I am enclosing the table of the isobutane cracking economics that I read to you over the phone on Thursday. The yields are based on the Foster Wheeler pilot plant data, and the investment and operating cost figures are based on the rough estimate that the Foster Wheeler process plant's representatives and I made during my recent meeting in their offices.
If these economics look promising and if it appears that the products can be sold and the rav> material obtained, it will be necessary to have Foster Wheeler refLne both the laboratory data and tne cost estimate before making a firm proposal for the project. However, we thought it would be desirable to see if the project looked good from the sales standpoint before recommending that more money be put into pilot plant work and engineering.
Please let me know what steps you would like to have me take next on this project.
Very truly yours
GFA:emb Enc.
Georgh F. Adams
CED0007029
Yields, Isobutane cracking
Production of 2500 BCD of isobutylene 95% at 340 Dly OSE = 2680 BSD
Charge Isobutane
BSD 7280
<2/gal
T75
$/BBL 2.73
Products
Isobutylene, 95% Propane
2680 1995
16. 0
10. 0
6. 72 4.20
Propylene
332 5. 0
2.10
Butane-Butylenes
122 4. 0
1.68
Pentane plus
408
6. 0
2. 52
Fuel gas 2 3.5 wt
14, 1 00#/m 20/mm 31 Omm/m
Net added value
Less operating cost
Net realization $/year
Estimated cost of plant
Note:
Estimated isobutylene analysis: 95% isobutylene 2% butene -1 3% isobutane
$/D 19874
18009 8379 697 205 1028 1490
29808 9934 3500 6434
Z, 180, 000 $5, 000, 000
CED0007030