Page 1 CHLORINE I PLANT CONSOLIDATED AUDIT PROGRAM I. OPENING (MONDAY, JULY 29,1991- DOW CONFERENCE CENTER) Howard Wilkinson of the LAD Auditing Group began the opening session by expressing gratitude to the Chlorine I plant personnel for the time and effort put into completing all the pre-work involved in preparing for the consolidated audit. The three day audit agenda was also reviewed. II. CHLORINE I PLANT OVERVIEW PRESENTATION Joe Muller and Stew Serpas presented an overview of the plant's Process, Policies, Organization, Communication Methods, Training Programs, Significant Incidents, Employee Job Descriptions and Expections. III. CHLORINE I PLANT TOUR (10:30 a.m. to 11:30 a.m.) Before leaving for the plant tour the Chlorine I plant indoctrination video was reviewed by the audit teams. Stew appointed each Chlorine plant contact to his respected functional audit team to serve as a tour guide. HAZARDOUS MATERIAL TRANSPORTATION LOSS PREVENTION/FIRE/SECURITY SAFETY OCCUPATIONAL HEALTH CHEMICAL EXPOSURE INDEX REACTIVE CHEMICALS JIM HANEY/CHARLIE COOK' BARRY GUILLORY/ JOE MULLER STEW SERPAS KEITH JEFFERIES/ MURPHY TORRES PAUL YONTS/STEVE LANDERS STEVE LANDERS/DON HULL SUMMARY: The Chlorine I plant overview presentation gave a clear understanding of the plants overall effort to make Chlorine a safe and productive place to work. We support the efforts being spent to implement the In-Plant-Training (IPT) concept at Chlorine and your efforts to up-date your plant procedures. Excellent job on your overview presentations. Thanks, LAD Consolidated Auditors * INDICATES PRIORITY ITEM do a o??987 GONFTDFNTTAl Pag 2 HAZARDOUS MATERIAL TRANSPORTATION REVIEW (Monday, July 29, 1991-12:00 p.m. to 1:30 p.m.) Audit Team: Dean Smith, Bill Herrin, Fritz Simonson, Ernie Wall, John Gallamore(U.S. Area) Presentation: Jim Haney Attendance: Charlie Golden, C/A Tech Center--C. Cooke, CL2-Marty Morrison, Power/Utilities-Allan Sandow, C/A Administration M. Thompson CL2-Buck Bailey, Loss Prevention-Joe Muller, CL2-Gary Meier, LAD Auditing Dept. Writer: Dean Smith The Chlorine Plant pre-planning and team work in the area of hazmat transportation has earned them a reputation for quality and excellence. The preaudit information was sent in in a timely manner and allowed both the plant and the auditors ample time to review necessary items. RECOMMENDATIONS: 1. As mentioned in the presentation, the plant will continue to support the Product Dept development of product quality Distribution Specifications for non-Dow shippers involved in Swaps, Tolls or Trades. Written documentation of compliance is required from the non-Dow shipper. 2. Concerning the IPT modules for T/C Securement, Loading/Unloading procedures, be sure this training coincides with the new Dot Hazardous Materials regulations that are coming into effect. Contact Dean Smith for review. 3. Consider reviewing with the carrier/supplier of Freon (DuPont) concerning regulatory compliance including E/R planning/capabilities of their drivers and equipment. 4. There was a question raised concerning the integrity of the load/off load hoses. Documentation has been supplied that address and confirm that the hoses are included in a pressure test program. * INDICATES PRIORITY ITEM DO A 0 ? ? 9 8 8 CONFTDFNTTAl Pag 3 5. During the plant operations tour, there were several questions raised concerning the "attendance" requirements for loading/off-loading. I will forward the relevant DOT regulations as well as an interpretation of those by the Chief Council to the DOT. CHEMICAL EXPOSURE INDEX (CEI) (Monday, July 29,1991-1:45 p.m. to 4:00 p.m.) Audit Team: Jim Gibson, Mark McCullough, John Gallamore (U.S. Area). Presenter: Paul Yonts Attendance: Charlie Golden, C/A Tech Center-S. Landers, CL2-C. Cooke, CL2-M. Morrison, Power/Utilities-J. Thomerson, C/A Tech Center-A. Sandow, C/A Administration-B. Bailey, Loss Prevention-Joe Muller, CL2-Gary Meier and Howard Wilkinson, LAD Auditing Dept. Writer: Jim Gibson In general the Chlorine Plant appears to be in excellent shape from a CEI stand point. The plant P&ID's are up to date, IPT concept is well underway, the operators are knowledgeable, and plant personnel in general have a good attitude. ACCOMPLISHMENTS/MAJOR CHANGES SINCE LAST REVIEW (1989): 1. Installed dual train, titanium chlorine scrubbers. 2. Eliminated "Worst Case Scenario" chlorine liquid manifold by removing all one inch nipples. 3. Implemented Mod V control on Rectifiers 2 and 3. 4. Program initiated to replace standard packed valves with bellows seal valves in liquid chlorine service. 5. Preventative maintenance completed on gas distribution to EDC, Solvents,and Glycol I. 6. The Chlorine Plant N2 pressure was increased with an additional feed from the Division N2 header. * INDICATES PRIORITY ITEM DO A 072989 CONFTDFNTTAl Page 4 7. Piping upgrades have increased Chlorine Plant Air reliability. RECOMMENDATIONS; * 1. Continue to pursue the idea of reducing the chlorine sphere pressure to near ambient. At the current storage pressure any spill would result in a 6.5% adiabatic flash. * 2. The Chlorine Plant eliminated one inch nipples on the liquid distribution header after the last CEI audit. This search should be expanded into the rest of the block with emphasis on high traffic, high risk areas. Any unnecessary small nipples should be removed. 3. The Chlorine plant personnel have identified the areas where surface corrosion has reached an unacceptable level mainly in T-54 piping area and in six emergency dump lines. Spot thickness checks show that pipe wall loss is minimal. Plans have been in place to sanblast and paint or replace affected piping this year. 4. "Worst Case Scenarios" should be developed for the next CEI review from sections of the plant where relatively large quantities of liquid chlorine are located other than the sphere. The diking, sump drainage, blower and scrubbing available to aid the containment of any spill from the sphere may keep it from being the worst case. 5. Testing of the EBV's at the bottom of T-54 should be implemented later this year as planned. Results of such testing should be documented and plans made to implement a similar plan for T-56. SECURITY AUDIT (Tuesday, July 30, 1991--8:00 a.m. to 8:30 a.m.) Audit Team: Bill Franklin, Buck Bailey, Al Lott Presenter: Barry Guillory Attendance: A. Sandow, C/A Administration-J. Thomerson, C/A Tech Center-D. Hull, CL2--T. Creel, CL2--J. Williams, CL2--J. Muller, CL2-J. Haney, CL2-G. Meier and H. Wilkinson, LAD Auditing Dept. Writer: Bill Franklin * INDICATES PRIORITY ITEM DO A 070990 CONFTDFNTTAl Page 5 ACCOMPLISHMENTS: 1. Personnel adhere to Corporate and Division Security Policies. 2. Personnel have a good basic understanding of their responsibility to protect company assets. 3. The C-9 checklist is used for documentation of several Security requirements. 4. Anti-Virus programs have been installed on all PC's. 5. All PC's are under lock and key. 6. Personnel are well trained on computer security. 7. Personnel have been trained to challenge visitors/strangers in their work areas. 8. Emergency Response and training is covered in IPT modules. RECOMMENDATIONS: 1. Consider identifying a Chlorine Plant Representative to serve as a manufacturer representative for P & ID's. Area piping and instrument diagrams should be released only through this employee and returned to him/her for disposal when no longer needed. 2. Consider developing a control system for P &ID's that will include a numbering system and document who drawings have been released to. 3. P &ID's should be stamped "Do Not Copy". 4. Computer prints should be properly disposed of by a paper shredder or burn barrel. 5. The equipment file room, production records and accounting information should be placed in a locked room. * INDICATES PRIORITY ITEM no A npp991 CONF IDFNT T Al' Page 6 ELECTRICAL RELIABILITY AUDIT: July 30, 1991 SPECIFIC AREAS OF IMPROVEMENT: (Since Audit of 11/88) Observation: 480 volt MCC building walls show severe crackling. Corrective Action: Walls repaired. Observation: Electrical rooms out of compliance with LPP i.e. no smoke detectors in building. Corrective Action: Building smoke detectors have been installed in all electrical rooms. Also smoke detectors have been installed in 480 V MCC's per latest recommendations of LPP. Observation: No records of routine battery maintenance. Corrective Action: LAD Battery Maintenance Group has taken over battery maintenance and has posted maintenance records. Observation: Several electrical equipment rooms cited for poor housekeeping. Corrective Action: In most electrical rooms, the housekeeping, generally was much more improved. Observation: External corrosion noted on several components of each of the rectifiers. Corrective Action: With the exception of reactifier 1, all other rectifiers showed marked improvement in areas of external corrosion. * INDICATES PRIORITY ITEM DO A 0??W CONFTDFNTTA! Page 7 RECOMMENDATIONS; 1. Clean, prime and paint transformers T-1A and T-1B (especially the radiators). Consideration should be given to removing the cooling fans from radiators and mounting on a freestanding rack to minimize future corrosion of the radiators. 2. Repair/replace exterior doors in 15 KV switchgear room (especially the battery room). * 3. Repair/replace exterior door on northeast entrance to MCC-4/5 building to curb corrosion becoming evident on MCC-E, 5A, and 5B. * 4. Seal cable tray entrances to MCC-4/5 building especially on north wall where water leakage is evident. * 5. Provide additional supports for open wiring on north wall of TDC room (specifically the Modicon Room) to remove the strain from the wiring terminations on the wall mounted terminal strips. (This is wiring for extremely critical system). 6. Label all electrical equipment and devices (especially buildings and transformers). 7. Install emergency lighting in electrical equipment rooms. Notes: The following general recommendations require long-term, continuous attention and action but will result in a much improved electrical installation enhancing the overall electrical reliability of the plant. 8. Discontinue the use of "unistrut" and conduit clamps to the largest extent possible on exterior support systems for field wiring and/or devices. Angle iron or channel iron and u-bolts are recommended instead. 9. Physically remove field wiring and conduit that has been identified for "demolition" as the equipment is removed. This will ease cable tray overloading and conduit clutter, etc. 10. Review all electrical equipment room seold's yearly and have them dated. * INDICATES PRIORITY ITEM 0??993 DO OONF A t OF 1 Page 8 11. Continue with the good p/m program for motor starters, transformers, etc. (Ex. Battery condition and C-40A imminent failure discovered during last p/m work). General Comments: 1. Overfilled and overloaded cable trays are common sights that can be observed in many sections of the plant. For the greatest part, cabling and cable trays are in good condition; however, at entries into electrical rooms and at transition points, cable trays tend to be over filled and overloaded, cables are not tied or anchored to the trays and cabling is dangling, jumbled, disorganized and/or not installed in a good workmanlike manner. 2. Electrical rooms are, for the most part, structurally sound and in good condition. Noted exceptions include: A. The laboratory or test building (no label) located in the brine area appears to be taking weight or for some other reason, the overhead concrete is breaking apart. Dangling bits and pieces could conceivably fall and injure someone. B. During inclement weather, there is a severe water leak at the cable tray entrance in the MCC room, building 2625. This building was audited during fair (not raining) weather and the statement made here is work of mouth. However, two brooms and three mops should be sufficient to attest the authenticity of the statement. 3. Non compliance with the Louisiana Division's Safety and Loss Prevention (S&LP) standard S-316, Electrical Safety, is common place throughout the plant. Noted areas worthy of concern include: Paragraph F. Identification of Electrical Equipment Unlabeled or incorrectly labeled equipment is commonplace for transformers, motors, enclosures, switches and other electrical devices. At least two buildings are unlabeled and one building 2605 is incorrectly labeled. In addition, on the Safety Electrical One Line Diagram, B7-012AC50-001, feeder H-207 is incorrectly labeled and the rectifier aux. backup power transformer, the north block service transformer and a transformer for the new office building are not identified (labeled). * INDICATES PRIORITY ITEM DO A 020994 CONFI DENT T A1 Pag 9 Paragraph E. Safety Electrical One Line Diagram (SEOLD) None of the audited electrical rooms were in compliance with S&LP standard S-316, Paragraph E. Safety Electrical One Line Diagrams are available in four electrical rooms; however, the drawings have not been updated within the preceding 12 month interval there are no posted Safety Electrical One Line Diagrams in the other rooms. Paragraph G. Safety Clothing S&LP standard S-316 does not require safety clothing for each electrical room but it does require the availability of protective clothing for switching and emergencies. Also, it requires periodic high voltage proof testing of the 15 kv rubber gloves. Protective clothing is available in the switchgear room, building 2627 and an incomplete set is available in switch house No. 3. The 15 kv rubber gloves, part of the protective clothing is located in the switchgear room, have not been high voltage tested during the preceding six month interval and when audited, there were no 15 kv gloves with the protective clothing located at switch house no. 3. Equipment audited has been in service for sometime and excluding the condition of cabling and cable trays in certain areas, the effects of corrosion (especially so for unistrut and exposed metallic parts) and some items not in compliance with Divisional safety standards, audited equipment appears functional, in relatively good condition and well maintained. In comparing statistics of this audit with those contained in the last electrical audit (November, 1988) improvement is indicated for the overall plant and for three of six audit categories. Electrical switchgear - starters or electrical rooms, transformers and rectifiers show improvement; whereas, electrical power feed, field wiring and motors remain the same or as before. Visually, improvements are more readily apparent in the switchhouses, in the building structure repairs (MCC building 2625), rectifiers and in some of the electrical rooms. * INDICATES PRIORITY ITEM no COtsIp A o?p99s Tr)FNTTAl Pag 10 REACTIVE CHEMICALS AUDIT (Tuesday, July 30 -- 8:30 a.m to 11:30 a.m.) AUDIT TEAM: Gerald Wagener, Mark Mitchell, Don Jones, Steve Milligan, John Gross Plant Team: Steve Landers, Joe Muller, Stew Surpas ACCOMPLISHMENTS SINCE LAST 2 YEAR REVIEW: The Reactive Chemicals package which has peen prepared since the last 2 yr review is excellent and Chlorine Plant personnel did a superb job at focusing in on the pertinent reactive chemicals concerns. Significant progress has been observed in the area of Operating Discipline, specifically with IPT modules. Also, reactive chemicals information is included in operating discipline. 50% of all the relief systems have been cataloged and excellent progress is being made to complete this survey. All liquid versus gaseous chlorine vents have been segregated. Excellent improvements have been observed in the critical instrument area with respect to alarms aimed at rapid detection of instrument failures. Reactive chemicals improvements have also been observed in the are of chlorine scrubbing with the new titanium scrubber system. Excellent lab chemical storage policies have been established to minimize reactive chemicals hazards. Elimination of metal containers for waste handling has reduced the reactive chemicals hazard potential in that area. Excellent program in place for avoiding incompatible heels in chlorine tank cars. RECOMMENDATIONS: 1. Consider obtaining more complete documentation on the worse case credible scenarios which were used for sizing the taffy pot PSV's. This information should reside in the Chlorine Plant reactive chemicals file and should be used in your reactive chemicals training program. * INDICATES PRIORITY ITEM DO A 0??996 CONFTDFNTTAL Page 11 2. Chlorine cells are not designed with conventional pressure relief devices for relieving pressure problems resulting from reactive chemicals excursions-instead the cell covers are the relief devices. Consider reviewing this with the Pressure Relief Emphasis Team. 3. Consider performing positive identification tests on Freon 12 deliveries. Certificate of analysis is provided by the vendor but this is not considered fool-proof. 4. The recommended spec and analytical testing requirements for HCL should be re-evaluated/re-written whenever the source is changed to reflect the particular contaminants that are possible at the new source. Currently HCL is obtained from DuPont, BASF and Texas. Acid obtained from the CMP plant in Texas contains methanol. Since methanol has been responsible for a taffy pot explosion at another location (due to formation of methyl nitrate) shipments from Texas should definitely be analyzed for methanol content prior to off-loading. 5. It was mentioned that not all critical instruments are truly redundant. Review the critical instrument list and determine if true redundancy exist in areas where key reactive chemicals concerns exist. 6. Document the fail safe positions of all critical instruments that are in area where key reactive chemical concerns exist. 7. Written policy should be established for covering set point changes for critical instruments. 8. Consider developing a comprehensive program for training in plant craftsmen and operators on the reactive chemical hazards pertaining to materials of construction with respect to process chemicals. 9. Concerning materials of construction: Review and if necessary update procedures aimed at assuring that parts issued are compatible with the process chemicals. Facts such as the voltage wire in the cells being made of titanium should be communicated to the appropriate plant personnel. The hazards of using aluminum in the wrong service should also be communicated. 10. Concerning operating discipline: Start-up procedures are in need of improvement and critical operating parameters with respect to reactive chemicals hazards should be reviewed for detection of failure. * INDICATES PRIORITY ITEM DO A 0??997 CONFTDFNTTAI Pag 12 11. A written policy should be established for ownership of lab chemicals. 12. Consider getting Maintenance Tech Service (Mark Bartel) to do a spot audit of your spare parts inventory to confirm the material of construction is indeed what you expect it to be. MTS has a portable x-ray analyzer that is used to verify materials of construction. 13. The hazards of potentially explosive levels of hydrogen in the tail gas scrubber should be communicated (perhaps in the reactive chemicals training program). It was mentioned that hydrogen concentrates in this area are due to removal of chlorine and carbon dioxide. 14. Concerning waste handling: Written procedures should be established for minimizing the risk of inadvertently mixing together incompatible waste. 15. Concerning NCL3 in the he heavies reboiler: Documentation of worse case credible scenarios should be obtained for establishing the various alarm set points and the zero deg C/24 hr dump cycle. This information should be reside in the Chlorine Plant reactive chemicals file and would be an excellent topic for reactive chemicals training program. 16. Consider developing a cross compatibility chart for all process chemicals in use at the Chlorine Plant. Unit 2 in Texas has an excellent compatibility chart based on the CHEMPAT computer program that perhaps could be modified for your purposes. Two contacts were mentioned that may be of some assistance (Eugene at Unit 2 and Dave Leggett in Texas Reactive Chemicals Lab). This chart could also be used in your reactive chemicals training program. 17. It was mentioned that ruthenium tetroxide can get into the the chlorine plant taffy pot and act as a chlorination catalyst which could lead to a reactive chemicals incident. An explosion occurred in due to this condition. Consider obtaining more detailed information on this incident for review and, if necessary, modify your lines of defense for avoiding a similar incident. 18. It was mentioned that a reactive chemicals hazard would result if excess HCL is pumped to the cells. A suggestion was made to review the shutdown trip logic to assure that lines of defense are adequate. 19. The potential problem of hydrogen backflow through the seal pots was discussed. A suggestion was made to document the known scenarios which could lead to this condition. DO A 09299S OONF T DFNT T Al * INDICATES PRIORITY ITEM Pag 13 COMMENTS: With respect to scrubbers it was mentioned that pH of greater than 10 does not guarantee the elimination of plugging problems due to bicarb formation. OCCUPATIONAL HEALTH AUDIT (Tuesday, July 30, 1991-12:00 p.m. to 4:00 p.m.) Audit Team: Gary Meier, Geof Kusch, Bruce Heinze, Marty Morrison, Freddie Gascon Presenter: Keith Jefferies Attendance: A. Sandow, C/A Administration-M. Torres, CL2 -J. Thomerson, C/A Tech Center-J. Muller, CL2 -H. Wilkinson, LAD Auditing Dept. Writer: Gary Meier EDUCATION AND TRAINING: Hazard Communication is emphasized through the annual employee meetings, a complete and readily available HAZCOM Manual and pre-job evaluations through the safe work permit process. This was also verified from the employee survey where all responses indicated they knew the hazards of the chemicals and where to find MSD sheets. The standard lab labeling system is used extensively. RECOMMENDATIONS: 1. The new employee orientation video for Contractor and Dow (including technical and clerical) employees is an effective method to convey consistent information in multiple sessions, but because it is about 4 years old, some updating is needed. The HAZCOM section could be strengthened with introduction to HAZCOM and more specific health hazard effects from the chemicals in the block. The Industrial Hygiene department can assist you with this. 2. Efforts to make the CPAI as complete and representative as possible for the job assignments will result in a helpful resource for indoctrination training and documentation purposes. * INDICATES PRIORITY ITEM DO A 0??999 CONF TDFNT T Al Page 14 3. We support your plans to develop IPT training modules for Industrial Hygiene. This will help improve the timeliness and formal documentation for new employee orientation as well as other reviews. 4. Documentation of safety meetings (including monthly, tailgate and prejob) could be improved with a more detailed agenda describing the items covered, along with your sign-up sheet that is currently being used. * 5. In general, labeling of vessels and containers was good except we did find some five gallon plastic sampling containers not labeled. It would be a good exercise to verify that all vessels listed in your HA2COM manual have the ID numbers printed on them (Are there any other vessels that should be on this?) and further communicate labeling requirements. RESPIRATORY PREOTECTION PROGRAM: Chlorine has a good weekly and monthly respirator inspection program and backed-up with inspection records and C-9 checklist. Annual training is done by the IH plant contact and this involves that each employee demonstrate SCBA proficiency. Full face respirators are checked out from the store room for daily usage and returned to the cleaning station at the end of the shift for cleaning and re-stocking in plastic bags. RECOMMENDATIONS: * 1. Consider upgrading the control room auxiliary air supply system by: a. replace the old Robt Shaw facepieces with the Scott-O-Ramic units with egress capability. b. include these masks in the Vallen's annual maintenance service program. c. simplify activating (opening all of the manifold valves) the breathing air cylinder system located outside. 2. We would also suggest replacing the Robt Shaw escape units at the loading racks with the more commonly used Elsa or Life Air. * INDICATES PRIORITY ITEM 00 A 023000 CONFIDENTIAL Page 15 * 3. We appreciate your support to review sulfuric acid sampling procedures and frequency and to select proper respiratory protection (such as Confo II or equivalent) while taking samples until an in-line system is developed. Industrial Hygiene will work with you to find the best combination of protective equipment. 4. We agree with your plans to emphasize the proper cleaning of the mouthbit respirator. * 5. We did find several respirators in the shop area that need immediate cleaning and storage attention. Further communication may help prevent a recurrence. 6. The written respirator program was last updated in August, 1989. This should be revisited and address fit testing and medical approval requirements. VENTILATION PROGRAM: Special task, such as analyzing cell samples are done in a fume hood. The main lab hood has a cell effluent scrubber to neutralize chlorine. There is an on going inspection/maintenance program. Hoods are equipped with Dwyer II static pressure manometer. Housekeeping in the hoods was good. RECOMMENDATIONS: 1. The new Dwyer manometer needs to be calibrated, (arrange a time with Industrial Hygiene to do that). The Dwyer manometer on the cell operations lab hood had been overfilled with fluid and can not be zeroed. 2. There is very little ventilation in the shop welding area other than natural draft through the large doors. Welding fume monitoring should be conducted under closed-up conditions. Local ventilation at the source of the fume is the best engineering control. HEARING CONSERVATION: The plant has a written Hearing Conservation Program and all personnel are given annual training and audiograms. All areas of the plant with noise levels above 90 decibels are posted to require the use of hearing protection. The chlorine drying train compressors and pumps accounted for most of the noise above 90 decibels. The OSHA Occupational Noise Standard 29CFR 1910.95 is posted in the control building. * INDICATES PRIORITY ITEM DQ A 023001 CONFIDENTIAL Pag 16 RECOMMENDATIONS: 1. Although limited personal audio dosimeter data suggest that only one job assignment (Liquidfaction Operator) exceeds 50% of the allowable daily dose, more data are needed to verify this and complete the exposure profiles. 2. Over the next 5 years, the compressors will be replaced and if noise abatement is in the design, the background noise levels in the plant can be significantly reduced. We agree with your plans to have octave band analysis done to identify those areas for engineering improvements. 3. It would be beneficial to include off the job noise exposure information in the hearing conservation training program. A program on off-the-job noise exposure is available through M.J. Joffrion R.N. in the Medical Dept. PERSONAL PROTECTIVE EQUIPMENT: Personal protective equipment is noted in all job procedures and reviewed when safe work multi-permits are issued. Verification of dielectric effectiveness of rubber boots is required and documented before entrance into the cell area. RECOMMENDATIONS: 1. We found several examples of where PPE was left in the work area and not properly stored. Better housekeeping is needed. Boxes for face shields could be located near the wheel grinders which would help to keep them clean and available. 2. You have identified that contractor employees could emphasize proper use of PPE in their training and will use opportunities to promote that issue. We all share and support that effort. DATA GENERATION AND MONITORING: An extensive data base for potential chlorine exposure has been built through the Dow-Tulane Epidemiology Study. The Industrial Hygiene annual report has been completed for 1990. Chlorine warning device probes continuously monitor the plant and alarm in case of an upset. RECOMMENDATIONS: * INDICATES PRIORITY ITEM D0 A 02300? -onf"dFNT1AL Page 17 1. On-going monitoring activities have been identified and we need your continued support to complete evaluations along with the proper documentation and reports. 2. Although there are chlorine warning devices through the plant, none are located inside the analyzer houses. We ask that you review this situation for the expanded use of probes or what procedural control could be adapted. 3. We agree with your plans to develop a plant IH-9 (similar to the C-9) checklist to organize and keep track of required IH activities. * 4. Follow-up is needed regarding wipe testing for Hex's during turnarounds. ASBESTOS: There is an Asbestos Abatement Team that overseas activities in the plant. The survey of asbestos usage is current (6/91). The hazards are communicated via an IPT module and annual HAZCOM training. All asbestos insulation and gasket work is handled by non-Dow employees with specialized training. There is an active program to evaluate gasket replacements. Asbestos is the only OSHA regulated chemical in the block. RECOMMENDATIONS: 1. Specialized task, such as pulping cells, should continue to be monitored to ensure regulatory compliance. * 2. The storage place for asbestos gaskets is in a high traffic area and even though Petrin cleans the area weekly, a more protective/enclosed location is needed to prevent the escape of any friable fibers. RADITION: Administration and inspection schedule is conducted by the Division Radiation Officer and follows Division Safety Standard S-307. Required posting are in the control room building. * INDICATES PRIORITY ITEM DO A 023003 CONFIDENTIAL Page 18 RECOMMENDATIONS; 1. Radiation hazard training should be part of the HAZCOM program, IPT module, block indoctrination film and listed on the CPAI. 2. The Ohmart unit will be removed from T-56 tank when the vessel is scheduled for inspection. 3. The radiation sign on the unit in the cell operation lab hood is weathered and needs to be replaced. GENERAL-INDUSTRIAL HYGIENE: There are designated areas for storing food and eating lunch and washrooms are strategically located. Dermatitis has not been a problem in the block. RECOMMENDATIONS: 1. We agree with your plans to formalize a policy of washing hands and face before eating or smoking. 2. The cleaning of lunch rooms are done by the janitors but refrigerators are not on their routine. Some refrigerators are in need of cleaning. MEDICAL: The employees in the Chlorine Plant undergo periodic medical surveillance examinations every two years and audiograms yearly. They have recently completed a five year involvement in the Dow/Tulane Chlorine Study. The results of this study should be available in the near future and will be communicated to the plant personnel. RECOMMENDATIONS: 1. A policy needs to be developed to check with the Medical Department when a new employee transfers into the plant to be certain that the employee does not have any medical problems which could affect his/her ability to safely work in the plant. * INDICATES PRIORITY ITEM D0 A 0?3004 CONFIDENTIAL Page 19 2. All employees need respirator fit testing, and this will be completed in 1992 after the next round of medical surveillance exams. Prior to performing these fit tests, the plant IH contact should get in touch with the Medical Department to be certain that all employees have medical approval for fit testing. 3. In the future, contractors will be responsible for their own medical surveillance. We will need to develop an auditing system (at the Division level with verification by the plant) which will allow us to be certain that necessary medical surveillance and training is being performed. NON-DOW EMPLOYEES: PPE is supplied to the permanent (nesters) in-block contractors and receive the same medical surveillance as Dow employees. Lunch rooms and change/shower facilities are provided for contractors. A Dow staff member attends the contractor safety meetings. IPT modules have been developed for contract loaders and employees are well on their way to completing the formal training. RECOMMENDATIONS: 1. A mechanism is needed to insure the results of the I.H. monitoring is conveyed to contractor employee/management in a timely manner and properly documented. 2. Other contractor items are noted throughout this report. LOSS PREVENTION AUDIT: (Wednesday, July 31, 1991 - 8:30 a.m. to 11:30 a.m.) Audit Team: Bill Franklin, Buck Bailey, Al Lott Presentation: Barry Guillory Attendance: J. Muller, CI2--A. Sandow, C/A Administration--J. Haney, CI2 --J. Thomerson, C/A Tech Center-J. Williams, CI2--T. Creel, CI2-G. Meier and H. Wilkinson, LAD Auditing Dept. The Chlorine plant appears to be in good condition with no serious Loss Prevention concerns. * INDICATES PRIORITY ITEM D0 ft 023005 CONFTDFNTTAl ACCOMPLISHMENTS; 1. The pro-audit preparations by the plant staff were very helpful in contributing to a successful audit. 2. Though not yet started up, the chlorine scrubber project has been a significant accomplishment in properly engineering and installing a new system. RECOMMENDATIONS: ELECTRICAL: 1. The electrical area classification plot plan needs to be reviewed and updated. Consideration should be given to reclassification of some currently unclassified hydrogen process areas. This evaluation should include participation by production, Loss Prevention, and the Electrical Emphasis Team. 2. Recommendations from the Electrical Audit team should be considered as part of this list. FIRE PROTECTION: 1. The plant consideration for use of foam for a large liquid spill around the sphere has changed, based on recent test results. This needs to be reviewed with the Fire Protection and Security Dept. EMERGENCY BLOCK VALVES: 1. Audit the plant EBV's and identify them in the field per LPP 1.5.5. 2. I support the CEI recommendation to review the possible need for additional EBV's in the purification area. EMERGENCY PLAN: 1. Review the Fire Protection Plot Plan drawing and assign someone to get it revised to existing conditions. Create a CHAMPS project number to get on the Engineering drafting work list and I can work with the draftsman to review and approve it. * INDICATES PRIORITY ITEM D0 A 023006 CONFIDENTIAL I LOSS PREVENTION: Recommendations continued: Page 21 * 2. Schedule a planning meeting with the Fire Protection Dept, to identify potential fire scenario situations. Develop tentative plans of action for their assistance upon arrival. 3. Add some information about the potential for an iron - chlorine fire and actions to take (or not take) if it happens. CRITICAL EQUIPMENT: 1. Review the critical equipment list to see if it is still acceptable and complete. BUILDINGS: * 1. Review the current positive pressure condition of the control room. Determine what would be required to guarantee a continuous positive pressure in the building? EXPANSION JOINTS: 1. Review the need for expansion joints in service on the HCI pumps. CONTROL OF CHANGE: 1. Send me a copy of your Management of Change implementation plans when they are developed. HAZOP: 1. Contact the Texas Operations-Chlorine Liquidfaction plant and discuss the results of their HAZOP study to see if there is any learning for the LAD Chlorine plant. 2. What area of the LAD plant would you consider as a candidate for a HAZOP study? 3. What upcoming capital projects should be considered for a HAZOP study? * INDICATES PRIORITY ITEM nn a 0?3007 Page 22 OTHER: 1. Not included in this list but considered as recommendations are the items identified by the plant as "Opportunities for Improvement". SAFETY AUDIT: (Wednesday, July 31, 1991-12:00 p.m. to 4:00 p.m.) Audit Team: Don Jones, Brad Marks, Gervey Smith, Howard Wilkinson and Gary Meier Presenter: Stew Serpas Attendance: J. F.Grissom, CI2-A. Sandow, C/A Administration -J. Haney,CI2-P. Yonts, CI2-T. Austin, C/A Administration --T. Creel, CI2-J. Williams, CI2-J. Thomerson,C/A Tech Center Writer: Don Jones SAFETY PROGRAM FUNDAMENTALS: The Chlorine Plant has a written Safety Policy. The Policy has been communicated to all employees by means of a letter. The safety committee has developed a mission statement. Also, safety is included in the Chlorine Plant and Chlor-Alkali group mission statement. RECOMMENDATIONS: None at this time. EMPLOYEE RESPONSIBILITY FOR SAFETY: Management/Supervision works with employees to set goals and review them twice a year. The new employee Safety JPR has been reviewed with all employees and goals set for the remainder of 1991. RECOMMENDATIONS: 1. Utilized the Safety Performance Improvement Process (SPIP) to help in identifying safety goals. * INDICATES PRIORITY ITEM 023008 DO A COMF1 dentiai Page 23 PROGRAM STRUCTURE - ORGANIZATION - PLANNING: All employees are responsible for safety. However an active plant safety committee exists with members from that serve a one year rotation. The committee conducted a survey in 1990 to aid in improving the safety pro- gram. The safety coordinator spends 90% of his time writing/reviewing permits and conducting on-site inspections. Permit writing has improved in quality the past six months. The coordinator also handles paperwork that drive the C-9 activity. The coordinator works approximately 20% overtime on a regular basis. RECOMMENDATION: * 1. Provide opportunity for operations employees to serve as chairman of the plant safety committee. * 2. Safety Coordinator: a. Provide help for the safety coordinator b. Re-evaluate the role of the safety coordinator .relative to the LAD safety coordinator job description. 3. Utilize the Safety Performance Improve Process (SPIP) in formulating safety objective, goals and plans. SAFETY TRAINING: All new Dow and Contract employees receive a plant safety indoctrination. Dow employees are trained using IPT's and videos. Contract employees are trained using a video and checklist. The plant felt that the LAD Contractor indoctrination needs improving and would be willing to work with Maintenance/Construction to improve. The plant has gone beyond the normal plant contractor indoctrination in a couple of instances: a. Developed a IPT training module for chlorine tank car loaders. b. Shutdown Training. Operating procedures/IPT's are used in lieu of a safety training manual. * 1. Consider developing a IPT module for the block indoctrination video. The module should be detailed enough to cover all aspect of the indoctrination. This will also help verify comprehension. Also, up-date the indoctrination video. * INDICATES PRIORITY ITEM DO A 023009 CONFIDENTIAL Page 24 * 2. Consider providing more complete formal documentation of safety training. The new documentation system for IPT's is a positive step. 3. We support your format of addressing safety at the beginning of each IPT module. 4. Consider developing a Chlorine Plant Safety Training Manual. OPERATING PROCEDURES: The IPT concept is the key. IPT module completion times are part of the goal setting and follow-up process by shift supervisors. A new IPT documentation system will provide the proper documentation. RECOMMENDATIONS: 1. Consider bringing in another operator to serve as a member of the training review board. EMERGENCY PLAN: Plant Emergency Plan is presently being revised. Drills are held on a monthly basis. RECOMMENDATIONS: * 1. Consider referencing shutdown procedures in the plant Emergency Plan. * 2. Consider addressing explosions and visitors in the plant Emergency Plan. 3. Consider developing an IPT module for the Emergency Plan. 4. Consider reviewing the Emergency Plan annually. Enter as a C-9 checklist item to insure review. 5. Consider formalize training meeting sheet to include "Header" of agenda items, presenter and attendance. This will include monthly emergency drills with space with "Learning Value", "Corrective Actions" and "Completion". * INDICATES PRIORITY ITEM DO A 023010 CONFIDENTIAL Page 25 ACCIDENT/INCIDENT INVESTIGATIONS: All accidents/incidents are investigated in the Chlorine Plant. The safety coordinator has primary responsibility for initiating the investigation. The supervisor and plant superintendent is also involved. Accident/Incident data is stored in a data base for retrieval and analysis. Also, the data base allows for tracking follow-up actions to completion. The Chlorine Plant is willing to share this system with the LAD committee working on a similar system. RECOMMENDATIONS: 1. Write up all on and off-the-job accidents/incidents that are classified DAWC's in the Safe Working Styles format. 2. Consider greater distribution and visibility of the plant safety committee monthly report including follow-up actions on accidents/incidents. SAFETY STANDARDS, GUIDES, REQUIREMENTS: New standards and regulations are communicated at safety, staff, and tailgate meetings. Gauge glasses in freon service are not presently registered in the Pressure Vessel Program. However plans call for completing registration by 12/91. RECOMMENDATIONS: None at this time. HAZARD DETECTION PROGRAM: The plant superintendent makes inspections on a regular basis. Housekeeping, C-9, Projects, Pre-Shutdown and Pre-Startup audits are also conducted as required. RECOMMENDATIONS: 1. Consider reinstating emphasis on Job Safety Analysis. * 2. Assure that all identified hazards are tracked to completion and the formal documentation exists to support the fact. 3. Consider developing a plan to better communicate the results of inspections/audits. * INDICATES PRIORITY ITEM DO A 023011 CONFIDENTIAL Page 26 SAFETY SUGGESTION SYSTEM: The plant has a safety suggestion system. Approximately 300 are written each year. 90% are completed within 30 days (plan goal). The safety coordinator initiates follow-up action. Engineers are frequently involved in follow-up. The plant safety committee assures follow-up. RECOMMENDATIONS: * 1. Assure that all suggestions are tracked to completion and the formal documentation exists to support the fact. AWARD/RECOGNITION SYSTEM: The Chlorine Plant has a Safety Award/Recognition Program. Everyone in the plant is eligible after achieving the goals set. Normal dollar value of a safety award is $50.00. RECOMMENDATIONS; None at this time. CONTRACTOR SAFETY: Contract employees are required to adhere to the same safety requirements as Dow employees in Chlorine. A member of the Chlorine plant staff attends all weekly contractor safety meetings. All contract employees are given a Chlorine plant indoctrination consisting of a video and checklist. RECOMMENDATIONS: 1. Consider involving contractors more in plant safety programs. 2. Consider documenting pre-job safety conferences and safety meetings. * 3. Consider developing an IPT module for the indoctrination film. OFF-THE-JOB SAFETY: Off-the-job safety is addressed in the plant safety program. Safety meeting topics such as Hunting Safety and Home Electrical Safety have proved to be the most successful. D0 A 0?30i? CONFIDENTIAL * INDICATES PRIORITY ITEM Page 27 RECOMMENDATIONS: None at this time. COMMUNICATIONS: The Chlorine Plant uses a number of different materials for communicating with employees on safety. RECOMMENDATIONS; None at this time. HOUSEKEEPING: Overall plant housekeeping is very good. RECOMMENDATIONS: Control Room: Overall housekeeping is very good. Red Tag board is easily accessible. One master was out of date. Many masters have been rolled over. Make sure all work crew rosters are current. Be specific on task description for each craft accepting permit. Safe work permit area is organized and neat. Office Area: Current information posted on bulletin board. OSHA posting on board - Super! Conference room looked good. Mechanical room needs attention. Sign on door indicated emergency equipment inside-none was found. Microwave inspection has exceeded one year. * INDICATES PRIORITY ITEM D A 023Oi-a C0NFrTDENrjAL Page 28 Plant Operating Area: * * * * * * * Safety Files: * * * * * INDICATES PRIORITY ITEM Safety shower visibility very good. Covers off many eye wash stations. Several ladders missing safety gate. Warehouse areas need attention. A thorough clean up should happen in the very near future-several tripping hazards, materials stood up against walls, asbestos gaskets laying around, flammable materials should be put back in storage cabinet. Dimensions on grinders rest plate needs adjusting. Add instruction sign at drill press. Unsecured cylinders in rack. Bar not used. One bottle secured with rope. Flammable storage area looks good. Lab is neat and clean. Look at re-labeling sample bombs. Run pan duct behind center island to house wires. Re-visit drainage concern for safety shower. Cell lab microwave needs an inspection sticker. Fire extinguisher should be made more accessible. Impressive computerized program with network capabilities. Need to have follow-up on actual completion dates. No dates under fire extinguisher training on C-9 check lists. Recommend follow-up test after watching plant indoctrination film. OSHA Star Box overall is in good shape. There were a few date concerns and need to add a few examples of follow-up actions/procedures. D0 A 023014 CONFIDFNTTAL Pag 25 ACCIDENT/INCIDENT INVESTIGATIONS: All accidents/incidents are investigated in the Chlorine Plant. The safety coordinator has primary responsibility for initiating the investigation. The supervisor and plant superintendent is also involved. Accident/Incident data is stored in a data base for retrieval and analysis. Also, the data base allows for tracking follow-up actions to completion. The Chlorine Plant is willing to share this system with the LAD committee working on a similar system. RECOMMENDATIONS; 1. Write up all on and off-the-job accidents/incidents that are classified DAWC's in the Safe Working Styles format. 2. Consider greater distribution and visibility of the plant safety committee monthly report including follow-up actions on accidents/incidents. SAFETY STANDARDS, GUIDES, REQUIREMENTS: New standards and regulations are communicated at safety, staff, and tailgate meetings. Gauge glasses in freon service are not presently registered in the Pressure Vessel Program. However plans call for completing registration by 12/91. RECOMMENDATIONS: None at this time. HAZARD DETECTION PROGRAM: The plant superintendent makes inspections on a regular basis. Housekeeping, C-9, Projects, Pre-Shutdown and Pre-Startup audits are also conducted as required. RECOMMENDATIONS: 1. Consider reinstating emphasis on Job Safety Analysis. * 2. Assure that all identified hazards are tracked to completion and the formal documentation exists to support the fact. 3. Consider developing a plan to better communicate the results of inspections/audits. * INDICATES PRIORITY ITEM DO A 023015 CONFIDENTIAL Page 26 SAFETY SUGGESTION SYSTEM: The plant has a safety suggestion system. Approximately 300 are written each year. 90% are completed within 30 days (plan goal). The safety coordinator initiates follow-up action. Engineers are frequently involved in follow-up. The plant safety committee assures follow-up. RECOMMENDATIONS: * 1. Assure that all suggestions are tracked to completion and the formal documentation exists to support the fact. AWARD/RECOGNITION SYSTEM: The Chlorine Plant has a Safety Award/Recognition Program. Everyone in the plant is eligible after achieving the goals set. Normal dollar value of a safety award is $50.00. RECOMMENDATIONS: None at this time. CONTRACTOR SAFETY: Contract employees are required to adhere to the same safety requirements as Dow employees in Chlorine. A member of the Chlorine plant staff attends all weekly contractor safety meetings. All contract employees are given a Chlorine plant indoctrination consisting of a video and checklist. RECOMMENDATIONS: 1. Consider involving contractors more in plant safety programs. 2. Consider documenting pre-job safety conferences and safety meetings. * 3. Consider developing an IPT module for the indoctrination film. OFF-THE-JOB SAFETY: Off-the-job safety is addressed in the plant safety program. Safety meeting topics such as Hunting Safety and Home Electrical Safety have proved to be the most successful. * INDICATES PRIORITY ITEM DO A 023016 CONFIDENTIAL Pag 27 RECOMMENDATIONS: None at this time. COMMUNICATIONS: The Chlorine Plant uses a number of different materials for communicating with employees on safety. RECOMMENDATIONS; None at this time. HOUSEKEEPING: Overall plant housekeeping is very good. RECOMMENDATIONS; Control Room: Overall housekeeping is very good. * Red Tag board is easily accessible. One master was out of date. Many masters have been rolled over. Make sure all work crew rosters are current. Be specific on task description for each craft accepting permit. - Safe work permit area is organized and neat. Office Area: Current information posted on bulletin board. - OSHA posting on board - Super! * Conference room looked good. Mechanical room needs attention. Sign on door indicated emergency equipment inside--none was found. * Microwave inspection has exceeded one year. * INDICATES PRIORITY ITEM k A 023017 confidential Pag 28 Plant Operating Area: * * * * * * * Safety Files: * * * * * * INDICATES PRIORITY ITEM Safety shower visibility very good. Covers off many eye wash stations. Several ladders missing safety gate. Warehouse areas need attention. A thorough clean up should happen in the very near future-several tripping hazards, materials stood up against walls, asbestos gaskets laying around, flammable materials should be put back in storage cabinet. Dimensions on grinders rest plate needs adjusting. Add instruction sign at drill press. Unsecured cylinders in rack. Bar not used. One bottle secured with rope. Flammable storage area looks good. Lab is neat and clean. Look at re-labeling sample bombs. Run pan duct behind center island to house wires. Re-visit drainage concern for safety shower. Cell lab microwave needs an inspection sticker. Fire extinguisher should be made more accessible. Impressive computerized program with network capabilities. Need to have follow-up on actual completion dates. No dates under fire extinguisher training on C-9 check lists. Recommend follow-up test after watching plant indoctrination film. OSHA Star Box overall is in good shape. There were a few date concerns and need to add a few examples of follow-up actions/procedures. 90 A 023018 CONFIDENTIAL Page 29 EMPLOYEE SAFETY SURVEY: There were 34 surveys returned. All surveys reflected job intervention (26 of 34 said they would not only intervine but would do more by showing/explaining other ways to complete the job and minimize risks). All employees knew the LAD was an OSHA Star site. However, only 40% knew their rights under the OSHA VPP/Star program. Responses to other questions are as follows: Supervisors view on safety - 97% very high to excellent. Training before starting something new - adequate to very well, several positive IPT comments. If acting at appropriate times, can accidents be prevented: 44% all of the time 56% most of the time 34 out of 34 said they knew where MSDS sheets were located. several said they had used MSDS sheets EMPLOYEE INTERVIEW SUMMARY: Overall, familiarity with Safety Phase III Program was low. While some stated they remembered the name, no one could remember any of the specifics. No one remembered ever having seen the 19 Safety Principles. Everyone understood and most were in agreement with the policy that limits overall rating to no more than safety rating. There was some concern expressed about how off the job incidents might affect a person's safety rating. Everyone stated that they were comfortable intervening and knew that this was a condition of employment. Everyone felt that management was committed to safety. One person felt that "upper management" was more committed than first line supervision. No one had been exposed to the Safety Performance Improvement Process. Everyone was familiar with their emergency plan. They were all aware of their job responsibilities. The monthly emergency drills were felt to be very helpful in keeping everyone up to date on specific emergency procedures. While everyone interviewed knew the assembly points, most expressed some concern about how well the newer contract employees knew them. Over half of those interviewed had no knowledge of the new Division Emergency Plan. * INDICATES PRIORITY ITEM ft 0230'q 0NF^^ Pag 30 When asked what suggestions for improvement do you have for Chlorine Plant Safety Program? 1. Put an additional person on days to work with the Safety Coordinator. 2. Continue to use incentive programs (money) to spark interest and participation. 3. Management should not accept unsafe acts in emergency situations and should provide more positive reinforcement. When asked what safety concerns do you have? 1. Plugs on H2S04 cars are sometimes so tight that a "cheater" is required to loosen them. This puts the person (who is working in an acid suit) in a very awkward position. 2. Almost everyone felt that the workload on the safety coordinator was too high. 3. Operations of the cell switches is of concern. 4. Catching unnecessary samples in the acid area was brought up as a concern. * INDICATES PRIORITY ITEM DO A 023030 CONFTDFNTTAl