Document g2Km31NB0rbMx2LVM51wne2DG
PLAINTIFF'S EXHIBIT USG-U54
SHORTAGES :s -'
Arecent National Production Authority "Memoran dum on Controlled Materials in Construction" stresses need for conservation of steel and other metals. It provides some guidance to material economy methods which conform to accepted standards of construction.
By directing its limited steel supplies into accessories, which combine with non-critical materials to build economical and durable ceiling and partition assemblies, United States Gypsum Co. is contributing to contractors' and plasterers' ability to do more work with lesser amounts of critical materials.
These gypsum lath and plaster wall and ceiling assemblies, recognized for durability and for their fire and sound resist ive ratings, save steel, cut costs.
C 6 0 <d G l O u a
TWO INCH SOLID ROCKLATH & PLASTER PARTITIONS
Space saving two inch solid partitions are misers of critical materials when built with Long Length ROCKLATH plaster base. With metal ceiling runner and metal or wood base they offer a sturdy partition with a one hour fire rating when plastered with proper proportions of gypsum-sond or gypsumperlite plaster.
Critical materials savings: approximately 585 lbs. per 100 sq. yds. with wood base, or approximately 455 lbs. with metal base.
BRACE-TITE ROCKLATH CEILINGS
A rigid and economical suspended ceiling can be achieved with ROCKtATH plaster base fastened to 34 inch channels with BRACE-TITE clips. Using insulating ROCKLATH plaster base this plaster-saving* ceiling gains insulating and vapor barrier properties. With perforated ROCKLATH plaster base and % inch gypsum-perlite plaster it has o one hour fire rating. Critical materials saving: approximately 290 lbs. per 100 sq. yds.
BRACE-TITE, ROCKLATH, TRUSSTEEL STUD PARTITION A hollow partition providing room for
plumbing and ductwork and offering a one hour fire rating, and over 45 db sound reduction advantage, is also a limited user of critical materials for this type of partition. It consists of TRUSSTEEL studs with plain or perforated ROCKLATH plaster base attached with BRACE-TITE attachment clips. Critical materials saving: 500 lbs. per 100 sq. yds.
FOUR INCH HOLLOW PARTITIONS
A hollow partition with one hour fire rating and over 45 db sound transmission loss rating can be built with Long Length ROCKLATH piaster base attached to a grid of channel studs spaced vertically no more than 48 inches on center, with hori zontal cross channels at a maximum of 36 inch intervals. Two ceiling runners are used and wood or metal base can be em ployed. The partition is economical in cost and in use of critical materials. Critical materials saving: 670 to 800 lbs. per 100 sq. yds.
COLUMN FIREPROOFING WITH ROCKLATH & PLASTER
Long Length V^-inch ROCKLATH plaster base, two layers thick, is the heart of a system for achieving a four hour fire rating for steel columns. Lath are placed directly against the column, wrapped with 1 inch, 20 gauge, hexagonal wire
mesh and plastered IV2 inch thick with gypsum perlite plaster. Ratings of 1, IV2,
2 or 3 hours may be achieved with less ROCKLATH and/or plaster. No mesh is
required for 1, 1 V2 and 2 hour ratings.
Critical materials saving: approximately 300 to 340 lbs. per 100 sq. yds.
^here are now new acoustical plasters which, in adJ dition to cleaning, can be repainted numerous times without appreciable loss of their acoustical efficiency. This feature is especially true of new stipple-perforated Red Top Acoustical Plaster. These new developments raise the question, "How do I paint acoustical plaster most efficiently and effectively?"
Spray painting is recommended, using a water thinned paint, color as desired. Imperial Texolite paint with its oil resin base or regular Texolite, a casein base paint, is especially effective. For the first coat, mix one part of Texolite paste to one part of water by vol ume. Second and succeeding coats should be one part of
4
Texolite paste to two parts of water by volume. Any spray gun which can be adjusted for a medium-
fine spray may be used. One equivalent to the DeVilbiss Type MBD with a No. 30 nozzle is recommended. Pres sure should be adjusted to 30 to 40 pounds in the gun and to 20 to 30 pounds on the paint.
Adjust the nozzle for a medium fine spray and hold it 14 to 18 inches from the work, using a slow, uniform pass over the surface, sufficient to cover in one pass. Do not build up the paint unnecessarily by passing over the same area several times. Allow overnight drying between coats, and longer if humidity conditions make additional drying time necessary.
fifcos B io a a
FREE
ORDER CARD
B DO 1.3 P.09 7
They're the big news, of the year in sound conditioning progress--improvements that make acoustical control with plaster faster, easier, more practical than ever. Sure I'm proud of 'em. Proud because they're just two more examples of the way U.S.G. de velopment and research benefit you--and the public. Two more good reasons why, in sound conditioning, it's ... Plaster to be sure!
TWO OUTSTANDING
ACOUSTICAL PLASTERS
RED/TOPT.M. Hf/ul. Pit.Oft. / STIPPLE OR PPLE-PERFORATED FINISH
CD
fU O -0
CD
-... wiu iiuumci, ncoi me uuiiumg wen m auvdiiLc ui
maintain a continuous uniform
temperature of 55 to 70 F. until the plaster is dry. After plaster has. set provide ventilation to eliminate excessive
moisture. In hot, dry weather, close all openings with sash or cloth. Do not allow plaster to dry before setting.
Scope-areas indicated in finish schedule shall be finished with acoustical plaster as described herein.
Materials-finish coat-acoustical plaster shall be SABINITE (trowel or float finish); or RED TOP (stipple or stippleperforated finish) manufactured by the United States Gypsum Company. Color shall be designated by the Architect.
Mixing and Application-of SABINITE or RED TOP and the basecoat plaster shall be in strict accordance with the manufacturer's printed directions which are hereby made a part of this specification.
;-!2V/ SATIMiTF ACOt ncAi
Trowel or Float Finish
Mixing--machine mixing recommended. Put 24 quarts clean water in mixer for each bag of SABI NITE. Add SABI NITE to water and mix until mortar weighs 15 to 17 lbs. net per 12-qt. pail (usually 3 to 5 minutes, depending on speed of mixer). For hand mixing, place SABI NITE in one end of mixing box. For each bag of SABINITE add 25 qts. of clean water in other end. Hoe SABINITE into water. The mix will appear dry. but do not add more water. Hoe until mortar weighs 15 to 17 lbs. net per 12-qt. pail (approximately 8-10 minutes per 2-bag batch). Application--SABINITE shall be applied in 2 coats to a uniform total thickness of lAr over a basecoat of RED TOP gypsum plaster. A lull scratch and brown coat are required over metal lath, ROCKLATH* plaster base, and masonry bases {excluding monolithic concrete) to provide proper rigidity, strength, and a solid base for the acoustical plaster.
Apply the first coat of SABINITE l/' thick by scratching in and doubling back over a set semi-green gypsum plaster basecoat that is level and cross raked. If basecoat is dry, spray lightly to reduce suction. Darby immediately to a level surface. Allow to set and to partially dry (at least overnight) before applying finish coat.
Apply SABINITE finish coat to a thickness of /*' scratching in and doubling back, over a set, partially dry first coat. Bring total thickness to */?'. Leave surface uniformly level and free of trowel marks, working from wet edge. Finish areas in one operation to avoid joinings. Trowel Fimsh--after water sheen leaves surface (about 30 minutes), trowel lightly to a uniform texture. Do not use water during troweling. Float Finish--float second coat 5 to 10 minutes after water sheen has left surface. Use a shingle, cork, or rubber float. Do not use water in floating.
Stipple or Stipple-Perforated Finish
Mixing--machine mixing required. Use 34 qts. clean water for each 40 pound bag of RED TOP. Add plaster to water. Mix until mortar weighs 15 to 17 pounds net per 12 qt. pail (usually 10 minutes mixing required, depending on speed of mixer). Application-- REO TOP shall be applied in 2 coats to a uniform total thickness of Vi' over a base coat of RED TOP gypsum plaster. A full scratch and brown coat are required over metal lath and ROCKLATH plaster base to provide proper rigidity, strength, and a solid base for the acoustical plaster.
Apply the first coat of RED TOP V thick over a set, semi-green or a dry. cross-raked brown coat. Darby lightly to a level surface. Allow to set and partially dry (at least overnight) before applying finish coat.
Apply RED TOP finish coat Vs' thick, scratching in and doubling back, leaving surface free of trowel marks. Work from wet edge to avoid joinings. When surface gloss has disappeared, stipple with a rice stippling brush to a uniform texture.
For stipple-perforated finish perforate the surface about 30 minutes later, and before set, with a perforator furnished by the United States Gypsum Company. Perforations should num ber approximately 500 per sq, ft. and should be at least V\t,' deep.
RED TOP ACOUSTICAL PLASTER
National Bureau of Standards
f ASOUND' ABSORPTION DATA--
Stipple Finish--W' Thick
Stipple-Perforated Finish V2" Thick
Frequency Cycles
Unpainted
Painted (6 spray coats TEXOLITE Imperial)
128 256 512 1024 2048 4096 N. R. C. .20 .24 .48 .77 .84 .86 .60
.19 .24 .49 .74 .83 ' .78 .60
Frequency Cycles
Unpainted
Painted (2 spray coats TEXOLITE Imperial)
Painted (4 spray coats TEXOLITE Imperial)
128 256 512 1024 2048 4096 N. R. C. .22 .25 .47 .72 .78 .80 .55
.27 .28 .50 .75 .82 .80 .60
.25 .28 .47 .70 .73 .61 .55
SABINITE Riverbank Laboratories
Frequency Cycles
Float W thick
128 256 512 1024 2048 4096 N. R. C. .49 .22 .42 .66 .83 .81 .55
Trowel Vi" thick
.54 .27 .47 .76 .99 .88
Painted (2 spray coats TEXOLITE Imperial) .44 .27 .48 .75 .89 .79
.60 .60
DIRECT APPLICATION OF SABINITE OR RED TOP ACOUSTICAL PLASTERS TO EXISTING CEILINGS OR CONCRETE
SABINITE or RED TOP may be applied over existing plaster and over new or existing smooth con crete ceilings, with the use of asphalt emulsion (Type N-13 HPC or C-13 HPC) as a bonding agent.
On existing painted plaster or concrete ceilings, the surface must be dry, dean and sound. Calcimine or similar powder paints must be washed off and wax. grease or oil removed. Loose or improperly bonded plaster or paint must be removed and such areas repaired with wood fiber or patching plaster. Allow patches to dry 2 or 3 days. On new concrete ceilings which are smooth, level, and dense, surface must be dry, free of dust, oil, grease or efflorescence.
Size any porous concrete or porous or unpainted plaster surface with cut-back asphalt, shellac or varnish to reduce suction before asphalt emulsion is applied.
Trowel on asphalt emulsion in thin coat not to exceed V\C thick. Cover entire ceiling area. The first /*' coat of SABINITE or V%' of RED TOP should follow application of the emulsion as closely as possible and while the emulsion is still soft and plastic.
Darby first coat of SABINITE or RED TOP to a true even surface with a minimum amount of pressure. Allow to set and partially dry Apply SABI.NITE or RED TOP finish coat as specified.
APPLICATION OF SABINITE OR RED TOP ACOUSTICAL PLASTER OVER MONOLITHIC CONCRETE SURFACES
T. M. Reg U S Pat Olf.
Over properly prepared rough monolithic concrete surfaces apply BONDCRETE* plaster accord ing to directions not to exceed %' thickness on ceilings and Vs' on side walls. Apply the SABINITE or RED TOP over the set. partially dry BONDCRETE basecoat, as specified above.
DIRECTIONS FOR PAINTING SABINITE OR RED TOP ACOUSTICAL PLASTER
Remove all loose dirt or dust from SABINITE or RED TOP by use of a vacuum cleaner with hose and brush attachment. Putty type cleaner may be used to clean SABINITE Trowel Finish.
Paint: Should be water-thinned. TEXOLITE Imperial is recommended. First coat --mix one part TEXOLITE paste to one part water by volume. Second coat if required--mix one part TEXOLITE paste to two parts water by volume.
Spray on with any gun with a medium fine spray. DeVilbiss spray gun, type MBD, with a
No. 30 nozzle or equivalent is recommended. Use 30 to 40 lbs. pressure in the gun and 20 to 30 lbs. on the paint.
Hold nozzle 14 to 18 in away from work. Use a slow, uniform motion. Cover surface in one pass. Do not pass over same area several times as this builds up paint unnecessarily.
Allow at least overnight drying between coats. If weather is extremely humid, allow addi tional drying as necessary.
BnoiB 2101
3 IT1MS
UNITED STATES GYPSUM COMPANY CHICAGO 6
SLOGAN STICKERS JOB SIGNS DECALS
RED BOOKTHE
of Good Lathing & Plastering Practice
BB018 2102
Jj ASt SEND:
I have not deceived previously a copy of THE RED BOOK of Good Lathing & Plastering Practices. Please send one to me FRtt.\
| | 200 "Plaster ... to be sure" stickers -- FRCK for use on letterheads, billheads, all outgoing mail
| | 5 "Plaster ... to be sure" job signs -- FRttj
| | 2 "Plaster ... to be sure" decals -- FRffj
| | Job signs imprinted with my company name and phone or
address at 15c each (minimum order, 25 signs, $3 75).
e detired imprint r Job Sign, hero
Check enclosed $------------------------ , is for------------------------ imprinted signs. (Mail this card with check in envelope)
NAME___________________________________________________________ COMPANY______________________________________________________ ADDRESS_______________________________________________________ CITY 4 ZONE ... -STATE.
EQ018 2103
BUSINESS REPLY CARD
First Clou Permit No. 760, Sec. 34.9, P. 1. & R., CHICAGO, ILL.
300 W. Adams Street Chicago 6, Illinois
new propeller
FOR DOUBLE HYDRATE
I deal results and workability are being obtained from Ivory double hydrated lime mixed in a new propeller type motor driven mixer. Complete mixing of lime putty is accomplished in IVi to 2 minutes with the new mixer.
Even more important than its speed is the high quality of lime putty produced. The mixer eliminates soaking and hodding difficulties sometimes experienced with doublehydrate limes and makes the finest quality lime also the easiest working lime. Plasticity and coverage are increased, the latter as much as ten to fifteen percent. The material, properly gauged and troweled, produces a hard glossy finish.
The photographs show lime and water being mixed into lime putty. On this job, gauging was being done on the board, in the usual manner. However, gauging can also be accomplished right in the mixing process, and mechanical mixing insures complete blending and permits addition of more gypsum gauging, which tends to reduce check crack ing. It practically eliminates "butterflies" which often show up as slight depressions in the finished wall. They are a result of shrinkage of unmixed patches of lime. It elimi nates "hot" spots of lime and makes painting easier.
With the mixer, control is easier. Putty stiffness can be regulated by water ratio during mixing.
The machine can also be used for mixing Keenes Ce ment, gypsum trowel finish, sanded, precolored, and light weight aggregate plaster finishes, Covercoat bonding plaster as well as for lime putty and gypsum-gauged lime putty finish. It has sufficient capacity to supply 15 or 20 plasterers with finish coat plastering material.
The new finish plaster mixer is a direct sale item. Fur ther information is available from E-Z-On Corp., 930 W. Division St., Chicago, 111.
lM3qt
Lime mixing begins (above) with five to six gallons of water (per 50 lb. bag of double hydrated lime) in the 15 gallon drum pro vided with the machine. The propeller is started and a bag of lime is dumped into the water while the propeller is running. On the job shown here, gauging was done on the board with a normal putty ring made of machine mixed putty. However, excellent re sults are obtained by adding gauging right in the mixer. Start with about as much water as would be used for both putty mixing and gauging. Add lime as indicated above and allow machine to
run about I-IV2 minutes. Then add 25 pounds of gauging plaster
and continue mixing for an additional minute.
At the' end of the mix, the propeller shaft is uncoupled just below the motor, and lifted from the mix (far left). Note the two blades --one about two inches from the bottom of the can, the other about 3 inches below the surface of the batch of material. The propeller is set in a bucket temporarily.
The can of mixed material can be dumped into a wheelbarrow (right), or if more than one can is available, the entire can may be wheeled to the work area and require only one dumping, di rect to the boards. The machine is highly portable (note large wheels) so it can always be close to the working area.
9
a io a a
hcently the nation observed Fire Prevention Week. In every part of the country attention was directed to the
ten to eleven thousand human lives sacrificed each year to fire. Fire damage costs about $700,000,000 annually in ad dition to lives lost.
Lives cannot be replaced, and restrictions now make it difficult to replace buildings. These facts should be reason enough to make all Americans cautious in their use of fire. Still, experience indicates that fire will originate, principally by human carelessness.
As long as buildings contain combustibles--wood, paper, fabric and furnishings--fire can start. But when buildings are constructed of materials which discourage the spread of fire, an eternal and never tiring guard is present to limit and confine its destruction.
Building materials made of gypsum (plaster, lath, parti tion tile, sheathing) provide the greatest protection of this kind. Gypsum will not burn. In addition, gypsum building materials will transmit only a limited amount of the heat of fire until the fire drives out the water forming part of gyp sum, a relatively slow process.
We hear that partitions of Rocklath plaster base and Red Top plaster have a one hour fire resistance period. That means that with intense flame directed upon one side of that partition continually, it will require one hour before this water, chemically a part of gypsum, is driven off as steam. The temperature of the face on the far side of the partition will not get much hotter than 212 degrees (the boiling tem perature of water) until this calcination is completed. In ad dition. the partition must also resist a hose stream of normal
10
fire fighting pressure, to merit the rating. For a partition built of four inch Pyrobar gypsum tile, with gypsum sand plaster both sides, the fire resistance rating is four hours.
Wood ignites at about 400 degrees F. A partition com posed of wood studs, gypsum Rocklath plaster base and gypsum plaster will resist the spread of fire because the wood framing will not ignite while the plaster and Rocklath on the fire side are intact and not completely calcined. This is not only because the gypsum surface is incombustible. It is because the material retards the passage of high tempera tures. If the wood studs were faced with steel, they would ignite much more rapidly if subjected to the same fire ex posure. The steel would not burn, but it would transmit enough heat to cause the wood framing to ignite rapidly. Steel, when used for columns and beams needs the protec tion of gypsum to delay and reduce danger of buckling and failure in case of fire.
Sell, specify and use gypsum materials (plaster, partition tile, gypsum lath, gypsum sheathing) for their adaptability, for their easy erection, and most of all, for their fire retard ant and safety qualities.
The insignia used as part of the headline for this article is a slogan that is sweeping the nation through the combined promotional efforts of all who are lathing and plastering contractors and tradesmen. RED TOPICS magozine offers 200 slogan stickers (size 1!4 x 1% inches), two slogan de cals (size 3V2 x 5 inches) and five job signs (size 16 x 23% inches) free of charge. Twenty-five job signs with your company name imprinted are avail able for $3.75, the imprinting charge. Send your order (and check if im printed job signs are desired) to RED TOPICS magazine. Dept. 122, 300 W. Adams St., Chicago 6, ill. Use stickers for your billheads, and corre spondence. Use decals for inside or outside of windows, and on your trucks. Display your name and slogan prominently on every job with a job sign. It's important to advertise.
BE018 2105
TRADE GROUPS BENEFIT FROM
*
"What's New in Plastering" meetings
he Operative Plasterers and Cement Masons Local 101 of South Bend, Ind. held a special meeting there to wit ness the "What's New in Plastering" program being offered by U. S. Gypsum sales offices. The meeting was held in the Oliver Hotel and local lathing and plastering contractors and some architects were also in attendance. A series of slide films was the basis of the meeting with commentary by Claude Sifferlen of USG's Indiana District office in Indianapolis. The film and commentary explained the series of developments and improvements in plastering methods and products that have been introduced in the past few years, and indicated how they are best used, and how they can benefit the lathing and plastering trades with in creased volume of work. The showing was followed by an open question session at which R. E. Hazelwood, U. S. Gypsum plastering expert from the Chicago office, joined Mr. Sifferlen and George Brunner, USG local representative, in helping those in at tendance with their specific plastering problems. Interest in the meeting was strong and those attending lingered long after it closed to discuss plastering and new developments with the USG experts. Similar meetings can be arranged for groups of building materials dealers, architects, and contracting or journeyman lathers' and plasterers' organizations through local USG representatives or United States Gypsum district offices.
Above: Claude Sifferlen, Indianapolis, addresses group of lathing and plastering contractors and journeymen, and architects at a "What's New in Plastering" meeting in South Bend, Ind.
_ plastering industry |jj handbook available soon
1444U-D
l444k-C-
TV The new Red Book of Good Lathing and Plastering Practice will soon be available. It is an up-to-date primary reference book of the plastering industry, published by United States Gypsum Co. This handy, pocket sized edition, companion and
guide for lathing and plastering contractors and journeymen, builders and architects, is the authoritative source of the following information, and much more.
Plaster bases. A discussion of each type --its advantages, limitations, where used to best advantage, application methods.
Gypsum base coat plasters. A detailed explanation of each type, a discussion of additives and the features and proper use of each, include ing the lightweight aggregates.
Finishing plasters. What they are and what they do. Mixing and ap plication recommendations for several, including acoustical plasters.
Base coat plaster problems. A handbook for the trouble shooter, and a guide to proper workmanship. Causes and cures for cracking, a dis cussion of setting, aggregates, bond on each type of lath. Radiant heating problems are also discussed.
Finish plaster problems. Comparable to the base coat chapter, in cludes temperature and ventilation control, working conditions, guide to the use of colored finishes and exterior finish plasters.
Partition systems. All the old and the new systems of partition con struction described and illustrated in detail. Brings the contractor, builder or architect right up to date on the new economical partitions and their premium features for all types of structures.
How to inspect a plaster job. Gives a specific list of what to look for when inspecting a plaster job. Especially helpful to architects, super intendents and to builders.
A copy of the new Red Book of Good Lathing and Plaster ing Practice is available through RED TOPICS magazine (use attached order card) or any USG sales representative.
Left: Local U. S. Gypsum sales representative George Brunner, discusses the new USG Woll Furring Bracket with Norman Quinn, plastering con tractor, at a table of exhibits of new products on display at the South
Bend meeting. Dale Brittain, president of the local plasterers' union is at far left next to Clarence Wilcox, union secretary.
Right: E. R. Spilsbury, USG's Indiana District Manager from Indianapolis makes a point to an unseen listener, as Ray Riffel, plastering contractor, helps himself to refreshments which were provided, following the meeting.
NOTICE: iThe following list of trade marks used in RED TOPICS magazine are owned and/or registered by the UNITED STATES GYPSUM COMPANY in the U. S. Patent Office, and are used by it to distinguish the products of its manu facture: USG (metal lath), RED TOP (plaster, lime), ROCKLATH (plaster base), PYROBAR (gypsum partition tile), IVORY (finishing lime), GRAND PRIZE (finishing lime), CHAMPION (gouging plaster), STAR (gauging plaster), CHESHIRE (finishing quicklime), ADAMANT (gypsum liner board), MORTA5EAL (masonry lime), SNOW ORIFT (Time), FREFLOTE (loth clips), BRIDJOINT (lath clips), SABINITE. acoustical ploster), BONDCRETE (gypsum plaster), ORIENTAL (interior finish, exterior stucco), BRACE-TITE (lathing system), STRUCTO CAL plaster), HYDRO* CAL (Super strength gypsum cement), TRUSSTEEL (studs), THE RED BOOK (pub lication
11
a cf a
03
iU t-*
o
ed.Statst^C rnPortage')
DO NOT REMOVE
PAID Chicago, Illinois Permit No. 780
^
ISS!uft13J9SZ'
Misjrf
Sa^ZIN^is^pablishetto
1 fft%>nri_e.c..<tsofr fin&.
Sr.**edltS jilrJLkL^ i ilasteringfby#
iK<YPSUyyi
. W&A'darrrs! Street .
Ghitiigti6f;llirnoi-
^tiantAI SAITIMOR HRMINGHA ioston'I lUFFAial
...
IHARlOTTEs :HiCAGO^|
IINCINNAtT; riEVEiAtlc^g )AiiAs:i|^
JENVER^v^^^^i )ETR^;i^^p
SRAND^APID? HARRISBURG^
HOUSfOK NDIA NAPOtl ACKSdlMVIlir :ANSAS.a OS'AtJGE
aiiwauke
AINNEAE
'- -'&Si
HEWAR
4EY^%gg 3AKLAF&
XlAHOti$& - ; 4-....
)MAHA.^ HILADElPHli HOENJ^I
ITTSBURGt ORTlANb/SRE
ROVIDENC ICHMpVypI^
T. louis: iAC.RAME$f<| .AiriAKE^ iAN^^*"* ;eatts'
iu&Hj, I authored the introduction to your
NEW RED BOOK OF PLASTERING PRACTICE
and what ! said there
is worth repeating!
This Book is published as a guide to good lathing and plastering practice on the job. Why? Because experience has proved that good procedure com bined with good U.S.G. materials produces more satisfied builders and owners. But why mince words ? The cold truth is that a good plastering job is still the most potent sales promoter we in the plas tering industry possess!
This book is designed for on-the-job use by Con tracting Lathers and Plasterers and Journeymen La tiiers and Plasterers--all in the interest of helping you turn out your finest plastering work, jobs that conform with whatever specifications and requirements are given, jobs that really sing out "Plaster--to be sure!''''
Speaking of being jure, let me remind you that any one of the distinguished family of U.S.G. trademarks gives you good reason to feel sure of your materials-- sure on three important counts: 1. Sure of uniformly high quality put there by a company whose quality control methods are a standard for the industry, 2 Sure of a product painstakingly improved, rigidly tested to bring you the full advantages of modern de velopment and research, 3. Sure of a product accepted by trade and customers alike--for the trademarks of U.S.G. are known and trusted everywhere.
I know you'll use this book to win even wider accept ance for the idea that ui building it's plaster to be sure!
Write me for your free copy
wr?>i. :^wm
United States Gypsu
For Building For Industry Gypsum lime Steel Insulation Roofing Paint
O vl