dea to n^verse publicity about the health bas^,rde of agbon ELG
studyis Liber Ford Motor Company had bron studying
studyisi studyisi
studyisi ib to be seed to replace arbestos fiber Unsuccessful Unsuccessful
studyisi studyisi studyisi
fioir
search for a substitute they asked for help to reduce the alar
barne enscentrations of asbestos fibar in the plent
Group 1 Radeston
plant
Sy mens
and blowTh to one
fiber is brought in hopper bottom oare to the of pressure air the material in fluidized of two bine in which it is stored On top of
the bibs are Flaz Kleen bag oollectors
the Periodically fiber is drawn from one of
ble the weigh belt Fiber drops off weigh
valve and through the valve into a pipe
bins and fed across into a rotary
which it is transported
Flakxiadndelle^'sor weighing under positive pressure to a
uniqhing reciver is rented to a Flak
feceiver above a miser Tm
xiadndel e^'sor xiadndelle^'sor
botches are made up in the mixer into which numerous materi^ln
including the weighed amounts asbestos fiber are charged
A
man maten up deficient weights of asbestos fiber into the mixer
7 band After the miner there is probably no health hazard
came the sixture fa sted and does not dust
agar!down exist later on in the prodosse after the nistazo
veer Alarged into presses and cured Pieces from the preEGER
fina ing cleaned off by hand and are drilled in jigs Both
y..
asical procensen generate borne dust
a
10
'
t 2 st and Nathods of Control
.
a
acteaton filer is blown into the bins the bins are undar
oak
resture because the Kleen dust collectors venting
Lo
slave 30 A There are openings in the top of the bina
.
:
antroln savo been removed
, Filia the plant
When the bine are being changed
All lake in the tops of the bine should be repaired A fan
t,
should be added to the Kleen dust collector so that the
air is vented under
pressure through that collector
negative That system must be studied to ensure that there is adequate
pressure cloth area in the Kleen collector to permit negative
to be maintained in the bin
poslan poslanreplaced leaktight COBASO Tau The piping to the bina homemade
that look to be homemade Thenu all split sleeve como
i10ML^ ~5 Ag haL Sotaten
leak Aust Lats the cise,
with
_'
couplings quick expect
work .
that are standard in pneumatic oonteying
An
parpore / the' The
weigh
"
does not seed to to my umarul
Pibe to wighed both on this belt and in the requirar
receiver weighing should be made proof and the migh
ait removed Aust balon
The weigh belt in difficult to enclose and generatan
11 L^u
blew The rotary wi > leaks and the pipe under positive pressure
dust into the enclosure under the bin A study should be made to .
cea whether the conraying system from the bin to the receiver #bould |
bo nada negative If it
be bin to the receiver should
can't the conveying system from the
made completely leaktight
#
ae
the receive above When we were there the Klemn collectors
wore leaking probablduye to holes in the bags
transported dust was slowing into the plant as fiber was being transported
The baya in the Kleen collector must be kept in perfect repair
the system is not made negative then a fan should be installed =~
- to keep at least the receiver under negative pressure Plat.
on Hettling Who Just oontral consnctionon the mixer itself is poor |
chambers should be
ahead of the dust connection so
installed it does not take away too much material when it is
adequately wanting the mixer
that
i
oa
=...
.
sin ae weighing process should be improved to the point where a
aan
(4a ot have to add asbestos fiber by hand into the mixer Onedl
:
t is done the open bage of fiber should be installed in advise
2
ening hood very similar to those designed for advise
eS tarts. ony scooping of fiber shouldbe done under that hood *
pl twat. ' couran la adequately
vinted so that 150 the
hhoood od tiate tiate fice velocity is maintained
maintained in the fame of the
|
charged clean npty bays of filar should be
from the hood into a
qsouch as it is done in Manville planta
cared
cared Tha accepted standards standards oshf ouli cdor nsiul llpreciso.
ve .
thin xagerts accepted
practi in
practi are followed
in this report ,
re If recommendations seed followed followed outlined
any
would would be
then hatitates hatitates authestes fiber
hatitates
or aperabivns 4h this
frun the description apparent Johns Manville rt report readilthyat
description operation in this
Asbestos fiber would
some of that customers that has been Asbestos
plants plants over know how |
.
,
ae
7
aig
J. Engineering
to Engineering
ook.
the Flex fiber is blown