Document g2N9jbNkzGo3jxdvDDNeKm0RJ

FRAZER PAINT COMPANT. 2475 Hubbard Avenue Detroit, Michigan SCHEDULE I TRADE NAME: CATEGORY: COLORi QUALITY: 100" Pure Exterior House Paint Exterior - Ready-mixed White First Figmenti 55 Leaded Zinc Titanox A Asbestine Lb. 675 157 237 Vehicle: 26% Stainless Raw Linseed Oil Heavy Bodied Linseed Oil Drier Tuf: entine Mineral Spirits 4?0 32 - 34 ' 12 28 Calculated Yield Manufacturing Loss - 2i% Actual Yield 1665 Yield in Gallons Unit Cost Total Cost O .W fr- O) vO Weight per gallon finished product. Laboratory record 15.6 lbs. .15 23.55 .01 2.97 Storage & handling cost through loss - \% .135 66.15 74.56 .75 .143 4.58 .07 2.38 .10 1.20 .015 .42 Storage 4 handlingl cost through loss - y% . 74.'73 2.24 106.7 2.6 104.1 152.58 Cost Analysis: Material cost per gallon Direct labor cost per gall cn Factory overhead per gallon Bulk cost per gallon Complete package cost per gallon, including filling charge Factory cost in package per gallon 1.47 .12 PRICES (a) To a company owned or controlled outlet (b) To an independent wholesaler (c) By company owned or controlled outlet to retail customer (d) To an independent retailer (Dealer) (e) To other (Industrial) (Contractor) None None 7.15 2.63 2.68 2 cc N 5119