Document ev3njNYgKxkmqBEJmpzK6vxbq

PLAINTIFF'S ASSEMBLY OF BOILER SECTIONS WITH HYDRAULIC DRAW-UP EQUIPMENT USE IN CONJUNCTION WITH REGULAR INSTALLATION-OPE RATION AND MAINTENANCE MANUAL American First in heating first in plvmbing BP-7841 REVISED, 5/66 21588 THIS HYDRAULIC ASSEMBLY KIT CONSISTS OF THE FOLLOWING PARTS All items listed to be placed in the lower level of the chest ITEM Number of Ite ms DESCRIPTION " ------------------------- 1 ----------- =--------------------- " Code 5104 : 3 3 2 3/4" X 15" Special Steel Tie Rod Extensions 3/4" X 24" Special Steel Tie Rod Extensions 4" X 10-1/2" Steel Channel Draw-up Blocks ^ 5841 Code 0556 6 3/4" Tie Rod Couplings 4 Cast Iron Draw-up Washers Code 6 3^4" Standard Hex Nuts .. 6813 Code 4 Cast Iron Draw-up Blocks 3013 Code . o 6Mb 6 3/4" Standard Flat S; ei. Washers C3> $? ' 3 --Cast Iron Draw-up Spacers All items listed to be placed on the upper shelf of the chest ft- ss 3 Rams dO- 3 Pump Sets Complete with Hoses Code 6899 1 Can of Special Hydraulic Pump Oil 1 Hydraulic Assembly Booklet r All items listed to be placed in a separate box 12 3/4" X 48" Special Steel Tie Rods ---------------J 21589 TYPICAL APPLICATION OF HYDRAULIC RAM AND STEEL BLOCK FOR DRAWING-UP BOILER SECTION ASSEMBLY Form BP-7841 21590 C.I. Draw-up Spacers 3 Required Burner & Misc. Box_ G-40 BOILER Steel Channel Block. 2 Req'd. IM PORTANT The bottom face of the hydraulic ram cylinders must be against the draw-up spacers, or channels, when drawing up the sections. A-5 Cast Iron _ Washer. 4 Req'd. 0-60 BOILER 21591 Steel Channel Block. 2 Req'd. A-5 BOILER A-5 Caat Iron y/ Waaher. 4 Req'c IMPORTANT ?he bottom faoe oi the hydraulic ram 21592 INSTRUCTIONS ! :v ..KMBLiNO :!I'K SECTIONS : ; n-n-MKKT The Hydraulic n !. H ..*>w . the following instruction.-. sr Ms-.: cd -muons i t r i... . used satisfactorily If 1. Consult the Installation-tvi'r: < :.r M.-.intenance Manual furnished with each particular type boiler as to arr.i.ummeru cf a-.-. ilons, cleaning of nippies and nipple ports, oiling and driving of the r.;: es. Drive each section w b m i n w nmes of the adjoining section with heavy piece of timber striking sections squ.u .. <............ v,,; ,.orts. 2. Do not apply hydraulic 1L-- > against a rmscd tapping boss opposite an upper nipple port. Use iiv si -* < m.,,-k with t!i-- /PUN SIDE against the section and the cutouts in the channel linages ovt- :<; b-.ss v uer epuued, so that pressure is applied around but NOT ON 'I HE BCMb proper. 3. Observe the spacing .vrcweeu the sections careful i; Cion op-rating the hydraulic pumps. It is possible that some :*t Llie nippies. pa: 1 icularly the upper nipples may not draw up uni formly as the hydraulic pressure, i; ?n 'J :o ur . C-.rs The larger the nipple, the greater the pressui t i c.u u., row of nipples is not even, strike the section with an aluminum hammei aiiectly over rue nipple port where the space is noticeably larger. 4. CAUTION -- |;o n t . .... .nt.-i t..m .. v Me iinir c,t Ihe stroke which is 2" for the Owatonna cylinder. Relieve the pressure, yuan ihe ram back into die cylinder and re-tighten draw-uu rod . Do not allow rams to operate against tic rod couplings in any case. 5. Boilers which are being drawn .mu u'.ipk- ,u,.'U shoaid havc reds approx:rr.ately centered in the opening. Dr:..-, -up " *' r;..!ic-n - m horizontal position where possible. In any case the bljck should *>;< i:r ng 'inst the m -f;,< e yc equally on each side of open ings or depressions, such - M ,,n t.1.; OV .rnni o. :v ;c rn fronts. Adjustments are easily made with a hammer who `c . m u-uler 1 wn Irmiion. 6. See that exin M*: r-.uiih c vent stripping oi ii.u a is. . .e inch on each end to pre 7. Be sure that rod couplings ha.e oli-.ir. ecu for movement,- otherwise it is possible for them to bind and possibly cause u.ci-age. Use snort nm c.-.tensions or the end opposite from where the rams arc rpoii-m .,w u , : xUcme . me must be used to see that rod coup lings do not come in con* -jo* .id* si' -upples draw-up washers or blocks when sections are being drawn tc-goth 8. The rods provided w.:;, i - ./-uu Kit ate made of high tensile strength steel so that a number of sc..:.i... r,, :-n d.y drawn together in one operation. CAUTION -- All personnel should rr r. , .>- - f .-;.u at both ends of boiler in line with the tie rods when pressure is being agpued m ...raw up die sections, Covering of the rod ends is strongly recommended as a sMC;measure. Form BP-78-M Page 1 21593 draw-up rod and block schedule NOTE: Use Tie Rod Couplings packed with the ref^ular boiler parts when additional Couplings are required for drawing up the G-60 Boiler Form BP-7841 Page 2 21594 Boiler Sizes Exbrook 207 208 thru 2010 2011 thru 2013 #2 Redilash 6 Section 7 A 8 Section 9 A 10 Section 11 A 12 Section 13 Section #3 Redflash 6 Section 7, 8. 9 Section DRAW-UP ROD AND BLOCK SCHEDULE (Can't.) Steel A-5 Special Draw-Up Rods Channel Cast Iron 15" Rod 24" Rod 48" Rod Block Washer 3-A 67 Draw-Up Block 32 3 32 333 2 4 4 4 33 3 33 33 33 3 2 2 2 2 2 4 4 4 4 4 3 32 4 NOTE: Refer to the following pages for instructions pertaining to each type of boiler. Form BP-7841 Page 3 21595 G-40 GAS BOILER a. Sub-assemble sections for the entire boiler. b. Use cast iron draw-up spacers on special tie rods between tie rod lugs and ram of hydraulic pumps. Use only 3/4" steel washers and 3/4" hex. nuts on tie rods at opposite end of boiler. c. Use 24" rods for 3 section boiler. Use 15" and 24" rods for 4-5-6 section boilers. Use 48" rods for 7 & 8 section boilers Use 15" and 48" rods for 9 and 10 section boilers. d. Remove the special draw-up rods, and replace with regular tie rods. Refer to page 6 of the Installation Manual for adjusting the tie rod nuts. . G-60 GAS BOILER a. Sub-assemble the sections, 19 or less, on the base. b. Use steel channel blocks for upper rod which whould be inserted through the upper nipple ports and 6" tapping on the end section. c. Use A-5 washers on the lower rods which should be inserted in the cored holes located above the 4" nipple ports. The raised side of the A-5 washer should bear against the section. d. U6e 48" rods for 6-7-15-25 and 33 section boilers. Use 48" and 15" rods for 6-9-10-17-19-28 and 37 section boilers. Use 48" and 24" rods for 11-21 and 31 section boilers. Use 48", 24" and 15" rods for 13-22 and 41 section boilers. e. Boilers of 21 to 41 sections should be drawn up as two units. After drawing up the first 19 sections, sub-assemble the remainder of the sections on the base with tie rods coupled to gether thru the entire boiler. Place blocks and rams on the extended rods and draw up the remaining sections. f. Insert regular tie rod in the upper tie rod hole and remove special rod from the upper tap ping. Replace the two lower special rods with regular tie rods. Refer to page 9 of the G-60 Installation Manual for adjusting the tie rod nuts. A-5 BOILER a. Sub-assemble sections for the entire boiler. b. Use steel channel blocks at top, at front and rear of boiler. .OPEN SIDE OF CHANNEL MUST BE AGAINST SECTIONS WITH CUTOUT IN CHANNEL CLEARING THE 3-5/8" DIA. BOSS ON THE BACK. c. Use A-5 washers in 2-1/2" tappings at bottom, front and rear. d. Use 24" and 15" rods for 4 section boilers. Use 48" rods for 5 and 6 section boilers. Use 48" and 15" rods for 7-8-9 section boilers. Use 48" and 24" rods for 10 and 11 section boilers e. Install regular tie rods in the tie rod lugs and adjust nuts as directed on page 5 of the A-5 Installation Manual f. Remove the special rods Form BP-7841 Page 4 21596 A-7 BOILER a. Sub-assemble sections on base except for the Back Section. b. Use steel channel blocks, Front and Rear for upper rod used in large nipple port. c. Use 3-A-67 blocks over 1-1/2" lower tappings at Front and 3" nipple ports on next to Back Section. d. Use 48" rods on 5 and 11 section boilers. Use 48" and 15" rods on 6-7-12 and 13 section boilers Use 48" and 24" rods for 8 and 14 section boilers. Use 48", 24" and 15" rods for 9 and 10 section boilers. e. Remove the special rods and assemble the Back Section. f. Draw up the Back with regular tie rods as directed on page 7 of the A-7 Installation Manual QAKMONT BOILER a, Sub-assemble all of the sections on the base. b. Use steel channel blocks at top, for Front and Rear of boiler. OPEN SIDE OF CHANNEL MUST BE AGAINST BACK SECTION WITH CUTOUT IN CHANNEL BLOCK CLEARING THE 2-3/4" DIA. BOSS. c. Use 3-A-67 blocks at Rear and A-5 washers at Front for lower rods. d. Use 24" and 15" rods for #84 and #85 boilers. Use 48" rods for #86 and #87 boilers. Use 48" and 15" rods for #88 and #89 boilers. e. Remove the special rods and install the regular tie rods in the tie rod lugs, f. Add safety nuts and washers as directed on page 4 of the Oakmont Installation Manual. SEVERN BOILER a. Sub-assemble all sections on the base except for the Back. b. Use steel channel blocks for the upper rod. c. Use A-5 washers at Front and 3-A-67 Blocks at Rear on lower rods. d. Use 24" and 15" rods for #17 and #21 boilers. Use 48" rods for #25 and #29 boilers. Use 48" and 15" rods for #33 and #37 boilers. e. Remove the special rods and assemble the Back Section. f. Draw up the Back with regular tie rods as directed on page 3 of the Severn Boiler Installation Manual. Form BP-7841 Page 5 21597 NO. 2 REDFIASH & EXBROOK BOILERS a. Sub-assemble all sections on the base except for the Front Section. b. Use 6teel channel blocks for the upper rod. c. Use 3-A-67 Blocks for the lower rods, Front and Rear. d. Use 24" and 15" rods for 6 section boiler. Use 48" rods for 7 and 8 section boilers. Use 48" and 15" rods for 9-10-11-12 section boilers. Use 48", 24" and 15" rods for 13 section boiler. e. Remove the special rods and assemble the Front Section. f. Draw up the Front with regular tie rods as directed on page 4 of the No. 2 Redflash and the Exbrook Installation Manuals. NO. 3 REDFLASH BOILER a. Sub-assemble all sections on the base except for the Front Section. b. Use steel channel blocks for the upper rod. c. Use 3-A-67 Blocks for the lower rods, Front and Rear. d. Use 48" rods for 6 section boiler. Use 48" and 15" rods for 7-8-9 section boilers. e. Remove the special rods and assemble the Front Section. f. Draw up the Front with regular tie rods as directed on page 7 of the Installation Manual. 'orm BP-7841 Page 6 21598