MONDAY, JUNE 19, 1978 PART III
ENVIRONMENTAL PROTECTION AGENCY
NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS
Asbestos Standard; Amendments
-010886
26372
RULES AND REGULATIONS
{6560-01] Till* 40--Protection of tho Environment
CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY tFRL *69-7]
PART 61--NATIONAL EMISSION
have been incorporated Into the pro
mulgated amendments.
Under section 112(e) of the Clean Air Act, as amended in 1977, the Ad ministrator may promulgate a "design, equipment, work practice, or oper ational standard, or combination thereof" for control of a hazardous air
pollutant If It is Infeasible to prescribe an emission standard under section 112(b) for the pollutant. Such infeasi-
(40 CFR 61.22(d)) to all friable asbes
tos materials and extend the coverage of the asbestos spraying provisions (40 CFR 61.22(e)) to all materials which contain more than 1 percent asbestos.
Materials In which the asbestos fibers are encapsulated with a bituminous or] resinous binder and which are not fri^
able after drying are exempt from the" spraying provisions.
STANDARDS FOR HAZARDOUS AIR blllty occurs, for example, when "a
Summary of Environmental and
POLLUTANTS
Amendment* to Abe*to* Standard
AGENCY: Environmental Protection Agency (EPA).
ACTION: Pinal rule.
SUMMARY: This rule amends the na tional emission standard lor asbestos by extending the requirements of the provisions which apply to the spraying of asbestos-containing materials and to demolition and renovation oper ations. These amendments are a result of a determination that the standard did not require control of asbestos emissions during spray application of asbestos-containing materials other than fireproofing and insulation or during the demolition and renovation of structures where friable asbestos materials other than fireproofing and Insulation are present.
EFFECTIVE DATE: June 19,1978.
ADDRESS: A summary of the public comments on the proposed amend ments and EPA's responses is con tained In the Standards Support Docu ment which may be obtained upon written request from the EPA Library (MD-3S), Research Triangle Park.
hazardous pollutant or pollutants
Economic Impacts
cannot be emitted through a convey ance designed and constructed to emit or capture such a pollutant" or when "the application of measurement methodology to a particular class of sources Is not practicable due to tech
nological or economic limitations." The spraying of friable asbestos mate rials and demolition or renovation of buildings containing such materials are sources of asbestos emissions for which EPA believes It is not feasible to prescribe a numerical emission stand ard. This Is because asbestos cannot be emitted through a conveyance which readily captures emissions for mea surement and because such measure ment, in any event, would be techno logically and economically impractical. Therefore, work practice standards rather than emission standards are being promulgated.
This promulgation Is not affected by
the Supreme Court decision In Adamo Wrecking Co. v. U.S. (No. 76-911, de
cided January 10, 1978). That case arose in the narrow context of a crimi
nal enforcement proceeding and was decided on an Interpretation of section
112 prior to Its amendment In 1977. The court held that the pre-1977 ver
The promulgated amendments to
the asbestos standard will have a sig nificant beneficial environmental -impact by reducing emissions of asbes tos to the atmosphere. There will be
minimal solid waste and water pollu
tion Impacts from the increased amount of friable asbestos materials which must be removed and disposed of in conjunction with demolition or renovation. No Impact on national energy consumption Is anticipated.
The amendments to the demolition and renovation provisions may in crease the cost of demolition or ren ovation because of the Increased amount of friable asbestos-containing materials which will be covered by these regulations. Comments from representatives of the demolition In dustry, however, did not address this point. Therefore, this Impact is not ex pected to be significant.
Spray-on asbestos-containing decora tive coatings are the primary products prohibited by the amendments to the spraying restrictions. Since substitutes are available for these products, no significant adverse economic impacts are expected to result from prohibit ing their use.
N.C. 27711 (specify Standards Support sion of section 112 did not authorize a
Document: Promulgated Amendments portion of the national emission stand
Significant Comments
to National Emission Standard for As bestos, EPA 450/2-77-030, January, 1978). The Standards Support Docu ment is also available tor public in spection and copying at the EPA Public Information Reference Unit, Room 2922 (EPA Library), 401 M Street SW, Washington, D.C. 20460.
FOR FURTHER INFORMATION CONTACT:
Don R. Goodwin, Director, Emission Standards and Engineering Division (MD-13), Environmental Protection Agency, Research Triangle Park, N.C. 27711, telephone number 910541-5271.
SUPPLEMENTARY INFORMATION:
ard for asbestos (prescribing certain work practices for demolition and ren ovation activities) because It consisted of requirements other than numerical limitations on emissions. The 1977 amendments to section 112 now clear ly authorize the Administrator to pro mulgate work practice or other nonnumerical standards In order to control emissions of hazardous air pollutants. Another Important 1977 amendment to the Clean Air Act explicitly au thorizes citizens and States, under sec tion 304, to enforce work practice and other nonnumerical standards promul gated under section 112.
Summary or Amendments
During the public comment period. EPA received 24 letters commenting
on the proposed amendments. These Included 16 from Industry, 3 from other governmental agencies, and 5
from other Interested parties. As a
result of these comments, there has
been only one significant change made
to the amendments since proposal.
This change involves the spraying re striction In {61.22(e). The proposed amendments would have prohibited the spraying of all materials contain ing more than 1 percent asbestos by weight.
Several commenters, however, re quested that EPA exempt from the spraying restrictions certain bitumi
On March 2, 1977 (42 FR 12121), The national emission standard for nous- and resinous-based asbestos-con
amendments to the national emission asbestos currently regulates demoli taining coatings. These coatings are
standard for asbestos were proposed tion and renovation operations Involv typically used as roofing compounds,
under section 112 of the Clean Air Act. ing asbestos-containing insulation and waterproofing of insulation exposed to
Interested persons participated in the fireproofing materials and prohibits the weather, automobile undercoat
rulemaking by submitting comments the spray application of these materi ings, and Industrial maintenance coat
to EPA. The comments have been con als If they contain more than 1 per ings.
sidered and, where determined by the cent asbestos. The promulgated Based on information supplied by
Administrator to be appropriate, amendments extend coverage of the the commenters, there are no accept
changes reflecting these comments demolition and renovation provisions able substitutes available for these
fCDCRAl UOKTR. VOL 41, NO. 11*--MONDAY, AMI If, in1!
0+0887
26374
RULES AND REGULATIONS
<dX2)(lil>. (dX4Xl>. (dX4Xli), (dX4XUI). which is present. Techniques of esti boiler, tank, reactor, turbine, furnace,
<dX4Xlv), (e), and (eX2); and adding mation shall be explained.
paragraph (eX3) to read as follows:
(2)
or structural member that has been removed as a unit or In sections as pro
(111) Description of the building, vided in paragraph (d)(4)(!ii) of this
(41.22 Emlulon standard.
structure, facility, or installation to be section shall be performed in accord
demolished or renovated. Including ance with paragraph (d)(4)(il) of this
the size, age, and prior use of the section. Rather than comply with the structure, and the approximate wetting requirement, a local exhaust
(d) Demolition and renovation. The
requirements of this paragraph shall apply to any owner or operator of a
demolition or renovation operation who Intends to demolish any Institu tional. commercial, or industrial build ing (including apartment buildings
having more than four dwelling units), structure, facility, installation, or por
tion thereof which contains any pipe,
duct, boiler, tank, reactor, turbine, fur nace, or structural member that is cov
ered or coated with friable asbestos
materials, except as provided In para graph (dXl) of this section; or who In tends to renovate any Institutional]
(CPUnerflalj or industrial_building,
atniCture.-facility. Installation, or por-, tlon thereof where more Than 80
Bittersica, 550 feet) of pipe'covereiToF
gated with friable^ asbestos materials are strlppetTor removed, or more than
15 square meters, (ca. 160 square feetT jjf_friable asbestos materials used UT
oyer or coat any duct, boiler, tank, re-^ jactor,_turbine, furnace, or structural "member are strippedjpr_remoye<L
~"(D' fi> The owner or operator of a demolitionoperation Is exemptedTrom
the. requirements of this paragrapH! grovided^(Ay The amount o? fname asbestos materials in the building or
portion "thereof to be demolishecTTs less than 8(y meters_(ca. 260 feetyused orT^plpes, and less_than i 5 square jiieters fca. 165 square feet) used on any duct, boiler, tank, reactoriTurblne,
"7umace, or structural membert and_(Bj tKc notification requirements ofpariT
graph (dXlKillare_met. Til) Written notification shall be
postmarked or delivered to the Admin istrator at least 20 days prior to com mencement of demolition and shall in-
.elude the information required by paragraph (dX2) of this section, with
amount of friable asbestos materials present.
(4) * (I) Friable asbestos materials, used on any pipe, duct, boiler, tank, reactor, turbine, furnace, or structural member, shall be removed from any building, structure, facility or installa tion subject to this paragraph. Such removal shall occur before wrecking or dismantling of any- portion of such building, structure, facility, or Installa tion that would break up the friable asbestos materials and before wreck ing or dismantling of any other por tion of such building, structure, facili ty, or installation, that would preclude access to such materials for subse quent removal. Removal of friable as bestos materials used on any pipe, duct, or structural member which are encased In concrete or other similar structural material is not required prior to demolition, but such materials shall be adequately wetted whenever exposed during demolition. (II) Friable asbestos materials used on pipes, ducts, boilers, tanks, reac tors, turbines, furnaces, or structural members shall be adequately wetted during stripping, except as provided In paragraphs (dX4Xiv), (dX4)(vl), or (dXvil) of this section. (ill) Pipes, ducts, boilers, tanks, reac tors, turbines, furnaces, or structural members that are covered or coated with friable asbestos materials may be taken out of any building, structure, facility, or installation subject to this paragraph as units or in sections pro vided the friable asbestos materials ex posed during cutting or disjoining are adequately wetted during the cutting or disjoining operation. Such units
ventilation and collection system may be used to prevent emissions to the outside air. Such local exhaust ventila tion systems shall be designed and op erated to capture the asbestos particu late matter produced by the stripping of friable asbestos materials. There shall be no visible emissions to the outside air from such local exhaust ventilation and collection systems except as provided in paragraph (f) of this section.
A
(e) Spraying. There shall be no visi ble emissions to the outside air from the spray-on application of materials containing more than 1 percent asbes tos, on a dry weight basis, used on equipment and machinery, except as provided in paragraph (f) of this sec tion. Materials sprayed on buildings, structures, structural members, pipes, and conduits shall contain less than 1 percent asbestos on a dry weight basis.
(2) Any owner or operator who In tends to spray asbestos materials which contain more than 1 percent as bestos on a dry weight basis on equip ment and machinery shall report such Intention to the Administrator at least 20 days prior to the commencement of the spraying operation. Such report shall include the following informa tion:
(3) The spray-on application of ma terials In which the asbestos fibers are encapsulated with a bituminous or re sinous binder during spraying and which are not friable after drying is exempted from the requirements of paragraphs (e) and (eX2) of this sec tion.
the exception of the information re shall not be dropped or thrown to the
quired by paragraphs (dX2) (ill), (vU, ground, but shall be carefully lowered
(vll), (vill), and (lx) of this section, and to ground level.
(Secs. 112 and 301(a) of the Clean Air Act as
shall state the measured or estimated <lv) The stripping of friable asbestos amended (42 C.S.C. 7412. 7601(a).))
amount of friable asbestos materials materials used on any pipe, duct. CFR Doc. 78-16891 Filed 6-16-78; 8:45 am)
RDCKAL KfOimt, VOL 41, NO. 118--MONDAY, AM It, 1828
OJ 0888
RULES AND REGULATIONS
26373
uses of asbestos. Among the most cusses criteria for determining wheth the amount of asbestos which may be
likely substitutes which have been in er asbestos material In a building is a present in the ambient air. The provi
vestigated are glass, cotton, wood, cel problem; the current knowledge of sional electron microscope method de
lulose, nvnernt wool, hemp, and other hazards from spray-on asbestos in scribed above is useful for cs' mating
types of inorganic and organic fibers: buildings: and alternative corrective airborne asbestos liber concentrations
gelling and thi-kentng agents: clay actions that may be taken. Including with greater precision.
thickeners. Including atlapulgitc: acceptable removal procedures and the Some commenters suggested that
ground cork; styrofoam: ground use of sealants for the coating of ma since asbestos is a carcinogen and no
rubber: vrrmiculite; feldspar: polyeth terial. The second volume of the docu threshold level for health effects has
ylene fibrous powder-; and ceramic ment, which is expected to be availa been established, the 1 percent allowa
fibem. Generally, these substitutes ble in la'e 1973, will present the re ble asbestos content for spray-on ma
have been found to be unacceptable sults of studies which will be done on terials permits too much environmen
tiirau.se of un:-alisfarlory durability; sealants to determine their effective tal contamination and should be low
.nsuffici-nt bulk: unsatisfactory qv.all- ness and acceptability for coating as ered considerably, if not completely
ti s related to fih-ous reinforcing, ho- bestos materials. Copies of the first eliminated. The I percent al'owable
mogencily. and adhesiveness, agglom volume of this document may be ob asbestos content ws selected primar
eration during sp-ayinc; and settle tained upon written request from the ily to allow the spray application of
ment in tlic container over time. Fur Emission Standards and Engineering materials which contain trace amounts
thermore. if asbestos fibers are re Division (MD-13), Environmental Pro of asbestos which occur in numerous
leased during application of the coat tection Agency, Research Triangle natural substances and which could
ings, during tin Ir service life, or Park. N.C. 27711 (specify Sprayed As- not be reduced or eliminated without
during demolition or renovation, the bestos-Containing Materials in Build effectively banning the use of these
fibers will not remain airborne because ings: A Guidance Document).
materials.
the3' arc encapsulated by droplets of The iRCk of EPA reference methods the binder and are too heavy to for making various asbestos measure
Miscellaneous
remain suspended.
ments was of concern to some com Note.--The Environmental Protection
Because there do not appear to be menters. Specifically, they suggested Agency has determined that this document
ar'-rptabl" substitutes available and any beneficial environmental impact resulting from the prohibition of this use of asbestos would be negligible,
that EPA publish a method for deter mining the percentage of asbestos In spray materials and reference OSHANJOSH procedures for measuring air
does not contain a major action -equirng preparation of an Economic Iinpaer As -! y sis under Executive Orders 11821 and 11919 and OMB Circular A-107.
the spraying of materials in which the borne asbestos particulate matter Dated: June 13. 1978.
asbestos fibers are encapsulated by a from spraying operations. bituminous or resinous binder and A number of methods for the analy which are not friable after drying is sis of asbestos-containing samples are
Barbara Blum. Acting Administrator.
exempt from the provisions of now in use and the variability of re In Part 61 of Chapter I. Title 40, of .
61.22(e) of the promulgated amend sults obtained by these methods is ex the Code of Federal Regulations.
ments.
tremely wide. In an attempt to stand 61.21 and 61.22 are amended as fol
There were several other significant ardize procedures and reduce this vari lows:
comments which did not result in ability, an EPA provisional electron changes to the amendments. To aid microscope procedure for measuring enforcement of the proposed spraying the concentration of asbestos in air
Subport B--National Emission Stondard for Asbestos
restrictions ir> 5 61.22(e), commenters samples has been developed. This 1. Section 61.21 is amended by revis
suggested that products should be la method can also be used for analysis Ing paragraphs Cm), (q), and (r) to read
beled as to tlicir asbestos content if of material samples. It will be further as follows:
they contain in excess of 1 percent as evaluated and refined for use in actual
bestos by dry weight and have the po field studies and it found acceptable, 61-21 Definitions.
tential for spray-on application. Re may eventually serve as the basis for
quiring labeling would constitute a sig an EPA reference method. The proce
nificant change in the amendments and would require reproposal. Rather than reproposing, the need for this provision will be assessed during en forcement of the amendments and. if
appropriate, labeling requirements will be proposed.
One commenter suggested that the regulation be extended to require re
dure is available In a publication enti tled Electron Microscope Measure ment of Airborne Asbestos Concentra tions: A Provisional Methodology Manual. EPA 600/2-77-178, August
1977. Copies of this document may be obtained upon written request from the Environmental Sciences Research Laboratory (MD-49), EPA. Research
(m) "Renovation" means the remov ing or stripping of friable asbestos ma terials used on any pipe, duct, boiler, tank, reactor, turbine, furnace, or
structural member. Operations in which load-supporting structural members are wrecked or taken out are excluded.
moval of existing asbestos-containing Triangle Park. N.C. 27711.
* * *
sprayed materials which present sig nificant risks to human health due to deterioration, particularly in buildings
accessible to the public. The proposed amendments would have only prohib ited the future application of asbestoscontaining spray material
This problem is being addressed through the preparation of a guidance document which will assist govern mental agencies and private Individ
The OSHA-NIOSH method meas ures airborne asbestos fiber concentra tions by phase contrast microscopy. It measures only those fibers which are
longer than S microns and does not differentiate between asbestos and other fibers. While such a method may be sufficient for enforcing the OSHA workplace asbestos standard, it is not sufficient as an indicator of total asbestos concentration in the am
(q) "Removing" means taking out friable asbestos materials used on anv
pipe, duct, boiler, tank, rcictor, tur bine. furnace, or structural member from any building, structure, facility,
or Installation. (r) "Stripping" means taking off fri
able asbestos materials from any pipe, duct. boiler. tank, reactor, turbine, fur
nace, or structural member.
uals who must decide on proper action bient air. Many asbestos fibers are to take when sprayed asbestos materi smaller than the smallest measured by
als are found in existing buildings. the OSHA-NIOSH method and these 2. Section 61.22 Is amended by revis
Tlie first volume of this document dis fibers can contribute significantly to ing paragraphs (d), (dKIKi), (dKIHli).
KOCftAl tEOtSTBt, VOL <3, NO. Ill--MONOAY, JUNE It, ItTt
9-10889
121:0466
FEDERAL REGULATIONS
Subpart B National Emission Standard Included, provided a number of such op The deposition of asbestos tailings or as
for Asbestos
erations can be predicted to occur during bestos-containing waste on roadways
g 61>20 Applicability.
a given period of time based on operating covered with snow or ice is considered
experience.
"surfacing."
The provisions of this subpart are ap (o) "'Emergency renovation" means a (c)Manufacturing: There shall be no
plicable to those sources specified In renovation operation that results from a visible emissions to the outside air, ex
I 61.22.
sudden, unexpected event, and is not a cept as provided in paragraph (f) of this
61*21 Definitions.
Terms used in this subpart are defined
in the act, in subpart A of this part, or in
this section as follows:
(a) "Asbestos" means actinolite, amo-
site, anthophyllite, chrysotile, crocidollte,
tremolite.
(b) "Asbestos material" means as
bestos or any material containing as
bestos.
(c) "Particulate asbestos material"
means finely divided particles of asbestos
material.
<d> "Asbestos tailings" means any
solid waste product of asbestos mining or
milling operations which contains as
bestos.
(e) "Outside air" means the air out
side buildings and structures.
(f) visible emissions'*
&&y
emissions which are visually detectable
without the aid of instruments and which
contain particulate asbestos material.
planned renovation. Operations necessi tated by non-routine failures of equip ment are Included.
(p) "Adequately wetted" means suf ficiently mixed or coated with water or an aqueous solution to prevent dust emissions.
(q) "Removing" queans taking out friable asbestos materials used on any pipe, duct, boiler, tank, reactor, tur bine, furnace, or structural member from any building, structure, facility, or installation.
(r) "Stripping" means taking off fri able asbestos materials from any pipe, duct, boiler, tank, reactor, turbine, fur nace, or structural member.
[Pingnph (q) and (r) revijed by 43 FR 26373, June 19. 1978)
(s) "Fabricating", means any process ing of a manufactured product contain ing commercial asbestos, with the ex ception of processing at temporary sites
section, from any of the following op erations If they use commercial asbestos or from any building or structure In which such operations are conducted.
[40 FR 48292. October 14, 1975|
(I) The manufacture of cloth, cord, wicks, tubing, tape, twine, rope, thread, yam. roving, lap, or other textile ma terials.
< 2) The manufacture of cement prod ucts.
(3) The manufacture of fireproofing and insulating materials.
(4) The manufacture of friction products.
c5) The manufacture of paper, millboard, and felt.
(6) The manufacture of floor tile. (7) The manufacture of paints, coat ings. caulks, adhesives, sealants. iS) The manufacture of plastics and rubber materials. (9) The manufacture of chlorine.
(g) "Asbestos mill" means any facility engaged in the conversion or any Inter mediate step in the conversion of asbestos ore Into commercial asbestos. Outside storage of asbestos materials Is not con sidered a part of such facility.
for the construction or restoration of buildings, structures, facilities or instal lations.
<t> "inactive waste disposal site" means any disposal .site or portion thereof where additional asbestos-con
(10) The manufacture of shotgun shells.
(II) The manufacture of asphalt con crete.
(d) Demolition and renovation. The
(hi "Commercial asbestos" means any taining waste material will not be depos requirements of this paragraph shall
variety of asbestos which Is produced by ited and where the surface is not dis apply to any owner or operator of a
extracting asbestos from asbestos ore. turbed by vehicular traffic.
demolition or renovation operation
(1) "Manufacturing" means the com (u) "Active waste disposal site" means who intends to demolish any Institu
bining of commercial asbestos, or In the any disposal site other than an Inactive tional. commercial, or Industrial build
case of woven friction products the com site.
ing (Including apartment buildings
bining of textiles containing commercial (v) "Roadways" means surfaces on having more than four dwelling units),
asbestos, with any other material(s), in which motor vehicles travel including, structure, facility, installation, or por
cluding commercial asbestos, and the but not limited to, highways, roads, tion thereof which contains any pipe,
processing of this combination into a streets, parking areas, and driveways. - duct, boiler, tank, reactor, turbine, fur
product as specified in I 61.22(e).
(w) "Asbestos-containing waste mate nace. or structural member that Is cov
Cl) "Demolition" means the wrecking rial" means any waste which contains ered or coated with friable asbestos
or taking out of any load-supporting commercial asbestos and is generated by materials, except as provided in para
structural member and any related re a source subject to the provisions of this graph (dXl) of this section; or who in
moving or stripping of frlahle asbestos subpart, Including asbestos mill tailings, tends to renovate any Institutional,
control device asbestos waste, friable as commercial, or industrial building,
(k) "Friable asbestos material"
bestos waste material, and bags or con structure, faculty. Installation, or por
any material that
more than-1 tainers that previously contained com tion thereof where more than 80
percent asbestos by weight and that cad mercial asbestos.
meters (ca. 260 feet) of pipe covered or
be crumbled, pulverized, or reduced to powder, when dry, by hand preesure.
(l) "Control device asbestos waste" means any asbestos-containing waste material that is collected In a pollution control device.
(40 FR 48292, October 14, 197S| (x) "Structural member" means any load-supporting member, such as beams and load-supporting walls: or any non load-supporting member, such as ceilings
coated with friable asbestos materials
are stripped or removed, or more than IS square meters, (ca. 160 square feet) of friable asbestos materials used to cover or coat any duct, boiler, tank, re actor. turbine, furnace, or structural
(m) "Renovation" means the remov
ing or stripping of friable asbestos ma terials used on any pipe, duct, boiler,
tank, reactor, turbine, furnace, or structural member. Operations In
which load-supporting structural members are wrecked or taken out are excluded.
and non-load-supporting walls.
(42 FR 12127. Mirch 2, 1977)
61.22 Emission standard.
(a) Asbestos mills: There shall be no visible emissions to the outside air from any asbestos mill except as provided In paragraph (f) of this section.
member are stripped or removed. (1) (i) The owner or operator of a
demolition operation Is exempted from the requirements of this paragraph: Provided, (A) The amount of friable asbestos materials In the building or portion thereof to be demolished Is
less than 80 meters (ca. 260 feet) used
[Pingnph (m) revised by 43 FR 26373, June 19,1978)
139 FR 15936, May 3. 1974|
on pipes, and less than 15 square meters (ca. 160 square feet) used on
(n) "Planned renovation" means a
renovation operation, or a number of
such operations, in which the amount of friable asbestos material that will be removed or stripped within a given pe riod of time can be predicted. Operations that are individually non-scheduled are
(b) Roadways: The surfacing of road ways with asbestos tailings or with as bestos-containing waste that is generated by any source subject to paragraphs (c), (d), (ei or (h), of this section ia
prohibited, exoept for temporary road ways on an area of asbestos ore deposits.
any duct, boiler, tank, reactor, turbine,
furnace, or structural member, and (B)
the notification requirements of para graph (dxixii) are met.
(U) Written notification shall be
postmarked or delivered to the AdminIstrator at least 20 days prior to com-
Environment Reporter
(Sec. 61-22(d)(lHl!)]
U
010890
J
HAZARDOUS EMISSIONS
S-412 121:0467
mcncement of demolition and shall in-
s elude the information required by \ paragraph <dK2) of this section, with / the exception of the information re
quired by paragraphs (d)(2) (til), (vl). (vii). (viii). and (ix) of this section, and shall state the measured or estimated
amount of friable asbestos materials which is present. Techniques of esti
mation shall be explained.
(Pingraph (d) revised by 43 FR 26374, June 19, 1978)
(2) Written notice of intention to de molish or renovate shall be provided to the Administrator by the owner or opera tor of the demolition or renovation oper ation. Such notice shall be postmarked or delivered to the Administrator at least 10 days prior to commencement of demo lition, or os early as possible prior to commencement of emergency demolition subject to paragraph (d) (6) of this sec tion. and as early os possible prior to commencement of renovation. Such no tice shall Include the following informa tion:
(1) Name of owner or operator. (11 > Address of owner cr operator. ail) Description of the building, structure, facility, or installation to be
demolished or renovated, including the sire, age, and prior use of the structure, and the approximate amount of friable asbestos materials present.
[Paragraph (iii) revised by 43 FR 26374, June 19,1978|
(lv) Address or location of the build ing. structure, facility, or installation.
(v) Scheduled starting and comple tion dates of demolition or renovation.
(vi) Nature of planned demolition or renovation and method(s) to be em ployed.
(vii) Procedures to be employed to meet the requirements of this paragraph and paragraph (j) of this section.
(vtil) The name and address or loca tion of the waste disposal site where the friable asbestos waste will be deposited.
(lx) Nome, title, and authority of the State or local governmental representa tive who has ordered a demolition which Is subject to paragraph (d)(5) of this section. -
(3) (1) For purposes of determining whether a planned renovating operation constitutes a renovation within the meaning of this paragraph, the amount of friable asbestos material to be re moved or stripped shall be:
(A) For planned renovating opera tions Involving Individually non-sched uled operations, the additive amount of friable asbestos material that can be pre dicted will be removed or stripped at a source over the maximum period of time lor which a prediction can be made. The period shall be not less than 30 days and not longer than one yesu.
(B) For each planned renovating op eration not covered by paragraph (d) (3) (1)(A), the total amount of friable as bestos material that con be predicted
.will be removed or stripped at a source. U, (11) For purposes of determining
whether an emergency renovating op eration constitutes a renovation within the meaning of this paragraph, the
amount of friable asbestos material to adequately wetted to ensure that such
be removed or stripped shall be the total materials remain wet during all remain
amount of friable asbestos material that ing stages of demolition or renovation
will be removed or stripped as a result and related handling operations. Such
of the sudden, unexpected event that materials shall not be dropped or thrown
necessitated the renovation.
to the ground or a lower floor. Such ma
<4> The following procedures shall be terials that have been removed or
used to prevent emissions of particulate stripped more than SO feet above
asbestos material to outside air:
ground level, except those materials re
(1) Friable asbestos materials, used moved as units or in sections, shall be
on any pipe, duct, boiler, tank, reactor, transported to the ground via dust-tight turbine, furnace, or structural chutes or containers.
member, shall be removed from any (vi) Except as specified below, the wet
building, structure, facility or inst-alla-
tion subject to this paragraph. Such removal shall occur before wrecking or
dismantling of any portion of such building, structure, facility, or Installa tion that would break up the friable asbestos materials and before wreck
ting requirements of this paragraph are suspended when the temperature at the point of wetting is below 0*C (32*F).
When friable asbestos materials are not wetted due to freezing temperatures, such materials on pipes, ducts, boilers, tanks, reactors, turbines, furnaces, or structural
ing or dismantling of any other por members shall, to the nuximum extent
tion of such building, structure, facili possible, be removed as units or In sec
ty, or installation, that would preclude tions prior to wrecking. In no cose shall
access to such materials for subse the requirements of paragraphs (d) (4)
quent removal. Removal of friable as bestos materials used on any pipe, duct, or structural member which are
encased In concrete or other similar structural material Is not required
prior to demolition, but such materials shall be adequately wetted whenever
exposed during demolition. - (11) Friable asbestos materials used
on pipes, ducts, boilers, tanks, reac tors, turbines, furnaces, or structural members shall be adequately wetted during stripping, except as provided in paragraphs (dX4Xlv>, (dX4Xvl)t or
(dXvli) of this section. (Ill) Pipes, ducts, boilers, tanks, reac
tors. turbines, furnaces, or structural members that are covered or coated
with friable asbestos materials may be
(lv) or (d) (4) (v) be suspended due to freezing temperatures.
(vll) For renovation operations', local exhaust ventilation and collection sys tems may be used. Instead of wetting as specified In paragraph (d) (4) (11), to pre vent emissions of particulate asbestos m&terial to outside air when damage to equipment resulting from the wetting would be unavoidable. Upon request and supply of adequate information, the Ad ministrator will determine whether dam age to equipment resulting from wetting to comply with the provisions of this par agraph would be unavoidable. Such local exhaust ventilation systems shall be de
signed and operated to capture the asbes tos particulate matter produced by the stripping and removal of friable asbestos material. There shall be no visible emis
token out of any building, structure, sions to the outside air from such local
facility, or installation subject to this exhaust ventilation and collection sys
paragraph as units or in sections pro tems, except as provided in paragraph
vided the friable asbestos materials ex (f) of this section.
posed during cutting or disjoining are (5) Sources subject to this paragraph
adequately wetted during the cutting are exempt from the requirements of
or disjoining operation. Such units II 61.05(a). 61.07, and 61.09.
shall not be dropped or thrown to the (6) The demolition of a building, struc
ground, but shall be carefully lowered ture, facility, or installation, pursuant to
to ground level.
on order of an authorized representative
<iv) The stripping of friable asbestos of a State or local governmental agency.
materials used on any pipe, duct, Issued because that building Is structur
boiler, tank, reactor, turbine, furnace, ally unsonnd and In danger of Imminent
or structural member that has been collapse Is exempt from all but the fol
removed as a unit or In sections as pro lowing requirements of paragraph (d) of
vided in paragraph (dX4Xl11) of this this section:
section shall be performed in accord (I) The notification requirements spec
ance with paragraph (dX4Xil) of this ified by paragraph (d) (2) of this section:
section. Rather than comply with the (II) The requirements on stripping of
wetting requirement, a local exhaust friable asbestos materials from previously
ventilation and collection system may removed units or sections as specified in
be used to prevent emissions to the paragraph (d) (4) (lv) of this section:
outside air. Such local exhaust ventila (ill) The wetting, os specified by para
tion systems shall be designed and op erated to capture the asbestos particu
graph (d> (4) (v) of this section, of fri able asbestos materials that have been
late matter'produced by the stripping
of friable asbestos materials. There aha.li be no visible emissions to the
outside air from such local exhaust ventilation and collection systems
removed or stripped; (lv) The portion of the structure being
demolished that contains friable asbes tos materials shall be adequately wetted during the wrecking operation.
except as provided in paragraph (f) of [39 FR 15936, May 3, 1974; 40 FR 48292,
this section.
October 14, 1975(
[4(0--(lv) revised by 43 FR 26374, June 19, (e) Spraying. There shall be no visi
19781
ble emissions to the outside air from
(v) All friable asbestos materials that the spray-on application of materials
have been removed or stripped shall be containing more than 1 percent asbes-
[Sec. 61-221.))
8-18-78
Published by THE BUREAU OF NATIONAL AFFAIRS, INC., WASHINGTON, D C. 20037
68
010891
121:0468
FEDERAL REGULATIONS
tos, on o dry weight basis, used on bulkheads, partitions and ceilings for
(il) Processing of asbestos-containing
equipment and machinery, except as marine construction; and flow control waste material into non-friable forms:
provided In paragraph <f) of this sec devices for the molten metal industry.
(A) All asbestos-containing waste
tion. Materials sprayed on buildings, (1) Insulating: Molded insulating ma material shall be formed into non-friable
structures, structural members, pipes, terials which are friable and wet-applied pellets or other shapes and deposited at
and conduits shall contain less than 1 in.<iiia.Mnff materials which are friable waste disposal sites which are operated
percent asbestos on a dry weight basis. after drying, installed after the effective in accordance with the provisions of
date of these regulations, shall contain 5 61.25.
jPar^n^h fe) revised by 43 FR 26374, June no commercial asbestos. The provisions
(3) There shall be no visible emis
of this paragraph do not apply to insu sions to the outside air from the collec
(1) Sources subject to this paragraph are exempt from the requirements of ) 61.05(a), f 61.07, and { 61.09.
(2) Any owner or operator who in tends to spray asbestos materials which contain more than 1 percent as bestos on a dry weight basis on equip ment and machinery shall report such intention to the Administrator at least 20 days prior to the commencement of
lating materials which are spray applied; such materials are regulated under
i 81.22(e). (j) Waste disposed for manufacturing,
fabricating, demolition, renovation smd spraying operations: The owner or op erator of any source covered under the provisions of paragraphs (c), (d), (e>, or (h) of this section shall meet the fol lowing standards;
(1) There shall be no visible emissions
tion and processing of asbestoscontaining waste material, except as
specified in paragraph (f) of this section. (4) For the purposes of this para
graph (j). the term all asbestos-con taining waste material as applied to
demolition and renovation operations
covered by paragraph (d) of this sec tion includes only friable asbestos waste and control device asbestos waste.
(k) Waste disposal for asbestos mills:
the spraying operation. Such report to the outside air, except as provided in The owner or operator of any .source
shall Include the following informa paragraph (J)(3> of this section, dur covered under the provisions of para
tion:
ing the collection; processing, including graph (a) of this section shall meet the
(1) Name of owner or operator. <ii> Address of owner or operator. (ill) Location of spraying operation. (lv> Procedures to be followed to meet
Incineration; packaging; transporting; or deposition of any asbestos-containing waste material which Is generated by
such source. (2) All asbestos-containing waste ma
following standard: (l) There shall be no visible emis
sions to the outside air. except as pro vided in paragraph (k) (3) of this section, during the collection, processing, pack
the requirements of this paragraph.
(3) The spray-on application of ma terials in which the asbestos fibers are encapsulated with a bituminous or re sinous binder during spraying and which are not friable after drying is exempted from the requirements of paragraphs <e) and (e)(2) of this sec tion.
(Paragraphs (2) and (3) revised by 43 FR 2*374. Jane 19. 197*1
(f) Rather than meet the nS-risibleemlssion requirements as specified bv paragraphs (a), (c). <d). (e). (h>. (J)'. and (k) of this section, an owner or op erator may elect to use the methods spec ified by I 61.23 to clean emissions con taining particulate asbestos material be fore such emissions escape to, or are vented to. the outside air.
(g) Where the presence ofiincombined water is the sole reason for failure to meet the no-visible-emission require ment of paragraphs (a), (c>, (d>, (e),
(h), (J), or (k) of this aection, such fail ure shall not be e violation of such emis sion requirements.
<h) Fabricating: There *n be no visible emissions to the outside air, ex cept as provided in paragraph (f) of this section, from any of the following op erations if they use commercial asbestos or from any building or structure in which such operations are conducted.
<1) The fabrication of cement building products.
(2) The fabrication of friction prod ucts, except those operations that pri marily install asbestos friction materials on motor vehicles.
(3) The fabrication of cement or sili cate board for ventilation hoods; ovens; electrical panels; laboratory furniture;
terial hii be deposited at waste dis posal sites which are operated in accord ance with the provisions of I 61.29.
(3) Rather than meet the requirement of paragraph (j) (1) of this section, an owner or operator may elect to use either of the disposal methods specified under (]M3) (1) and (li) of this section, or an alternative disposal method which has received prior approval by the Administrytor:
(1) Treatment of asbestos-containing waste material with water;
(A) Control device asbestos waste shall be thoroughly mixed with water Into a slurry and other asbestos-containing waste material shall be adequately wetted; There shall be no visible emis sions to the outside air from the collec tion, miTtng and wetting operations, ex cept as provided in paragraph (f) of this
(B) After wetting, all asbestos-con taining waste material shall be sealed into leak-tight containers while wet, and such containers shall be deposited at waste disposal sites which are operated in accordance with the provisions of f 61-25.
(C) The containers specified under paragraph (j)(3)(l)(B) of this section
shall be labeled with a warning label that states:
Caution Contains Asbestos Avoid Opening or Breaking Container Breathing Asbestos is Hsssrdons
to Tour Health
Alternatively, warning labels specified by Occupational Safety and Health Standards of the Department of Labor, Occupational Safety and Health Admin istration (OSHA) under 29 CFR 1910.93a(g> (2) (11) may be used.
aging, transporting or deposition of any asbestos-containing waste mate rial which is generated by such source.
(2) All asbestos-containing waste ma terial shall be deposited at waste disposal sites which are operated in ac cordance with the provisions of i 61.25.
(3) Rather than meet the requirement of paragraph (k)(l> of this section, an owner or operator may elect to meet the following requirements in para graphs tk) (3) (1) and (ii). or use an alternative disposal method which has received prior approval by the Admin istrator:
(i) There shall be no visible emissions to the outside air from the transfer of control device asbestos waste to the tailings conveyor, except as provided in paragraph (f) of this section. Such waste shall be subsequently processed either as specified in paragraph (k) (3) (ii) of this section or as specified in paragraph (J) (3) of this section.
(ii) All asbestos-containing waste
material shall be adequately mixed, with a wetting agent recommended by the manufacturer of the agent to effectively wet dust and tailings, prior to deposition at a waste disposal site. Such agent shall be used as recommended for the partic ular dust by the manufacturer of the agent. There shall be no discharge of visible emissions to the outside air from the wetting operation except as specified in paragraph (f) of this section. Wetting may be suspended when the ambient
temperature at the waste disposal site is less than --9A*C (ca. 15*F). The ambient air temperature shall be determined by an appropriate measurement method with an accuracy of ml*C (2"F) and recorded at least at hourly Intervals dur ing the period that the operation of the wetting system is suspended. Records of
MD892
Environment Ropo rtor
(Sec. B1-22(J)(3>1
*>
HAZARDOUS EMISSIONS
S-412 121:0469
such temperature measurements shall be
U) The asbestos-containing waste only for so long as it takes to shut down
\ retained at the source for a minimum of material shall be covered with at least the operation generating the particulate
two years and made available for tnspec- 15 centimeters (ca. 6 Inches) of com asbestos material.
/ . t!on by the Administrator. (1) The owner of any inactive waste
pacted non-asbestos-containing mate rial, and a cover of vegetation shall be
61,24 Reporting,
disposal site, which was operated by grown and maintained on the area ade The owner or operator of any existing
sources covered under 5 61.22 (a), (c) or quate to prevent exposure oi the asbes source to which this subpart Is applicable
(h) and where asbestos-containing waste tos-containing waste material: or
shall, within 90 days after the effective
material produced by such sources was
(ii) The asbestos-containing waste date, provide the following information
deposited, shall meet the following material shall he covered with at least 60 to the administrator:
standards:
centimeters (ca. 2 feet) of compacted
(a) A description of the emission con
(1 > There shall be no visible emissions non-asbestos-containing material and trol equipment used for each process:
to the outside air from an Inactive waste maintained to prevent exposure of the
(b) If a fabric filter device is used to
disposal site subject to this paragraph, asbestos-containing waste: or
control emissions, the pressure drop
except as provided in paragraph (1) (5)
(ili) For Inactive waste disposal sites across the fabric filter In inches water
of this section.
for asbestos tailings, a resinous or petro gage.
(2) Warning signs shall be displayed
at all entrances, and along the property line of the site or along the perimeter of the sections of the site where asbestoscontaining waste material was deposited,
at Intervals of 100 m (ca. 330 ft) or less,
except as specified in paragraph (1) (4) of this section. Signs shall be posted in such a manner and location that a person may easily read the legend. The warming signs required by this paragraph shall
leum-based dust suppression agent which
effectively binds dust and controls wind erosion shall be applied. Such agent shall be used as recommended for the partic ular asbestos tailings by the dust sup pression agent manufacturer. Other equally effective dust suppression agents may be used upon prior approval by the Administrator. For purposes of this para graph, waste crankcase oil is not con sidered a dust suppression agent.
(1) If the fabric filter device utilizes a woven fabric, the airflow permeability in ftVmin/ft'; and. if the fabric is syn thetic, indicate whether the fill yam is spun or not spun.
(2) If the fabric filter device utilizes a felted fabric, the density in oz/yd', the minimum thickness in Inches, and the airflow permeability in ft7mln/ft*.
(c) For sources subject to 55 61_22(j> and 61220c):
conform to the requirements of 20" x 14"
(40 FR 48292, October 14, 1975]
(1) A brief description of each process
upright format signs specified in 28 CFR
that generates asbestos-containing waste
1910.145(d)(4) and this paragraph. Ihe signs shall display the following legend in the lower panel, with letter sizes and styles of a visibility at least equal to those specified in this paragraph.
8 6U3 Air-cleaning. If air-cleaning is elected, as permitted
by 45 61.22(f) and 61.22(d) (4) (lv). the requirements of this section must be met.
[40 FR 48292, October 14, 19751
material.
(2) Hie average weight of asbestoscontaining waste material disposed of, measured In kg/day.
(3) The emission control methods
UOCMD
Auuns Wun DanuL Sir \ Do Not Create Dust
(a) Fabric filter collection devices mdst be used, except as noted in para graphs (b) and (c) of this section. Such devices must be operated at a pressure
used In all stages of waste disposal. (4) The type of disposal site or incin
eration site used for ultimate disposal, the name of the site operator, and the
) Breathing Asbestos is Hazardous s to Tour Health
drop of no more than 4 inches water gage, name and location of the dlspos*1 site.
as measured, across the filter fabric. The
id) For sources subject to { i -22(1):
Notation
airflow permeability, as determined by
(1) A brief description of the site.
1" Bans Serif. Gothic or Block '' Sans Serif, Oothtc or Block 14 Point Gothic
ASfM method D737-69, must not exceed 30 ft*/min/ft1 for woven fabrics or 35 ftVmin/ft* for felted fabrics, except that40 ft7min/ft* for' woven and 45 ft*/
(2) The method or methods used to comply with the standard, or alternative procedures to be used.
Spacing between lines shall be at least equal to the height of the upper of the two lines.
(3) The perimeter of the site shall be fenced in a manner adequate to deter access by the general public, except as
min/ft* for felted fabrics is allowed for filtering air from asbestos ore dryers. Each square yard Of felted fabric must weigh at least 14 ounces and be at least one-lxteerth Inch thick throughout. Synthetic fabrics must not contain fill yam other than that which Is spun.
(e) Such information shall accom pany the Information required by f 61.10.
The Information described in this section
shall be reported using the format of Appendix A of this part.
-(40 FR 48292, October 14. 1975!
specified in paragraph <1>(4) of this section.
(4) Warning signs and fencing are not
(b) If the use of fabric filters creates 61.25 Waste disposal sites. fire or explosion hazard, the adminis la. order to be an acceptable site for trator may authorize the use of wet col disposal of asbestos-containing waste
required where the requirements of lectors designed to operate with a unit material, under 5 6122 (J) and <k), an
paragraphs a) (5) (1) or (U) of this sec tion sire met, or where a natural barrier adequately deters access by the general public. Upon request and supply of ap propriate Information, the Adminis trator will determine whether a fence or a natural barrier adequately deters ac cess to the general public.
(5) Rather than meet the requirement of paragraph (1) (1) of this section, an owner may elect to meet the require ments of this paragraph or may use an
contacting energy of at least 40 inches water gage pressure.
(c) The administrator may authorize the use of filtering equipment other than that described in paragraphs (a) and (b) of this section if the owner or operator demonstrates to the satisfaction of the administrator that the filtering of par ticulate asbestos material is equivalent to that of the described equipment.
(d) All air-cleaning equipment au
active waste disposal site shall meet the requirements of this section.
(a) There shall be no visible emissions to the outside air from any active waste disposal site where asbestos-containing waste material has been deposited, except as provided in paragraph (e) of this section.
(b) Warning signs shall be displayed at all entrances, and along the property line of the site or along the perimeter of the sections of the site where asbestos-
alternative control method for emissions thorized by this section must be properly containing waste material is deposited,
from inactive waste disposal sites which installed, used, operated, and maintained. at intervals of 100 m (ca. 330 ft) or less
has received prior approval by the Bypass devices may be used only during except as specified in paragraph (d) of
Administrator.
upset or emergency conditions and then this section. Signs shall be posted In such
010893
8-18-78
6125(b)) Published by THE BUREAU OF NATIONAL AFFAIRS. INC., WASHINGTON, DC. 20037
si
121:0470
FEDERAL REGULATIONS
a manner and location that a person may easily read the legend. The warning signs required by this paragraph shall conform to the requirements of 20" x 14" upright format signs specified In 29 CFR 1910.145(d) (4) and this paragraph. The signs shall display the following legend in the lower panel, with letter sizes and styles of a visibility at least equal to those specified in this paragraph.
UOXNS
Asbestos West* Otaroasi. Sit*
Do Not Create Dust
Breathing Asbestos Is Hazardous to Tour Health
Notation
1 " Sans Serif, Oothic or Block
4" Sans Serif, Oothic or Block 14 Point Oothic
Spacing between lines shall be at least equal to the height of the upper of the two lines.
(c) The perimeter of the disposal site shall be fenced in order to adequately deter access to the general public except aa specified in paragraph (d) of this section.
(d) Warning signs and fencing are not required where the requirements of paragraph (e)(1) of this section are met, or where a natural barrier ade quately deters access to the general public. Upon request and supply of ap propriate information, the Administra tor will determine whether a fence or a natural barrier adequately deters access to the general public.
(e) Rather than meet the require ment of paragraph (a) of this section, an owner or operator may elect to meet the requirements of paragraph (e) (1) or <e) (2) of this section, or may use an al ternative control method for tmiinn from active waste disposal sites which has received prior approval by the Administrator.
(1) At the end of each operating day, or at least once every 24-hour period while the site Is In continuous operation, the asbestos-containing waste material which was deposited at the site during the operating day or previous 24-hour period shall be covered with at least IS centimeters (ca. 6 inches) of compacted non-tabestoe-containing material.
(2) At the end of each operating day, or at least once every 24-hour period while the disposal site la In continuous operation, the asbestos-containing waste material which was deposited at the site during the operating day or previous 24hour period shall be covered with a res inous or petroleum-baaed dust suppres sion agent which effectively binds dust and controls wind erosion. Such agent shall be used as recommended for the particular dust by the dust suppression
agent manufacturer. Other equally ef fective dust suppression agents may be used upon prior approved by the Admin istrator. For purposes of this paragraph, waste crankcase oil Is not considered a dust suppression agent.
(40 FR 48292, October 14, 1975J
(Sec. 114 of the Clean Air Act as amended (42 U.S.C. 7414))
Subpart C--National Emission Standard for Beryllium
61.30 Applicability.
The provisions of this subpart are ap plicable to the following stationary sources:
(a) Extraction plans, ceramic plants, foundries, incinerators, and propellant plants which process beryllium ore. beryl lium, beryllium oxide, beryllium alloys, or beryllium-containing waste.
(b) Machine shops which process beryllium, beryllium oxides, or any alloy when such alloy contains more than 5 percent beryllium by weight.
S 6131 Definitions.
Terms used in this subpart are de fined in the act. In subpart A of this part, or in this section as follows:
(a) "Beryllium" means the element beryllium. Where weights or concentra tions are specified, such weights or con centrations apply to beryllium only, excluding the weight or concentration of any associated elements.
(b) "Extraction plant" means a fa cility chemically processing beryllium ore to beryllium metal, alloy, or oxide, or performing any of the'Intermediate steps in these processes.
(c) "Beryllium ore" means any natu rally occurring material mined or gathered for Its beryllium content.
(d) "Machine shop" means a facility performing cutting, grinding, turning, honing, milling, deburrlng, lapping, electrochemical machining, etching, or other similar operations.
(e) "Ceramic plant" means a manu facturing plant producing ceramic Items.
(f) "Foundry" means a facility en gaged in the melting or casting of beryllium metal or alloy.
(g) "Beryllium-containing waste'' means material contaminated with beryllium and/or beryllium compounds used or generated during any process or operation performed by a source subject to this subpart.
(h) "Incinerator" means any furnace used in the process of burning waste for the primary purpose of reducing the volume of the waste by removing com bustible matter.
(i> "Propellant" means a fuel and oxi dizer physically or chemically combined which undergoes combustion to provide rocket propulsion.
<J) "Beryllium alloy" means any metal to which beryllium has been added in order to increase its beryllium content and which contains more than 0.1 per cent beryllium by weight.
(k> "Propellant plant" means any facility engaged in the mixing, casting, or machining of propellant
61.32 Euuiion atandard.
(a) Emissions to the atmosphere from stationary sources subject to the provi sions of this subpart shall not exceed 10 grams of beryllium over a 24-hour period, except as provided in paragraph (b) of this section.
(b) Rather than meet the require ment of paragraph (a) of this section, an owner or operator may request ap proval from this Administrator to meet an ambient concentration limit on beryl lium In the vicinity of the stationary source of 0.01 *g/m\ averaged over a 30-day period.
(I) Approval of such requests may be granted by the Administrator provided that:
(i) At least 2 years of data is avail able which in the judgment of the Ad ministrator demonstrates that the fu ture ambient concentrations of beryllium in the vicinity of the stationary source, will not exceed 0.01 ag/m', averaged over a 30-day period. Such 3-year period shall be the 3 years ending 30 days before the effective date of this standard.
(II) The owner or operator requests such approval in writing within 30 days after the effective date of this standard.
(ill) The owner or operator submits a report to the Administrator within 45 days after the effective date of this standard which report includes the fol lowing information:
(a) Description of sampling method including the method and frequency of calibration.
(b) Method of sample analysis. (c) Averaging technique for determin- | lng 30-day average concentrations.
(d> Number. Identity, and location (address, coordinates, or distance and heading from plant) of sampling sites.
(e) Ground elevations and height i above ground of sampling inlets.
(/) Plant and sampling area plots showing emission points and sampling sites. Topographic features significantly affecting dispersion including plant building heights and locations shall be included.
(?) Information necessary for esti mating dispersion including stack height, inside diameter, exit gas temperature, exit velocity or flow rate, and beryllium concentration.
(h) A description of data and proce dures (methods or models) used to de-
Environment Reporter
010894
(See. 61.32(h)]
82