Document g2V2yDXkgO1NrO62MBoJGvGKq
,
SODS tEV. I t-69
1 1-69
crAjVAMlX* ^
RFQUEST AND AUTHORITY FOR CAPITAL EXPENDITURES / RETIREMENTS
DIVISION Oft COMPANY
Organic Chemical Dept
J.O. CONTROL POINT
R E PORTING CLASSIFICATION
OATE APPROVEO
D 5 1/9/78
SUMMARY OF DESCRIPTION
JOB ORDER NO.
I OC-3853
AMOUNTS
LOCAL CUftRCNCV
U.3. DOLLARS
ESTIMATED PROJECT COST
$4500.
Ja TITLE
Chicago. Illinois 097
DISMANTLEMENT EXPENSE TRANSFER EQUIPMENT
Install locker room heating system GROSS AMOUNT FOR APPROVAL
LESS TRANSFER EQUIPMENT
$4500.
LESS SALVAGE OR TRADE-IN ALLOW.
COST
RETIREMENT DATA
AMOUNT
NET CASH REQUIRED (COP-3C27)
$,45.0,0,
ECONOMIC JUSTIFICATION
(YEAR AV6.
nev.
REVISlOh ! DETAIL (c r o s s AMTS.)
DAT t
AMOUNT
CUM. AUTHOR! Z AT ION
NET SALES
1
DISMANTLEMENT LESS SALVAGE
NET SAVINGS BEFORE TAXES NET AFTER TAXES % ROt (ON TOTAL INVEST.)
2
3 4
PAYOUT YRS.
S
TOTAL- CHARGE RESERVE
6
DESCRIPTION AND REASONS REQUIRED
Funds of---------------------------------------------------------------------------------------------$4500.00 are requested to install a new heating system in the employees locker room.
CVAATAMXU
OC-3853 1/9/78 Page 2 of 3
DESCRIPTION AND REASONS REQUIRED
A. Proposed Work and Cost
Funds totaling--------------------*-------------------------------------------------------$4,500.00 are requested to install a new heating system in the employees locker room.
B. Present Situation
All production and supervisory personnel are required to shower at the end of their shift in accordance with industrial hygiene regulation. Presently the only source of heat in the five room locker-shower complex is a unit heater in one locker room and a radiator in the rest room. This is not adequate and is creating a morale problem.
C. Justification
The installation of a central heating system will:
a. Assure adequate heat throughout all five rooms.
b. Improve employee morale.
c. Keep the locker room under a slight positive pressure at all times which will minimize the amount of lead dust entering the locker room from the work area.
D. Commerical Factors This order supports a 1977 plant budget as follows:
Sales-Pounds 6,616,000
Sales-Pounds
First ten (10) months of 1977 Sales-Dollars $3,064,000
Budget for 1977 Sales-Dollars
Profit on Sales 786,000 (25.7%)
Profit on Sales
7,950,000
$13,985,000
$1,062,000 (26*6%)
N14471.01
CYWI 24-0006890
c v a j v a ivdr x x>
2- -
OC-3853 1/9/78 Page 3 of 3
E. Details of Proposal
An electric heater will be installed in the existing air conditioning system which will allow for equal distribution of heat throughout the five rooms.
P. Production Factors
This proposal will not alter production quality or production rates.
G. Contingent Future Commitments
This proposal will not require additional funds to complete.
H. Alternatives Considered
Installation of steam heat instead of electrical heat was rejected because of cost. Due to design and space limitations a complete new system would have to be installed instead of modifying the present duct work.
I. Risks No operating risks are involved.
J. Concise Summary
The installation of heat in the locker room will provide the employees with the proper climate in which to take their mandatory shower.
RJ:ck
R. Johnson
CYWI 24-0006691