Federal Register / Vol. 51. No. 119 / Friday, June 20. 1986 / Rules and Regulations
5?
Appendix E Co 1926.58--Interpretation and an enclosure around the removal site, the
Materials and Equipment Necessary for .
Classification of Chesl Roentgenograms--
standard requires employers to provide
Asbestos Removal
Mandatory
(a) Chest roentgenograms shat] be interpreted and classified in accordance with a professionally accepted classification system and recorded on a Roontgenographic Interpretation Form..`Form CSD/NIOSH (M) 2.8. .
(b) Roentgenograms shall be interpreted and classified only by a B-reader. a board ellgible/cerlified radiologist, or an experienced physician with known expertise in pneumoconioses.:
(c) All interpreters, whenever Interpreting chest roentgenograms made under this section, shall have immediately available for reference's complete set of the ILO-U/C International Classification of Radiographs for pneumoconioses, 1980. .
Appendix F to 1926.56--Work Practices and Engineering Controls for Major. Asbestos Removal, Renovation, and Demolition Operations--Non-Mandatory
This is a non-mandatory appendix designed to provide guidelines to assist
hygiene facilities that ensure that their asbestos contaminated employees do not leave the work site with asbestos on their persons or clothing; the construction of those facilities is also described below. The steps in the process of preparing the asbestos removal site, building the enclosure, constructing hygiene facilities, removing the asbestos-containing niatertal. and restoring the site include:
(1) Planning the removal project: (2) Procuring the necessary materials and equipment; (3) Preparing the-work area;. (4) Removing the asbestos-containing material: (5) Gleaning the work area; and (6) Disposing of the asbestos-containing waste.
Manning the Removal Project
The planning of an asbestos removal project is critical to completing the project safely and cost-effectively. A written asbestos removal plan should be prepared that describes the equipment and procedures
Although individual asbestos removal projects vary in terms of the equiprrient required to accomplish ihe removal of the material, some equipment and materials are common to most asbestos removal operations. Equipment and materials that should be available at Ihe beginning of each project are: (1) rolls of polyethylene sheeting: (2) rolls of gray duct tape or clear plastic tape; (3| I IEPA filtered vacuum(s): (4) HF.I'A- * filtered portable ventilation systcm(s): (5) a welting agent; (6) an airless sprayer; (7J a portable shower unit; (8) appropriate respirators: (9) disposable coveralls: (10) signs arid labels: (11) pre-printed disposal bags: and (12) a manometer or pressure gauge.
Rolfs of Polyethylene Pluslic and Tape. Rolls of polyethylene plastic (6 mil in thickness) should be available to.construcl the asbestos removal enclosure and to seal windows, doors, ventilaiion systems: wall penetrations, and ceilings and floors in the work area. Cray duct tape or clear plastic tape should be used to seal the edges of the plastic und to seal any holes in the plastic enclosure. Polyethylene plastic sheeting can be purchased in rolls up to 12-20 feet in width
employers in complying with the
that will be used-throughout the project The and up to 100 feet in length.
requirements of 29 GFR 1920.58. Specifically, - asbestos abatement plan will aid not only in
HEPA-Filtered Vacuum. A I IKPA-filtered
this appendix describes the equipment,
executing the project but also in complying
vacuum is essential for cleaning the work
methods,.and procedures'that should be used with the.repoiiing requirements of the USEPA area after the asbestos has been removed. . .
in major asbestos removal projects
asbestos regulations (40 CFR 61. Subpart M). Such vacuums are designed to be used with a
conducted to abate'a recognized asbestos hazard or in preparation for building renovation or demolition. These projecls . require the construction of negative-pressure
temporary enclosures to contain the asbestos . materia! and to prevent the ,exposure of
bystanders and other employees atthe. . . worksite!.Paragraph (e)(6) of the standard . requires that:**-(Wjhenever feasible, the.
which call for specific information such as a description of control methods and control equipment to be used and the disposal .sites the contractor proposes to use to dispose of the asbestos containing materials.
The asbestos abatement plan should contain the following information:
A physical description of the work area:
HEPA (High Efficiency Particulate Air) filler, which is capable of removing 99.97 percent of the asbestos particles from the air. Various sizes and capacities of HEPA vacuums are available. One manufacturer. Nilfisk of
America. Inc.*, produces three models that range in capacity from 5.25 gallons (o 17 gallons (sec Figure F-1). All of these models are portable, and atl have long hoses capable
employershall establish negative-pressure . . A description of the.approximate amount of reaching out-of-lhe-way places, such as.
enclosures bcfore'comnieftcirig asbestos
. of material to be removed;
areas above ceiling tiles, behind pipes, etc.
. removal, demolition, or renovation . operations '! Employers, should also be aware
. A schedulcTor turning off and sealing existing ventilation systems;
Exhaust Air Filtration System. A- portable ventilation system is necessary to create a .
. . that, when conducting asbestos removal. projects; they may be'requircd under, the:
. National Emission's Standards for Hazardous
Personnel hygiene procedures; .* Labeling procedures; :
negative pressure within.thc asbestos removal enclosure. Such units are equipped . with a HEPA filler and are designed to
. Air Pollutants'(NESHAPS), 40 CFR Part 61.
A description of personal protective
exhaust arid.clean the air inside the enclosure
.. $ubpaftM.;or EPA regulations.undcr the-.
cquipmenland clothing to be worn by
before exhausting.it to the outside of the
Clear Water Act. .
, employees:
enclosure (See Figure F-2). Systems are
Construction of a negative-pressure .enclosure is a simple but.time-consuming ' .. process-that requires careful preparation ;and execution; however, if the procedures below - are followed. Contractors should be assured of achieving a temporary barricade that will
protect employees.and others outside the ' ' enclosure frdm'cxposure to, asbestos arid : -. minimize tolhe extent possible the exposure
of asbestos workers inside the barrier as ' well..";>
A description.of the local exhaust . yentilntionsystems to be used;. . - ' . <
A dcscripliofvof work practices to be observed.by employees: .
A description of the methods to be used . to remove the asbestos-containing material;
,The wetting agent to be used;
. * .A description of the sealant to be used at the end of the project;
An air-monitoring plan;
available from several manufacturers. One supplier. Micro-Trap. Inc.. # has.two ventilation units that range in capacity from.
600 cubic feet per minute (CFM) to 1,700 CKM According to the manufacturer's literature. Micro/Trap * units filter particles . of 0.3 micron in size with an efficiency of .
99.99 percent. The number and capacity of units required to ventilate an enclosure depend.on the size of the area to be ventilated.
-The equipment and materials required to
construct these barriers are readily available and'easily installed and used. In addition to
A descriplion of the method to be used to transport-wastemiaterial; and
'Meotion of trade names or commercial ` products does not constitute endorsement or- -
.* The location of the dump site.
recommendation for use.