Document emnyR61Vnv9KjwoQy5d2QroeG
4
. Operating Manual D-700 PVC Reactors
]{ Page 19
GENERAL PROCESS DESCRIPTION (CONTINUED!
G. Water Swirl (Continued!
charge line into the reactor. When the water charge reaches a
preset amount, the water charge system Is automatically shut down.
The reactor agitator is then used to swirl the water for
,
l
approximately 25 minutes. The lead operator then drains the water
r
to the sewer. This completes one reaction cycle; the reactor is
now ready for evacuation.
i
.1 H. Blowdown Collection System
r 9
Various waste water streams from the process must be collected in an
T
V
enclosed system for treatment. Water streams containing PVC and VCM
; from the recovery system, the VCM storage tanks, line and vessel
4 1
purges, and miscellaneous flush and seal waters are intermittently
J sent to the blowdown tank.
When the
the blowdown tank reaches a level 22 inches from
the top of the tank, a high>JLevelBB(alarm<^ounds in the control room.
At the discretion of the operator, the water in the blowdown tank
Lb steam stripped at 175 F and 16 inches Hg vacuum, using the reactor recovery system.
The vapors from the blowdown tank are recovered in the manner previously described in the recovery section of the process description. Due to the operating pressures of streams collected in the tank, the pressure in the blowdown tank should be minimised
A
VAB.0001042907
Operating Manual
0*700 PVC Reactors
fags 20
'% t:
'f&f. ii:
I. GENERAL PROCESS DESCRIPTION (CONTINUED)
.*, i s-'r
^r.
H.
%Y.t
*' :. 11 if -r l
'Aifr.l
> gj
`I
`i
l
*
.. ii
` " j'.;
L
Blowdown Collection System (Continued)
When the
of the blowdown tank ia completed.
the lead strained of PVC particles and Is sen
The--M&tSLF la During draln-
steam
taintain enou
to allow
blowdown tank pump. Wfreq
to 12 lnche
tank.
JS
m
i* :
i >!
/
l* i-
i^` F . J 4t ]
r:*
l. V i 1
S'
*
,*
*
VAB.0001042908
4
Operating Manual D-700 PVC Reactors Page 132
I. EQUIPMENT ENTRY PROCEDURE
EPA standards for VCM emissions and OSHA regulations on personnel
exposure to VCM require that certain operating procedures be followed
when there is the possibility of VCM emission to the atmosphere or
personnel exposure to VCM. For this reason and to ensure safe working
At. * Vi
conditions at all times, the "Engineering and Work Practice Control
j M-
'fr
Program for the Reduction of Employee Exposure to Vinyl Chloride" manual
should be consulted whenever equipment in the reactor area is opened for
reason. This manual contains a list of detailed procedures as well
as safety precautions for equipment opening.
%
*>IS4LG. K&t/jsmo
J**. AT