Document g27V7rRokXVN82BLywxOyGY6V

, ^ ~r t Hmmm * MPtniMtii M. Murphy Ntim * OtcmiMni Redmond Plant Manager Industrial Hygiene fif* Cotfe Division General Manufacturing Oi vision Employee & Indus. Relat. Oil* February 2, 1978 ' tUU Sa**b*r Detroit Forge and Axle 440-00-C Pure Or...* Chrysler Center LIM Numbf 417-05-1 SEMIANNUAL ASBESTOS SURVEY - DEPARTMENTS 78, 80, and 81 On January 9 through 11, 1978, the semiannual asbestos survey was conducted by T. Carapezza, F. M. Borawski and the writer in the Eldon Avenue Axle Plant. This periodic monitoring is required by the OSHA asbestos standard. None of the samples obtained were in excess of the permissible expo sure limit of two fibers per cubic centimeter of air. However, because several employees in all three departments have been exposed to asbestos du6t concentrations exceeding 0.1 fibers per cubic centimeter during this survey and during previous surveys, it is recommended that employees per forming the following operations be given annual physical examinations, which are to include chest x-rays and pulmonary functions tests: Department 78; Excello Grinder Operators Belt Sander Operators Pelletizer Operators Glue Room Employees Loaders of Brake Shoe Ovens #1 and #2 Unloaders of Brake Shoe Ovens #1 and #2 Department 80; Brake Assemblers Gangler Machine Operators Gaugers Loaders of Brake Assemblies into Tote Boxes Shoe and Lever Machine Operators Department 81; Assemblers of Brakes to Axles Inspectors Employees along the assembly line following the assembly of the brakes to axles hm Attachment C. J. Bogucki, M. D. F. M. Borawski F. A. Burnett J. J. Hayes N. McCallum R. D. McIntosh, M.D. W. M. O'Brien Louis Redmond Senior Industrial Hygienist ^^LAINTIFF^ I f EXHIBIT li r u-?*5" Data Sheet Eldon Avenue Axle Plant Airborne Asbestos Dust Concentrations Permissible Exposure Limit Location Department 78; (1) At XLO machine 55-0141 (2) Unloading #2, Brake Shoe Oven (3) Unloading 01, Brake Shoe Oven (4) Loading #1 Brake Shoe Oven (5) Unloading #2 Brake Shoe Oven (6) At XLO Machine 55-0137 (7) Transfers shoes from trays to tubs, Utility Man (8) Loading #2, Brake Shoe Oven (9) Glue Room, Floor inspector (10) Glue Room, Loader (11) Unloading conveyor and loading oven (12) Unloading conveyor at #1 oven and loading #1 oven (13) At Pelletizer Area sample, on nearest grinder #0136, north side not operating - near Pelletizer Area sample, on top of Pelletizer (14) At Pelletizer, also adds Portland cement(Type 1A) Fibers per rc of Air 2.0 < o.i < 0.1 . 0.1 - 0.1 < 0.1 < 0.1 <-0.1 0.1 0.1 0.4 1.6 0.3 0.1 <0.1 <0.1 0.1 Department 80; (15) Line 6, assembler (16) Line 6, assembler and utility (17) Line 8, assembler, small brakes (18) Operator of Gangler Machine #6 (19) Line 7, Brake Shoe assembler (20) Line 9, Brake Shoe assembler (21) Operator of Gangler Machine #2 (22) Line 7, Finished assembly loader (23) Line 9, gauger (24) Line 7, gauger 0.2 0.1 < 0.1 0.6 0.2 0.2 0.5 < 0.1 0.1 <0.1 (25) Line 9, Inspection and loading (26) Line 8, gauger, (L. Body) (27) Line 8, Brake adjuster assembly Department 81; (28) 9i" Line, Mounting brakes to axles (29) 8k" Line, Inspection (30) 8k" Line, Mounting brakes to axles (31) 8fc" Line, Mounting brakes to axles, (32) 7V Line, Mounting brakes to axles, (33) Tk" Line, Nut running, west side west side west side <0.1 <0.1 0.1 <0.1 0.1 <0.1 0.1 <0.1 0.1 The above samples were collected on cellulose ester filters, utilizing MSA Model C Pumps. The fiber counts were made utilizing phase microscopy.