Document emOYRmB1KardJRJNw46mvV0VG
Ethanolamines/Glycol Ethers
In Plant Training (IPT)
S ction Number Issue Number Origination Date Revision Date Section Test
13 1.3 06-25-91 12-23-97
:13
Author
:Mike Viator
Ethanolamines Purification Control Module T-271
Answers:
1. State the DEA and TEAGE specs for t-271 overheads. A. .25 to .70 DEA. B. .15 to .95 TEAGE.
2. State the primary ejector used for T-271. Secondary. A. EJ-260. B. EJ-130A or (EJ-270).
3. State the set pressure of PSV-T271. 100 psig.
4. State the parameters) on T-271 controlled by the VAX computer. As of the date of this procedure, none.
5. State the set pressure of PSV-E273 A/B. 100 psig.
6. State what adjustment you would make if the DEA in T-271 overheads was .85% and the TEA in T-260 overheads was .06%. Increase T-260 temperature set point.
7. State what would be the possible cause(s) of T-271 overheads being wet. A. E-273 leak. B. E-270-1 tube leak. C. E-272 leak.
8. State what you would do if the recirculation flow was lost to E-270-1. Cut steam off to the reboiler (E-270-1).
9. State the target bottoms flow for T-271. Based on production plan, the value is communicated through the instruction log book.
Date Printed: April 18,1998 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update.
The Controlled Document Resides In File: T:\ORIGINAL\IPT\EACONTRL\PURIFICA\ASOST271 .DOC
Page 1 Of 2
DO A 058639 CONFIDENTIAL
10. State what would be the cause(s) of high color in the overheads. A. Excessive cut on the tower. B. Air leak on T-271. C. Spent charcoal.
11. State the conditions that need to exist for packing auto ignition. Product saturated packing exposed to air at high temperatures.
Revisions:
Revision No. 1
06-18-93
Yearly Review
Revision No. 2
12-18-94
Yearly Review
Revision No. 3
12-23-97
Yearly Review
Date Printed: April 18,1998 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update.
The Controlled Document Resides In File: T:\ORIGINALMPT\EACONTRL\PURIFICA\ASOST271.DOC
Page 2 Of 2
DO A 058640 CONFIDENTIAL