Document evZabqp3Ed63w2V0BvzyNO8ep

OCCUPATIONAL HEALTH PROCEDURE #145 SABINE RITE?. WORKS SAFETY MANUAL ASBESTOS HANDLING AND DISPOSAL Reviewed or Revised 1/17/84 page i of 9 PURPOSE This procedure presents the per missible asbestos dust exposure limits, methods of controlling exposure, respiratory protective equipment, disposal, and methods of handling. The principle sources of exposure to airborne asbestos dust at Sabine River Works have been: 1) Removing old insulation; 2) filter aids; 3) waste dis posal; 4) mixing asbestos cement; 5) cutting transite; 6) removal of clothing after completing asbestos insulating duties; 7) working with asbestos type packing and gasket material. A. DEFINITIONS 1. Asbestos Material - Any material containing asbestos. 2. Particulate Asbestos Material - Finely divided particles of asbestos material. 3. Visible Emissions - Any emissions which are visually detectable without the aid of instruments and which contain particulate asbestos material. 4. Removal - The taking down or stripping of Friable Asbestos Material. NOTES AND REFERENCES ----------------------------------------------- Reference Du Pont Engineer ing Standard S4T. OSHA Regulation, Section 1910.1001 (ETS) dated November 4, 1983, and 1910.141. "Asbestos dust concentrations in air shall not exceed one-half (0.5) fiber, longer than 5 micrometers, per cubic centimeter of air. At no time may the concentration exceed a ceiling of 10 fibers longer than five (5) micrometers per cubic centimeter". DUP 0833633 Z(l(Y72iw If I 11 n IM--iiWia -- OCCUPATIONAL HEALTH PROCEDURE 4145' jg^2of9 ASBESTOS HANDLING ____ AND DISPOSAL 5. Friable Asbestos - Any material that contains more than 1% asbestos by weight and can be crumbl ed, pulverized, or reduced to powder when dry, by hand pressure. (Transite is not friable asbestos material.) .NOTES AND REFERENCES Transite is friable only when it is being cut. 6. Wet method - Sufficiently coated with water to pre vent dust emissions. B. GENERAL RULES 1. Material containing asbestos shall not be used where there are satisfactory substitutes. Any insulation not known to be free of asbestos will be considered to contain asbestos for purposes of this pro cedure. 2. Each job involving the handling of asbestos must be thoroughly reviewed. 3. Insulation to be removed and discarded should be adequately wetted prior to and during removal. Material removed shall not be dropped or thrown to the ground, but shall be carefully lowered to ground level. 4. Each employee handling asbestos or exposed to the dust must wear an approved respirator, trained in it's use, and fit-tested. The 3M respirator, Type 8710 is approved for use, CTI-87-50-450. Contact the Safety Division for other approved respirators and filters. If concentra tions are expected to ex ceed 100 times the TLV, then an atmosphere supply ing respirator must be used. : ttiV^ST.usr'z. *-3n&-- "ELr-.'W OCCUPATIONAL HEALTH PROCEDURE #145 ASBESTOS HANDLING AND DISPOSAL Page 3 of 9 5. Asbestos free insulation will be used on all new or altered facilities. 6. All hand operated or power operated tools which may produce or release asbestos fibers in excess of the permissible exposure limits shall be provided with a dust catching system. NOTES AND REFERENCES Vacuum area daily to prevent accumulation of asbestos dust on ledges, shelves, floors, and machines. Air hoses or dry sweeping is not permitted. 7. Asbestos in the work place must be maintained in a "bound" condition. If asbestos is found in an un bound condition, it must either be removed or re bonded. 8. If there is a delay in doing either of the things required in paragraph 7, caution label as specified in Figure 2, Page 6 of this procedure is required. Monitoring results as outlined in Paragraph G is also required. C. WORK PRACTICES Bonding of asbestos contain ing insulation consists of 1) wrapping with aluminum or plastic sheathing or 2) wrap ping with fiber glass cloth and then either brushing, rolling, or spraying on an insulating mastic material, or 3) application of a bond ing agent, coating, mudding, etc. Small tubing that has been wrapped with asbestos tape or sleeve material must be sealed with a waterproof material such as Lagtone. 1. The minimum requirements for any job involving asbestos are: a) Use of wet method. b) Use approved respirator. c) Proper waste disposal. d) Caution label if unbound asbestos is left over night. Where measurements on a pre vious job of the same or a similar nature demonstrated asbestos concentrations with in allowable limits. Ref. par. E of this procedure Ref. fig. 2 page 8 of this procedure. 2. If the job involves more than two manhours or if unusual dusting is anticipat ed, the following precautions must be considered along with those listed in paragraph C above. D]/f 2007208 a) Monitoring Contract Process Lab, Moni toring Group. DUP 0833635 OCCUPATIONAL HEALTH PROCEDURE #145 Page 4 Qf g ASBESTOS HANDLING AND DISPOSAL b) Use of protective clothing c) Barricades and posting of temporary warning signs. 3. Any job which is classified demolition requires all of the requirements of C.l. & 2. Please contact the Environmental Coordinator. NOTES AND REFERENCES Ref. fig. 1, page 3 of this procedure. Ref. J of this procedure. 1 D. ASBESTOS - MATERIAL MIXING .1 Cement, mortar, coatings, grout, and plaster contain ing asbestos shall be mixed in closed bags or other containers. 2. Any dried out cement should be discarded. Do not attempt to rework it. c. E. WASTE DISPOSAL .1 Pipes and equipment in sulated with asbestos will require special handling to meet waste disposal criteria. a. If the material is stripped in place or immediately after removal, the group doing the work must adhere to the work practices out lined in par. C of this procedure. b. Equipment covered with This can be accomplished by asbestos must be tempor wrapping with polyethylene arily bound and labeled and taping each individual prior to being transported portion that is not in a on the plant. "bound" state. It may be desirable in some instances , i to wrap and tape the entire wagon rather than the in dividual pieces. DUP 0833636 DV) Z007SIC9 OCCUPATIONAL HEALTH PROCEDURE #145 ASBESTOS HANDLING AND DISPOSAL Page 5 of 9 i 1 NOTES AND REFERENCES 2. The Material Recovery Should the MRC personnel discover Center will not accept insulated hardware not labeled, insulated hardware unless it is known to be free the following action should be taken: , of asbestos and is so labeled. 1) If sender is known, have them remove it for stripping in accordance with Paragraph C. ! 2) If sender is not known, then: (a) Maintenance Services will treat it as though it were asbestos and have it removed to #311 T.F. for stripping. 3. Asbestos waste shall be Asbestos contaminated clothing collected and disposed of and throw away respirators shall 1 in sealed, impermeable be handled in sealed labeled bags bags or containers. with instructions for proper CTI-87-03-110. handling. j Caution labels shall be attached conforming to Figure 2, page 6. 4. The Area Mechanical Fore- The Shipping notice must bear man following the job the following: SRW Code-13 should prepare a purchase Description - Use Material, Pri requisition and shipping marily insulation containing notice (SR-630). The asbestos. requisition must include Class I Du Pont ID X05. TDWR Code - 170750 Disposition - Off-Site 5. Until the material is picked up by the vendor, it must be stored in a place where the bags will not be punctured or otherwise damaged. DlJP 0833i When the material is shipped, the responsible Mechanical Foreman must fill out the Part I section of a TDWR Industrial Waste Shipping Control Ticket form, which the carrier truck driver will bring with him for each ship ment or truck load. a &Vi 2007210 ........... ..ii.iii...in..... ii-- ii------------------------ o> CO OCCUPATIONAL HEALTH PROCEDURE #145 Page 6 of 9 ASBESTOS HANDLING AND DISPOSAL F. HYGIENE NOTES AND REFERENCES 1. Separate lockers for work clothes and street clothes must be provided to prevent contamination for known exposure to high level concentrations. 2. Special clothing (coveralls) should also be provided for high concentrations such as spraying and demolition of asbestos insulation. 3. Food, gum, tobacco, or any edibles shall not be con sumed in areas where asbestos is being handled or fabricated. SAMPLING Monitoring is required where employees might be exposed to asbestos dust to determine the amount of exposure. H. IDENTIFICATION OF INSULATION Intervals between monitor ing of samples shall not exceed six months. Contact the Industrial Hygiene Monitoring Group, Building #5 for assistance. 1. All insulation that is not marked is to be handled as containing free asbestos until proven otherwise. 2. All newly installed in sulation will be marked as follows: a. All non-asbestos material should be identified by the vendor with a green stripe. When mate rial is delivered that does not have vendor identifica tion, the contractor 5fiC1&lwill verify that the material is a non asbestos type and , \ DUP 0833638 OCCUPATIONAL HEALTH PROCEDURE #145 ASBESTOS HANDLING AND DISPOSAL Page 7 of 9 NOTES AND REFERENCES will then identify the insulation with a blue stripe as it is installed. b. Where insulation is See Figure 3 for tape speci being replaced in an fication. area of unknown asbestos content, identify the replace ment insulation by a strip of tape placed around the circumference of the pipe furnish at strategic location on equipment pieces. FIGURE 3 c *I Whit* bockgr Blue Utters Tape suppliers are listed in Eng. std. SN 218 P I. CAUTION SIGNS AND LABELS j 1. Signs shall be at all approaches to areas where asbestos concentractions may be above permissible exposure limits. (See Figure 1 below) The signs shall be placed at a sufficient distance to permit an employee to read the signs and take necessary precautions before entering the area. 2. Labels conforming to Figure 2 below shall be used to identify con tainers of raw materials scrap, waste and other products containing asbestos. Vl 2007212 DUP 0833639 OCCUPATIONAL HEALTH PROCEDURE #145 Page 8 of 9. ASBESTOS HANDLING AND DISPOSAL Ysllow lattars on block background - NOTES AND REFERENCES FIGURE 1 - CAUTION SIGN - ASBESTOS DUST ____ r - 2' 1 ' - 13/8 ' 1 CAUTION T Block lattars on yoilow background Lottor sizes and stylos to b# at least as visible as that listed below; t Sans Serif, Gothic, or Slock ^4 Sans Serif, Gothic, or Block Gothic Spacing to be at least equal to the height of the upper of any two lines ASBESTOS OUST HAZARD Avoid breathing dust Wear assigned protective equipment Do not remain in areo unless your work requires it Breathing asbestos dust may be hesardous to your health CAUTION Contain* asbastes (Ibar* Avoid emoting dust Breathing osbastos dust may causo serious bodily harm FIGURE 2 - TYPICAL CAUTION LABEL* Label size and printing to bo readily visiblo and logiblo. J. EPA REGULATIONS ON ASBESTOS 1. The Environmental Pro This requirement does not tection Agency requires pertain to transite siding certain reporting pro because transite is not cedures when operational considered "friable". facilities containing asbestos are being de molished. Reporting procedures are also required involving renovation of 80 meters (262.4 ft.) of pipe or more than 15 square meters (161.4 sq. ft.) of friable asbestos.^- .2007413 DUP 0833640 ;..^agaaafe:i. m OCCUPATIONAL HEALTH PROCEDURE #145 Page 9 of 9 ASBESTOS HANDLING AND DISPOSAL NOTES AND REFERENCES 2. It is the responsibility The Industrial Hygiene Moni- of the Proprietary Super- tor ing Group in Building #5 intendent to ascertain those locations where can assist identifying in sulation that contains asbestos exists and to asbestos. ensure notification prior to demolition or renovation. 3. If demolition or re novation as outlined in Paragraph 1.1. above is to be done, notify the EPA Regional Administrator, Dallas, Texas, Provisions are made for emer gency renovation and the Environmental Coordinator, Ext. 6421 can assist with this requirement. twenty days prior to commencement of demoli tion or removal stating the measured or estimate amount present. Oc -o m