Document ej6bR6R1MNbQgmDZ82OyXJJe

INTER-OFFICE To Ail Maintenance Supervision From W. D,, Skipper Subject Asbestos Material Address Address Date May 27, 1976 In order to assure compliance with the present EPA Standard on Asbestos as established in October, 1975, it is necessary to develop and maintain a procedure for handling asbestos material at the Baton. Rouge Plant. With this in mind, a procedure has been drafted and is attached. Also attached is the form for notification as explained in the procedure. In reference to items iistea in the procedure, the following comments are necessary: 1. Asbestos Warning Tags are being printed. When received, they will be carried in Stores as a general stock item. A bin number is being established. 2. Copies of the "Notice of Intention to Renovate" will be available as needed. ' 3. The centralized dumpster for asbestos material is to be located east of the garage. 4. A list of vessels for which notification will be required should be prepared as soon as possible. WDS:pmk Attachment Wayne D. Skipper ETH00003495 NOTICE OF INTENTION TO RENOVATE DATE: Name of Firm: Address of Firm: Description of Facility to be Renovated: Age of Facility: Size of Facility: Use of Facility: Approximate Amount of Asbestos to be Removed: Location of Facility: Scheduled Starting and Completion Dates: Nature of Renovation and Methods: Procedure for Handling .n-soestos Waste Iviaterta.1.: Name and Address of Disposal Site: ETH00003496 *, n ist of ail vessels v/xtn more tnan xoo sq. it. of asbestos insulation or fireproofing shall be prepared. 2. Written notification shall be made 10 days prior to commencement of asbestos removal where more than LoO sc. ft. of asbestos material is removed or more than 260 ft. ox pipe insulated or fireproofed with asbestos is stripped. 3. When written notification is necessary, the form "Notice of Intention to Renovate" shall be-completed and forwarded to Mr. H. O. Bourque, Manager of Maintenance. 4. Unless otherwise assigned by Maintenance Area Superintendents, procedures if 1 through ff3 shall oe tne responsiDility ox the Maintenance Supervisors. Superseded by \ eHcr 55^ +o D EC daAeci '5-t'2.-79 6. All asbestos material to be removed shall be adequately wetted prior ' to removal and shall be kept wet during all phases of handling. by UUer H o ft -*-0 dcAccfc 8 All containers with asbestos waste shall be tagged with an Asbestos Warning Tag. ^ e f % e d e di leAVev "Vo fEEC. ddecS il. No new insulation containing asbestos is to be applied at- the 3aton Rouge Plant, Substitutes are to be used exclusively. Del cd K 13 On jobs above ground levei, all safety rules governing above ground level work, as outlined in tne "Safety How", shall be followed. Note: his procedure shall remain in effect until superseded. 5/27/76 ETH00003497 ------ ^ ETH00003498