Document g2V2yDXkgO1NrO62MBoJGvGKq

, SODS tEV. I t-69 1 1-69 crAjVAMlX* ^ RFQUEST AND AUTHORITY FOR CAPITAL EXPENDITURES / RETIREMENTS DIVISION Oft COMPANY Organic Chemical Dept J.O. CONTROL POINT R E PORTING CLASSIFICATION OATE APPROVEO D 5 1/9/78 SUMMARY OF DESCRIPTION JOB ORDER NO. I OC-3853 AMOUNTS LOCAL CUftRCNCV U.3. DOLLARS ESTIMATED PROJECT COST $4500. Ja TITLE Chicago. Illinois 097 DISMANTLEMENT EXPENSE TRANSFER EQUIPMENT Install locker room heating system GROSS AMOUNT FOR APPROVAL LESS TRANSFER EQUIPMENT $4500. LESS SALVAGE OR TRADE-IN ALLOW. COST RETIREMENT DATA AMOUNT NET CASH REQUIRED (COP-3C27) $,45.0,0, ECONOMIC JUSTIFICATION (YEAR AV6. nev. REVISlOh ! DETAIL (c r o s s AMTS.) DAT t AMOUNT CUM. AUTHOR! Z AT ION NET SALES 1 DISMANTLEMENT LESS SALVAGE NET SAVINGS BEFORE TAXES NET AFTER TAXES % ROt (ON TOTAL INVEST.) 2 3 4 PAYOUT YRS. S TOTAL- CHARGE RESERVE 6 DESCRIPTION AND REASONS REQUIRED Funds of---------------------------------------------------------------------------------------------$4500.00 are requested to install a new heating system in the employees locker room. CVAATAMXU OC-3853 1/9/78 Page 2 of 3 DESCRIPTION AND REASONS REQUIRED A. Proposed Work and Cost Funds totaling--------------------*-------------------------------------------------------$4,500.00 are requested to install a new heating system in the employees locker room. B. Present Situation All production and supervisory personnel are required to shower at the end of their shift in accordance with industrial hygiene regulation. Presently the only source of heat in the five room locker-shower complex is a unit heater in one locker room and a radiator in the rest room. This is not adequate and is creating a morale problem. C. Justification The installation of a central heating system will: a. Assure adequate heat throughout all five rooms. b. Improve employee morale. c. Keep the locker room under a slight positive pressure at all times which will minimize the amount of lead dust entering the locker room from the work area. D. Commerical Factors This order supports a 1977 plant budget as follows: Sales-Pounds 6,616,000 Sales-Pounds First ten (10) months of 1977 Sales-Dollars $3,064,000 Budget for 1977 Sales-Dollars Profit on Sales 786,000 (25.7%) Profit on Sales 7,950,000 $13,985,000 $1,062,000 (26*6%) N14471.01 CYWI 24-0006890 c v a j v a ivdr x x> 2- - OC-3853 1/9/78 Page 3 of 3 E. Details of Proposal An electric heater will be installed in the existing air conditioning system which will allow for equal distribution of heat throughout the five rooms. P. Production Factors This proposal will not alter production quality or production rates. G. Contingent Future Commitments This proposal will not require additional funds to complete. H. Alternatives Considered Installation of steam heat instead of electrical heat was rejected because of cost. Due to design and space limitations a complete new system would have to be installed instead of modifying the present duct work. I. Risks No operating risks are involved. J. Concise Summary The installation of heat in the locker room will provide the employees with the proper climate in which to take their mandatory shower. RJ:ck R. Johnson CYWI 24-0006691