Document g28E2eJxJ4n289d2njg0Kj21V
Produced JLa canari under seel by order Judqee Peui Riley end Cordon Meeg, October It, 1989, in Jamimon y. A. P. r. et el. 87-L1230
OWENS-CCRNING 7IBERGLAS CORPORATION PRODUCT EEVELOPH21T U0ORATOKI GRAWV7U. OHIO
To: Tros:
Benorandus for Record
i
R. E. Devi* - Granville W. G. Pansiu* - Granville
Subject: MINUTES. IAC. RAD REVIEW GRANVILLE, (HO MOVaa-R 4. 1966
Boveaber 7, 1966 ee: See Distribution list Attached
C
The following is a sunnary of the significant fact*, decisions, and assignoents resulting froa the Industrial and Couaercial Division's Research and Developaent Review conducted at the Owens-Corning Fiberglas Technical Center, Building ifl Conference Rosa, Granville, Ohio on Frida;, Koveaber 4, 1966.
PARTICIPANTS
^/Kansgeacnt - O-CF Toledo
Mr, V. W. Boeschenstein, V.P. Marketing Kr. V. E. Sedgaaan, Quality Standards and Control
Marketing (I A C Division) - O-CF New Tork
Mr. D. W. laid, Vice-President IAC Marketing Division Mr. V. Johnson, Comptroller, IAC Marketing Division
Technical Center - O-CF Granville
Mr. J. E. Thomas. Vice-President Research and Developaent Mr. R. J. McEvoy, Director Research Mr. A. J. Pearaon, Manager General Products Developaent laboratory Mr. J. R. Boeksr, Cost Analyst Mr. R. E. Davis, Supervisor EAI Drvelopoent Mr. V. G. Panslus, Supervisor Architectural and Roofing Development Kr. F. C. Wilson, Manager Produet Testing laboratory Mr. D. 0. Richards, Supervisor, Process Developaent . Project Managers Manufacturing - 0-C? Toledo
Kr. E. V. Smith - General Products Process and Quality Control Manager
Others
Kr. V. E. Deardurff, Supervisor Resale Purchases
j, ij r ' *: j
'
42 002 0125
Maaorandua for Record
2
wccoD^r i, i$ei t 1. 87-L1230
1~
* -- --------
1 by ordr t Maaq,
v- * p- q,
w
Mr. Ladd reported on the status of tolas for 1966 and projected eales activity for 1967. Currant talas art running approximately loZ. In total, ahead of 19$5 with the exception of Sound Control and Distributor Sales which art somewhat behind last year. In'spit* of a downward trend of overall construction activity forecast for 1967, 2&C Olv. projects talas of $114,000,000 as compared to estimated 1966 sales of $105,000,000.
It vas also reported that approximately 92I of current talas la derived froa products developed prior to 1961 and tha balance froa products developed in the past five years. Ihosa produets developed since 1961 include: Bi-Teaperature Insulation; Multi-Tezp; Cold Storage Stud; Self Sealing lap; I.S. Board; Bated Tile ($250,000 loss in 1966); Fissured Tile and Board; Gravel Stop; Duet Systeas; and Aeroflex.
*
Failure to Bake a significant penetration in the duet market vas attributed to the lack of having a suitable flexible and rigid round duct. The lack of a 4 ail vinyl prevented a greater participation in the aetal building insulation market.
Resoonsibilitv
Iter No.
Action Date
Action
General
t
1
1
Fansius e
1m
Non-Moisture Sensitive Tare
F. D. Meyers
2 11-15-66
J. E. Boynton 3 31-21-66
F. C. Wilson
4
m
Eon-?5oisture Sensitive Cover
J. S. Boynton
5
11-30-66
Fansius reported overtll roofing and sound control expenditures to be within budgeted funds by year end.
901 for 4th bushing for 625 aat aaehine to be submitted for approval.
Detailed Test Marketing Program to be prepared.
kr. Wilson agreed that a slx-aonth test marketing program for 625 tape vas ade quate for evaluation purposes.
A F.O.R. is to be prepared to resolve wind blow-off problems. (This is not necessar ily related to 625 cover).
!
1: I'
ii 1 ; ii 1r!'<t; 1. i! i
1
F. C. Wilson
6
12-30-66
Test methods and equipment designs are
t
required to determine adequacy of insula
tion to satisfy wind blow-off requireoeots.
(On-the-job and agency requireaenta).
Manufacturing IB. . Boyd)
7
10-25-66
Report due covering plan and cost of putting 625 facility at Santa Clara and
1
Anderson.
42 002 0126
Produced Xa et<ra undr 1 by ordr e Judges Peul Riley end Cordon Maq, October U, lf9, In Jamison v. a. p. r.t el. 87-L1230
L
Resaonsibilitr V. Staith
Item Bo. 8
V. E. Sedgeman
i J. B. Boynton A W. A. leek
9 30
Action Ik to 12-30-66 12-30-66 12-15-66
Acoustical Systems Pis*.'.si oruf re . V. fcith
n
11-1S-66
O
V. A. leek
Dimensional Grid V. G. Pansius
12 13
31-18-66 31-25-66
V. A. lk
1* 12-1-66
Acoustical Product Improvement
V. G. Ptnsius
15
12-15-66
Action
Dust problem on bett-split AF fer 1/2<U> insulation to bo resolved.
The 625 typo product Defied for Perms Ply 6 is to bo dofiaod..
Marketing is to dofino their require sents of an hourly rated eeiling/roof aystaa. i.o. typos of constructions they vish to pursue. (Typo of fill, typo of form board, typo of coiling board, with or without lights, etc.)
A nev P.O.R. is required.
A sooting is to bo sot up between Marketing, Xsnufseturing, Quality Control, Production Planning and Product DevelopB#nt to raviav ordering procedures, ship ping. Branch responsibilities, Com. Center responsibilities, etc.
A detailed forecast of projected requireBent* by itea, of all purchased Baterials Bust be given to Purchasing.
D. V. Ladd is to have confirmation of data "freeing Jig" la available for demonstration, Ladd to arrange meeting. B. V. Smith to send objective teaa to evaluate fabrication. Acceptance or rejection to be specifically detailed.
Anticipated sales volume is to be de termined along with test marketing plans.
Results of modifications to pin perf. rolls evaluated - by 12/15* Unless significant improvement apparent, present pin perf. patten to be used nationally. Vo further work to be done.
42 002 0127
e?/7
Maaoraadua for Record
.U
\
Produced
cimn undar tal by ordar
Judgaa Pmi
*nd Gordon Maag,
October II, 100*# in Jamleon v. a. p.
c l. 07-1,1230
noveaner 7* i.yoo
lesnonsibilitr V. C. Prnsius
Ztes No. 16
Action Date 12-31-66
I
V. 0. Pens!us F. C. Wilson
17 12-31-66
F. C. Wilson F. C. Wilson
W. G. Pansius
IB 12-2-66 19 21-30-66
20 m
Budret Davis
21 At Once
Ugh Tncperature Insulations
McEvoy Johnson
22
12-15-66
Action
Product Developoent to slutto effect" of renoving large fissures fros fissuring roll. Hilt is a nanufaeturing responslblllty and la being undertaken as a posslblo solution to reduce fluking, chipping, and edge dsnsgo of fissuro tils and bosrd.
Tenporaiy policy ro TL backing is that all acoustlcsl products sold vith Diaonsionalro for use in return air pisnuns sro to bo TL becked. Soiling tests are to be run vlth and without TL becking at variable negative pressures. Results will fore basis of flra policy on TL becking.
Produet Testing to evaluate abuse resist ance of JVescor board and advise.
Product Testing to select a given density for all PF and one for all AF acoustical products. All plants are to oo^sly with density selected.
The I967 acoustical produet line vas presented as stated In D. V. Ladd's aeao of October 13. 1966 with following ex ceptions :(1) Vinyl finish celling board reinstated as optional finish, end (2) textured glass cloth delated froa the line.
Mr. Devis reported the EAI Product Dovelopaent budget oould be balanced by trans ferring regaining I.B.O. and Exploratory funds to Alr-Eaniling Systans. This action was authorised.
The Basic end Applied Research budget for Kaylo is $17,212 over end projected to be $30,000 over b7 the end of the year. Mr. Johnson la to discuss this with rred Swank and resolva the source of these additional funds by U-15-&*
a/s
42 002 0128
Memorandum for Record
5
' Produced is gr undr ...1 By ord.r Judq* Mul *Hr nd Cordon Maaq, octobar is, in', u Jaaiaan v. a. p. c:
1ae ai. 7-L12J0
l~
Woveaber 7* 1966
^jtsponslMH ty All
Item Ro. 23
Vyvarberg Shannon
Vyverbsrg
^Shannon
24 25 26
Shannon Wong
Shannon
Shannon Vyverberg l
I
27
28 29
Action Date
11/30/66 11/30/66 11/30/66 11/30/66 At One*
Action
_
Wayne Johnson explained th* current
situation regarding th* health hazard aspect* of asbestoa relrtforceaent in Xaylo. E* recommended that O-CF move, without delay, to conduct a feasibility atudy for dav* loping a different type of reinforcement in order that w* ean adjust th* product in an orderly manner.
Xr. ladd formally requested that the feasibility study recommended in Item {23 be Included in th* 1967 Basle and Applied
Ssaaarch Xaylo Program. Vyverberg to initiate a P.O.Jt. to eover this work by 11/30/66.
Tyvarberg to meet with the legal Depart ment and recommend to ladd by 11/30/66 an appropriate caution atetenant to be
printed on Xaylo cartons alluding to the asbestoa content.
Shannon to lay out a program including timing and eoata to replace th* asbestos
reinforcement 1a Kaylo with cotton or some other appropriate material, submit to Vyverberg with oopy to Davis by 11/30/66. Marketing strongly stated their desire is to completely eliminate asbestos from Xaylo.
Marketing emphasised that a high tempera ture glass A binder aystarn la a major re quireBeat. Shannon to work with Wong to establish feasibility, courses of action available and an eatimato of the cost
and timing to do. Submit to McSvoy and Vyverberg by 11/30/66.
Mr. ladd emphasised that th* key 1967 ac tivities relating to Xaylo should be tress oorroslon and feasibility of elim
inating asbestos reinforcement.
Xr. ledd stated that th* stress oorroslon Xaylo Project should be continued to the
point of securing DuPont approval, but without work on property improvement. A
.decision will then be mad* on th* desir
ability of moving ahead with th* prooess 901
42 002 0120 J/t
Memorandum for Record
Produced ia camera under eeel by order Judqee Paul Riley and Cordon Haag, October 16, 1909, ifl Jaalaon v. k. 9. G, at al. 07-L123O
t
6 Bovamber 7 1966
Responsibility Yyverberg
Item Ho. 30
Action- Pete 11/30/66
I
Pre-Er-rinecred Bulldlnrs
Rammsnd
31
It Once
Vonr Davis
32 11/30/66 33 At One*
Incombustible Commercial System
Grant Smith
34
11/14/66
^ith
35 At 0bo*
Action
--
Proper* plan to call DuPont ot o prleo
lavol to compensate for ineraosod costs ef the stress corrosiod product. Con sider the dual stockag*. problem and the
tin* lag necessary to neet production schedules following submission of the 901. Submit to Iadd fay 11/30/66.
Hr. Fargo .reported no candidate 4 mil vijyl predict bad passed U.L. to date. Bert candidate will be submitted to UL by mldDecesber. On this basis. Mr. Ladd stated marketing would eontinue negotiating with Cleveland Fabricating for a labeled prod uct.
Dr. Wong stated that a eoeplet* analysis of the 4 nil Vinyl components will be complete by the end of Bovamber. This data will provide c besls for the design of product components is conjunction with outside vendors.
Mr. laid accepted the proposed program for Pro-Engineered buildings for 1967 contained in Soetion 2. Be authorised redistribution of funds to neet this plan by eliminating I.B.O. A Exploratory Pro jects for 1967. Davis to adjust plans by 11/9/66 reflecting this decision.
Mr. Xedd expressed eomplate dissatisfac tion with the response of manufacturing to their assignment to eorreet the con centricity problem noted in Item #5 of the April 28. 1966 RAD Review Minutes. SSL and Inooahustlble Commercial Systems now in jeopardy. Smith directed to seek means of resolving this problem at once. Advise ladd and Davis of plans by 11/15/66.
Davis stated the present 901 to improve the Semi-Automatic Process was not satisfactory as it did not include all sites required, fbith to investigate and insure complate ases.
42 002 0130
JJL.V
Produced in camera under seel by order o
Judge* Paul Riley end Cordon Maeg,
October 16, 19flf, in Jnaieon v. a. r -
et ei. 67-L12J0
11
i
Ueaorandu* Tor Record
w Resoonsibildtv
Vyverberg'
Grant
1
Iter. No. 36
Alr-Eardlinr Svstacs
VtmmnnA
37
KLlaoc
38
Riehxrds langlois
rrr
39 <i0
Tarr Ranzanberger Karzanc
Bwifinn-<
Riehards
41 42 43
44
7
Bovasiber 7, 1966
Action Date
Action
Davl* reported that Vyverberg did not Intend to eove with the Incombustible Conaereial System until the pipe procejs problea is solved.
At Once 3/i/6?
Vl/67
n/ifl/66
VV67 At Once 1V30/66 1V30/66
Eaooond to reviev with ledd the eeonoed.es provided by Boeker concerning the proposed purchase of JX Rigid Round Ifcct.
Couplets all Air Erosion tests on O-CF and affiliated maober duct products and have report issued by lettering to sub stantiate results.
Resolve with Xanufaeturing and Marketing 901 for composite facing aa chine by VV67.
Insure that an adequate Instruction and Data sheet for Plejdble Duet to be ineluded in the Test Marksting Package by 11/18/66.
UL Class I Label on Plejdble Duet.
Investigate new naans of packaging Plejdble Duet. Need smaller. less expensive method.
Investigate nanufacturlng the Plejdble Duet at SdC Unita. Reconaend an action plan to Ladd including coats and tiring 11/30/66.
letter to Ladd outlining eost and tiring to reach the production phase vlth New Rigid Round Duet by 11/30/66. Include estimated Capital
e
{ ! j ' t i
t
! 1 {
42 002 0131 M
Memorandum for Reoord
Produced 1a cawre under seel by order Judge# Paul Riley and Gordon Haag, October 16. 1969. la Jaralmn v. a. p rat el. 67-L1230
t..
6 Bovember 7. 1966
yasnonslbllltT 1?^? p1*""
* Davis
Davis Sanson
Pearson
Item Ko. *5 46
i*7
Action _Dte 11/9/66
11/16/66
Action
i
Hr. laid agreed that the exploratory and Immediate Business Opportunity (I.B.O.) Prograss bo eliminated from the 196? plans. Davit to adjust plans to reflect this directive by 11/9/66.
the ZAC Developnent Prograa for 1967 Is to include the following major projects: Incombustible Cosaerelal Systems, Air Handling Systems. Pre-Engineered Buildings (Including Cold Storage) and Kaylo Improve ment.
Hr. laid requested a single Manager System be established in the Product laboratory on Pre-Engineered Building Programs. This organization to parallel the marketing organization now in offeet. John Minteer heads up the I&C Division Marketing Teas. Pearson, Pansius and Davis to resolve and advise laid by 11/16/66.
The meeting was adioumed at 12:20 PM Kovaaber 4, 1966 subject to the eall of the Chairman (Kr. laid) on a Quarterly Basis.
PEDjWGP vmh
Produet Development laboratory General Products
JJ3-
42 002 0132
Produced lfl camera under feel by order c Judoee Paul Riley end Gordon Meeq. October 1*, 19, In jMliBB v. A. P. c. et el. P7-L1230
i.
ZAC MARKETING PROGRAMS -- EAILO * il
V 1. Stress Corrosion Prevention 2e Improved Breakage 3. 1600 P Max. Temperature 4. Water Rapellency 3* Largs Size Sectional Pipe (14.24") 6. Dimensional Uhifomity 7e Improved "K" Factor 8. Improved Appearance 9 Fittings
42 002 0133
Produced la tmtt under eeal by order < Judqee Paul Rily and Cordon Maaq, October it. 19. la JaalagQ v. a. p. r., at al. I7-L1230
k ..... '
POSSIBLE APPROACHES FOR ELIMINATING ASBESTOS PROM HIGH TEMP INSUIATIONS
4 {
EATLO Replace Asbestos in Eaylo with Glass and/or Rockwool Pibars
FIBROUS GLASS Develop a Che Stap Process for Manufacture of High Tacp Glass Fibar Insulation
BONDED AGGREGATE 1. Develop a Propriatary, Non-Autoclaved, Bondad Aggregate Insulation Product Reinforced withGlass Pibars 2. Licanse Carey-Tacp Proeass
FOAM Davalop a Structural, Inorganic High Taop Foaaad Insulation
WET PROCESS Davalop a Rockwool and/or Glass Rainforcad, Bon-Autodavad Insulation by the Vat froeess Method
42 002 0134
1
i
i
!
iI ! I*
I
I I
I I
I l
I
a
\
-J
0cto6c If, lift, la Jamiv> t 1. 7-LIJ30
i.
r UTLO RESEARCH 4 DEVELCPHEKT
Marketing Dlv. - 6l
Sponsor - J. F. Vyverberg
STATUS
1. Developed Strx Corrosion I>10 Kaylo Batch Formulation
A. Lab Prepared Staples Fsssed duPont 6 Iky ^arrival Test
*
2. Cost Projection on Stress Corrosion Batch
A. Gross Margins Will Be Reduced 0,7* IT Product Marketed as "SPecial" and 0.1* If Extended to All 1-10 Production
3 Plant Trial
)
A. Identify Process Problems Related to Seale Up of Batch froa laboratory to Plant
PLARS
1. Optimise Stress Corrosion Batchto EliminateProblems Encountered in Seale Up froa lab to Plant
2. Full Seale Plant Runs on Both Pipe and Block for duPont Samp!ini; and for Test Marketing
3. Obtain duPont Approral of Plant Poured Stress Corrosion Batch Foraulation
Um Coordinate vith Marketing Test Market Program on Stress Corrosion Inhibited Xaylo
PROCESS EQUIPMENT REQUIREMENTS
Melting, Grinding, Conveying and Storage Equipment for Manu facture of Silicated Glass, '901' Being Prepared by Manufacturing
Ky PRODUCTS POT *67" 1. HO Pip# and ELock for Stalnleaa Steel Applications 2. Ceramic Drying Pallats (U.S. Patent 3*276*09*0
i i 1
*
{
i j i | |
IJ
f `
42 002
13S
cJJ S~
Produc%d la
sn<lc
Judg P*ui Riley And Cord
OtctMobl.er05it-L,12139O99, In
HISTORy-RZDXTION GR ELJXDttTK* OP ASBESTOS IK HIGH TEMP INSULATION
t
\
I943-if7 OI/OCF Coop Program to Develop Gloss Wool Tiber for Kaylo Rainforesaent
1959 MARKETING Requested Research to Develop Bonded Aggregate Product like Careyteop
1960- 61 RESEARCH Develop Bonded Aggregate High Temp Insulation
1961- 62 RESEARCH-PROCESS ENG. Develop & dess Reinforescent for laylo
1962 RESEARCH-UCH Develop Bonded Aggregate Product Based on tJCK Binder System
1962- 63 PROCESS 2NG.-R A R Develop Bonded Aggregate Product Based on R A R Binder System
1962-66 RESEARCH-PRODUCT DEV. Develop. High Temp Glass Tiber Insulation (Multitemp)
1965 RESEARCH Proposed Program to Develop a Proprietary Bonded Aggregate High Temp Insulation - Program Hot Approved
1965 RESEARCH Program to Replace Amosite Asbestos With Cotton Reinforcement
42 002 0136