VICTORIA PLANT CENTRAL SAFETY COMMITTED MINUTES OF MEETING HELD MAY 9, 1978
Members Present
A. D. Cyphers, Chairman
A. H. Peters
R. M. Robertson
C. R. Steele
__
G. L. Brennan
W. L. Smith
J. V. Woodrick
R. E. Keith
M. C. Dorris (for W. J. Faassen) W. T. Dodson
T. J. Feske (for W. P. Ledet)
D. G. Jentsch
B. L. Sutphen
B. S. Smith
G. B. Foertsch (for M. A. Ervin)
D. O. Oyen (for H. W. Anderson)
J. S. Bray
H. W. Shahan
D. J. Logan
S. V. Hinson - Construction
C. E. Bunn
J. E. Borden
J. M. Kayser
Members Absent
H. W. Anderson 0. A. Sampson M. A. Ervin W. P. Ledet W. T. Procter W. J. Faassen
Visitors
B. G. Baca R. W. Heller A. H. Nickolaus
DU 007869
DUP 0801402
Victoria Plant Central Safety Committee Minutes of Meeting Held May 9, 1978
Page 2
I. Reports
The Monthly Safety and Houstkeeping Audits and Injury Summary
for April were reviewed.
'
Relief valve mating flange identification on compressed gas cylinders needs plantwide review.
Lack of a barricade at a maintenance job on PAC-2 was discussed. J. S. Bray reported that an incident report will be issued.
The No. 2 Boiler relief valve drain line contains a valve which was found closed. This 'could result in the
accumulation of hot water in the R.vj. vent line. Hot
water continues to be of major safety concern. There was general concern about the !c-20 cylinders and
the nitrogen used to empty them. Itj was recommended that the nitrogen cylinders be checked for oxygen content. The time interval in getting the correct relief valves on the C-20 cylinders has been excessive.
There appears to be a general need for follow-up on barricading requirements.
A safety blow air nozzle had been modified by placing tape over the vent holes in the nozzle discharge pipe. Even minor modifications to safety equipment must not be made.
As a result of the hot water burn in DDDA, the shifts are reviewing procedures for protective clothing require ments .
The mashed thumb at #1 extruder cutter box door was a result of a binding hinge and the exertion of too much force.
It was noted that the entire "Alathon" area received an excellent rating on the April housekeeping inspection.
Beginning in May the four plant housekeeping inspection areas will be regrouped into five areas.
Congratulations to the Good Housekeeping Award winners.
DUP 0801403
DU 007870
Victoria Plant Central Safety Committee Minutes of Meeting Held May 9, 1978
Page 3
II. Ill.
Incident Reports
Unusual Incident Reports Nos. 78-18 through 78-23 were reviewed.
78-18 - Recommendation No. 3 was recognized as being "good" and is accepted plantwide.
78-20 - Points out the need for a better understanding of the necessity and procedures for maintaining a clean seal oil system.
78-22 - The power line being only five feet above the
pipe bridge, vs. a 15 ft. requirement, raises the question of how many similar situations do we have on
the plant, findings.
All areas should survey and report their
78-23 - Points out the value of seat belts, This should receive plantwide publicity.
Safety Activities Committee - B. S. Smith
On Plant
No lost or restricted workday cases for April.
Thirty-seven Silver Dollars were awarded for recognition of unsafe acts or conditions.
Achieved 1 MM safe hours on April 24; next goal is 2 MM (September 10, 1978).
Off Plant
There was one off-the-job injury in April. A mechanic fell from a ladder, breaking several ribs.
Safe "T" Bingo - Straight line winners (tentative) 5-6-78, Joe Gomez and Don Angell.
Mug Program - Delivery scheduled for last week of May.
Operation ID - Markers are availablej at gates.
Vacation Safety Program - First of five newsletters will
be out on May 8, 1978. Letter to be prepared requesting
one-on-one safety contact before employees leave on
vacation.
I
DUP 0801404
DU 007871
ffffrf*-;
iff^;
Victoria Plant Central Safety Committee Minutes of Meeting Held May 9, 1978
Page 4
IV. Nylon Area Eye Wash Stations
The objective is to have all eye wash stations converted to the new standard by year-end. It was pointed out that all eye wash hoses need to be thoroughly flushed when inspected.
V. Perchloroethylene
All areas should be reviewing their use, and be searching for a replacement cleaner.
The current TLV of Perclene is 100 ppm and is expected to be lowered.
Perclene must not be setting around and available for indiscriminate use.
VI. Emergency Drill - H. W. Shahan
The recommendation that Control Room personnel be trained to assist in getting "Immediate Action" information to the scene was rejected rather than accepted as stated in the S&F memo to Central Safety.
VII.
It was agreed that personnel signed into an area should sign out of that area before reporting to their normal accounting group during an emergency.
4,000,000 Safe Hours - Hinson
H. B. Zachry completed 4,000,000 safe hours May 9. This is a record for Zachry. Congratulations for a great
achievement. The Zachry Company founder will be here May 25 for the celebration. This allso completes 10 safe
years, 800,000 hours, for the local DuPont Construction force. This is an admirable achievement.
CEB:j cm