Document evzYp3nw6LJ4o6mjQN1GjEEd4

'I F*OOAU* REPORT .fc KftUMMMQM FtWtT CO.L. Bratsch B *BD.W. Jackson B BD.J. O'Toole B *0 B, W. Corlew ' B B B 8 B 0 R, McCutchan B ' 8 *SV, C. Engman * D C. P. Buckley a H) a' 8 .8 C B a 1 8 8%------------ --: IMSHS. ' . , IMMUtSS. IBATC j MNiMierptci OTttCftt D M.P. Lux Anniston D D. Danna (4) *B J.C. Landwshi 0 D.B. Hosmer/ Nltro P.J. Holtapfel DW.R. Kellogg `O R.E. Howard fend St. BJ, R. Savage TJP.0. DeOarmo * Bw. Papageorge TJT.M. Patrick B Ol.f. Guinn B "D R.L. Wiese 8 2______ ___ tithi AROCLOR POLLUTION - AIR POLLUTION REDUCTION PROGRAM pbrsoknbli W. A. Krull (W, C, Engnan) MfL(Mi Determine levels and define problem areas. As part of the overal PCB pollution control, a study Mas Initiated to measure the Aroolor air pollution levels and develop a program for reduction. A tentative goal of two pounds/day was set at this tine. The present level as measured and/or calculated from the manufacturing department Is about 5-7 pounds/day. Most of this Is due to the sparging of Aroclor blends with nitrogen In the mix tanks. To reduoe the losses to 2 pounds/day or less the following should be done. 1. Blanket the mix tanks Instead of sparging with nitrogen. XDC j/l/TO. 2. Route the relief lines on the batch chlorinatore to the concrete pad. EDC k/l/70. V. (A. Krull Technical Services Dept. /br RONS 056604 COMPANY CONFIDENTIAL INFORMATION TUa Inm.ii | tlM (mwN F Mnuili CiM,--, Ml to >mI>I.M k i.wwkk to IK IlkWiFW mt CsmSIm. h mUIm tol UTmmmIm F MmimIi Cmhiw Met ml HI U nwNm.6 imiiM la. uallM.tiM |nmm m ml MUM. to mmhh SNHT MtorlaMlM. Bltor null la M*l Bln w 4*Mr*w KG M BtV.I/U ' 9lJ70i*tll9(5) -2- December it, 1970 BACKGROUND As part of the overall PCB pollution control, a program was Initiated to define and reduce the level of Aroclor air pollution from the W. 0. Krummrich Plant, This progress report describes the results of this program relative to the Aroclor Production Department, PROBLEM AREAS A survey of the department and consequent sampling and calculations defined these problem areas. Sources 1, Mix tanks (while sparging with nitrogen) Measured Loss Not samp1leZdSSbEut visible loss exists. Calculated Lobb Cay 2. Tanks and loading areas (assuming _ 55 H #/yr production) 0.70 0.10 J. Scrubber stack 0.0C1 0.0A A, Fume removal stack 0.05 0.01 5. Vacuum jets Not sampled. None ob served and condenser should remove most of Aroclor. No calculations. 6, Thermlnol Furnace Not sampled. No visible fumes or odors. No calculations. Estimated Totals - About 7.0 #/day. The relief lines on four batoh chlorinators relieve Into the air creating a potential loss. REDUCTION PROORAM To reduce the loss to two pounds per day, a blanketing system should be applied to the mix tanks. The rupture discs on the batch chlorinators should be routed to the concrete pad to eliminate a possible large loss. H. ft. Krull Technical Services Dept. /br MONS 056605