Document g2K63rp4EvRyvZ4agYmxBOXOq
'? i
Monsanto
=: s.iiL:c:oNi
SAC Committee
:-?SlsC: :o
August 18, 1981
SAC Minutes of Meeting 8/13/81
G. W. Daues, Chairman A. Glass
D. E. Kaldenberg C. F. Navarrete S. G. Pappas
PMSB
LAINTIFF'S EXHIBIT
SAFETY PROCEDURES
GLT memo to staff, 7/20/81 - How can we maintain high level of knowledge and use of our procedures in the field?
SAC recommends each general superintendent give the plant manager a plan of how he will improve the communications on plant procedures within his group by September 15, 1981. Then, the general superintendent will be expected to report at the monthly PMSB meeting or at a staff meeting.
INTERLOCKS
The interlocks in the Texas City plant are listed on the attached table. A review of this list was requested by SAC at the July PMSB meeting. No changes were reported to SAC. We are, therefore, assuming that all who have interlocks are satisfied with the authority level for bypassing as described in the list.
TECFACTS
This bulletin produced by S&PP in St Louis contains technical information and is regularly sent to LP&S and certain engineering personnel. Attached is a February 27, 1981 issue on "Unique Safety Features". After review of this bulletin and discussions with the LP&S supervisor, SAC recommends that general superintendents and manufacturing superintendents be put on the distribution for this interesting safety bulletin.
SC 13353
LAM014573
STG 2430323
2- -
OPEN-TOED SHOES
It was brought to SAC's attention that people in operating areas have been observed wearing open-toed shoes. This is clearly a violation of our safety rules. However, there are areas which may or may not be considered as operating areas. SAC did not feel it was advisable to attempt to define precisely where an operating area begins or ends.
Rather, SAC recommends that problems such as these be handled by the line organization.
^f-j <!L
G. W. Daues
sc 13354
LAM014574
ST& 243032^
(
TEXAS CITY PLANT SUMMARY OF INTERLOCK INFORMATION
A--1
INTERLOCK
S/U Rx, Air heaters and WOB's
Flash back steam to WOB's
Delunge System on Pump Alleys, Tanks, C.T.
Process Interlock
DEPARTMENT AN AN AN
AN
Process Interlock
Low Reformer Fuel
Electrical Interlock Electrical Interlock
(Emergency)
MEOH MEOH
SM SM
Process Interlocks Desuperheating Water
SM Util
984C6-6
Util
Sequences Low pressure S/D of IBY/HCN Feed to RX Tenor or TBA RX/hydrol Low RX temp Low Circ of RX Low HCN Flow Low ACH Flow HCN/ACH Ratio
LA
TBA TBA
LN LN LN LN LN
APPROVAL LEVEL
Supv 8 hours Supv 8 hours Operator
Supv
DONE BY (HOW)
Operator Operator Operator
Operator
Supv 8 hours Supv 8 hours CO or Board Operator Supv Supv Nite Supv
CO Electrical & Operating Supervision Electrical Foreman & Operating Supv & Supv Operator
Jumper wire oper or maint?
Operator Operator Electrician CO & Elect, called to close cabinet Operator Operator
Operator
Operator
Supv CO Supv Supv Supv Supv Supv
LAA/1014575
Operator Operator Operator Operator Operator Operator Operator
SC 13355
STG 2430325
Summary of Interlock Information Page A-2 June 16, 1981
INTERLOCK
DEPARTMENT
Low Acetone Flow
ACY
Low HCN Flow
ACY
High Temp
ACY
Low Caustic Flow
ACY
Low Agitation
ACY
Filter Interlocks
ACY
1st Stage Concentrator
ACY
Hi RX Temp
, HDPE
Fenwall Systems
HOPE
C^Hih Temp Cj^ Low Pressure
HDPE HDPE
Low Pressure
HDPE
Line 3 Extruder/ Pelletizer
HDPE
Line 3 Extruder/ . Lo Water Flow
HDPE
Line 3 Extruder/ A]9 Dryer
HDPE
Line 2 Extruder/ Pelletizer
HDPE
Various Interlocks on Bench Units
PT
APPROVAL LEVEL CO CO CO CO CO CO CO Never by-passed Supv Supv Supv Supv
CO
CO
Supv
Supv
Only By-passed on Start-up
DONE BY (1 Operator Operator Operator Operator Operator Operator Operator
--
Operator Operator Operator Operator
Operator
Operator
Operator
Operator
SC 13356
LAM014576
STG 24-30326