEN "AFFLAIR" ~ NF-128-D
PERIOD COVERED: October, 1965 - December, 1966
ABSTRACT; This report covers the preparation for and the manufacture of the first plant batch of NF-128-D.
DATE SUBMITTED: 1/3/67
DUP050027087
TABLE OP CONTENTS
INTRODUCTION
SUMMARY AND CONCLUSIONS
PATENT STATUS
PROCESSING DETAILS
A. Process Plow Sheet (Exhibit A) B. Mica Selection and Processing C. Hydrolysis, Pressing, and Washing D. Drying E. Classification before Calcination P. Calcination G. Pinal Classification
H rfN N N N
Page ~T
1 X 1
DUP050027088
INTRODUCTION
This report covers the preparations for and the manufacture of the first plant batch of NF-128-D, based upon the lab and Semi-Works data as reported in KN-66-7.
SUMMARY AND CONCLUSIONS
No significant operating problems were encountered and material fully equal to goal was produced in the plant. Dry instead of wet classification was used prior to calcination for quality reasonsj wet classification will be studied later.
PATENT STATUS
The product in this report is covered by the existing "Afflair" patent (U.S. 3,087,828).
PROCESSING DETAILS
A. Process Plow Sheet - see Exhibit A
B. Mica Selection and Processing
PA-1 type mica of #7 + color was selected and a blend
made (l) of 4200# of #10 color and 1400# of #2 color. This
blend was then Hurricane classified to remove
material
(see XOA-5, attached), based upon MEP-1037-7. A yield of 66.5#
was achieved in the plant, which was essentially equal to the
67# for MEP-1037-7. A lab hydro (104-65H) made from the plant
classified mica checked the control very well.
Approximately 100# each of the mica blend and the classified mica blend was sent to Newark for storage as reference materials,
ihese were given Semi-Works lot numbers as follows s
SW-00933 and 00934, blend #1 and #2, respectively SW-00921 classified blend
C. Hydrolysis, Pressing, and Washing (See XOA-6, attached)
A 5420# hydro was made (Lot 28-1) using 3500# of the classified mica blend, and 1952# of TiOa (no Sb20s added). The conditions were essentially the same as for NE-103-D with the following exceptions:
1. No SbaOs added. 2. Slightly slower TiOa addition rate. 3. Controlled heat up rate.
4. No water added during the boil period, 5. End point determined by color.
No problems were encountered, and the vat control checked the lab material very well.
The batch pressed and washed rapidly.
DUP050027089
D. Pitying
-2*
The plant presscake was dried in the #14 Building Semi-Works Gordon Davis tray drier (low velocity air flow).
The pans ware loaded to a depth of t 2", and the material was
left in the drier for 48 hours to insure complete drying. A
shorter cycle may be possible. No unusual dusting was en countered during drying, even though the trays were uncovered.
E. Glassification Before Calcination (See XOA-7 attached)
!l?he dried material was Hurricane classified as for MEP-1085-5 and 1189-2 (plant material used), and a yield of 64,6$ achieved (compared with 62.5$ for MEP-1189-2). Evaluation of this material (cut 21, "Rejects") indicated it to be quite ! satisfactory.
F. Calcination
The entire 3,288# of cut 21 was rewet with water to ca. 50$ solids and then sent to Edge Moor for calcination#
Temperature resistance data (run at Newport) indicated a re sistance range of 18-30 for goal quality. The kiln was run at a temperature set point of 950 C. and 8 drums of material fed. The resistance of the product ranged from 1-15, primarily because of feed control problems. The temperature was raised to 975C. and the run. finished at this setting; the resistance ranging from 18-30. Attached (Exhibit B) is a tabulation of the data collected during the calcination. A mix of the 950C. material (mix A) was very close to goal; a mix of the 975G. material (mix B) was somewhat more golden than goal. It was agreed that the two products be combined, and a plant mix was made.
G. Pinal Classification (see X0A-8, attached)
REFERENCES
Letter HHG to DM, attached NB-104 XOA-5, 6, 7, 8 Vinyl series - 66-342-C Paint series - 66-341-A
DUP050027090
EXHIBIT A
Mix 74 (4200# PA-1 (#10 Color (1400# PA-1 (# 2 "
Class.Mica 3500#
TiOa
19.52
(A)NP-128-D
DUP050027091
EXHIBIT B
Product Drum #
1 2 3 4 5
6
7 8 9 10 11
12 13 14 15 16 17 18 19 20 21 22 23 24
Set Temp. C.
950
II II II
P, C. Peed#/15 Min. Resist.
35
Very erratic U II 11 IT
1 1 8 1
1
Color vs Goal
Not eval. ca *s ca * s It, red ca
ti
it
975 II II II
II It II U u 11 H 11 It n it n it
120(?)
120 II II ti II
n it It II It It 11 11 ti II II II it
3 ca .PS
4 ca =*
2 ca 15 vs better 18 a n 13 ii ii
3 it ii
8 ti ii
18 n ti
2Q
28
n ti
ti
20 it it
20 ii n
27 It 11
24 ii ii
18 it it
20 ii it
24 ii it
30 it ii
Remarks
Vibrating feeder used ti ii n
u tt ii
11 H II
Started shovel feeding (see results in drum 7 or 8) Raised temp.- Shov. at drum 9(?) pH 7.6 pH 6.2
pH 8.5 Interrupted feed * shov. in drum 15. pH 6.9 pH 8.2 pH 8.1 p Mix A - Drums # 9,10,11,14,15,16,17, 18,19,20,21,22,23, 24 Mix B - Drums # 3,6,7,8,12,13