Document evaYwr6ODNYBKKozawRM2V02p

index 1 CAUSTIC PLANT SAFETY AND TRAINING 1982 TOPIC ACID TRUCK SAMPLING ACID TRUCK UNLOADING ALARM, SPILL, WEEKLY INSPECTIONS AMMON IA PROPERTIES, PRECAUSTIONS,ACCIDENT PROCEDURES AMMONIA SPILL - MASSIVE AMMONIA TRUCK SAMPLING AMMONIA TRUCK UNLOADINGPROCEDURES AREAS, HOUSEKEEPING ' ATTENDANCE, CALL IN PROCEDURE BATTERY MAINTENANCE PROCEDURE 3LINDING/UN6LINDING/BREAKING INTO LINES AND VESSELS THAT HAVE CONTAINED HAZARDOUS MATERIAL BOMB THREAT CABLE TRAYS, PULLING CABLE CABLE TRAYS, WORKING IN CALL IN PROCEDURE, ATTENDANCE CAUSTIC PROPERTIES, PRECAUTIONS, AND ACCIDENTPROCEDURES CELL EFFLUENT BALANCES - CAUSTJC/CA H /CHLORINE CHLOR-ALKALI DEPT. POLICY - REPORTING/INVEST I GATING ACCIDENTS AND INCIDENTS CHLORINE - PROPERTIES, PRECAUTIONS,AND ACCIDENT PROCEDURES CONDUCT, PERSONAL CONNECT/DISCONNECT HOSES TO PROCESS STREAMS CUTTING INTO Or LINES & VESSELS THAT HAVE CONTAINED HAZARDOUS MATER IAL PAGE E-26 E-26 C-I5 F-3 C-24 E-40 E-37 C-31 D-16 - E-34 E-41 % E-52 D-26 D-25 D-16 F-24 D-1 E-43 F-7 D-17 E-21 E-41 00 125849 CONFIDENTIAL index 2 DANGEROUS MATERIAL - PROPERTIES, PRECAUTIONS, ACCIDENT PROCEDURE: AMMON IA CHLORINE HYDROCHLORIC ACID (HCL) HYDROGEN PEROXIDE (H^) NITROGEN NITRIC ACID (HN03) SODIUM HYDROXIDE (CAUSTIC) D.C. BATTERIES, INSPECTION DELUGE GUNS INSPECTION D. I.'S IN CAUSTIC PLANT DISPOSITION OF DRUMS & DRUMMED WASTE MATERIAL DOUBLE BLOCK & BLEED VALVES DRESS CODE DRIVING IN THE DIVISION DRUM CUTTING POLICY E. B.V. (EMERGENCY BLOCK VALVE), INSPECTION EMERGENCY ALARM RESPONSE EMERGENCY COMMUNICATION, WEEKLY TEST EMERGENCY LIGHTS, INSPECTION EMERGENCY POWER (UPS), TEST EMERGENCY RESPONSE (TRAVEL EMERGENCY) EMERGENCY SPILL RESPONSE EPA NON-COMPLIANCES PROCEDURE EPA NON-COMPLIANCES FOR 1978 - 1981 EXPLOSIVE METER, INSPECTION EXPLOSIVE MIXTURE THROUGH OUT PLANT RACIAL HAIR POLICY DO 12S8S0 CONFIDENTIAL. F-3 F-7 F-10 F-13 F-17 F-21 F-24 C-18 C-19 A-2 E-45 E-18 - D-7 D-18 * D-29 * C-18 C-23 C-15 C-18 C-18 D-23 E-1 D-24 A-4 C-17 E-2 D-13 index 3 FUNCTIONS OF SAFETY CHAIRMAN C-2 FUNCTIONS OF SAFETY COMMITTEE GAS TORCHES PROCEDURE, SHUTDOWN/LITE UP C-3 E-16 GOALS FOR 1982 HAIR, FACIAL, POLICY D-13 HARASSMENT, SEXUAL D-19 HOIST, SAFETY INSPECTION C-20 HONEYWELL KEY, USES OF B-26 HOSE AND HOSE STATION, INSPECTION C-16 HOT WORK PERMITS E-50 HOUSEKEEPING AREAS C-31 HOUSEKEEPING, INSPECTIONS . C-14 HURRICANE PROCEDURES E-3 HYDROCHLORIC ACID (HCL), PROPERTIES, PRECAUTIONS, ACCIDENT PROCEDURES HYDROGEN PEROXIDE (H202), PROPERTIES, PRECAUTIONS, ACCIDENT PROCEDURES ' F-10 F-13 HYDROGEN PEROXIDE (H202) TRUCK SAMPLING HYDROGEN PEROXIDE, TRUCK UNLOADING E-14 * E-13 INJURIES (FIRST AID VISITS) 1978 -1981 A-4 INSTALLING NOZZLES IN 50* CAUSTIC TANKS E-56 INSPECTIONS PERFORMED BY: A - SHIFT C-16 B - SHIFT C-17 C - SHIFT C-13 D - SHIFT C-19 F - SHIFT C-20 INSPECTING SHIPS AND BARGES AT MARINE DOCK E-35 INSPECTIONS, WEEKLY INVESTIGATING ACCiDEN~S/!NCI DEN D C7 " ! C ^~ - 1 j^ ^ DO 125851 CONFIDENTIAL C-15 r_-?' LADDERS, WOODEN LADDERS, INSPECTION LANCE, USE OF, FOR STEAM/CONDENSATE HOSES LOADING CAUSTIC INTO SKID TANKS LOCK OUT PROCEDURE LOSS OF ALL RIVER WATER TO PLANT LUBRICATION LOG, WEEKLY MAINTENANCE MINIMUM SAFETY RULES MANLI FT, INSPECTION MIXING OF WATER, CAUSTIC, ACID NITRIC ACID (HN03) PROPERTIES, PRECAUTIONS, ACCIDENT PROCEDURES NITROGEN - PROPERTIES, PRECAUTIONS, ACCIDENT PROCEDURES NON-COMPLIANCE, EPA OFF LOADING TANK CARS INTO T-11 OIL SPILL ORGANIZATION, CAUSTIC PLANT ORGANIZATION, SAFETY OSHA RECORDABLES, 1978 - 1981 OUT OF BLOCK, WORKING OVERLOADED CAUSTIC CARS, UNLOADING AT RACK OVERLOADED TANK TRUCKS OVERTIME POLICY PERMIT ISSUING, PROCEDURE PERSONAL CONDUCT PERSONAL PROTECTIVE EQUIPMENT, INSPECTION PIPEWAYS, WORKING IN PLANT EVACUATION oq POWER FAILURE, TATAL UE:nTx^l PROGRAM, SAFETY INCENTIVE index 4 D-30 C-16 D--21 E-31 E-44 E-11 C-15 C-8 C-20 C-25 F-21 F-- 17 D-24 E-33 D-22 A-3 C-1 A-4 D-27 E-30 E-25 D-5 E-50 D-17 C-6 D-28 C-23 E-12 PSA/PSf'S - 1978 - 1981 PSV ON COMMON HEADER, REMOVAL/INSTALLING POLICY PUMP LOGS PUMP SAFETY CHECKLIST (BY EDO) RED TAGS REPORTS, UNSAFE CONDITION, PRACTICE OR PROCEDURE RESPIRATORY GUIDELINES RESPONSIBILITIES, TRAINING & SAFETY SUPERVISOR ROSEBUDDING CAUSTIC LINES RULES, SAFETY, CAUSTIC PLANT RULES, SAFETY, MAINTENANCE (MINIMUM) RUPTURE OF FIRST EFFECT HEATER OR EVAPORATOR SAFE WORK PERMITS SAFETY COMMITTEE SAFETY COMMITTEE, FUNCTION OF SAFETY INCENTIVE PROGRAM SAFETY LOCKER, INSPECTION OF SAFETY OBSERVER CHECKLIST SAFETY OBSERVER, RESPONSIBILITIES & QUALIFICATIONS OF SAFETY OF SAYBOLT EMPLOYEES SAFETY ORGANIZATION SAFETY RULES, CAUSTIC PLANT SAFETY RULES, MAINTENANCE (MINUMIM) SAFETY SHOWERS & EYEWASH FOUNTAIN, INSPECTION SAFETY MEETING AGENDA FOR 1982 SAMPLING AT MARINE DOCK SAMPLING PROCEDURE, GENERAL SAMPLING TANKCARS . TANK TRUCKS BEFORE LOADING SC5A - AIR BOTTLE INSPECTION SOFA - `-CNTHLY o0 l.?^53 CONFIDENTIAL index 5 A-4 E-24 C-15 C-7/E-50 D-2 C-11 D-31 B-4 D-20 C-13 C-8 E-10 E-50 C-1 - C-3 C-4 - C-17 C-28 C-26 D-14 C-1 C-13 C-8 C-19 B-5 E-35 E-55 E-36 C-1C .Z index 6 SEAT BELT REQUIREMENTS, LA. DIV. SERIOUS INJURY, HOW TO HANDLE SEVENTY-THREE PERCENT (73?) CAUSTIC TANKCAR UNLOADING (PARTIALLY LOADED) SEXUAL HARRASSMENT SHOP MECHANICAL EQUIPMENT INSPECTION SIGNS, BLOCK PERIMETER INSPECTION SKID TANK, LOADING CAUSTIC INTO SPANNER WRENCH STATION INSPECTION SPARKLER FILTER - TAG OUT PROCEDURE SPILLS - 1978 - 1981 SPILL ALARM, WEEKLY INSPECTION S31 LL, AMMONIAC MASSIVE) S=ILL, OIL (CONTAINMENT) SPRINKLER SYSTEM INSPECTION STEAMING OUT PLUGGED CAUSTIC LINES WITHSTEAM HOSE SWAPPING SHIFT DAYS SWITCH GEAR FIRE SUGGESTION POLICY TANK TRUCK RACK OPERATIONS TANK TRUCK, OVERLOADED TOW MOTOR INSPECTION (BLOCK) TRAINING PROGRAM TRANSPORTAT I ON EMERGENCY EQUIPMENT, INSPECTION TRAVEL EMERGENCY (EMERGENCY RESPONSE) TRUCK INSPECTION (BLOCK) TWENTY THREE HUNDRED (2300) VOLT SWITCH GEAROPERATION UNSAFE CONDITION, PRACTICE OR PROCEDURE REPORTS UPS (EMERGENCY =OWER) TEST D-18 C-22 E-29 D-19 C-20 C-16 E-31 C-16 E-42 A-4 C-15 C-24 D-22 - C-19 E-19 ' D-12 E-9 D-15 E-49 E-25 C-17 B-1 C-18 D-23 C-16 -23 C-11 C-16 DO 125854 CONFIDENTIAL USE OF CONDENSATE/STEAM HOSE WITH LANCE VACATION POLICY VALVE, CHAIN OPERATORS, INSPECTION VESSEL ENTRY PROCEDURE: D-1 D-2 D-205 E-7 E-204 TRIPLE EFFECT (E-1A, E0202, E-203) TRAIN II COMPLETE (E-1A, E-202, E-203, E-204) VESSEL ENTRY PROCEDURE - DIV. RULES - CAUSTIC SUPPLEMENT WARMING UP STEAM LINES WHEN TO CALL PLANT SUPERINTENDENT/MAN ON CALL WORK PERMITS WORKING OUT OF BLOCK WORKING IN CABLE TRAYS WORKING IN PIPEWAYS WORKING ON 2300V. SWITCH GEAR (PREPARATION) index 7 D-21 D-9 C-17 H-1 H-4 H-7 H-10 H-14 H-20 H-27 C-30 E-54 D-3 E-50 D-27 D-25 D-28 E-22 125855 confidential