Document g29wQEk3okdXoyRZ5dQ3gVOyG
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Appendix B
Photograph Log
Unique Project Identifier: 3E22WN014A
1
Inspection Date: March 24, 2022
ED_019088A_00000085-00001
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Sediment
03.24 2022 10
Photograph 1.
(DSCN3938.JPG) View of stormwater inlets in the south area of the site. Note
the sediment adjacent to the stormwater inlets.
Sediment
03:24 2022 104
Photograph 2.
(DSCN3939.JPG) View inside the stormwater inlet shown in Photograph 1 of
sediment collected by the filter fabric.
Unique Project Identifier: 3E22WN014A
2
Inspection Date: March 24, 2022
ED_019088A_00000085-00002
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Collapsed
Silt Fence
4202-10-05
Photograph 3.(DSCN3941.JPG) View, facing west, of curb inlets in the south area of the site.
Note that the silt fence was collapsed.
Unstabilized
Soil
Collapsed
Silt Fence
03.24.2022 10:00
Photograph 4.(DSCN3942.JPG) View, facing north, of curb inlets in the south area of the site.
Note that the silt fence was collapsed, and surrounding soil was unstabilized.
Unique Project Identifier: 3E22WN014AInspection Date: March 24, 2022
3
ED_019088A_00000085-00003
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Worn and Full
Filter Sock
Photograph 5.
(DSCN3944.JPG) View, facing northwest, of curb inlets in the south area of the
site. The filter sock appeared worn and inundated with sediment at the time of the inspection.
Collapsed
Silt Fence
Unstabilized
Soil
Photograph 6.
(DSCN3946.JPG) View, facing north, of curb inlets in the south area of the site.
The silt fence had collapsed and the surrounding soil was unstabilized.
Unique Project Identifier: 3E22WN014A
4
Inspection Date: March 24, 2022
ED_019088A_00000085-00004
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Collapsed Silt
Fence
Worn and Full
Filter Sock
Unstabilized Soil
2022 10:07
Photograph 7.(DSCN3947.JPG) View, facing west, of curb inlets in the south area of the site.
The filter sock appeared worn and inundated with sediment, the silt fence had collapsed, and the
surrounding soil was unstabilized.
Inlet
Photograph 8.(DSCN4078.JPG) View, facing south, of an inlet north of the site covered in
debris. The EPA Inspection Team observed that it appeared to receive runoff from the site. It was
unclear where the inlet discharged.
Unique Project Identifier: 3E22WN014AInspection Date: March 24, 2022
5
ED_019088A_00000085-00005
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Manhole
Photograph 9.
(DSCN4077.JPG) View of a manhole above the inlet shown in Photograph 8
covered in debris north of the site.
Stormwater
Flow
Photograph 10. (DSCN4081.JPG) View, facing east, of an inlet north of the site, on 28th Street
SE, that appeared to receive stormwater from the site. The EPA Inspection Team observed
stormwater flow at the time of the inspection. It was unclear where the inlet discharged.
Unique Project Identifier: 3E22WN014A
6
Inspection Date: March 24, 2022
ED_019088A_00000085-00006
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Photograph 11. (DSCN3996.JPG) View, facing west, of two full uncovered drums in the north
area of the site.
Hole
Photograph 12. (DSCN3999.JPG) View, facing north, of an uncovered drum in the north area of
the site. A rusted hole revealed the drum was filled with soil.
Unique Project Identifier: 3E22WN014A
7
Inspection Date: March 24, 2022
ED_019088A_00000085-00007
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Photograph 13. (DSCN4002.JPG) View, facing north, of three full uncovered drums in the north
area of the site.
Photograph 14. (DSCN4011.JPG) View, facing west, of three full uncovered drums in the north
area of the site.
Unique Project Identifier: 3E22WN014A
8
Inspection Date: March 24, 2022
ED_019088A_00000085-00008
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Drum
Photograph 15. (DSCN7756.JPG) View, facing northeast, of an uncovered drum in the north area
of the site.
Drum
Drum
Photograph 16. (DSCN4013.JPG) View, facing east, of uncovered drums in the north area of the
site.
Unique Project Identifier: 3E22WN014A
9
Inspection Date: March 24, 2022
ED_019088A_00000085-00009
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Open Container
prolan
03:24 2022: 10:44
Photograph 17. (DSCN4029.JPG) View, facing south, of approximately 24 partially covered
containers labeled as porcelain in the north area. One of the containers was open.
45
Photograph 18. (DSCN4034.JPG) View, facing north, of approximately 30 uncovered bags of
cement in the north area of the site. Approximately 8 of the bags were opened.
Unique Project Identifier: 3E22WN014A
10
Inspection Date: March 24, 2022
ED_019088A_00000085-00010
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Photograph 19. (DSCN4042.JPG) View, facing east, of approximately 15 uncovered boxes and
buckets of electronics in the north area of the site.
LIGHTING
WAC Responsible
1084.2022 10:48
Photograph 20.
of the site.
(DSCN4043.JPG) View of a bucket that contained paint residue in the north area
Unique Project Identifier: 3E22WN014A
11
Inspection Date: March 24, 2022
ED_019088A_00000085-00011
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
10324 2022 10:49
Photograph 21. (DSCN4044.JPG) View of an uncovered and unlabeled bag in the north area of
the site.
No Perimeter
Control
Photograph 22. (DSCN3926.JPG) View, facing northeast, of a silt fence along the east perimeter.
The EPA Inspection team did not observe perimeter controls at one location along the southeast
perimeter.
Unique Project Identifier: 3E22WN014A
12
Inspection Date: March 24, 2022
ED_019088A_00000085-00012
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
On - site
Silt Fence
Off - site
03 24.2022 113
Photograph 23. (DSCN4069.JPG) View, facing south, of a silt fence along the north perimeter.
Photograph was taken off - site.
2022 10:51
Photograph 24. (DSCN4053.JPG) View, facing south, of a silt fence along the west perimeter.
Unique Project Identifier: 3E22WN014A
13
Inspection Date: March 24, 2022
ED_019088A_00000085-00013
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
24.2012-10-07
Photograph 25. (DSCN3948.JPG) View, facing northwest, of a filter sock along the west
perimeter.
Photograph 26. (DSCN4004.JPG) View, facing west, of a wash rack at the stabilized
construction entrance at the northwest corner.
Unique Project Identifier: 3E22WN014A
14
Inspection Date: March 24, 2022
ED_019088A_00000085-00014
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Teel Construction,
Inc. Sign
TEL
03:24 2022 09:40
Photograph 27. (DSCN3919.JPG) View, facing north, of the paved entrance that led to the
disturbed area of the site. A Teel Construction, Inc. sign was posted at this location.
03.24 2022
Photograph 28. (DSCN4068.JPG) View, facing northeast, of the stabilized construction entrance
at the northwest corner of the site. Permit - required elements were not posted on a sign at this
location.
Unique Project Identifier: 3E22WN014A
15
Inspection Date: March 24, 2022
ED_019088A_00000085-00015
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Track - Out
03.24.2022 09:57
Photograph 29. (DSCN3924.JPG) View, facing north, of the paved entrance that led to the
disturbed area of the site. Note the sediment track - out along the entrance.
No Perimeter
Control
03.24.2022 13:55
Photograph 30. (DSCN3925.JPG) View, facing southeast, of a location that lacked perimeter
controls. Pooled stormwater, debris, and sediment were observed downgradient of the location.
Unique Project Identifier: 3E22WN014A
16
Inspection Date: March 24, 2022
ED_019088A_00000085-00016
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
No Perimeter
Control and
Unstabilized Soil
Photograph 31. (DSCN3934.JPG) View, facing north, of a location at the southeast corner of the
site that lacked perimeter controls. Unstabilized soil was adjacent to the location.
Trash
Pooled
Stormwater
Unstabilized
Soil
Photograph 32. (DSCN3927.JPG) View, facing east, of the sediment - laden stormwater pooled at
the southeast corner of the site. Note the unstabilized soil and trash upgradient of the pooled
stormwater.
Unique Project Identifier: 3E22WN014A
17
Inspection Date: March 24, 2022
ED_019088A_00000085-00017
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Trash
Stormwater
Flow
03 / 14-2022 09:59
Photograph 33. (DSCN3928.JPG) View, facing east, of trash upgradient of the pooled
stormwater at the southeast corner of the site, as shown in Photograph 32. Stormwater flowed
from this location downgradient to the pool.
Stormwater
Flow
Trash
Photograph 34. (DSCN3929.JPG) View, facing southeast, of the sediment - laden stormwater
pooled at the southeast corner of the site. The pool contained trash and was downgradient of the
locations shown in Photographs 31 through 33.
Unique Project Identifier: 3E22WN014A
18
Inspection Date: March 24, 2022
ED_019088A_00000085-00018
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Trash
Photograph 35. (DSCN3930.JPG) View, facing south, of the sediment - laden stormwater pooled
at the southeast corner of the site. Trash was located downgradient of the pool.
Trash and
Debris
Photograph 36. (DSCN3931.JPG) View, facing south, of trash and debris downgradient of the
stormwater pooled at the corner of the site. The southeast corner of the site did not have perimeter
controls.
Unique Project Identifier: 3E22WN014A
19
Inspection Date: March 24, 2022
ED_019088A_00000085-00019
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
No Perimeter,
Controls
Sediment
Photograph 37. (DSCN4055.JPG) View, facing west, of the west perimeter near the southwest
corner that lacked perimeter controls. Note the sediment that traveled off - site.
Sediment
03.24.2022 11.05
Photograph 38. (DSCN4060.JPG) View, facing north, of sediment transported off - site from the
west perimeter. The location lacked perimeter controls and is on the other side of the wooden
fence of the location shown in Photograph 37.
Unique Project Identifier: 3E22WN014A
20
Inspection Date: March 24, 2022
ED_019088A_00000085-00020
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Unstabilized Soil
Photograph 39. (DSCN3951.JPG) View, facing northwest, of a location along the west perimeter
that lacked perimeter controls. Unstabilized soil was adjacent to the perimeter.
No Perimeter
Controls
Unstabilized
Soil
24.2022 10
Photograph 40. (DSCN3952.JPG) View, facing northwest, of a location along the west perimeter
that lacked perimeter controls. Unstabilized soil was adjacent to the perimeter.
Unique Project Identifier: 3E22WN014A
21
Inspection Date: March 24, 2022
ED_019088A_00000085-00021
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
No Perimeter
Controls
Unstabilized
Soil
22022
Photograph 41. (DSCN3953.JPG) View, facing west, of a location along the west perimeter that
lacked perimeter controls as shown in Photograph 40. The EPA Inspection Team observed
unstabilized soil adjacent to the perimeter.
Sediment and Debris
Photograph 42. (DSCN4061.JPG) View, facing north, of sediment and debris transported off - site
along the west perimeter. The location lacked perimeter controls and is on the other side of the
wooden fence shown in Photograph 40.
Unique Project Identifier: 3E22WN014A
22
Inspection Date: March 24, 2022
ED_019088A_00000085-00022
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Unstabilized No Perimeter
Soil
Controls
STRITTMATTER
03: 24: 2022 10.90
Photograph 43. (DSCN3954.JPG) View, facing west, of a location along the west perimeter that
lacked perimeter controls. The EPA Inspection Team observed unstabilized soil adjacent to the
location.
03-24 2022 11.06
Photograph 44. (DSCN4062.JPG) View, facing east, of a location that lacked perimeter controls
along the west perimeter. The location is on the other side of the wooden fence of the location
shown in Photograph 43. The photograph was taken off - site.
Unique Project Identifier: 3E22WN014A
23
Inspection Date: March 24, 2022
ED_019088A_00000085-00023
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Sediment
24-2022-11-07
Photograph 45. (DSCN4063.JPG) View, facing south, of sediment located off - site adjacent to the
west perimeter. Photograph was taken off - site.
Photograph 46. (DSCN4014.JPG) View, facing south, of stormwater pooled adjacent to the mid-
west perimeter in the north area of the site.
Unique Project Identifier: 3E22WN014A
24
Inspection Date: March 24, 2022
ED_019088A_00000085-00024
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Portable Toilet
Photograph 47. (DSCN4016.JPG) View, facing south, of stormwater pooled adjacent to the mid-
west perimeter in the north area of the site. Note the portable toilet adjacent to the mid - west
perimeter. The EPA Inspection Team did not observe perimeter controls at this location.
Sediment and Debris
Photograph 48. (DSCN4017.JPG) View, facing east, of stormwater pooled adjacent to the mid-
west perimeter in the north area of the site. Note the sediment and debris. The EPA Inspection
Team observed perimeter controls at this location.
Unique Project Identifier: 3E22WN014A
25
Inspection Date: March 24, 2022
ED_019088A_00000085-00025
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Sediment
Photograph 49. (DSCN4022.JPG) View, facing south, of the mid - west perimeter downgradient
of the pooled stormwater in the north area of the site shown in Photographs 46 through 48. Note
the sediment. The EPA Inspection Team did not observe perimeter controls at this location.
Silt Fence
Photograph 50.
(DSCN4024.JPG) View of a silt fence in the stormwater pooled in the north area
of the site shown in Photographs 46 through 48.
Unique Project Identifier: 3E22WN014A
26 26
Inspection Date: March 24, 2022
ED_019088A_00000085-00026
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Photograph 51. (DSCN4019.JPG) View, facing south, of a portable toilet located adjacent to the
mid - west perimeter in the north area of the site. The portable toilet did not have a containment
pan or have any other observable secondary containment.
Sediment and Debris
Photograph 52. (DSCN4065.JPG) View, facing north, of the mid - west perimeter downgradient of
the portable toilet. The location was on the other side of the wooden fence of the location shown
in Photograph 51. Note the sediment. Photograph was taken offsite.
Unique Project Identifier: 3E22WN014A
27
Inspection Date: March 24, 2022
ED_019088A_00000085-00027
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Sediment
NATIONAL
08-24 2022 10-54
Photograph 53. (DSCN4058.JPG) View, facing east, of the south perimeter that lacked perimeter
controls. Note the sediment that led offsite.
youran
Sediment
gradin
03.24.2022 11:05
Photograph 54. (DSCN4059.JPG) View, facing east, of the south perimeter that lacked perimeter
controls. Note the sediment transported offsite. Photograph was taken offsite.
Unique Project Identifier: 3E22WN014A
28
Inspection Date: March 24, 2022
ED_019088A_00000085-00028
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Sediment
Photograph 55. (DSCN3950.JPG) View, facing northwest, of the filter sock along the west
perimeter that had accumulated sediment above one - half the height of the filter sock.
Sediment and
Debris
822 10
Photograph 56. (DSCN3966.JPG) View, facing north, of sediment and debris in the mid - east area
of the site downgradient of a stabilized stockpile.
Unique Project Identifier: 3E22WN014A
29
Inspection Date: March 24, 2022
ED_019088A_00000085-00029
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Erosion
Sediment and
Debris
Photograph 57. (DSCN3967.JPG) View, facing west, of erosion, sediment, and debris
downgradient of a stabilized stockpile.
Collapsed Silt Fence
03.24 2022 10:15
Photograph 58. (DSCN3968.JPG) View, facing west, of collapsed silt fences downgradient of a
stabilized stockpile.
Unique Project Identifier: 3E22WN014A
30
Inspection Date: March 24, 2022
ED_019088A_00000085-00030
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Erosion
Photograph 59. (DSCN3969.JPG) View, facing east, of erosion by the mid - east perimeter. The
silt fence was undercut by the erosion.
Erosion
Photograph 60.
(DSCN3971.JPG) View of erosion underneath the silt fence shown in
Photograph 59.
Unique Project Identifier: 3E22WN014A
31
Inspection Date: March 24, 2022
ED_019088A_00000085-00031
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Gully
Photograph 61. (DSCN3973.JPG) View, facing east, of a gully off - site downgradient of the
erosion shown in Photographs 59 and 60.
Collapsed Silt Fence
Photograph 62. (DSCN3977.JPG) View, facing east, of collapsed silt fencing along the east
perimeter.
Unique Project Identifier: 3E22WN014A
32
Inspection Date: March 24, 2022
ED_019088A_00000085-00032
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Collapsed Silt Fence
Photograph 63. (DSCN3980.JPG) View, facing northeast, of collapsed silt fencing along the east
perimeter as shown in Photograph 62.
14872
Photograph 64. (DSCN4026.JPG) View, facing south, of an uncovered and overflowing
dumpster.
Unique Project Identifier: 3E22WN014A
33
Inspection Date: March 24, 2022
ED_019088A_00000085-00033
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Uncovered
Construction Waste
Photograph 65. (DSCN4028.JPG) View, facing south, of uncovered construction waste adjacent
to the dumpster shown in Photograph 64.
Collapsed Silt Fence
03 24.2022 10
Photograph 66. (DSCN3985.JPG) View, facing north, of the steep slope at the north area. Note
the collapsed silt fence along the east perimeter.
Unique Project Identifier: 3E22WN014A
= 4 34
Inspection Date: March 24, 2022
ED_019088A_00000085-00034
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
3.24.2022
Photograph 67. (DSCN3986.JPG) View, facing north, of the north perimeter downgradient of the
steep slope.
Trash
3.24.2022 11.30
Photograph 68. (DSCN4070.JPG) View, facing south, of the north perimeter downgradient of the
steep slope. Note the trash. Photograph was taken offsite.
Unique Project Identifier: 3E22WN014A
35
Inspection Date: March 24, 2022
ED_019088A_00000085-00035
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Trash
Photograph 69. (DSCN4072.JPG) View, facing south, of stormwater pooled north of the site's
north perimeter downgradient of the steep slope. Stormwater flows downgradient from this
location. Note the trash. Photograph was taken offsite.
Stormwater
Flow
Photograph 70. (DSCN4071.JPG) View, facing south, of stormwater pooled north of the site's
north perimeter downgradient of the steep slope. The EPA Inspection Team observed stormwater
flow from the pool shown in Photograph 69 downgradient to this location during the inspection.
Photograph was taken offsite.
Unique Project Identifier: 3E22WN014A
36
Inspection Date: March 24, 2022
ED_019088A_00000085-00036
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Stormwater
Flow
Photograph 71. (DSCN4073.JPG) View, facing east, of stormwater pooled north of the site's
north perimeter downgradient of the steep slope. The EPA Inspection Team observed stormwater
flow from the pool shown in Photographs 69 and 70 downgradient to this location during the
inspection. Photograph was taken offsite.
Stormwater
Flow
Photograph 72. (DSCN4074.JPG) View, facing north, of debris downgradient of the pool shown
in Photographs 69 through 71. Stormwater flowed through the debris before reaching the
stormwater inlet in Photograph 10. Photograph was taken offsite.
Unique Project Identifier: 3E22WN014A
37
Inspection Date: March 24, 2022
ED_019088A_00000085-00037
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Trash and Debris
24 2022 11
Photograph 73. (DSCN4079.JPG) View, facing east, of trash and debris collected north of the
site. Stormwater flowed from the pooled stormwater shown in Photograph 69 through 71
downgradient through the trash and debris. This location is downgradient of the location shown in
Photograph 72. Photograph was taken offsite.
Trash and Debris
Stormwater
Inlet
Stormwater
Flow
03 2 22 11:31
Photograph 74. (DSCN4080.JPG) View, facing east, of trash and debris collected north of the
site. Stormwater flowed from the pooled stormwater shown in Photograph 69 through 71
downgradient through the trash and debris to the stormwater inlet shown in Photograph 10. This
location is downgradient of the location shown in Photographs 72 and 73. Photograph was taken
offsite.
Unique Project Identifier: 3E22WN014A
38
Inspection Date: March 24, 2022
ED_019088A_00000085-00038
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Dripping Pipe
Photograph 75. (DSCN4006.JPG) View, facing east, of an unlabeled dripping pipe that ran
underneath the stabilized construction entrance at the northeast corner of the site.
Discharge
03:24 2022
Photograph 76. (DSCN4009.JPG) View of the unlabeled dripping pipe shown in Photograph 75.
The EPA Inspection Team did not observe signs of pollutants originating from the discharge,
such as sediment, foam, or discoloring.
Unique Project Identifier: 3E22WN014A
39
Inspection Date: March 24, 2022
ED_019088A_00000085-00039
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Photograph 77. (DSCN4030.JPG) View, facing north, of an unstabilized uncovered stockpile in
the north area of the site.
Photograph 78. (DSCN4031.JPG) View, facing south, of an unstabilized uncovered stockpile in
the north area of the site.
Unique Project Identifier: 3E22WN014A
40
Inspection Date: March 24, 2022
ED_019088A_00000085-00040
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Cement Bags
03 24.2022 10:45.
Photograph 79. (DSCN4032.JPG) View, facing east, of an unstabilized partially covered
stockpile and the uncovered cement bags in the north area of the site.
Cover
03.24.2022 10 17
Photograph 80. (DSCN4039.JPG) View, facing northeast, of an unstabilized partially covered
stockpile in the north area of the site.
Unique Project Identifier: 3E22WN014A
41
Inspection Date: March 24, 2022
ED_019088A_00000085-00041
Skyland Holdings (2626 Naylor Road SE)
Construction Stormwater Inspection Photograph Log
Photograph 81. (DSCN4040.JPG) View, facing east, of an unstabilized stockpile in the north area
of the site.
03:24 2022 10:50,
Photograph 82. (DSCN4050.JPG) View, facing east, of an unstabilized uncovered stockpile in
the north area of the site. Teel Construction, Inc. representatives stated that they were actively
contributing to the stockpile at the time of the inspection.
Unique Project Identifier: 3E22WN014A
42
Inspection Date: March 24, 2022
ED_019088A_00000085-00042