INTER-OFFICE
To Ail Maintenance Supervision
From
W. D,, Skipper
Subject Asbestos Material
Address
Address Date May 27, 1976
In order to assure compliance with the present EPA Standard on Asbestos as established in October, 1975, it is necessary to develop and maintain a procedure for handling asbestos material at the Baton. Rouge Plant. With this in mind, a procedure has been drafted and is attached. Also attached is the form for notification as explained in the procedure.
In reference to items iistea in the procedure, the following comments are necessary:
1. Asbestos Warning Tags are being printed. When received, they will be carried in Stores as a general stock item. A bin number is being established.
2. Copies of the "Notice of Intention to Renovate" will be available as needed.
' 3. The centralized dumpster for asbestos material is to be located east of the garage.
4. A list of vessels for which notification will be required should be prepared as soon as possible.
WDS:pmk Attachment
Wayne D. Skipper
ETH00003495
NOTICE OF INTENTION TO RENOVATE
DATE:
Name of Firm: Address of Firm: Description of Facility
to be Renovated:
Age of Facility: Size of Facility: Use of Facility: Approximate Amount of
Asbestos to be Removed: Location of Facility: Scheduled Starting and
Completion Dates: Nature of Renovation
and Methods:
Procedure for Handling .n-soestos Waste Iviaterta.1.:
Name and Address of Disposal Site:
ETH00003496
*, n ist of ail vessels v/xtn more tnan xoo sq. it. of asbestos insulation or fireproofing shall be prepared.
2. Written notification shall be made 10 days prior to commencement of asbestos removal where more than LoO sc. ft. of asbestos material is removed or more than 260 ft. ox pipe insulated or fireproofed with asbestos is stripped.
3. When written notification is necessary, the form "Notice of Intention to Renovate" shall be-completed and forwarded to Mr. H. O. Bourque, Manager of Maintenance.
4. Unless otherwise assigned by Maintenance Area Superintendents, procedures if 1 through ff3 shall oe tne responsiDility ox the Maintenance Supervisors.
Superseded by \ eHcr 55^ +o D EC daAeci '5-t'2.-79
6. All asbestos material to be removed shall be adequately wetted prior ' to removal and shall be kept wet during all phases of handling.
by UUer H o ft -*-0
dcAccfc
8 All containers with asbestos waste shall be tagged with an Asbestos
Warning Tag.
^ e f % e d e di
leAVev
"Vo fEEC. ddecS
il. No new insulation containing asbestos is to be applied at- the 3aton Rouge Plant, Substitutes are to be used exclusively.
Del cd
K 13 On jobs above ground levei, all safety rules governing above ground
level work, as outlined in tne "Safety How", shall be followed.
Note:
his procedure shall remain in effect until superseded.
5/27/76
ETH00003497
------ ^