Document eDkeL5GeBpa3X4NZQ770gaLM
HONS 095466
1
HONS 095467
Append rx F
UTILITIES SUMMARY
ITRAL ENGINEERING DEPARTMENT
4CCT NM*C
ARoclor.
WAsTZ disposal
UTILITY SERYICE
UNITS
INITrIi,AL ISSUE
(s/70
PCAACO T
W. C. MIEMBYBR
REV. |
ARRMVID
TPAH (l2pp;id
TEAM (tops*) ltiA'HA
'oven.
installed] HP
7 00 300
Soo IOOO
!7S 250
lAYVHAL 6,AS SCFH
5000 4oo o
VEL OIL
JELL WATER
crn
ns
GO
150
:ITY WATER GPH
-0
CCA MO
24 IS
REV. 2
ARC*
RACE
!~
REV. 3
/
cr*w
Xc z
i
*" ' EQUIPMENT LIST
VI r ' APPENDIX 2 ^
Material of Construction
1-101
1-102 1-1 SI 1-152
1-153 1-154
1-155
1-150 1-104
Montar Tank Trailer
Incinerator
Quench Column Quench Pot
Venturi Scrubber
Packed Scrubber Column
Demister Pad
Coirbustion Air Blower Tncinerator Feed Pump Koyno Positive Displ.
Carbon Steel Refractory-Lined Carbon Steel
'
Hastelloy "C" Polyester-Lined Carbon Steel
| |
Hastelloy "C" Polyester Ductwork Polyester-Lined Carbon Steel
Monel
Carbon Steel
Stator - Viton A
.
Rotor - Chrome
Plated Tool steel Housing - Cast Iron
1-106
, Scrubber Circulating Pump
Chlorimet 3 (Hastelloy "C")
1-107 1-110
Drum Heater Tank Car Unloading Pump
Structural Steel Frame; Insulating
Board Enclosure Worthington Self-Priming (Worthite)
1-111
Tank Truck Unloading Pump
Durco A20 (Ductile Iron)
1-112
Well Water Booster Pump
Durco A-70 (Alloy 20)
1-114 .
Fuel Oil Storage Tank {20,000 Gallons)
Carbon Steel
1-115, 1-123 Fuel Oil Pumps
Roper Gear Cast Iron
1-116, 1-117, 1-118 waste Storage Tanks (20,000 Gallons) Carbon Steel
1-119 Drum unloading Sump Pump
Taber Vertical Ductile Iron
1-120
Incinerator Area Sump Pump
Taber Vertical (304 SS)
1-121
Aroclor Sump Pump
Goulds vertical Ductile Iron
1-122
Water Sump Pump
Taber Vertical (304 SS)
1-124 1-126
Settling Basin City Water Break Tank
Concrete Carbon Steel
1-127, 1-132 City Water Pumps
Patterson' (Semi-Steel and Bronze) .
1-12B
Drum Crane Capacity 2000 lbs.
Air Technical Industries'
(7 U r? S '3
HONS 095469
y-i J C,NT*4l 1 ' BN.iM.ri.i~o Otr MiittNt
::imr t n,niiawi*h"Lliftitlm.i.`.i 1
Oxld.ifeor-ScrubJber Unit
r.OJ/BtPT
punt ErACT-^rj^h-..aiivc-~XiraairLc.
et* no. 2415 .... ho. fll
"V SPECIFICATION NO: 2415-01-103.000
1.1 The unit will oxidize waste liquid to CO2, HjO, HC1 and CaO with auxiliary fuel and-.cxcess air at sufficient resi-
' donee time and temperature to destroy the organic compo nents of the waste. The unit will quench and scrub the
flue gases with water to remove IIC1 and particulates.
2. STREAM DEFINITIONS . .'
.
2.1 The waste liquid will be Aroclor 1242, Aroclor 1260, Aroclors which are chlorinated at some level between 1242 and 1260, Inerteen PPO, the distillation residue in tho pro duction of Aroclor (Montar), or any combination of the Aroclors and Montars. Maximum waste rate will be 1250
' pounds per hour. Vendor possesses analysis and testing recults on these materials.
' 2.2 Auxiliary fuel will normally he natural gas available at ` , , 35 psig. However, #2 fuel oil will be used when natural
gas is not available in the viinter months. Natural gas will be available for the pilot at all times.
2.3 Atomizing steam will be available at 150 psig.
2.4 Hard well water will be provided at 100 psig to be used . for quench and scrubber liquor. Analysis of this water
is attached. Specification 2415-01-102.000A.
2.5
' '
'
Effluent gases from the oxidizer shall not. contain more than 0.001 pounds per hour of polychlorinated biphenyls and
effluent stack gases shall not contain: more than 5 pounds of HC1 per hour, more than 0.05 grains of particulates per standard cubic foot, particles larger than 20 microns in diameter, more than 50 ppm of free chlorine for 1250 pounds per hour feed rate.
2.6 Scrubber liquor will be sewered without neutralization.
3. OPERATING CONDITIONS
' IS-7
3.1 Unit y.-ill be capable of operating from 2000 to 2800r' for the Aroclors and from a maximum of 2hO'>F- for the Montar at 1250 pounds of waste per hour and ten million pounds of waste per year.
MONS 095470
3.2 Combined quench ar.d scrubber liquor makeup not to exceed 143 gpm (70 gpm to the packed bed. 68 gpm to the quench spray nozzles and weir in the'quench tube, 'and 5 gpm to
the oxidizer quench spray nozzles. System to be designed to prevent scaling and plugging due to the well water.
'SMer,
--
i U*v.V...,,4. 01-10 2 -OOP
ei`A uA 2415 AM* Nft. fll
t -'T-.. I... Wl.cll--o>r , O*Tf0/ I 1 /l/n lurr. V
4. MATERIALS TO DE SUPPLIED BY VEMDOR
.
4.1 Equipment
A. Thermal Oxidizer
' .
.
.
,
... .
. .. , :
' .
a. b. c. d. e. f. g. h. i'. j. k.
. 1.
. .
. m.
.
9'-6" O.D. oxidizer furnace
Flanged exhaust
-
Bolted access door
Thermowell and sample connections at oxidizer outlet
Sight ports
Shop installed refractory anchors as required
Control connections for items specified in Section 4..2
Flanged burner connection
A283 carbon steel construction
Lifting lugs
Ladders and platforms to the burner on one end of
the oxidizer and to the thermocouples and sprays
on the other.end, hot dip galvanized according to
Specification 2415-01-102.000E
All external carbon steel surfaces which are not
galvanized will be sandblasted and then painted
with inorganic zinc primer in compliance with
Monsanto Standards, Specification 2415-01-102.OOOB
Weak seam welding on rear oxidizer head, weld
thickness to be one fourth of head plate thick
ness provided plate is three eighths of an inch
.
minimum thickness.
. -*"
B. Burner
'.
One high intensity fuel gas-fuel oil-waste liquid burner. The burner will include the following:
a. Electric igniter .
b. Gas pilot
c. Raw (natural) gas auxiliary fuel burner
d. Standby auxiliary fuel oil burner
e. Adiustablo air register
f. Forced draft, design
g. Secondary waste liquid burner (steam atomized)
h. Burner tile
.
Refractory .
.
'
The pxidizer furnace will be lined with 6" of B-40
brick, a special high duty .basic firebrick adequate
for extreme tempora.turo service and the attack of the
calcium to b# fouv.U Vir. the Mont^r*, backed with 4.5"
Groonciyrome'fortac'is to b* used. The
lined with
v;All r*fraofcory
.
roh*!
u|nt ofoviltage tarv-^y s
o^lfor.Jfi*M i
RONS 095471
I
Cm****vVr. ` . OmmuiNt
ton for thermal S<'rublber Unit
MJ/OCPt i -- r---n~ .- .......... -
.
IIhamt Koo^rj.c:i.^o>viow.^r^i>u.a^i-.
EEc-r* xx>/ |j..u,... 01-10?.000 ) *>. 241 5 . A..*--- fll
4. MATERIALS TO DE SUPPLIED BY VENDOR (Continued)
4.1 Equipment (Continued)
D. Quencher
The quencher consists of a water wall direct spray contactor flanged directly beneath the oxidizer followed by a vortical, cylindrical quench pot with a horizontal
flanged exhaust. Features of the quenching system are as follows:
a. 9'-6" O.D. quench pot
b. 30" O.D. contactor tube of Hastclloy C construction
c. Mechanically atomized water spray nozzles in the
contactor tube capable of operating with hard well
water. Specification 2415-01-102.000A.
d. Glass flaked reinforced polyester lined carbon
steel construction in the quench pot, Atlac 382
resin, 100 mils minimum thickness
e. Suitable connections for a drain and the control
items specified in Section 4.2
f. See Section 4.1.A.1, for procedure for painting
-
quench pot
,....................
............
3
B. Scrubbing System and Vent Stack
''
A venturi type scrubber will be flanged directly to the exhaust of the quench pot. It will be fabricated from Hastelloy C. Water manifolds, jacketing and support structure will be included. The vent stack is a vertical, cylindrical, free-standing unit includ
ing a packed bed to serve as the secondary scrubber for the scrubbing of hydrogen chloride in the effluent gases. The vent stack will be flanged directly to the
diffuser section following the fixed throat venturi. Design features of the vent stack are:
a. 5' O.D. stack base (packed bed diameter)
b. 15' (minimum) packed bed of 2" Intalox saddles
complete with overhead spray bar designed to pro
vide absorption efficiency without plugging due .
to particulates or scaling
c. A lining of firebrick in the lower part of this
stack to protect the shell from erosion
d. The stack and its entrance duct complete fiberglass
lined to protect the shell from corrosion
e. Mesh type monel mint eliminator at the top of the
stack
f. 45' overall height
.
0 g. Necessary connections for access and controls
h. A283 carbon steel construction
i. See Section 4.1.A.1. for procedure for paiabing.
scrubber and stack external surface*
MQNS 095472
4MC.ri 03LfS--{
c we. 2415
_
y 4. MATERIALS TO HE SUPPLIED BY VENDOR1 (Continued)
4.1 Equipment (Continued)
E. Scrubbing System and Vent Stack (Continued)
j. Two samples ports with access ladder and 180 plat
form to be located .at top of stack. The ports will
be located 90 apart at the same height. Access to ,
mist eliminator from the top platform is to be
provided. Platform and ladders are to be hot dip
galvanized. Specification 2415-01-102.000E. .
k. Two 18" access doors located above and below pack
ing with step-offs from the ladder are to be pro
. vided
F. Blower
.. :\
A blower will be included complete with a TEFC motor
to supply the combustion air. This blower will be a
Buffalo Forge Model 45-3CB or equal, complete with a
100 HP motor which complies with Specification 2415
01-102.000D.
,,
4.2 Controls
- `..............
All' controls must meet FIA standards and must be models
acceptable to Monsanto Specification 2415-01-102.000C. Also, electrical work must be in compliance with Specifi cation 2415-01-102.000D. A list of the major items follows.
A. Honeywell Model 4075B UV flame detection relay
B. Honeywell Model 7012E UV scanner to scan pilot
C. Time delay relays for purge and trial for ignition
D. Ignition.transformer
E. Safety shutoff solenoid valves for fuel gas, pilot gas, and fuel oil lines, manual'reset
F. High and low fuel' gas pressure switches and parallel fuel oil controls
G. High and low temperature switches with temperature
recording controller on oxidizer
.
H. Auxiliary fuel gas control valve and parallel fuel oil
controls
I. Waste shutoff valve J. Prossuro gauges on waste liquid line, atomizing steam
line, auxiliary fuel gas line, auxiliary fuel oil line,
and pilot gas line
'
tlnr.d tiring valves
'
Necessary rotameters and their associated hand valves
Level controls on th^ jumps of the quench pot and the
vent stack
. .. 1.s' '
Low prosfuro shutoff .on steam line
'Jligh.ton.pouoturo shutoff on quench pot gas phase
u*lii>g bi-metallic switch on
EIVS60 SNOW
$
r'>'' , (yafVl *
4.
ClMTAAl
EHOlHKCniNO
Dll* AATMENV
II ' Specification for thermal
Oxidizer-Scrubber Unit
rnoj/oe*T
-
-
[ ^L/.nt
--
,,Piyt>qu.Qrr-Tr; j_^
--j>&zr, P2~$> -`#2-
OU|M. IDKMT MO 0 1 ~ X02 . OOiO ^
ee wa.:2413 n 0. (11 * -sIm__lb_Waldber-r
OAti^Zll ' 7 A . i Mg r. t __5-- o r
MATERIALS TO BE SUPPLIED DY VENDOR (Continued)
4.2 Controls (Continued)
P. Low flow shutoff switch on water supply Q. Low flow shutoff switch on combustion air supply R. Solenoid shutoff valve on quench water line to . oxidizer
S. A pre-wired control cabinet in weatherproof con struction and suitable for outdoor installation, NEMA 4, whicli contains all necessary instruments for operation of controls in Sections 4.2.A. through 4.2.R.
0 at-7
HONS 09547,4
Monsanto COMPANY
LOCATION
name:_____________
Performance__ Patm____ In OHttATS*. FEED Pt/MP_____ >roj-- Atoacp Waste disposal
} 0 4>EQUIP. 1DENT NO. /"*
AUTH NO. 24t?
PLANT XtUMMJtltM
,, W.G. MlEMCffR Dit B/zs/po
APPQ VI , H V/a-fA* SHEET j OP i
Incinerator Feed Pomp
'
description :______ IDS 1 TIPS PISPI ACC MENT PUMP
NUMBER REQUIRED Function :
___ L___ LJ-Z-LEAX_______________________________________________________
TO PUMP__ A MIXTURE OF WASTE AROCIOP AND MMTAA F*0/M STOfiAte TANK {l-fl 8) 'TO TH WCtKA70A. WASTE Liquid BURNER.
materials
handled : -
A MIXTURE OF WASTE AROCLOR And M0N7AR
Mixture mat contain up to io'/. sr-MT.) soots
SOL IPS ARE CALCIUM OX IOC { IRON CmonoE F CARSaxj
PHYSICAL PPOPCPTIFS !
J
.
SPECIFIC ' GHAVITiv AT IQO-C - /.'SI TO /.4?
DENSITY (L`ytXL'l AT ItO'C - lO.B ro 12.3
V/Scos/ty (<rN7ipffisej a* iOO*c z 8.6 to 37,9
YLCok. PRESSURE (PUA'i AT 100'C z NEC. L 1 & 18L E
DESIGN capacity-.
Design fun rate: izro lss/hrux 0, PM - LSI TO I.TO pin*. Fun.ZGPH
pin. TLtuu :0Tgpm
orekatins conditions:
Duty: continuous
D/s chars e Pressure:_______________________________________ _ normal: IPO Psig
MAXIMUM! ISO PSIG
MINIMUM: 100 PSIS
T F PIPER A TURE ;
normal : / OO'C.
________________ maximum: lOO'C__________________________________ _
MINIM U M ! 75 C
SPECIAL DFS/GIU CONSIDERATIONS :
0 Pump must be able to handle solids AS SHOWN ABOVE 2) HAVE A TURUDnun Ratio of 3 To!
CONSTRUCTION :
MATERIALS OF CONSTRUCTION: CARBON STEEL
" NITON A" RUBBER MAY BE USED
IN VALUE SEATS
DRIVER :
ELECTRIC MOTOR'. ALLIS ChalHEXS TYPE RGZ , TEFC
P P aiping on discharge of ump wui.
t rsvipep with a
ariif/ valve.
REV NO. A S
A
REVISION
Br | OAT( | APPO j OAT* MONS 095475
Monsanto
company
LOCATION-------------_
[\)ft MB:
~^<trr astaf-jg
S-P.ECIELCRHQN
[equip. IQtNT NO. /Oy -A24M0
__________
Inc.i*erafor Ftrd -tfojtyo/ ........ j |auth no. AlJiK
PLANT
IwKJJ/l
\11 DisposeI InT.H.UlaiJittB^F n.rt n-J-fg
tMI,T ` " `
Incinerator Fere/ Primp
tytmae* rip limits.'
QMS.
tonieaiALt HttaiPLeti:______________________________________________
C h lot ihattci________________ Oria mi c. liquid r ftvlcjininy up in /n%ftf s&htil. r--la. Lai--at_--calctltra--Ovirle y irnn r h lnnrloi nnrt ration
______________ SpPrific artuTiy (> /0P*C s 1,3 ia //~
___________ V >'t rn^i-ty fr. rr^iipoiro f)t/vfr s fe
______________ Vapor Ptoicatn rSl lanC ~
A A*
_____________________________
CfiPALuy..: ,
.......... -........... .............. ........
,
'Z
Q.t^icn_________________ Kaje . ___ JrQ gpjy_______________________________________
tJoranal_________________ Raft__ !__ h 0 j a ? O j pan________________________________
QPEflBTlMll /QMOiHoMa:
Normal tJi ffrrmiial pressure ISOpiij
Dg.'t/*.. rhU-Qr rn'iitj ymXtlrr a fSO p{irj___________________________________ _______________
Do i^n tPrrpQrojjrc_ loaH. C ____________________________________________________
______________ _______blatmnI iompor oitne; /0a *C
PUMF hexrRiPTtoA/:........
...................................
...
--- - .......
PnZl'ffyP Cati* itfin
jjif Jcrpr
fiix. plot fwlln "t CnnnLI* o-f af i?at+ A 3 j a I 'Jbfhg/aujtt jiurnp houi Inj________________________________________________________________________
/g< pQc. kinj_________________________________________
?At HP -TEFC - U romp include major pulley -Far _________________________________ I____ capacity Genital1______________
RIV NO. A
A fit*
REVISION
BV | DATE I ARPD | DAT! MUNS 095476
ROBBINS l MYERS, INC. MOYNO PUMP DIVISION ___________________________SprlnglUld, Ohio '
9
CE&_j2dtL-- ,
JTa/& iMt-x-A 7vA. fr Q Pi/S>P
MONS 095477
s&zrr o**/--a/
Monsanto
COMPANY
CENTRIFUGAL RUMP PERFORMANCE DATA
Aboclbk VIAitt Dismal
l-IO(,EQUIP. lOtNT NO-.
AUTH NO. 24^5*
PlANY
[by W. Q. NIEHSygH^t 10/12/76
AFTO YL fi.
sheet / OS 2
NAME
ZtSAii
ruNCTiON TQ PUMP
POMP
JmZZ1
no. REQO
DILUTE Mrt>XOCHLO*tC AdD (2% 0Y wt.) from Te
PAckcq Column to tuz veAirutKi sraussgft
0>g^T>0N COHT/H-VOVS FLOW TO ]/FfjTU*.l SCRuSee* - MANUAL FlO*j e0AJT*ai
COMPONENT
DUTY: INTERMITTENT
~^g^CON Tl NUOU S
MATERIALS HANDLED
UNITS NORMAL OESION
HmoCHlO/UC AC!P(Z% Br WT.) 5
3PM
70 -SO-.
KOuSPER TtiR REMARKS
TOT A L
SOU oyy ufjRrAcrea 0A
Line
30 S4'
PUMPINO T BMP gn A T URt >t,F
130
PROCESS DATA f 5POR ft P T Q, J Q ____ SO F
f,00
Jc R Y ST A L L 1 Z INO . T CMP a F AftKi't J 0*
viicomr, Ctun PtiSC iunitsi <?pt 0,3S'
^ 60 f /,/
VAPOR PRESSURE. PSlA, (PT 7, S'f
60 r 0.2&T JsOLIOS S ***0. >S V WT jj3ENSITT
f>IZE
CORROSION/ERO SION: NEGLIGIBLE
^MODERATE
QSEvGPE
------
ESTIMATED PERFORMANCE REQUIREMENTS
CAPACITY, USOPM: NORMAL
70
; M** OESION
BO _
CONTROL ALLOWANCE*
PUMP RATEO CAPACITY (MAXIMUM OESION CAPACITY PLUS CONTROL ALLOWANCE). USOPM
8o
STATIC HEAnG'PT,
12 FT 5*,/ PSI | EQUIPMENT LOSS. PSI:
$2 normal
PIPE OIA, NP$' SUCTION
;OlSCHAPOE
piping loss, psi:
NORMAL
CONTROL VALVE PRESSURE DROP, PSI:
NCRMAL Java L ABU E NP5H, FT.
NORMAL
RATEO TDH <*' PT: 273 rj
UC PSI FBOM FUMP CALCULATION SHFT NO. 5 3f
SYSTEM CUR VC CALCULATIONS FROM SHEET NO.
DRIVER ^Xj'ELEC MOTOR [_J TURBINE
iS 18,/
0 T HER
RAT RAT RAti
PUMP DATA
MATERIALS OF CONSTRUCTION:
CASINO AND NOZZLES imp,,Lt Hn
LINERS
CMLP^lMtT "3 CHLOP.lHer -3 C#LetlMET-3
1
e Z|
x\
MECHANICAL sea PACKING GLAND BASE PLATE
CAay/t A'a. * a
zz:~:________CONSTRUCTION FEATURES REQUIREO FOR PROCESS OR PERPQRMANCF. CONSIDERATIONS:
_____
y--L*AMe _______________________________________
REMARKS. SPECS, TESTS. ETC._______________________________________________________ _______ ______ __________________ ____________________ ____
couru^a___ '&uaro to m?st wax plant srg___ iu^_srp
1
"Cwiicity in crlbss u< mammum dest^n lo contio* imposes.
R(V NO. !
REVISION
/h
SI
.
ttftft fVBZ)
BY | DATE I API-D | LI A !| '
MflNS 0954
COMPANY
>ACKEP
H PUMP
CtHTKIFUGAL P0MP CALCULATION sheet
PteiM n l AN T _
SQUtP. NO..
AUTM NO. OY W.
hl06 _ _
g*r^
OAT> /0Zl
. IHT__ 2
Spgfe
I - >K
CONDITIONS Matsual Pumped H'i&WCfftMlC ACfO.
HF7j*
P.T. Pumping Temperature 82, *C
JAQ.. *r
gpw" Flow Pats: Normal _ *7 0
CSlyw
FiO
S- Specific Gravity*
0. 9& Danltv -8*l6 Ih7gt
(i - Viscosity*P-jT_______________________ Centlpofi*
' Vapor I
AP: Control Valve rT.;^ f _psi; Equip.
-PM
Pipe (Material..
r, t^-Scn or Wall Thh .
=Nominal Size_________J
.Suction
rf, Actual ID, inches. 2.49 .Suction
_OHchet(m
7S _OtacNaiM
*At Pumping Temperature
)A S**y
+ MP"Aan V*vi*toru
mac,Mire* j-znri
EQUIVALENT LENGTHS Enter Type end Factor for each valve or fit*
Suction
Discharge
ting. Enter Number of oech type, end line size Multiply Factor * Size x Num* Typo Factor C Number Feet Type Fsctoi e Number Feet
bet and antar Fact equivalent length. Sea handbook for types not listed.
Factors for Valves (open) and Fittings
Qite
1.1 Plug Vslve
l.S 90" 1.1. oi w*id ell 1.7
hvz l.S H
Jll >' l 1-7 i V
i i
r ?"'> V 1.7 (V Z
rti s
/iii
l,s 4N1l 1
7
Globe, Lift Chock 28.0 Butterfly (6" & up) 1.7 Std Tee (on run) 1.7
1!
Z
Wye, Angle, Dlaphr 14.0 90* Std Elbow
Swing Cheek
11.0 45* Std Elbow
Length of straight pipe In feet
L Tout Equivalent Length, feet
2.S Std Too (side out) S.O 1.3
I ' z5
s JLt
.5
i
fP
FRICTION HEAD LOSS
(p.o^x^X-7^
V - (0.406) gpw/V', feet pet second
Re (Reynolds Number) * (3162)
. (o.AOBY&yytx-
('?/?J8Yc. 9fi^7</aJ0
Suction
A,FI. 2&1 wo
DIschMIB
'<>49 A OS.OOP
/- Friction Factor (See Appendix C of 014.2 Std 2) if Re <2100 omit this step.'V. ?y.P'T)|^9'*^ 5
A nHRWes'JjJglIW) 0.15f^riynti
[(Re> 2100)- 16.63/V*/rf J ' O' 'Ml P' >0 '' equivalent
r
o.eir
2. n
0.0 >3 IF 8
Tots! Friction Head Loss - Aa * L/100 x is (safety factor), feet o( fluid
Q.37
'r.4
SUCTION AND DISCHARGE HEADS
Suction
Discharge SYSTEM HORSEPOWER (ottlfflated)
Voxel Pteuuto (p.'irb 2.S1/J)
<> 3r.2 (4)
Liquid Level (above pump *; below pump -)
) 1.0
Static Hoad (above pump 4; below pump -)
Total Friction Head Leas (Plus Vsloelty Head. See Note 4.) (-) PUriSSil Valve (Aptl x 2.31/T) (Sea Notes 1 and 2) 10 Pj 1 (-)
OA o
(+) (+) (+)
Ounce (Apil 2.31/S) (See Note 2)
Equipment (Aptl 2.31/1) 9 2 7SI
Suction Hoed Sum, foot of fluid, abs.
M 0 (4)
(-) 0 (+) TTf~l
Discharge Head Sum, feat of fluid, abs.
A 0.3
12.0 IS. 4
23 4 0
2/7. 0
i08.3
gpm * TDH * 5 39S0 x (Note 3|
80 * 273 0.9 8
3980 x 0. WO
Aj<Pfo Mo;; ertiarwi
DYNAMIC HEAD Discharge Head Sum Suetion Head Sum
T!)ll" Total Dynamic Head, feet of fluid NPSH
Suction Head Sum
/ \/ ^ \y
'VpImmHg* 0.0.5/S) 01 (p.l.x 2.31/S) (7, SIX7.31/0. 98
NPSH Available, feet of fluid, ab.__________________________
PUMP SELECTION
MpitulKluiti
OVP'CO
.; Model _
ImH 3TOP fnm: Imp Sue.
OPM
- TDH------
308.3
35-.8
L&. TV?"
Tvn. 3 x I4 x to
Ell
1. Assume control valve loss to be 70% to 100% ef piping plus equipment friction less for Initial calculation. Consult Instrument onglnoer foe final selection.
2. Control valves and orifices not normally weed In pump suction,
3. Use combined efficiency of pump and drive.
4. See D14.2 STD 2, a guide lor the use of thie calculation procedure.
RRV NO. "IP
eiviSroN
av | DATS | Anmo | qati
- X 'i
^MUNdANto
a im .*
CENTRAL EN.GIL..D6HL V
MOMS 095480
^ '0 '-/0 ~ Z O UL33S'
SMc.r. 0
Monsanto
COMPANY i&4U8SL nme TAhnC~CAR
CmfolFUQAL MJMF TOtfORMANCE DATA 4*60.6* \JASTE PtiPPSAL
EQUIP. fOfNT NO. I~ )
AUTH NO. 2Atf st W &. NIEMEYPR
sri.nt&wU'
_Z
\JNLOAl>tN PVMP (TO BE RtLOCATtt) )
NO. RgQQ l
function To PUMP WA6TE AKOO-OK FROM A TANK CAP. TO 7 HE
WAiTtr AROCkOR_______________ ST0AA. . TAHKS. t-/lj Am.^Ii1I7-
operation
IMTEP.MITTENT PUMPlfJG.
COMPONENT
DUTY; "flgflNTeRMITTENT
CONTINUOUS
MATERIALS HANDLED
UNITS NORMAL DESIGN
AkOCLOK 5
6PM too id r>
HOURS ^E# YEtlf REMARKS
TOTAL SOLIOJrp^
ZL JlM- 100
GAS
PROCESS DATA
* F 2 12 ^PUMPING TEMPERATURE, PT,
PR ffPT l~3J Tal,4 7 froV /, rg/^y*lcwv>T*LLIZ,NO. TtMf * r
vi>contr, crtrnrotfc iun^w^pt 4 rt ;0 e0F 300 ro 100,000
________________
VARQW PRESSURE, RSlA, f PT WECL. & * F NE&L.
|QLIPS
% W~t J DENSIT Y ~ '
~ | tug
COWROON/EROHON.' jg^NCOUQIGLE
QMOOERATE
Q SEVERE
CARACITY. USORM: NORMAL
ESTIMATEO PERFORMANCE REQUIREMENTS
/oo
! 0 0 '; MAX OESION
: CONTROL ALLOWANCE*
PUMP RATED CAPACITY (MAXIMUM OESION CAPACITY PLUS CONTROL ALLOWANCE). USORM,
STATIC MEApf'PT, PIPS DlA, NPS: SUCTION
2 E PT
3M
1 !T, 1
i DISCHARGE
psi | equipment loss, psi;
NONE
3 " 9.r|p|PlNG LOSS, psi
OOTMNIS VALVE PRESSURE DROP, PSIr
29,3
NORMAL (available NPSH, PT:
RATIO YDHpPT:
J2
rT i-r.5- PSI PROM PUMP CALCULATION SHEET NO,
27. U
NORMAL NORMAL NORMAL
VST ttM CURVI C ALCUL* TIONS PROM SHEET NO.
Tf* 4-fi^O' D*1 VE" Kfc L E C MOTOR [^TURBINE f^OTHER
MATERIALS OP CONSTRUCTION:
CASINO ANO NOZZl.lt
WOR THITS WeATHITE
SHAFT, SHAFT SL8EVC
WOKTJft7
MECHANICAL SEAL PACKING GLAND BASE PLATE
AMES TPS N0A/S Worthite
CONSTRUCTION FEATURES RgQUtWEO FOR PROCESSOR PERFORMANCE CONSIDERATIONS:________ __________________
Pfit SSLlPE SWITCH To ' SHUT bDlV7I> Pl/MP AT lan> DlsPHAK&r rutstuKE MO70*~ ALUi-(P/AiPtfEf .TOT XSZ TfC
REMARKS, SPECS. TESTS. ETC
jffx ISTl/Ut PUMP : WOftTH)A>tTAJ SELT -- PRIM INC, Ut$ 2CNHX-84-
=
2" suetipv ^ 2" DiscJiAme % 3
I ^ react
____________________ l2JP__KJJ-x'7^__nt
(rutnpl Derr.__ tl*.. S3S)__________ Moyjri cat/ok)__ ggay/Arp : . chanc,e___7,s hp m?tc*. to t s up
RAT
RAT1
iRAT
*C*pSCliy in xcota'ormaximum dtsign lot control purpesos.
MV NO.
,A
REVISION
i,-,..Si.-.
A
... HHirmi
TIV 1 DATS
A *
MONS 095481
TAUK CAR uNlfiAbins, Purrp bct^ ozot-a/
CENTRIFUGAL PUMP
CALCULATION SHEET - AROfi OA VJASTe tlSfPSAu
EQUIP. IDCNT NO /- no
|auth no. 24 )!>
RV W
APPQ
SHEET
2
CONDITIONS
Material Pumped \s/AST jAROCLO/! P.T. Pumping Temperature IZMZjc 2IZ
gpm" Flow Rate: Normal --LQ.Q_____ Design . too _
5- Specific Gravity* /3/fo A^/__ Density iO>% r*)?.Z m/gei
(i - Viscosity*________4_T<?. / 0'
Cnlma.
<t '' "Vapor ~Piessuie`* Ak>/"fGL' . mmHg___
l\P'. Control Valve A/ 0AJ nsi: Equip. _ NAj
Pipe {Material CMfigFw S7fei
sch uiomww.lti
.put
-psi
46 \
Nominal Size______ 3_1!Suction___3 '____ Discharge
rf, Actual ID, inches_]?.*Qh$.__Suction At Pumping Temperature
Onrh*tg
EQUIVALENT LENGTHS Enter Type and Factor to/ each valve or fit ting. Enter Numbor of each type, and line size. Multiply Factor x Size * Num Type |Factor
ber and enter Feet equivalent length. See handbook tor types not listed.
Factors for Valves (open) and Fittings
G|p 1.1 Plug Valve Globe, Lift Chock 28.0 Butterfly (6" & up)
Wye, Angie, Diopht 14.0 90 Std Elbow
1.5 90 1.1. oi Weld ell 1.7 1.7 Std Tee (on run) 1.7 2.S Std Tee (side out) 5.0
Swing Check
n.o 45 Std Elbow
1.3
Length of straight pipe in feet
wP.A.JiL
TU if- I'l
iLV. 2
/,,- Total Equivalent Length, feet
FRICTION HEAD LOSS
A/,.,.5/
V (0.408) gpm/ti*, feet per second ` ^
ffO- $ ^ ,
'
c
Re (Reynolds Number) (3162) sp5/Wfi
(/ *^>^7)
/- Friction Factor (See Appendix C of D14.2 Std 2) if Re < 2100 omit this step.
[(Re*1 gtOPV - friM \i
A h feet of fluid per 100 feel equivalent length. (Re > 2100)- 18.63 /V7rf J
Total Fiiction Head Loss ~ Aa x /,/100 x 1.15 (safety factor^ feet of fluid
SUCTION AND DISCHARGE HEADS
Suction
Vessel Pressure (psia x 2.31/5) Liquid Level (above pump *; below pump -)
1+) 24.4 (f) /. o
Static Hoad (above pump *; below pump -)
Total Friction Head Loss (Plus Velocity Head. See Noto 4.) <-)
HMUAi. ---- Vlv (Apn x 2.31/3) {See Non. 1 and 2)J*.CW (-)
2, 2 0
Oi ifice fAps. x 2.31/1) |Se Non 2)
(-) 0
Equipment (Apsi x 2.31/3)
(-> 0
Suction Head Sum, feet of fluid, abs.
77. U
Discharge Head Sum, feet of fluid, abs._________________ --
DYNAMIC HEAD
Discharge Head Sum
Suction Head Sum 77)// - Total Dynamic Head, feet of fluid
NPSM
Discharge i*i 24,4
i+l ?S.O 1*1 IS. 8 <> 49.4 r> u *) c>
SYSTEM HORSEPOWER (estimated)
///> . piI-u-h---T--O-H--x--5---
3960 fc'(Nott 3)
(CO , 9 2 - 1.39
3960 *
X0. )s XO, 3
10, 3 ________ _
"TTaT
> )4,C 92.0
NOTES
1. Assume contiol valve loss to be /U" to IUQ'joI piping plus equipment (notion loss for initial calculation. Consult instrument engineer for final selection,
Suction Head Sum
P,y* tmmHg - 0.04b'5' or (psia * 2.31/5)
NPSH Available, foci ol fluid, abs.
PUMP SELECTION
l.tam'frctu'i-r
7**2. _f. ; Model
Ja_?_4..; Type
Speed / 7 > l''___ 'pm; 1nP Sire. ^/Z.. . Hr*.. _____ ; HI o.
GPM (66; ioh_22_______________
; NPSH Tffg/0
2 FT.
27. (n
p.fn,wv* '
2. Ccntiol valves ami orifices not normally used in pump suction.
3. Use combined efficiency ol pump and dnvo.
1. Sec DM.2 STD 7, ,t i-.uidc for U.,* use ol thu calculation piocortme.
MQNS 095Adi
____
|Sjj^ cemiFuoAi.nMP PERFOMUNCC 6ATA
Atone*. V/tiTf Disposal
**c*t0-aL0/-0/
QUIP. (DINT NO._ /-///
rfy ruwcTiON L. '
TANK TKUCK UNLOAOINS PUM"
70 pump WAS re AQOCLOK. OUT OP STORAGE TAAiPS into Pesiour TRAiLta.-______________ To Pump a pone* -hmtak from Res/eue taailfa iuto stm TANKS- TO CIRCULATE_______________ STOAA&e TANKS Oft, RESIPUS T/UUr*
operation interhitteiut___ PumpimA
OUTYi tgf INTERMITTENT
[^CONTINUOUS
HOUWSPEWYEAW
MATERIALS HANDLED
COMPONENT
UNITS NORMAL DESIGN
AktCLOP. TO TRAILER
6Pm too too
Anode*- MeNTAR -r2_70jWi
JJLSl loo
5 ClfUVLAlf TAUKS OH TAAH.tR <jrn 100 JOJL
` REMARKS
J
TOTAL
*
BOLIMX'''
y/oil
TtM* PF PUMPino tMPgBATUB, pt7* f
200
SlQfrPROCESS DATA_____________________________________________ l*** {J2 ro l'4y ffsoF/.jy to/,$Y IcpVstaluxino. temp *r
VISCOSITY, Cf*TfP0tS iunitK?pt 4 JO fQ eor $qq to 100,000
_____________________________
vapor
psia,>t N6Lm......3** Nt&L. 1o-ips _________
% *t (density
[mu
COOWOSlOWPOSIONi KffNEOLlOIBLE__________QmOOEWATE
___ _________
ESTIMATED PERFORMANCE REQUIREMENTS
eAPACITV. UBOfM: NORMAL
,/gjgL.
i MAX DESIGN
IOO
; CONTROL ALLOWANCE*
PUMP RATIO CAPACITY (MAXIMUM OESlON CAPACITY PLUS CONTAOL ALLOWANCE). USGPM,
STATIC NSAD0 PT.
JZ1L
IS. I
jH EQUIPMENT LOIt, Ptl
NOME
PIPE OlA, NPSl SUCTION
iNmii
PATtO TOWfPYt
; DISCHAftOB
PIPING LOSS. PSI:
21 L
NCPMAL (AVAILABLE NPSh, XT:
PTP FROM PUMP CALCULATION SWEET NO.
5 3S
JLL 2tJ_
SYSTEM CURVE CALCULATIONS FWQM SHEET NO. pURCQ Mg 7i00V ; pW1 V 6 * R<? g*-* C MO T0 * QtuWBINE Q OTHER
MATERIALS OP CONSTRUCTION:
CASINO ANDNOXILIS
ductile
IMPILLKR SHAFT, SHAFT SLEEVE
DUCTILE
UNSPS
IKON IKON_______
PACKING MECHANICAL SEAL PACKING GLANO BASE PLATE
CONSTRUCTION FEATURES REQUIREO POR PROCESS OR PERFORMANCE CONSIDERATIONS:
REMARKS, SPECS, TESTS. ETC.
jtxtsr/Nc pump: bVRCO A-20
DUCTILE j.nuM.efi. p/a. __________________________ ( ZSO__KPM,_Z<) Ht.-CIPTP* Ifhmol 0err, item n. 6 / 7 q>- AP-o)
IRON
Sss(|A lot control purposes. DIVISION
aBtutr. iiWA mi*nr r^a ro An sm liA Mgv/ \i/n/9j\
MONS 095483
'faILtAOm fUMt
J SeCrTT *iW~ &/.
BtQUIR. (DINT WO. I -- / I I
. PIAHT. !* w. 6. NitMSve* _DTI
,MT * < *
CONDITIONS
Material Pumped. was r__e____ a Roclop.
P.T. Pumping Temperature . S3
200
too
S" Specific Gravity* L3 2 r L4 7 Density H>4 re 12,3 ih/*w
4 To
pt* " .Yppor, Pressure* NC&l. mmHo N(mL.
,NP AXIS.,,.
osii Eauin. NCAj
Pine (Material CAKtON fUlL
Sch or Weil Thk
Nominal Size
3" Suction
2 * Diachate*
d, Actual ID, inches 3.OCt Suction 2.0L7
At Pumping Temperatura
EQUIVALENT LENGTHS Enter Type and Factor for each valve or fit
Suction
Discharge
ting, Enter Number of each type, and Una size. Multiply Factoi * Size * Num Type Factor JS Number Feet Type Factor e Number Feet
ber and antat Feat equivalent length. See handbook for types not listed;
Factors foi Valves (open) and Fittings
Gate
LI Plug Valve
1.5 90 1. >. .1 Weld all . 1.7
Glebe, Lift Check 2B.0 Butterfly (6" A up) t.7 Std Tee (on tun) 1.7
Wye, Angle, Dlapht 14.0 90* Std Elbow
2.5 Std Tee (side out) 5.0
Swing Check
11.0 45* Std Elbow
1.3
eu 2,0
Wk
1.1
Tff/!/,
rJSJU
) <5
Ie
___ ___ ZEO
5 z 1
37 H47C
U
4
7
IS
(Tiuthsj t.s <3
*>
p 1
j
1
8
I
Z
Tt
1O 19
Length of etialfht pipe In feat
SO
m
t. Total Equivalent Length, feet
109
MICTION HEAD LOSS
{040^/10(^4,4}
Vv-m (lu0.4e0u4e)rt&pmm/d*'l,, freaert per saeacondo ` _ s/
./
Re (Reynolds Humbat) - {ilWtpmS/dp
1 (Wofytoetfajt.
\ \s \s \s . x
/c 2$/. 0 f/j)
/ Prlctton Factor (Sat Appends C of D14.2 Std 2) il Ra < 2100 omit this stap.
feet 6f ,,u,d pei 100 f8#l *qulv>nl length0*\^'0t5)/S.07
Aa L(mRe.>> 21001 -* W.M/vVrf J
pq
(
Suction
434
ZO, 400
0.021
2/3 a
Discharge
9.S* 3 6.400 0.02+
Total Ftlctlon Head Lass Aii x L/l00 x MS (safety factor), feet of fluid v
3.74
SUCTION AND DISCHARGE HEAOS
y
j Suction | Discharge | SYSTEM HORSEPOWER l.ltlmjlrt)
Vassal Prassure (pslax 2.31/J) Q4,7*1 ' *{f(" Liquid Laval (above pump +; below pump -)
() 24,A El 24.4 1 m i. O
gpm x TDH S
3*2
Static Hoad (above pump *; below pump -) TotalPilcUon Hoad Lose (Plus Velocity Head. Sea Noi SSSSt Valve (Apsl X 2.31/S) {See Notes 1 and 2)
Orifice (Apsl x 2.31/S) (See Nats 2) Equipment (Apsl * 2.31/S)
Suction Head Sum, fast of fluid, abs.
W 2 S.O 1 M 3.7 l|J| 3 3,21 (-) 0 () 4S-.0 (-) 0 (*) 0
(-) 0 () 0
immmrnmmm
Dlschaige Hoad Sw% foot af fluid, obs.____________ DYNAMIC HEAD Discharge Head Sum
II 3,6.
\?9.L
Suction Head Sum TDHm Total Dynamic Head, feet of fluid
NPSH Suction Head Sum
- ?l.7 ___ JQj.j.
21.7
Ptip (mmHg x Q.04S/S) or (psia x 2.31/S)
NPSH Available, loot of fluid, ab>.
21.7
uMP SELECTION
_ AVS
Mjnuf.ciuic._____ P.H5J0________ . Modol__A 2 ______; Type .3 X 3--______ ;
tpaad i7SO tom: Imp Size____ lj_ " HP 3
awi
IPO ,, : TDH ' IIS
NPSH__
1. Assume contiol valve lets to be 70% to 100% of ptpmg plus equipment fiiction loss for initial calculation. Consult instalment enginoer for final selection.
2. Control valves and orifices not noimally used in pump suction.
3. Use combined efficiency of pump and drive.
4. Sec D14.2 STD 2, .1 guide loi the use of this calculation pioceduie.
'.iti
im
HP*
MUNS 095484
3
Monsanto
c O M If * H r
NAMg wait
function 7*0 TO OP
o-aejme-K cx-at -- 0/
WA7E*. PUMP
inMALfUMP
flOuir. IOSNT NO..--LrJlZ.
LIANCE bATA
Loj-- ArcfiM Wimr IVftinr
-H.AHrWS.Jf W?6.%emey -PATS lO/tih*
XHUT_ 7 q>2
BOOST?*. PUMP t TO gg AELOCAtYd
no. RgQQ y
WLLWAtER. FROM AN 1/PJC>Yrs,P0vkio well In/AT?* HCADPg
THE COfJTACTO? Tt/gr fOA <3 UFN CH COOL /VS AND TO THE TO? TA/ PACKSP COAUMN FOR Hd ABSORPTION___________ _______________
opKWATioN___ CONTINUOUS.___ FL6W__ &4V.igLCP
COMPONENT
DUTY: IMTCRMITTENT....... ^CONTINUOUS__________ HOURS RtR TEAR
MATERIALS HANDLED
"" ~
UNITS NORMAL OESION
REMARKS
WELL WATER TO ONTACrct TUBE & PM (oO 14-
1 )MIL
WATER TO IU CITED COLUMN
4iM .-14-
80
total
soti
&TMJ J1P - / S'0. TF.NCt
IPUMPIMO TgMPKRATVRt. PT,*
PROCESS DATA
g........\LM~t"~ /,0~ frSOP i,~0 "
jcRVSTALLI tlNC, T|M
viscosity, CFT!poise iunitsiOpt
/,3Qwr /./
VAPOR PRESSURE, PIA, g FT Qt / fl
>tV #
[SOLIDS T KAC % WT }oENSlTY
|sUC
CORROSlON/EROSIONt te?TNC0LI0IBLt
QmODSRATE
Q SEVERE
?2_
............... ESTIMATED PERFORMANCE REQUIREMENTS
...............
CAPACITY, MSQPMi NORMAL
/3Q
: MAX QUIQH
ISO______ ; CONTROL ALLOWANCE*
PUMP WAT CO CAPACITY (MAXIMUM PESION CAPACITY PLUS CONTROL ALLOWANCE?, USOPM,
L STATIC HEAOS'PT, ^
FT j.J* / i3 | EQUIPMENT LOSS. PSIj____
____ NORMAL
f/Q ' m*Y
PIPE OlA, NNi SUCTION
3*
j PISCHARq 3" ^ g "
| PlPINOCQIi,~PSl;NORMAL________7
AAT
--SOMSOL VALVE PRESSURE ORQPi~PSIt /fl
NC RMAt} AV AIL ABLE NPSH, PT:
NORMAL 77.3
RRTEOTOnQPTi Z7C FT i 20 PSI FROM PUMP CALCULATION SHEET NO. es sr
SYSTtM CURVE CALCULATIONS FROM SHUT NO. PV*Cfi Mff~7SO0V ' OWIVEW J^SLEC MOTOR Q TURBINE pOTHER
WAT
MATERIALS OP CONSTRUCTION:
CASINO ANO NOZXLIS
^iior 2o
IMPKLLCR
Alloy so
PUMP DATA _________________________________________________________________
RACKINO MECHANICAL scal
LlNtRS
BASE PLATE
CONSTRUCTION FE*RURES REQUIRED POP PROCESS OR PERFORMANCE CONSIDERATIONS:
REMARKS. SPECS, TESTS. ETC.
exisriNC PUMP ; PUAtO A.7.0.
Site : 4X3 XIO
LOT 2 0
impeller dia. 8 7b
3500RPM 75 HP
~7r*ef)oil)kfr. item Wo7 (>05)
modification aeomeTi Increase Imkuc* sme qm ~$W~ to__ $T_
*Pljlttrtiy IR Mem of miximum dotifn foi control purposts.
MV NO. , . "TT~
REVISION
| ST
OATC | APPQ
. OATS
777 TATT7"P 5'7a-.-.;--..--.-.-'--------------- :
. '' ------------------- =------------ o----------------
HUNS 095485
-- ' MJE
'&OOST** Pun? saer. o z.o/-0/
jDCNTRIFUQAt. PUMP
CALCULATION SHEET
Akoclo* WdSTf diSPaiAU
IIIQUIP. JOINT N0. I-112 ||rau--t-m--nKoA.N. T W<Z |.y W. &. NlEMf'ffH oat, /<>//n /7o
' 2
0^-: Sm Soecific Gravity* _ /, 0
p m Viscosity*
/. 3
Density .33
10/AM
Ptm " Vapor Pressure* AP: Control Valve
9.3
mmHe 9. 1 P
osi: Equips 1X9
BS
tf, Actual ID, inches 3.FA8
--
,v .. 1
-
- Suction _*_y f Or echargr
- Suction lAhl/^ALZCkscher*
At Pumping Temperature
# SMAf HOMHzItot
Fit TO'.
z IB f
*0MftfTf/l 5 1 *
EQUIVALENT LENGTHS Enter Type end Fectoi for eech valve or fit* Un|* Enter Number of eech type, end line size. Multiply Factor x Size x Num*
Oischatge
bet end enter Feet equivalent length. See handbook tor types not listed.
factors for Velvet (open) end Fittings
Get*
1.1 Plug Valve
l.S 90 1. i. oi Wold oil 1.7
Globe, Lift Check 26.0 Butterfly (6" A up) 1.7 Std Tee (on run) 1.7
Wye, Angle, Diaphi 14.0 90 SU Elbow
2.5 Std Tee tstde out) 5.0
Swing Check
11.0 S* Std Elbow
1.3
Length of straight pipe in feet
L Total Equivalent Length, feet
FRICTION HEAD LOSS
vw
.
c V-{0.S)pWrf*, teetper second ('-4*X,XV4,4) fte (Reynolds Number) - (Sl62)tp-.J/r^ (*er}'/,j) /* Friction Factor (See Appendix C of 014.2 Std 2) if Re < 2100 omit this step.
A* [( > 21MI * m!h
'*' ' nul<l *" 100 ,Ml
'"!' ('S-1
Total Friction Heed Loss * Aa* L/100 * 1.1S (safety factor), feet of fluid
SUCTION AND DISCHARGE HEADS ,, Vtssol Pressure (psiax 2.31/S) to nit Liquid Level (above pump ; below pump -) Static Hoed (above pump *; below pump -)
HUMAAtf
1.4 ntt
Volvo (Apai x 2.)i/i) (See Notot 1 end 2) tftl
Orlfite (Apt! x 2.31/St (See Koto 21
Equipment (Apel * 2.S1/J) /to ft!
SuctlpA Head SwqjploAIttiM, aba.
Dleehatte Heed
dal fluid, abe._________________
Suction
Oischaige SYSTEM HORSEPOWER (estimated)
(> Baz -> 33. S
(l 0
.
.tjj___ !AL-
<-> 2.5 <*> 22.5-
Up
-
ppm x TlVt v S -t-------------------------
3960 v /-(Note 3|
iso , 3QQ. I.o
(") 0 (+> 23.1
(->
O in
o
3960 x 9.33 X 0. 3
(-) o
2 77. 0
. 77.2 ttiMmm
3Z4__________
DYNAMIC HEAD ^ Discharge Heed Sum Suction Hood Sum
TDH* Total Dynamic Heed, feet of fluid NPSH
3 77.1
NOTES
1. Assume control valve loss to be 70* to 100* of piping plus equipment friction toss for initial calculation. Consult instrument engineer for linel selection.
Swuscutiown Hnevewd Swumir
.. .
Pi* (mrnHR x 0.04S/S) or (psie x Z.31/SJ (p. I $[** V
NPSH Avellnble, feet of fluid, abt.___________________
2ZZ 7.3
2. Control valves and orifices not normally used in pump suctron.
PUMf SELECTION
Manufacturer_________________________ ; Model. A
smmd 3500 rpm; Imp Size ft.*
HP_
QfM
I SO
TOH_____ 312
70
AVS , Type ,4 *3 * ^0
Ell
:
3. Use combined efficiency of pump and drive.
4. Soc DI4.2 STD 2, a guide (or Hie use ol ttus calculation procedure.
1-
"VHP.
1Z
v3>.
Nr.-
L
`'
AIVISION
1 PY | OAT(
OAU
MONi 095486
'____
m
W'v
--
TANK OR PRESSURE VEKa
PERFORMANCE DATA Ihoj-- A2eq.it Waste Pis rosAi
Seer, 02.0/ --a/
lltQUIf. IOINT NO.
/~ /f4
AUTMNO. 24 IF
MANT W.C.K.
If W &. NlEMFYER NATf JO/, t?o
NAME
tvEL. OIL S70RA&E TANK (exhtwh /At PL Act) NO. REOO
FUNCTION to *eegiy F-m oil ani___Heie as auxiliary back up fuel
AMCLt*. INCINERATOR.
1 for.
duration BATCH INPOT FROM 7P.VCK UNLOADING ( Remote stoaase FU1H/ TO INCINERATOR RUKutR Dotiwi SAS Curtailments
MATERIAL
UNITE
Ht.lfun.OIL TO WCMEtASCA 3 PM
MINIMUM MAXIMUM
&ZA____
l.rjr
HtAuhlOIL TO CIRCULATE & PM ____1^____ ______10. F
WORKINO VOLUME CAPACITY
TOTAL VOLUME tfRETENTION OR cvcu* TIMC
INTERNALTEMPERATURE
OCNMTT
ARIA OP Q JACKET OR 1x1 COIL
MCATINO OR COOUNO , PLUIO
PLOW RATE TEMPERATURE
UNITE
NORMAL OPERATION
&AL
I8QZO
CAL
________ s_iao_____________
SAL
TVloo
DAYS
VARIES
______ ATMOSPHERIC______
AMPIFNT
LiS/sAL
7.4 To 2T?
FT*
IN OUT
DC SION OASIS J 8.120
980 - 12"ST. SIM 19 COO
ft 3 AT mA*. eu tort ATMOSPHERIC
APIlieNT 7.4 TO C..9
IN OUT
C ____ freei.
CONSTRUCTION falNTBRNAL COM* flEXTERNAL COIL
NONE T
j*we-
flJACKET
INTUMNT COMNNCTIOMt 0M[ LEVEL iNOlCA TOA
ntnutHtt d<*. h*. c- issrsr oAn r/s/s-j
NltfLATtON
MOAIF n* (Avet n**t AS >
IN C- 13 S7F
VKMTB, IN1UW WKLIir ONE 2" YEA>T
otmkh si[ reFeetnee tww< or this
sr-f-NR vJ.C.A riAur.
mwuol pfrr. item No. 20s
rnyutJM-;
--
:fvvi .`k --
NOZZLE.
CORR ALLOW. CORR ALLOW. CORR ALLOW.
SCHEOULE
hpjjl:
THIt "TANK U EAIS71NIL IN PLACE
MODIFICATIONS -&SS.___Util___inteinal nr pipe to _f'H__ 2" NOZZLE Ft*.__ RfCiPcvUrre on, FRm i-IIS ON___tJH-
sT
HONS 095487
-- ' %,-
SEC-T. 02-0/ --0/
Monsanto
COMPANY
Fvsl Oil Pvmps
jjfQUIF. IOCNT MO. ! " !
PERFORMANCE DATA
mAtoCLQK WASTE DISPOSAL
I >Z3 PLANT W. &. K
date IOflf7C
>Httr '
JVSL
7/A/G /A/ ft
)
NO. RCQQ 2
function -TP ruidr_ No, 2 pUEL <7/4.. FROM Fi/El OIL STOP ACE TAMM >-//
TO A HO CL OR IMCIMEPATOA__________________________________________ J
operation TO Be. USED POPINC, <*AS CURTAILMENTS /A/ WIMTEK MONTHS
IN TEAM 1 TTEMT DUTY
MATERIALS HANOLEO
'
No. 2 FUEL OIL
PfSCPIPTIOM POSITIVE DISPLACEMENT
- ROTARY
&EAR TVPE
'
--
process PATA ________
MAXIMUM fiUA/LMJ/.M
DENSITY viscosity
FLOW____ r t.ss -&I*L
TO BvAnfa.
FLOW
= CLSZ &PM ______ m___ B URNEP.
OP N. Z Fuel -J/-U- 7.4 to 679
L/S/6AL
OF N.. 2 FutL ou 2 FO'F : 48 to ?E SSO
EQUIPMENT SPECS, MATL OF CONST, ETC.
MATi. OF CfiA/SrfUCTJftuCORROSION ALLOWANCE
* 1STUK POMPS'. ROPER. grPCIST ____ Case ; -CAST__ LAtOl________________________
VV* INLET fOUTLET
Gears: STEEL
2 HP. 12.00 RPu1
shaft : STEEl
NomihAL___CAPACITY - II & PM
(Phenol diet. Item No. 204 / 205}.
RCMARKI, TESTS, SPECIAL. FEATURES, BTC.
A CESS___ FLOW____TA .M___ RECYCLEP TO STOKA&E TANK^ 1-114 THRU____A tgESSU&JE__ ClEXSe.L VALVE.______________ :_______ZZ__Z_
~NOk M AL~ PuM P DISCHA PC E fke SSUP.E~- too fS/&
'
MV NO, VA
1
-X.
MVtSlON
ST 1 OATS 1 AFFO 1 OATI MONS 095468
:Wi
S>d cr, 3 Z.&S -- <?/
Monsanto
TANK OR PRESSURE VESSEL PERFORMANCE DAYA
ARKLOR WAIT/- DISPOSAL
(Quip, ioiht no.___ l-UC.
|AUTM no. \ByW. 6.
2N4/EfMEYffj
BATE
sfi&j 1J7L9.
.
AWP r\,tf, W'.'tfijL H!T I 0, I
am
STORAGE TANK
(ex/ST/N& !AJ PLACE)
function to Receive A Hoclor waste And holo for iNcirueRATiotj
operation
BA-TCM INPUT FROM) DRUMS TAfJK TRAILER ( TANK CAR unloABiNU Hatch Loading to tamk tKailek or trams fit* to qthfr
MATERIAL
UNITS
Aroclcr th au e.B.-kerntts, (*<
AP.OUOK TO TRANSFER
AROCLOR TO CIRCULATE (SPM
Jj? 0 100____________________________________________________ _ /o o
C
WORKINO VOLUME CAPACITY PREEBOARO
TOTAL VOLUME
5rtcntion or n cycle time
UNITS
<3>AU &AL &AL DATS
INTCRNAL TEMPERATURE
DENSITY % 200*? ARgAOP JACKgT OR gj COIL
H1ATINO <T S'
PLOW RATI PRCSSURg TEMPERATURE
F TTv5T
FT* lbs/hk
PS/&
*F
NORMAL OPgRATION
IS 620
9$ 0
19,600
~
VA HIE S
atmos ?Hi*>e
ZOO
II. o to 12.3
ZS.&
TJ5
80
324 in
324 out
OISlON BASIS
18 620 9 80 = 12" ST. JIM
19. 600 ^7/
ATMOS PHtRIC ZOO
12.3 25.8
320
100
338 ,N
338
rw;,
~gi ~"B 'fi**h ' |t yTT
DIVERT (--iHOW
MATSRIALS
CAgBO/O___ STSet-j SA-28S- 6RAPC e
CONSTRUCTION jgpNTIRNAL COIL
Q IXT IRNAL COIL
Q JACKET "
DIMENSIONS /3 0" OO 20'md" HlOH/D CONN ALLOW.
CORN ALLOW.
REVIEWED WITH MATLS ENQR Q T tt Jgfr
I'-L" DIAUi, IttI Tt UvR^rNvS* QWF-PMV V-p fr/fTtC\*Hnj, t't'*y` 'SW, 0QvSji fj?
>it>E aJTKIAJ<*. lONr. MlUCO SSfSP RfPVCfK
Iff
MQOBL 2JO VSE tOj 17S0 I 420 AfM
INSTRUMENT CONNECTIONS ONE TUF/tHtVSELL
V,W-
ONt LCVti. iNPUAroA
THIS TANK IS
insulation jw THlfK K 11.2 S7D 100
WEAThEK RAR/llFO. K 11.7 S TP L?
V1NTS, PRESSURE RELIEF OUZ & ^VEftj T
SCHEDULE l. RtF*ENCC bRAKlVL
EXISTINi IN PLACE
oTHH
ggg nrfftewce orawiml oa this
Tajik . P
Nsu_I>_r i <?
AV~".t-)o. 749.10-4- IPS
\MODIFICATIONS ;
mpdiay 24" lot MANm-r et*n p-ok __ hCAHHS lk--<tM/-*'*.'UAL-
mod icy Lfi'ft iHQiCxror._________________
MONS 095489
'I
Monsanto
TANK OR PRESSURE VESSa PERFORMANCE DATA
-- AkoCLen WATTE Disposal
EQUIP. JOINT NO.
AUTH NO. 24 I S'
t~ n7,
PLANT _W
1^"
QATt 3/18/76
function fa RtCEtve AlOLLOR WAiTf AND HOLD FOR iNONEFATiON
e^tWATlON BATCH INPUT FROM DRUM TANK TRAIL ER ( TANK CAR uhlOADiijS
BATCH LOADING, TO TANK TRAILER OR TRANSFER. TO OTNtp
C T> A A/p
)-/// A.< /_ / / Q
MATERIAL
UNITS
AROCLtR trails*, loading, <S> PM
too
AROCLOR TO TRANSFER 6t Pfl
too
._
AROCLOR TO dRCULAre 6 PM ,aoo_________________________ I__________________________
UNITS
NORMAL OPERATION
CHON OASIS
WORKINO VOLUME CAPACITY FRCEOOARD
TOTAL VOLUME
&AL &AI &AL
\8CoZo___________
380
_
._________1 ?6 0g____________
IRC.ZQ
9 80 - I2"ST. SIB*
f 9feoo____________
DAYS
Varies
7. /
Atmospheric
ATMOSPHERIC-
INTERNAL TEMPERATURE
*f
zoo
2 oo
acmirr
a? ZOO'F
Lt,AAl
U.O to 12.3
12,3
ARIA OP JACKET OR (SICOIL.
FT1
2 5. 8
2 5.8
L
HKATINO Bpi
PLOW RATE PRESSURE
L BS/HF rstc,
140 HO
320 LOJO
F
324 * 324 OUT
338 '
33 8
[ttp
gfvCWT HOW QtMgNSIONS /3'*0 ^QP-ig^g^HiqM/R
patir.ali CAB86AJ STEEL^ *A - 2 fl T 6RAPC C
CONN ALLOW. conn allow.
CONSTRUCTION
Pev.gwVo WITH MATLS tNOR QVESpftS*
[(g INTERNAL COIL fcj EXTERNAL COIL, JACKET
I'-V D/A L 'VCfUANS 9hj 4"rITCH,
4f>, STt?< ?/f* `NETTLE SCHiOUUE
aoitator }/* EN7E*IN& IOHrMixCO~*ZtO VSElOAlORfH^
4 9Afrits EQ. trACEt> J'-Q"X 18-k" LO* INSTRUMENT CONNECTION! QfjP THBkMPWfLL
SC REFERENCE DRAyy/M
ont. Lfyei jAt&c*Tp*_________________________
NQTe :
insulation \W7HICK K\t,Z STD loo iNEATF/r.R 84 RR IE & K 11.3 STfi 6r
THIS TANK IS EX/ST/Ng )H fLACt
RIIURt MLUK ONE C" MfAJT
othkh Sfp REFERENCE DRAWIA/S <?-* TVtS IJ.&U v/latank,._ p";_n_p.- yoi- - moz.
AiTth. No. 74 2.10 -4-/0 i
MCpifUAjlCMi:
_m ^r-^Y__i erf l ..wr&f.ff'S....
(mt/ei pen, item No. zoi) HC wvwb.
OATC
APPO
OATC
-Id
MGNS 095490
' V1' ' ' -"1% -T'J 'f*' '
i
Monsanto
e b m *am v
TANK OR PRESSURE VESSEL PERFORMANCE DATA
' ieen crke>J-J/
!OUIP. IOENT NO._ /- ue_________
UUuTH NO., 24/S-
MNT.OT-
vW. &,N MfYfiBA,. 9/16170
FUNCTION TO Rtce/vk A M/KTUf/E OF MIQNTAR ANO AKOCkoR WAS7C an D HOLD FOR INCINERATION
operation batch INPUT FROM tank trailer.
CONTINUOUS FBSD TO INCINERATOR
BATCH 7RANSPER TO OTHER STORMS TANKS
MATERIAL
UNITS
WAITS AROCLO*- MQAJTAd MIXTURE to tNCMtAAlt*. `*hh.
WTAR H/KTVRS TO TRANSFER & PM
!2so too
1-1/6.
Ano
1-1/7
WORKINO VOLUME
TOTAL VOLUME jg RETENTION ON Q CTCLE TIME
INTERNAL TEMPERATURE
a 2oo *f ~
ABBAOrQjACKBT OB gf COIL
TBMPBNATUNB
,Ak_ &AL JiAL_ DAyS
f
--4HLts/HK
rsio,
NORMAL OPERATION
iei2o
98 0
I9&00 VA Rif5 ATMOSPHERIC
zoo, II.o TO 12,3
JS. g lCL 80
3 24
384
OESION BASIS
I8(,2Q 980 = i?'ST Slot
I 3 (>00
_Z_L
200 12.3
25, 8
32 0
too -338
.3,3.8
class JLL
type
carbon___sreei.;
Ml
f~3 HOB
SA-2BS chape c
0DIMENSIONS_L3J^'f OP 2 Q
CORR ALLOW. CORR ALLOW.
HIOMQ
CONSTRUCTION
CORR ALLOW.
_ INTERNAL COIL Q EXTERNAL COIL JACKET_____________________________________
?-fe" DIA. II TURNS ON 4" PITCH I H "*<* 84 STEFe. PIPf
aditatoi. TOP ENTERING /5 HP, /FALK RIOVCtR. URPM___________
4 BAfFLlf E9. SRACEO' I'-O^H !-(,"CONS,
INBTPUMBNT connbctionb ONE THERMOWELL
ONE L gyf L INQlCATOR
insulation 2 thick
k II.2
K/J.3
STD 700 STD 6S~
MOTE: THIS tank
BNT, PBBSSUPB SlUtF f> N E CVENT
bl-OZ^LS SCHE0ULE~ SEE REFERENCE 0RANIN&
IS EXISTINS IN AlacC
A NEW EQUIPMENT.-.
othbp iff REFERENCE ORAWINC OF THIS
INTERNAL HEATltJi COIL AS srectntB
\ nuST/Nt. TANK , t>W(No,...O - LQS - HI. 7.0 2__
1LAYl>J,....NoJ^2.-12JP.s.zlS..
L--M.O.PlEKA-T.imV__________ ___ _____
(ruetoti t>en. Item hit. 210)
Mod ify___ Li/El /vp-(A1S&.
MV MO.
.
REVISION
AM*P MEW MEATINC COIL
, V DATE | ARfO \ DATE W.&.N. TMMJML
MONS 095491
Monsanto
company
-----------3i-_A Jl
CCNTRIFUQAL JMP PERFORMANCE DATA AROCkOfi WASTC DiSP&ML
\
/-//?
l>NLQji>N& lUMP PVMP
J&UtL
(exisr/fJt
function TO PUMP WASTE AROCLOR FROM THE PR UM UNLOAOING, SUMP
TO THE WASTE AROCltfX. S70RAHE TANKSJ l-//i *uo !-))7
OPERATION
IK)Tr#MtTTA>7 fl/MPlHG*
COMPONENT
MINTERMITTENT
ri CONTINUOUS
MATERIALS HANDLED
UNITS NORMAL DESIGN
Zr'oclor
|
&PM SO
SO
HOURS PER YEAR REMARKS
.
9*ML
TOTAL SOLIOLX^
' 4FM 201 So
OAS
_PROCESS DATA______________________________________________________________________________ _________________________
PUMPINO TEMPERATURE. PT, * P |40 ~ I>p c F P T /, Sf To / SO
TO /, ffJcRYST ALL1Z1NO, TEMP *
VISCOSITY, CtNTtntSt iunithEpt 7 r 7S
9 *r 300 T ICO. OOP________________________________
VAPOR PRESSURE, PSIA, g>PT bi(mL. g*0F NSfrnL. loups NQ/Jf
; WT OENSITY
EM:CORROSION/ERO SIO
NBQLIOIBLf
Qmooerate
severe
ESTIMATED PERFORMANCE REQUIREMENTS
CAPACITY, U*OPM: NORMAL
So
; MAR OfiSlON
SO
; CONTROL ALLOWANCE*
PUMP RATIO CAPACITY (MAXIMUM OESlON CAPACIT 1 PLUS CONTROL ALLOWANCE!. USGPM,
ST ATIC MEAD fi> PT,
12-
PSI I EQUIPMENT LOSS. PSt:
NOAJg___
PIPIOIA, NPSi SUCTION
NflA/
: OlSCHAROE
I PIPING LOSS, PSI:
'leal
i VALVE PRESSURE OROP, PSI:
tO.A
NORMAL AVAILABLE NPSH, FT:
2L3-
RATED TON <9 PT:
_fe
AO- PSI FROM PUMP CALCULATION SHEET NO. S * $S"
SYSTEM CURVE CALCULATIONS FROM SWEET NO. TABER
DW!VEI< J^tELEC MOTOR Q TURBINE
OTHER
PUMP DATA
MATERIAL SOP CONSTRUCTION:
CASINO AND NOZZLES IMPELLER
t>VCTU OVCTllt
SHAFT, SHAFT SLEEVE
PUCTliS
LINERS
IRON mooj 1 ROM
PACKING MECHANICAL SEAL PACKINO GLAND base Plate
_RNE Nome NOME
. ..
CONSTRUCTION FEATURES BEQUIREO FOR PROCESS OR PERFORMANCE CONSIDERATIONS:
Ift/fZ. SWtreH 76 TUArt
0A/ AMP OFF
REMARKS, SPECS. TESTS, ETC.
__ gx/;rwc PUMP,
TABER SITE CZ - YtATKAL' suction I1/*" dischakoe
!7 rp ROM 1 S' HP________________
231.
ppindication RE4PJAEJLi-2l4l-JL s nr motor 70 7 s hp
V,.' '
/ tCspKlly ifTtictst o( maximum design foi contiol pinposes,
MV NO. . 1
I1 -
_i k_
REVISION
;"
:;
:
1'
j BY
( DAT! | APPQ | U A T t
"
mons
09549^
Monsarto
eOM^A'MV
Mm|-
svnp tmF
ifm&ir." **&/--*/
PUMP ''CALCULATION SHEET
AfOCLOK wasix turesAL.
Iiquip. totNT no.-- i-ltf
Iauth mo. 24IJT
Pt>WT ''iitsfri'
|w W. NIEHftf* DATE
CONDITIONS
Materiel Pumpad \A/AS7^ ARC C L Oft
P.T. - Pumping Temperature
*C 140
gpmm Flow Rata: Normal.
S O Otalgfl S"0
3- Specific Gravity* /?f tp I,SO Pentr* IL1 rp f?.f iu/j.
P - Vlaco.lty*------Z--Tg 75* CenWpeie " vPt>r Pressure* NE(mL mmHa NE&L.
AP: Control Valve 10.4
pmi
Pipe (Material_C; Nominal Size. rf, Actual ID, Inchat _NPfl
2"
Suction S.OL 7
Ditchery
At Pumping Tamparatura
C
EQUIVALENT LENGTHS Enter Type and Factor for each valve or fit*
Suction
Discharge
ting. Enter Number of each type, end line elze. Multiply Factor x Size x Num| Type jFector| jg|Numbar| Feat Type Praetor] ]Numbw FaoS
bar and enter Feat equivalent length. Sea handbook for types not listed.
Factor! for Valves (open) and Fittings
Oat#
t.l Plug Vatva
l.S 90* I. r. or Wald all 1.7
Hfu 1,7
[smrIl.aUdgdr
M,
Globa, Lift Check 28.0 Butterfly (6" & up) 1.7 Std Tea (on run) 1.7
TeeY* ).7| l 4
Wye, Angle, Dlaphi 14.0 90* Sid Elbow Swing Check______ 11.0 45* Sid Elbow
2,5 Std Tee (side out) 5.0 1.3
ttree p5,d
13
Length of straight plpo in foot
L m Totof Equivalent Length, foot
FRICTION HEAD LOSS V- (0.408) tPm/J*, feet per second C-
v v/
N_______________ "~
Vto (Reynolds Number) (3162) gjmS/d^ (3 / (
0 t 7)^3^} -
/- Friction Factor (Soo Appendix C of D14.2 Std 2) If Ro < 2100 omit this stop.
Suction
Discharge
4,79
JOJSL
Aa (nor; 2100) OilMfiiV^F^' foot of fluid par 100 foot equivalent length Q B,
.(Ro> 2100) " 18.63 fV'fd
39
SUCTION AND DISCHARGE HEADS
Suction
-2UL
Discharge SYSTEM HORSEPOWER (estimated)
Vessel Pressure (psle * 2.31/3) LlQUld Level (above pump ; below pump -) Static Hoad (abova pump *; below pump -)
<) 23? <4> m i. 0 aw
amm <M 20,0
fr_ gpm*TDH*S 3980 x fi(Note 3)
Total Friction Head Lose (Plus Velocity Head. Sea Nate 4.) <->
O (-) 218
1.42
mmm Velve (Apsi * 2.31/3) ($e# Notes 1 and 2)
H
0 i`>
17.0
HPCeM, Po<4
3960 x 0,40 *0.74
Orlflcs (Apsi x 2.31/3) (See Noto 2)
H O ()
v'lf/eufY
Equipment (Apsi * 2.31/3)
(-)
0m
O
HP- 4,3
Suction Hood Sim, foot of fluid, aba.
Discharge Hoad Sum, foot of fluid, abs. DYNAMIC HEAD Discharge Head Sum Suction Hoad Sum
7Dff* Total Dynamic Head, feat of fluid NPSH Suction Head Sum Ppp (mmH, x 0.005/S) or (csia x 2.31/S)
NPSH Avolloblo, fool ol fluid, t.
Jju J^Z.
J1
24.9 2 4.3
MOTES
1. Assume control valve less to be 70% to 100% of piping plus equipment friction loss for Initial calculation. Consult instrument engineer for final selection.
2. Control valves and orifices not normally used fr pump .suction.
FUMP SELECTION
Menulsclurcr___________
Speed_____
.rpm; Imp Size_
: TDH `
_; Model _ ; HP____ ; NPSH.
: Typo. ; EH___
3. Use combined efficiency of pump and drive.
4. See DI4.2 STD 2, guide for tho use of this calculation procedure.
mv wo.
~|~~~ OATS
MQNS 095493
Tpw;
Monsanto
C O M FAN V
CENtMl PERFORMANCE bATA
Nijnire*, o*te.
AQ Jf.fi.WM. SHEET /
- IHdijrRATIOkl FLOOR -Wwift/Xf WWf tllUSr/A/& In PlMC't
function TO PUMP A MIXTURE OP WATS* APOCLOr ( MeAt TAR _rtf T//f AkOUOR - WATCR. SOf-tr^ >-)Z4
no. reop / P ton Florr
operation
INTER M I TTEA/T PURlTtA/&
WA 7FP FROM R At fJ AMD Flop* WASI/JAlS,
AHOCLOn AKttt HovTAR FROM PVMF LEAKA&e AND
Out y:
YENT
Q CONTINUOUS
MATERIALS HANDLED
COMPONENT
WATER -AROC10R
MIXTURE___ |
ARocioa J
UNITS NORMAL DESIGN
_ C.PM too. 10 0
0
SPULS
HOURS PER YEAR REMARKS
TOTAL
SOLIOlx^'
GAS
PROCESS DATA
ROMRtNO TEMPERATURE, PT,*P
_j6l2.
vncoiiTv7~ffNTtPotse <unit Pat
VAPOR PRESSURE, PSIA, PT Q,?&
_L__
/, /_________ Pao a
JLL
gtor 0,2 G |sOUP T#ACE
/. 0
CRYSTALL1ZINO, tEMP'f
? WT joENSITY
3H
COR WO SI ON/EROSION: fig NEGLIGIBLE
Qmooirati
(3 SEVERE
ESTIMATED PERFORMANCE REQUIREMENTS
CAPACITY, UIORM: NORMAL
loo
i MAX DESIGN
1QJD-
; CONTROL ALLOWANCE*
PUMP RATIO CAPACITY ^MAXIMUM OESION C.APACIT.Y ALUS CONTROL ALLOWANCE), USGPM.
/ gp
T ATIC HEAO 9 PT, WIRE DIA, NWS: SUCTION
2 P.
biONS
VALVE PRESSURE PROW, WS:
8.7
PUCHAWOE
f^QA/
Pfr | EQUIPMENT LOSS, PS|; NONE
wiping loss, psi: NORMAL lAVAILABLE NPSH, FT
ZA. 3 S'
RATEQ TON ft PT: ,,.4iL- FT
!9,ST PSl TROM PUMP CALCULATION SHEET NO.
SYSTEM CURVE CALCULATIONS FROM SHEET NO.
; driver ^Jeuec motor Q turbine Qother
MATERIALS OF CONSTRUCTION:
CASINO AND NOZZLES IMPELLER SHAFT, SHAFT SLEEVE
304 30 4 3 04
LINERS
ss ss ss
PACKING MECHANICAL SEAL PACKING OLANO RASE PLATE
AiOfi/E biOt^E NONE
CONSTRUCTION FEATURES REQUIRED FOR PWOCESS OR PERFORMANCE CONSIDERATIONS
LRXEl twnCH To ToRht fuPtT W /A>P OFF____________
iTEAM SPARSE INTO TlPPR SvHP
REMARKS, SPECS, TESTS. ETC.
exhtins pomp: ......................... ............ ~
~taser
s>zt cz - vertical
/ ,/i" svption . / '4 ..DiscHAta I 7fO RFM ~ f HP
7. L31
^JLSAS.
l
PCFT. 7 rfM Me. 2 I tT
Cspiclty In excess of mtiiimum^tsijn fOf control purposes,
sty no. I
________ __
i>iv')s'ioi_
W^UMiL YACHT A f <1 Pfl' FM WAV* tn tfM~
Ltu. ai ff* . f* appcha p r <m
MONS 095494
'i;V-
Monsanto
COMPANY
**T-f2?*f~**$
IcenTmfugm. PUMP PERFORMANCE DATA
i ------ ---------------- `AKPCLOK wasre dismal
EQUIP. JOINT NO ___
AUTM NO.-.24 I S'
:w, G.,K.
> W, tZJti'JJiHtXf* oi siriJJo
APPO II. B WnJjL. Shut j_
NwpAyMiE>
wAfiMi'C/tALto/fk\ *SyUnMr? rPyUrM>Pr
_ (hCmxpur>/wt/eii IpN/y PrtpiAnceev)
_Lno, wtoa
function to Pi/a-tp accumulated aroclok from the 80trt>/v ar t//e
AkOCU* - WATfK SUMJ>. 1-IZ4. BACk'~INT(? WAST/r AtOClO* ST*a&m
7ANKS^ hJJC An tt J-J97.:
...........
_.................................
operation
INTIXMITTEUT PVMFtN&
... .....
COMPONENT
OUT Y: (^INTERMITTENT
[^JCONTINUOUS
MATERIALS HANDLED
UNITS NORMAL OESION
ARPCLOR ?
<s rn 30
HOURSPERTgAR '
REMARKS
TOTAL
' ' <sm 30
solidys*
OAS
PUMPINO TIMHIUTuVl. PT, * P
) 4Q
PROCESS DATA
| P 0 R g P T /,
J, g'O 0 F /. 3 3 T /.
" * T ALL I UNO. TEMP ' W ------
VISCOSITY, CtNVMtSi (UNITS! gPT J fff J ^Qir
If APQR PRESSURE, PSI A, g RT tfEG,\_k
Q to r ------------
ago To \PO.QOQ
____________________________ I^ZZIIZZZZ
(so Lips f40hJE
%WT~|'pEN5ITr
|sne
C 0 AAONON/ EROSlON: 'RfNeOllOItU
""
'
j~") MODERATE
[H SEVERE
estimated performance requirements ~
CAPACITY, USQPM: NORMALj Q________________________ ; MAX PgSiQN________ g Q; CONTROL ALLOWANCE*
___________
< PUMP RATIO CAPACITY (MAXIMUM DESIGN CAPACITY PLUS CONTROL ALLOWANCE), USOPM,
C STATIC HEAOPPT, PIPEPlA.NPSl SUCTION
2^
PT
/f,3
NQN
i OUCHAWPC
Pl | EQUIPMENT LOSS. P SI: NONENORMAL
1
2y
|p|PlNO LOSS, PSl:NORMAL/4
(2t3i BS^--1 VALVE PREMIE DROP, Ptl
NCRMAL ) A V AIL A PLS NPSH, FT: "2 S. 3________NORMAL
*Art RATS
RATS
RATlQTOH^PTi
PT 40
Pll FROM PUMP CALCULATION SHEET NO. &OUI t>i C PS 1249-3 fUM? &*
SYSTEM CURVE CALCULATIONS PROM SHE! T NO.
.CM 1*49-3 i ORIVK" frgfELEC MOTOR Q) TURBINE Q OTHER
PUMP DATA
MATERIALS OF CONSTRUCTION:
CASINO ANO NOZXLES
P PCTue IA.PM
IMPELLER
PUCTUE >K/>\>
SHAFT. SHAFT SLEEVE
tTtei / ti-ISKOftOHt
PACKING MECHANICAL SEAL PACKINO OLANO
LINERS
BASE PLATE
none
N6ME NONE
CONSTRUCTION FEATURES REQUIRED FOR PROCESS OR PERFORMANCE CONS!DERATIONS:
igygL Switch ip tvan Tump____Qh> amp. off ~
S7AM HFATtA/(L COik T0 BE APP*t> TO Sy/V/>.
REMARKS, SPECS, TESTS, ETC.______________________ ;
Ex/sr/w& Pvmp:____ dOULPt . VERTICAL EPHP , HoPEk 3171
................. "
~ J/gc: / ? * 2 x 8 .Ducrue mm___ m ret. Left PM. ~ 8Jq_____________________________________________
irSOj Hl^TEFC M D TOR
JU>SF*(ATtftN. -MAV.I* gp ; CHAN&e CHP JHO7P* TO to HP_____
T" '"~ ................
'
,
Morea: Zi Li. IS
CHALKer.}____ J3 ^_Lfe.__
Hen xj.ui-iji.___ (aisj.
"
tM* ol maximum dtal|n lot conuorpurposos.
RVNQ. . . .
REVISION
.
iW OATI 1 ARpn | OAT*
A
t v,al.` a.:
$$!<"
------ :---- -------------- :-----------------------
^SCK >Z-o/-r/
Monsanto
COMPANY
centmfuqm. hump PERFORMANCE DATA AmciaaWaew D/spvai
EQUIP. IDCNTNO. / *" / 2 2
AUTM NO. 24/^*
PLANT
iv W. <. NlEMCYER oat.
LOCATION
I
AWO
MIIT
NAME WATft SUMP
reloeateF)
NO. BEQQ /
FUNCTION TO RUMP THE WATCH LA TER OUT OP THE A ROCLOR - WATER
SUMP J I-IZ4 TO A PlAtuT SEWER
OPgwATiOM
IH 7AMlTTe/>jr
COMPONENT
DUTY: ^INTERMITTENT
pCONTINUOUS
MATERIALS HANDLED
UNITS NORMAL OESION
WATCH.
0
6 PM too too
HOUHIPKR HH REMARKS
TOT AL
SOLIDS**"'1'
OA*
PUMPlNO TEMPERATURE, FT, 0 F
PROCESS DATA TQ \40 {** "* ~P~PT 1.0 TO Q 9 S 0* <> F
/, Q ___~fcR Y ST ALU ZINO, TEMPV
J2
viscosity, CfHTtretst iunitsiApt p,f 7o/,4 frgor
VAPOR MIIWKI, PSIA, 9 PT QJj
& SO T
O.j^
I, )___________________________ _____________________________ ________________
|sOLIOS
% WT |pKnITYj^E^ZZIZIII
CORROHON/EROSION: JgfNEOLIQIBLK --***
Q MOOERAT 6
C1Sevg,*E
ESTIMATED PERFORMANCE REQUIREMENTS
CAPACITY. USOPM: NORMAL.
I 00
; MAX OESION
100
; CONTROL ALLOWANCE*
PUMP RAT tO CAPACITY IMAXIMUM OESION CAP AC IT Y PLUS CONTROL ALLOWANCE!. USQPM,
STATIC MgAOffPT,
I^
*r, z
NONEEQUIPMENT LO 66, PSI:
PIPEOlA, NPS: SUCTION
NJflAjg
Z" PIPING LOSS, P81: AWWlt 3,0 NORMAL
. VALVE PRESSURE DROP, PSI: RATIO TOM 9 PTi 47- -- I
11.2
NORMAL (AVAILABLE NPSH, FT
5" PSI PROM PUMP CALCULATION SHEET NO.
2 Z.S________ NORMAL __________
SYSTEM CURVE CALCULATIONS FROM SHEET NO.
CVRVC
; DRIVER ^tELC MOTOR [^j TURBINE Q~) OTHER
RAT' RAT
MATERIALS OF CONSTRUCTION:
CASINO AND NOZZLES IMPELLER SHAFT, SHAFT SLEEVE
3 04 SS 3 04 SS 304 SS
LINERS
.
PACKING MECHANIC AL SEAL PACKING GLAND BASE PLATE
NONE NONE
NONE
CONSTRUCTION FEATURES REQUIRED FOR PROCESS OR PERFORMANCE CONSIDERATIONS:
REMARKS. SPECS, TESTS, ETC.
L ...TAB (JL-t JSj2S_CTZ..jtE_R)is__Ne, 2? 7 - yjEATHAL.
_ J-Y* "JiKAiA&E__ }S~$"JA4-S.^_______
____'750
__5L-H____________________l_________________
-fr/irNy.' pr?i;. "rr.-'n n?, r/jjL
......"
* Capacity in excess ol maximum design lot contioi purposes.
RIV NO. A
REVISION
-JS
BY | OATt 1 APPO | 0At|
MQNS 095496
* . ,.>.
1M1 o_ns,anito
COMPANY
^Bc-A <**.*/'-57----------
1 TANK 04 PRESSURE VESSEL
I performance data
eouif. IOINT NO. !" 12 4
AUTH NO^ 24 IE
PLANT WS.IE.
PlSPOSAL W6. NlEMEYEH date 10/6/70
name
AR0CL6R - WATFP. SomP (EXIST/NC
function TC PFCFH/E
AM AK0CLOR- WATFA
PuAscs sr Settj.//j& . And hold
!AJ PLACE)
NO. REOD
M! XTUP F . SFPAPATF
For PufipouT
/
THF
OPERATION /N7C r MI7TfjT IN PUT FROM I/JOHCRATI0N FLOOR. P*A)M St/Mr POMP/-/70
Ih/TIRMITTF.NT Pt/MPOuT Op Apoclor LAYER, TO S70PA6E TA/U/CS !->) i-H7
internittf/ut Pumpout of- water layer to s/tyvex
MATERIAL
UNITS
AROC LOP. WATER
SPM
<S PM.
30
I4
.... . ..
WORK 1 NO VOLUME
CAPACITY PRSCBOARO
TOTAL VOLUME
J^RETENTIONOR fl CYCLE TIME
INTERNAL PRESSURE
INTERNAL TEMPERATURE
DENSITY
areaopCIjacketorSI com.
PLOW RATE
COOtMMG _ FLUID
PRESSURE TEMPERATURE
UNITS
NORMAL OPERATION
G* A L
TT75TU
' C.AL &AL
1 430 13.409
PAYS
'VARIES
ATMOSPHERIC
/ "F 4 TO &6 / 4 Tp 140
Lf-/6Al
U.C to 13.0
___F T*___
lk^/hp.
34
2 SO
PS 16
'cT'f
.To
,.
1C.Z /JZ4
ICZ/224-^
DESION BASIS
Ti.TfcT 1 430 - W ST, S/M
T3aoo
Varies ATMtStHflLlL 4 To CO / 46 T* 140
__ ___________ 34
2FO
100
/70/33B'" //o/333
type CONCRETE
I6'-0"X 1 3'-0"h S'-O'OtrP INVERT o dimension --------- oo--r=Y hioh/lone
material* OP
RUNfORCfO CONCRETE
CORR ALLOW. CORR ALLOW.
IMCN IMCP
CONSTRUCTION
CORR ALLOW.
INCH
|j*I INTERNAL COIL 3] EXTERNAL COIL QjRCKBT
F LAT HAIRPIN) 14 `~0 L ONC / 2 " OFF BOTTO.YI^
6" APART 2* SCH. SO CARBON STEEl PIPE
J
.
AOITATOR 'NOKJE
'
NOZZLE SCH. SEE KFF. DRA NINES
INSTRUMENT CONNECTIONS if,
TCNPltATVAS INOICATOA
INSULATION
NONE
(/X A^OCl&X POMP C." FROM BOTTOM
NFW EQUIP. ___ _____ UEAJJH&.___ (PH
As ..SPfcir'Et_____
vents, pressure relief
other "r-//:-///.T
" ...........
........*
RrfERCuCC p,\ W/fe CtS OP 7HU
ftsAiP
;... 3 ..
s' - />??-/
/Oja- 3 -- E>- 310,4-0 S-i*Z-l
. .tumm/njiv^m _____M cu/F t JTfCA_. F.i*B.-ei 4 T, IS.
auon instaua tich of:______________
. WiArf<g___st/f/r rvM**
_______________ HC;ijjA'6
<#; -Jv. TAl*r
CI. OiE Tfi'rncn ENl**h:H j P<t*)Pt OVftHt*
to ___
MONS 095497
->Gc.r.
Monsanto
COMPANY
| CENTRIFUGAL PUMP EQUIP. IDENT NO
PERFORMANCE DATA
AUTHNO. . 2 4 IS*
KANT W. L.K.
Aroclop Waste Disposal BY W. Q. NIEMETFRa.i, IO/lt/70
A'TO
Wf+f> . SHUT J or 2
name vuloaoimc Dock JUMP PUMP
(EXISTING, !H Pi A CP")
NO. REOD
1
function 7`q Pump IA AOCU}K___ JRliL. to sroeAte tapaks /-//C. i~"U7 f., I-U.2l.1-.________
opgHATtoN ) h re Km i rrf/v T PUMPjAG
COMPONENT
OUT V;3$NTERMITTENT
CONTINUOUS
' MATERIALS HANDLED
UNITS NORMAL DFSlON
AROtLOK afcww/7f
i WITH PH[POL f WATER.
4*d_1 50 7sr
HOURSPER <{* REMARKS
TOT AL
solioix'"'
OAS
PUMPINO~TMPgRATURC. PT, 9 f j 4 Q
PROCESS DATA ) SP OR ' P T /, Jj* ffr / 5 Q fr SO f / 35 rp~J. 5~,i* } CR YST AL L > 7 INO, TgMPP
VISCOSI T Y, C(NTtl*0l3G IUNITS1 ffl_PT _ 7 TO 7S' -*1 r___ 3 00 Tg /~00, <?0ff _
vapor pressure. psia. C* pt
WE&L
t/FGL f*oup> TA_____'V wr |densit y
[sue
CORROSION/ EROSION: ><j^EG LI 010 L V
QmoOERATF.
QsFVERE
~ ................ESTIMATED PERFORMANCE REQUIREMENTS
--- -- ______________
c,
IWUAl
CAPACITY, USQPM. NORMAL
" Q: MAX OESiQN _
_____________. CONTROL ALLOWANCE*
RUMP RATED CAPACITY (MAXIMUM DESIGN CAP ACITY PLUS CONTROL ALLOWANCE). USOPM,
STATIC MtAO ? PT,
30
PSI QUlPMLNT LOSS. FSI:
hi 0 tJ
Pipe DIA, NPS: SUCTION
h/0Aj
i OISCHAWOE ___3"____ jplPlNO LOSS, MSI:NORMAL
__NORMAL_____
___ RAT 9, /RATI
VALVE PRESSURE DROP, PSl;
9. 3_________NC RMAl" | AV All. ABL E NPSM, FT'__ __
__________NORMAL
2A3________ RAT*
RAT EO TON &'PT:
0
$FT 3^.8 P SI F ROM PUMP C A L C UL A T ION SHE K T NO. f $S"______________________ _____________
SYST EM CURVE CALCULATIONS FROM SHEET NO.
CQfKVE DRIVER ^j^gLEC MOTOR
TURBINE C^OTHER
___________________________________ PUMP DATA__________________________________________________________
MATERIALS OF CONSTRUCTION:
CASING AND NOZZLES IMPELLER SHAFT, SHAFT SLEEVE
304 3D 4
10A
LINERS
SS. S.S. S.S.________
PACKING MECHANICAL SEAL PACKING GLAND BASE PLATE
NOAJF N9N& W0AS&
.
CONSTRUCTION FEATURES REQUIRED FOR P^PCESS_C^* PERFORMANCE_CONSIOERATjON^^_
MAWAL........START
__ !(??AT/___!
REMARKS. SPECS, TESTS. ETC.
_
T>TJJrfAJCj_____PUMP J7_.T^BpC>./ZE ...?:Z"~SkTFJ No. 227 - VFKT'ual
"....~ "j ~~
- _ il/$"$vcriOAj I Va PJScharj^e^
'zslKp'ZI1~ --___________________ !
** Capacity in excess ol maximum design lot cotiuol (imposes.
RIV NO.
--S~
A ~lk
R( VISION
.
OAT(
appo
DATS
MONS 095498
Monsanto
COMPANY
rM*r
-sjar. &-Z0/--0/
CENTWFUCWU. rUMP CALCULATION SHEET
r Aroclok Waste Onretjt.
IliQUIf. IOINT WO.
2 41?
1--125'
W.6 K J9//9/70
CONDITIONS
Material Pumped. WAiTE AKOCLQK
P.T. - Pumping Temperature
CO t~.
TMl
gpm" Flow Rate: Normal _ -SjB_ Design____ 7_ _f_,,_______ 5- Specific Gravity* LlfTO LSO Density 11,2 T I2*F ih/g^
P" Viscosity* _ 7 TO 7i~___________ ___Centipoiae
Vapor Pressure* VfdtA
mmHg *J&L.___ pm
AP: ttipMalS/alve
9.3
otl: Equip. NOM
p-
Nominal Size. MBNE..
d, Actual ID, inchat__
At Pumping Temperature
.Suction.
.Discharge
.Suction. 2JLZ .Discharge
/iANVAL
EQUIVALENT LENGTHS Enter Type end Factor for each valve or lit*
Suction
Discharge
ling. Enter Number or each type, and line si ze. Multiply Factor x Size x Num* Type |)Factor | ejNumberl Fed Type (iFactoi
Feet
bar and enloi Feet equivalent length. See handbook for types not listed.
Factors lor Valves (open) and Fittings
Gate
1.1 Plug Valve
1.5 90 1. f. oi Wald ell 1.7
Globe, Lift Check 28.0 Butterfly (6" A up) 1.7 Std Tee (on run) 1.7
Wye, Angle, Diaphr 14.0 90 Std Elbow
2.5 Std Tee (side out) 5.0
lik-
\\&ATf 1 1.1
mJsLM
o SI
_Lft_
AL
10
Swing Check
11.0 45 Std Elbow
1.3
Length ol straight pipe In leet
t. Total Equivalent Length, lot FVRIC(0T.4I0O8N) gHpmEAtdD', LleOeSt Sper second
j, s^* ^ ^
.w
zn
Discharge
Re (Reynolds Number) - (3l62)gp5/</fi
* H 1' * `7\`3
/- Friction Factor (See Appendix C ol 014.2 Std 2) if Re < 2100 omit this step.
yrv*rf*S=]
A* [L(iRnee >9 2u1w00i )-- 1w8..o83j /yV*//d
Jj
leet of fluid per
100 leet equivalent length /
\/ \/
\
Toml Fric lion Head Loss AAx f./lQQ x l.is (safety factor), feet of fluid (*3.^5)^. fCjj /, )SJ
3AS_ Zilo_
0,0 4 0
3.03
n:r
SUCTION AND DISCHARGE HEADS
Suction
Discharge SYSTEM HORSEPOWER l.alimaled)
Vessel Pressure (psla x 2.31/5)
<)
Liquid Level (above pump <; below pump -}
W
Static Head (above pump *; below pump ~)
Total Friction Head Loss (Plus Velocity Head. See Note 4.) (-)
Z3.3
/, 0
O
(> Z7.9
,'4' m m 8 o.o
(*) 1 4. 0
am * TPII * S HP - ---------------------------
3960 * E|Not 3)
' 7E/1.1* ^94 1.4z
DMt Valve (Apsi * 2.31/5) (See Notes 1 and 2) Jrt) (-1
Orifice (Apsi x 2.31/5) (See Note 2)
(-)
0 () tt.2
O (+)
0
3960 . 0._4J? X 0,74x4.9
Equipment (Apai * 2.31/5)
<-) o (*)
0
6. C
Suction Heed Sum, feet of fluid, aba. Discharge Head Sum, feet of fluid, tbe._______________
.2.4.4 . `"Trg
DYNAMIC HEAD Discharge Head Sum Suction Head Sum
7T>ff~ Total Oynarnlc Head, feet of fluid
NPSH Suction Head Sum
(minHg * 0.045/5) or (psiax 2.31/S) NPSH Available, feet ot fluid, abs. PUMP SELECTION
84,9
24.?
C.0.0 24.3
24.9
1. Assume control valve loss to be 70S to 100% of*
piping plus equipment friction loss for initial
calculation. Consult instrument engineer for
final selection.
*
2. Control valves and orifices not normally used in pump suction.
3. Use combined efficiency of pump and drive.
____ _______________
Speed . . _
pin; Imp Size___
GPM_______
TDH J____
; Typ; EH___
4. See DM.? STD 2, j guide for the use of tins calculation piocedwe.
HT i.
MONS 095499
~"
Monsanto
COMPANY
!><AT.
CENTRIFUGAL PUMP PERFORMANCE DATA AKPO-tA WAIlt DjtWAI.
EOUtP. IOCNT NO. 1_ -127, )-)3Z
AUtH NO. 24^________-
.r W, G. NieMtreK
HART. DATE
MJi
to/tohZr
fSRSAK "TANK. . PMMPS C XU TIk/6, iJ PlAtr')
TO ?UMP CITY WATffi TO THE CONTACTO* TUBE \A/IfK AHt> THE
-TAf&ftMii-
to rtoviPE frtrtaevCY waiek Svmr to rut cca/tactoh tube
operation
contiguous
COMPONENT
DUTY: INTERMITTENT__________^CONTINUOUS_____________________________ HOURS Eg* TEAR
MATERIALS HANDLED
UNITS MORMAlMRNMM PESiAN
REMARKS
Jn
WA Tfft. TO CCfJTMCTOR WfIR
WATf/t. Pectcie re Stcaktank
WATER TO THERMAL OXIDliTF,
a fit
8"
&PM lE
Grrt 0,1 T9 S'
8
0
F
FHrMtAtfT MTM TO <9A>74i70fi,
<k err O
?4
8 IF F
34
TOTAL SOL D|/
'
<kitl ?3 Tt?S 47
62
OAS
PUMPINO TEMPERATURE, PT, 0 F
$ (Q
PROCESS PATA
j SP 0 B PT
/, Q<'60F ), Q
[c R Y ST AL LI 2INO. T EMP * F
VISCOSItT. ClM T! t*0li I UNI T SI (? P T
yapor prehuri, p si a. pt
Qf) Q
/, 3 9 >o w
g* 60 F f }________________________________
Q, 2 ipT [souqs ~NOfij
* WT | PPmSIT V
(size
CORROSION' ERoYlON: ^TnEOLI 01 U
Q MODERATE
[~J SEVERE
'
CAPACITY, USQPM. NORMAL
ESTIMATED PERFORMANCE REQUIREMENTS 2 3 TO 2 $______, MAX DESIGN_________ ^ 2 CONTROL ALLOWANCE*
PUMP RATIO CAPACITY (MAXIMUM OdlON CAPACITY PLUS CONTROL ALLOWANCE). USOPM,
\
T ATIC HEAP 6' RT,_______g Q
W T 8, 7
PSl {EQUIPMENT LOSS. PSI;(02,
NORMAL102.RAT
PIPE 01 A, NP I: SUCTION
/ f/Z U
; DISCHARGE
[p^PlNO^-OSS. PSl:NORMAL
2 3,/RAT
KlEffE MMwm MM PRESSURE DROP, PSl:j>7,f
NCRMAL [ AV AIL ABLE NPSH, FT:NORMAL 2 /. 5
RATEO TPW (.*' FT: 4 7S'
FT 2 O 6 PSt PROM PUMP CALCULATION SHEET NO. j % S~
SYSTEM CURVE CALCULATIONS FROM SHEET NO.
; DRIVER
MOTOR 21 TURRINE [^OTMER
RAY
PUMP DATA
MATEniAUSOF CONSTRUCTION:
CASINO AND NOZZLES IMPELLER SHAFT, SHAFT SLEEVE LINERS
seiri- S7FEL tRA12E STAtNLEiS STEEL
'
PACKING MECHANICAL SEAL PACK INQ GLANO OASE PLATE
CONSTRUCTION FEATURES REQUIRED FOR PROCESS OR PERFORMANCE CONSIDERATIONS:
LW FLOVJ i*/!TCH
OH Pi/nr DlSCHAKZ*
IHTC/>.U>C-HT> TO &HVT DtfWM
-Ltnm\*ATOJt._____SLMMfA, .srsTert--------------------------------------------------------------------------------------------------------------
REMARKS. SPECS, TESTS. ETC.
$)OST)A)G, PUMP : PATTFR StJ .MAS. TYPE. nze: I 4" suction I 'A" ouchakU .
_1',,_______ "_______ ifJiP.___________ ^__________ _
~ ________ ' ~~~ ~ 3FFO KPM
g Va "iMrtuef*.
* 'CapscHy In excess of maximum design lot eontiol purposes.
MV NO-
REVISION
. BY
j OATI | APFO j U AT |
I1
- HONS 095501
COMPANY
M'#***W**t!K TA"K WHPJ S&C77 <? JLo/ --<?/
cEwminwALPUMP CALCULATION SHEET
/tega.**- ^AiTf-HamAk
ZOUlh. 10INT NO. 1-127, /-/JZ AUTH NO.,,H+--J--F--------- tfl /fl___________
|bt W. &. ^NlEM(T2nAtt W?o/7 0
2 o 2.
CONDITIONS
Material Pumped_ WATER,
P.T. Pumping Temperature.
ppm " Flow Rate: Normal ,,
Sm Specific Gravity*___________
p Viscosity*___________ /. 3
Jb/gM Centipoise . _____ ^ ^ S psia
d, Actual ID, inches _ i,st_ At Pumping Temperature
psi; Equip.oat Sch t**h***m 40 >
Suction____ / ^ ' Discharge
Suction !i50 Omtwgfr JPAAV A/0Z7k('te* XMMEtf*. r t
EQUIVALENT LENGTHS Enter Type and Factor for each valve of fit
ting. Entlt Number of aach type, and line size. Multiply Factor * Size * Nvm*
bet and enter Feel equivalent, length. See handbook for types not listed.
Factors for Valves (open) end Fittings
Gate
1.1 Plug Valve
l.S 90 1. t. ot W,ld all 1.7
Glebe, Lift Check 23.0 Butterfly (6" A up) 1.7 Std Tee (on run) 1.7
Wye, Anglo, Diaphr 14.0 90* Std Elbow
2.5 Std Tee (side out) S.O
Swing Chock
11.0 45* Std Elbow
1.3
Length ol straight pipe In foot
Dischjifc
Type flFactoi Number] Ft
|qrqUL `7
JA unrn
S
m.2
IX
LiL-
-L5L
loo
L Total Equivalent Length, feet
FRICTION HEAD LOSS
V-(0.403) gp*/A feet per eecond Re (Reynolds Number) (1162) gpmS/dp
ft>.4ot)(6t)4.2r
' ~\?r\ / (?/& iJi v2JL
, i)
/ Friction factor (See Appendix C of 014.2 Std 2) if Re <2100 omit this step
A
h
riAn.JWi Vue^rrff1^' l_(R> 2100) - W.6S/VVrf J feet of fluid per
100
teet equivalent length
(iic
----------------.----- ---i jW. Suction j Discharge
znnzjjrrz loi.ooo | L0Loo'i_ J>~. 02_3_ 0 02 3
3X7
Total Friction Mead Loot" AA* L/100 x 1.15 (aefety factor), feet of fluid
SUCTION AND DISCHARGE HEADS
Suction
Discharge
Veasef Pressure (pile * 2.U/S) Liquid Level (above pump ; below pump -)
<) 3 4.0 (> 40,3 m I. o
Static Naad (above pump *; below pump ~)
W 2 0.0
12.7
SYSTEM HORSEPOWER (animated)
,,.TO).S 39C0 ITINot, })
Total Frletlon Hoad Lots (Plus Velocity Hoed. See Note 4.)
Control Volvo (Apal * 2.31/5) (Sot Notes 1 and 2) Oilflce(Aptl* 2.31/3) (See Note 2) Equipment (Apsix 2.31/S) (tOlX***?
I")
Suction Head Sun, feet ef fluid, eba. Discharge Head Sum, feet of fluid, aba.
UAL '-> S3A
l<)
<`> I 37.0 E&E (*> 23C.O
"TSTf
2 .460. 1.0
up.------------------- '
V, --
3960 x Q, ?f
UP - / 4. /
DYNAMIC HEAD
Dischmga Head Sum Suction Hoad Sum
1VII - Total Dynamic Hood, foot of fluid NPSH Suction Hoad Sum Piy (mmHg x 0.045/S) or (psla * 2.31/S)
NPSH Available, feat of fluid, abs. PUMP SELECTION
(cm y7.Ti>
22,3
aA
ZJJ
1. Assume control valve inss to be 70% to 100% elpiping plus equipment friction loss for Initial calculation. Consult instrument engineer lor final selection.
2. Control valves and orifices not normally used in pump suction.
3. Use combined efficiency of pump and drive.
4. See DI4.2 STD 2, a g-nde lei ti.e use or ur* calculation piocedure.
o
095502
Monsanto
COMPANY ^CATIOT
N/AME: description:________
Huhber Refuin.ro : Function ;__________
SS.C.7T 0*-e>/ --0/
CQUIP. IOINT N0._ 1-1-30
..V.*NT PhJtlVER . I autm wo. 24 IS'
HIM W f. K
I-- Aroclq/l Waste Disposal
VENT BLOWER
r.W.6. NtB*tfer-omMLh2lz*_
(TOp>0 BTE). B. Rl/EYL*4OACiAMTtEnD')! 0, i
centrifugal Blower
side inlet
' ______ C._____ i_________________________________
j
C** >w
1
*1
To BtO*s A IF ConTaMinA rro wjtn solvent VAPOR FROM PROM UNLOADING SOME SHELTER TO ASMOSPNERB
MATERIALS HANDLED '
Air contaminated with solvent vapor
DESIGN CAPACITY: OPERATING conditions:
AT LEAST Z AIR CHANGES PER MINUTE
Putt; intermittent service C when dumpins. druptil AIR TEMPERATURE 0 TP / 0 O *A
special desicn
Considerations :
Material of cohstrvctun :
,
BLOWER MUST BE ABLE TO HANDLE EJ.AMMARLE mixtures of air (solvents
CARBON___ STEEL____________________________________________________ _
existing
Slower
: CHICAGO BLOWER No. SLS
IB INCH DIAMETER Z HP motor
(PHENOL SEPT. ITEM '
MODIFICATIONS
No. 220) '
REQUIRED Jr......... ............... ................................... ... Motor mat heed to r
EfiPLOJION PROOF. TO BE REVIEW Sr K. J. J'OHNSTON.
--
MV NO.
A. j 5>
AIVIKON
'
.
V | OAT*
---- ' OAT|
HONS 095503
&eLc^T: *2-o2r&/ Preset Manual, Sect. CBAi.. 2415 Date! 10/8/70 Author c. R. Lepper Approved byi R. g. Corley Page 1 of 23
INSTRUMENT DESIGN BASIS for the
INSTRUMENT FACILITIES within the
W. G. KRUMMRICH PLANT
PROJECT: DIVISION: PLANT LOCATION:
Aroclor Waste Disposal Organic Chemicals Sauget, Illinois
INSTRUMENT DESIGN SECTION CENTRAL ENGINEERING DEPARTMENT MONSANTO COMPANY 800 N. LINDBERGH BLVD. ST. LOUIS, MISSOURI 63166
HUNS 095504
TABLE OF CONTENTS
SBC.T 0 2-01--ft
Project Manual, Sect. CEAs- 2415 Dates -10/8/70 . Authors C._R. Lepper Approved bys R. G. Corley Page 2 of 23
1. General Description of Project 2. Reference Documents 3. Scales, Charts, and Units of Measurement 4. Decisions and Selections Affecting Project Areas
4.1 Control Philosophy 4.2 Instrument Applications 5. Control Room instruments 5.1 General Comments 5.2 Panel Mounted Vendor Preference 6. Field Mounted Instruments 6.1 Flow 6.2 Pressure 6.3 Level 6.4 Temperature 6.5 Field Mounted vendor Preference 7. Valves 7.1 Control Valves 7.2 Safety Valves 7.3 Rupture Discs 7.4 Solenoids 7.5 Valve Vendor Preference 8. Pneumatic Signal Tubing 9... Instrument Air 10. Electrical Wiring 10.1 Wire Specifications 10.2 Reducing Electrical Interference 10.3 Tagging 10.4 instrument Connections 11. Instrument Decisions Effecting Electrical Work 12. Instrument Installations 13. Control Rooms and Panels 14. Documents
MONS 095505
____
.fB-c-r: ax-o 2. --a) Project Manual, Sect. CEA:- 2415
Data: .10/8/70
Author: C. R. Lepper Approved by: R. G. Corley Page 3 of 23
1. GENERAL DESCRIPTION OF PROJECT The primary objective of the project is to thermally decompose all used liquid Aroclors and Montar fed semi-continuoualy to the incinerator, at a capacity of 10M lbs./yr., producing harmless by-products which have sewer stream contamination less than 0.29 lbs./day of PCB's. Atmospheric effluent shall be less than 7.5 lbs./hr. of HCl.
The secondary objective is to provide these same facilities for possible future incineration of other plant wastes.
A package of an incinerator and scrubber column is to be provided by purchase. Storage, dumping, sump, and fuel oil storage is to be provided by utilization of as much existing ' equipment and instruments made available by dismantling of the Phenol process as possible.
2. REFERENCE DOCUMENTS The following documents have been used in the preparation of this design basis: Project Scope Report - dated 8/6/70 Notes Project Strategy Meeting - dated 8/14/70 Preliminary Process Flow Diagram "L" Manual for W. G. Krummrich Plant The Scope Report included an Equipment information Summary, as Instrument Information Summary, and a preliminary Plot Plan.
095506 HONS
Project Manual, sect. CEA: 2415 Date: 10/8/70
Author: C. R. Lepper Approved by: r. g. Corley Page 4 of 23
. SCLAES, CHARTS. AND UNITS OF MEASUREMENT
Ouantity
Units
Scale Chart
Level pressure
% 0-100 PS1G or inch of W.C. D.R.
0-100 D.R.
Vacuum or Absolute Pressure
Temperature
mm Hg oc (3), (5)
D.R.
D.R.
D.R.'6) D.R.
Flow
.
Process Vapor
Process Liquid Steam
Utility Air Utility Water
LBS/HR
GPM LBS/HR
SCFM GPM
D.R. D.R.
D.R. D.R. D.R.
0-101 (4)
NOTES: (1) (2)
(3)
(4) (5) (6)
D.R. - Direct Reading
.
Square Root or uniform as required by signal.
0-10 is uniform or 0-100 is uniform, depending
whichever is standard with the manufacturer.
Iron-Constantan or Chromel-Alumel preferred as
applicable.
with applicable multiplier on nameplate.
Degrees F for power house or refrigeration service.
When using IO thermocouples with instruments whose
outputs are linear with millivolts a linear chart or
scale is not satisfactory for spans of 100C, and
above, and may not be considered "direct reading".
For 50C spans, and smaller, the difference between
the linear and direct calibration is almost negligible;
and in most cases, the linear scale may be considered
"direct reading". For spans between 50 and 100C the
application will dictate whether the linear chart or
scale may be considered D.R.
M0NS 095507
Project Manual, Sect.
CEA: 2415
Oiat-//
Dates 10/8/70
Author: c. R. Lepper
Approved bys R. G. Corle-
Page 5 of 23
'
DECISIONS OR SELECTIONS AFFECTING PROJECT AREA 4.1 control Philosophy
This project will utilize considerable existing and relocated equipment; for instance, the 3 waste aroclor storage tanks exist in place, the aroclor water sump exists but new interface detection instrumentation must be provided, also the water pump is to be relocated, and the existing fuel oil storage tank is to be used.
In all cases existing or relocated equipment will be utilized where available. For used items each will be dismantled, inspected and refurbished if economically feasible. When new instrument items, are required, the preference lists included will be adhered to.
4.2
instrument Applications The degree of automation will be based on the premise
that: 1. Full
time coverage is required to set up and
oversee the semi-continuous operations.
2. interlocks and alarms to the incinerator
panels will be provided from critical process sensors and loops,
3. in general, the instrumentation will be pneumatic. The
major exception will be the utilization of flow, level,
and temperature switches,
-
4. A
panel for incinerator operation will be pro
vided by the vendor. This panel will be externally located near the incinerator. 4.2.1 Aroclor-Water Sump
Operation of the existing 10K gallon sump (item
1-124) provides for handling of a two phase (water/ heavy organic) collection system. Material will be collected from spills or from the incinerator floor sump (item 1-120). Water will overflow the
sump until such time as the aroclor reaches the
HONS 095508
Project Mutual, Sect.
CEA: 2415
0 Z.OZ.-C?/
Dates 10/8/70
Author: C. R. Lepper
Approved by: R. o. Corley Page 6 of 23
DECISIONS OR SELECTIONS AFFECTING PROJECT AREA (Continued)
4.2 instrument Applications (continued)
.
4.2.1 Aroclor-Water Sump (Continued)
set level, evidenced by local level gauge and
remote alarm. When the full water sump pump
(item 1-122) will be started amd the water layer
pumped to the sewer. When water is gone, the
steam will be introduced to the heater coil in the sump and the aroclor layer heated to a pumpable
viscosity. The aroclor sump pump (item 1-121) will
be turned on until the organic phase is pumped to
storage tank 1-116 or 1-117. Steam to the heater will be turned off when the sump reaches minimum level interlock.
4.2.2 city Water Break Tank
The level in the tank (item 1-126) is sensed by dis
placer and used to operate a control valve to
make up water as required. A pressure switch will
4.2.3
be used to signal low level. Packed Column Recirculation.The pressure and flow of well water
to the
packed column will be indicated to permit manual
adjustment at such a rate to insure that the escape of HCL content from the packed column stack
is less than 7.5 lb./hr.
4.2.4
Pressure Gages Local pressure gages are provided for indication on the discharge of all pumps. Where corrosion is no problem isolation valves with built in ball checks are provided. In areas where corrosion is a problem chemical seals will be.provided to isolate the gages from the process fluids.
MONS 095509
Preset Manual, Sect.
CEA:~ 2415
OZ.01. -a/
Date: ..10/8/70
Author: C. R. Lepper
Approved by: R . G. Corley
Page 7 of 23
4. DECISIONS OR SELECTIONS AFFECTING PROJECT AREA (Continued) 4.2 Instrument Applications (Continued) 4.2.5 Level Indication of Storage Tanks Local indication will be provided on the aroclor storage tank by the use of pneumatic differential pressure transmitters UBing a fluid specific gravity of 1.35.
The existing varec level indicator on the fuel oil storage tank (item 1-114) will be cleaned, re calibrated and reused.
4.2.6
Incinerator Package The incinerator-scrubbler system includes: incinerator, quench pot, venturi scrubber, packed column, demister pad, and air blower.
Controls to be provided are: flame safeguard, temperature controls, and water flow controls. All provided with fail safe feature to protect personnel and equipment.
4.2.7
Drum Unloading Station
Due to the possibility of flamible contaminant*
in the returned material drums, all electrical equipmei
should be ClasB I, Division II electrical classifi
cation.
.
4.2.8
Pumps The drum unloading sump and the incinerator floor drain sump are both to be controlled with auto start of pump from level float, but will be provided with a manual-auto-off station to permit manual operation.
MOMS 095510 t
Project Manual, sact.
CEA:-. 2415
Ol.aX'*O/
Date i .10/8/70
Authort C. R. Lepper
Approved byj R. G. Corley
Page 8 of 23
5. CONTROL ROOM INSTRUMENTS 5.1 Power supply to all instruments will be 115 VAC +1054 and 60 Hz.
Instrument air pressure will be 20 +0.5 PSIG. All annunciator alarm circuits to be normally closed.
Nameplates will be provided with a suitable title and instrument numbers for each panel mounted instrument. Nameplates shall be made from laminated plastic so that engraving through top layer will be a clear legend on a contrasting background.
5.2 Panel Vendor Preference List
1. Indicators pneumatic electronic
2. Indicating controllers pneumatic electronic
3. Recording controllers pneumatic electronic
4. Multipoint Recorders
5. Annunciators
6. Totalizers
7. MV/l converter
8. MV/P converter
Foxboro Series 50 Foxboro ECI
Foxboro MS2 No preference
Foxboro M54 W M58 Foxboro ECI Honeywell 153 Series Tigerman Foxboro Foxboro
Foxboro
$
M0NS 095511
____
Project Manual, Sect.
CEAl.. 2415
93-02.-0/
Dates 10/8/70
Authors C. R. Lepper
Approved bys R. G. Corley
Page 9 of 23
6. FIELD MOUNTED INSTRUMENTS All field mounted instruments shall meet the electrical . classification of the area involved.
All field mounted instruments will be installed in accordance
with Monsanto Standards in the r (instrument) Manual. These
are in Sections Rl.2 (instrument connections), R2.2 (flow
instruments), R3.2 (level instruments), r4.2 (pressure, instru
ments), R5.2 (temperature instruments), and R17.2 (instrument
piping) .
Due to atmospheric corrosion aluminum cased instruments are to be used only in the event that steel or epoxy coated instruments are not available.
6.1 Flow instruments A meter range shall In general be no greater than 100 inches W.C.
Metering rangeability for d/p instruments shall not exceed 3 to 1 full scale.
All flow meters shall generally be the dry type.
Differential pressure transmitters for flow measurements
' are to be the forced balance type with 1500 psi stainless
steel body, 316 stainless diaphragm, 1/2 inch NPT process
connections, universal pipe mounting bracket, and have a
continuously adjustable range. Transmitters shall with
stand over-range pressure equivalent to meter body rating.
Wetted parts will be compatable with piping specifications
and process fluids.
. MOMS 095512
Field mounted flow controllers shall be pneumatic, the indicating type, with a 10- 20094 proportional band with reset action. Meter shall generally be the bellows type ..with minimum 500PSIG carbon steel body with stainless steel
Project Manuel, Sect.
CEAs . 2415
O2~O7.--0/
Date; .10/8/70
Authors C.--R. Lepper
Approved bys R. o. Corley
Page 10 of 23
FIELD MOUNTED INSTRUMENTS (Continued) 6.1 Flow Instruments (Continued)
Flow alarm switches shall generally be a pressure mounted on the output of d/p transmitter. Other types of line mounted flow switches may be used for "Flow-No Flow" service.
Magnetic flow metera can be used for high temperature or other special services; shall be coal tar epoxy coated.
Field mounted flow indicators to be a 6" receiver gage on the output of a d/p transmitter or a bellows type with a direct mechanical linkage to the 6" gage, integrators, where required, are to be of weather proof design.
6.2 Pressure instruments Indicating Pressure gages shall generally be of the bourdon tube type, bottom connected, with 4*5" nominal diameter dials. Dials of smaller sizes may be used in pneumatic instrument circuits and for auxiliary services on mechanical equipment. Dials should be white with black numerals and pointer. Damping devices shall be provided for gages subjected to pulsating service. Process gages shall be provided with safety blowout backs. Gages shall be provided with drawn alloy steel Bourdon tubes for pressure ranges of 1000 psig or less, and bored alloy steel, or drawn type 403 or type 4130 steel for ranges greater than 1000 psig. When required by service conditions, other materials may be used. Bronze tubes for steam, water, or air service under 400 psig. For operating pressures under 10 psig, bellows type pressure elements may be used.
M0NS 095513
Project Manual, Sect.
CEA: . 2415
*2-0Z.-0t
Date: 10/8/70
Author: C. R. Lepper
Approved by: R. G. Corley
Page 11 of 23
FIELD MOUNTED INSTRUMENTS (Continued) 6.2 Pressure instruments (Continued)
All pressure transmitters shall be the force balance type. Process connections to be V' or V female NPT and instrument to be equipped with pipe mounting yoke. Over range protection of 1.5 times the maximum scale range is the minimum requirement for pressure elements. Materials used for pressure elements shall be selected for compatability with process stream or otherwise be sealed.
Fluid pressure transmitters should be provided with a 3V' output gage and 0-100% uniform scale.
All instruments used for handling viscous or corrosive materials are to be sealed or purged - seals preferred. Seals may be of the liquid type employing seal pots, or the chemical type employing a diaphragm and a silicone fill between the diaphragm and the pressure element of the instrument. The bottom housing of the diaphragm sealing device shall be of a material suitable for handling the process stream. The diaphragm seals are preferred for applications within the temperature and pressure limitations of this type seal. Capillary tubing, if required, shall be armoured stainless steel with plastic covering.
Pressure switches shall be DPDT (preferred) or SPDT
with adjustable set point and suitable for the electrical
classification of the area where used. Switches used
in conjunction with transmitted air signals shall be
SPDT. Pressure elements of bronze with switches having
adjustable set points.
MGNS 095514
Self-actuated pressure regulators (not including pilot
operated) shall be used only on those services where a
variation of 10% or more is not objectionable. Bypass . *>--not be used except where neoassary for
Project Manuel, Sect.
CEAr.. 2415
^2./)?
Date: .10/8/70
'
Author: C. R. Lepper
Approved by.- R. g. Cories Page 12 of 23
. FIELD MOUNTED INSTRUMENT (Continued)
6.2 Pressure Instruments (Continued)
.
emergency operations. A local pressure indicator shall
be provided at each regulator to facilitate control
point adjustment.
Mercury switches using mechanical linkage shall not
be used in general.
6.3 Level Instruments Vessel mounted liquid level switches shall have 300 psig minimum steel float chambers and stainless steel float. Connections to be 1". Switches to be DPDT. Other alloys used as necessary to meet process requirements.
Float type level indicators to be used where local indication on storage tanks required. Do not use fixed float guides on agitated vessels.
Controllers shall have 5-100% minimum proportional band. If automatic reset selected use 200% PB.
Both transmitters and controllers shall be provided with flanged rotable head for orientation. Radiation fins provide for service in excess of 450F.
Differential pressure level transmitters shall be in accordance with flow transmitter standards. Range suppression provided, if required. Transmitter output shall increase with increase in level.
MONS 095515
Project Manual, Sect.
CEAt - 2415
02.02.-0/
Date: ..10/8/70
Author* C..R. Lepper
Approved by: R. 6. Corley
Page 13 of 23
FIELD MOUNTED INSTRUMENT (Continued) 6.4 Temperature
Thermocouples may be either bare wire with ceramic insulators or metal sheathed type with magnesium oxide insulation. Couples shall be installed in thermowells except where excessive time lags cannot be tolerated.
Sheathed type couples and resistance bulb assemblies shall be spring loaded.
Duplex TC assemblies used where separate temperature indication is required for checking critical temperature controllers may be fabricated, using bare wire and 4 hole ceramic insulators or the magnesium oxide sheathed type may be used.
Filled capillary systems
liquid filled.
Wherever possible bulbs are to be stainless steel 3/8"
diameter, bendable neck, and adjustable union connection.
Capillary to be copper with flexible bronze armour with
overall
plastic jacket or stainless steel with
flexible SS armour and plastic coating.
Filled systems shall not be used where startup or shut down conditions may exceed the normal over-range limits of these systems.
Pneumatic transmitters shall be the narrow span force balance type. Spans of 50, 100 or 200 shall be used for temperature control applications, output 3-15 psig.
M0NS 095516
Project Manual, Sect. CEAs - 2415 Date: ..10/8/70 Authors C. R. Lapper Approved bys R. G. Corlay Page 14 of 23
FIELD MOUNTED INSTRUMENTS (Continued) 6.4 Temperature (Continued)
Electronic transducers, if used, shall convert a thermo couple input signal to a proportionate milliampere d-c output. Cold junction compensation shall be incorporated for TC inputs. Transmitters shall be fixed range type with upscale burnout protection. For spans less than 100F resistance thermometer type shall be used.
Field mounted controllers shall be pneumatic, indicating type and shall have a minimum 5-50% proportional band. Reset and rate action included when required by process conditions.
Temperature switches may be DPDT or SPOT, preferably DPDT, and shall be suitable for the area electrical classification. Bi-metallic and snap action switches should be used wherever possible, when filled systems are used they should conform to the paragraph on filled systems.
Thermowell should be of 304 stainless steel with minimum of 1" screwed or flanged process connection, other material! are used as warrented by process conditions. Test wells shall be equiped with brass plug and chain.
Dial thermometers should be of the bi-metallic or filled type and generally be the all-angle universal type. Dial size to be 5" diameter.
Separable sockets should be provided to facilitate removal of thermometers.
MONS 095517
Project Manual, Sect.
CEAt . '2415
C7 2.(72-0/
Date: -10/8/70
Author: C...R. Leppor
Approved by: R. G. Corley
Page 15 of 23
6. FIELD MOUNTED INSTRUMENTS (Continued) 6.5 vendor Preference List Instrument
1. Filled temperature controllers/ transmitters
2. Pressure transmitters 3. d/p transmitters 4. Rotameters 5. In line flow switches 6. I/P transducers 7. Temperature transducers 8. Turbine flow meters 9. Magnetic flow meters 10. Level, displacer or float type
11. Level, d/p cell 12. Level, tank gage 13. Pressure gages, bourdon 14. Chemical gage seals 15. Dial thermometers
bimetallic type filled type 16. conservation vents 17. Process pressure switches 18. Orifices
Manufacturer
Taylo r/roxbo ro Foxboro Foxboro Fisher-Porter McDona ld-Mi Her Fisher Rosemont Invalco Foxboro Fisher/Brooks Foxboro Varec Ashcroft Mansfield-Green
Ashcroft Palmer Varec Mercoid/Ashcroft Daniel
7.0 VALVES 7.1 control Valves Diaphragm operated standard control valves will be flanged with 1" minimum body size, except for low flows. Piping specifications will be followed on body materials.
Iron body will be restricted to utilities and 80 psi steam. Standard trim will be 316 SS and Hardened SS trim will be used on steam above 140 psi.
M0NS 095518
T.
pro5et Manual, Sect.
CEA: . 241S
02JJ2--JI
Dates -10/8/70
Authors C.-.R. Lepper
Approved by: R. G. Corley
Page 16 of 23
VALVES 7.1 Control Valves (Continued)
Separable steel flanges will be used on all split body valves.
Ball valves will be used in on-off service around filter and for throttling such as polymer slurry.
Valves will be sized as per each manufacturer's recommen dations .
Valve positioners will generally be side mounted, direct acting, with 3 gages and by-pass. Positioners will be supplied with control valves in the following service:
1. Temperature control valves 2. Valves with pressure drop 150 psl or more. 3. Valves operating at 450F or higher. 4. Valves in flashing service. 5. Valves in split range service (no by-pass). 6. Valves where solids may deposit on stem, or
where deep stuffing boxes required.
l/P transducers will have high volume pilots. Where multiple valves are used on one signal, one transducer only will be used. Transducers will be separate from the positioner, but will be mounted on the valve.
7.2 Safety Relief Valves Flanged relief valves construction in generaL shall be enclosed spring, bolted bonnet, screwed cap, full nozzle type with stainless steel nozzle, disc, guide and spindle and cast steel bodies. Alloy steel bodies and trim may be used when particular service dictates. Body pressure ratings for flanged valves shall bo the same as the
MQNS 095519
Project Manual, Sect.
CEAs - 2415
0 2^32. ~0J
Date: .10/8/70
Authori C. R. tapper
Approved by: R . G. Corley
Page 17 of 23
VALVES (Continued) 7.2 Safety Relief Valves (Continued)
rating of the inlet flange. Area of discharge opening shall not be less than four times the area of the valve seat. Screwed valves may have screwed bonnets and may be used where small orifice areas are required, if allowed by the piping specifications.
No lifting levers are required for process valves, car bon steel springs are to be supplied for valves in service of 450F and below. Tungsten steel springs are to be supplied for valves in 450F relieving temperature service.
Pressure balances valves shall be used for varying back pressure applications and where back pressure exceeds 10% of the set pressure of the relief valve. These valves shall have stainless steel bellows. A rupture disc may be installed between a relief valve and the vessel provided it meets all requirements set forth in paragraph UG-127(d), Section VIII of ASME code.
7.3 Rupture Discs Generally, the safety head fitting shall be of the type with a diameter that fits inside the bolt circle, such as the "BS&B Quick-Sert". This type of head shall be used on all flanged connections. Flange type safety heads may be used in screwed pipe where rupture of the disc is infrequent. Materials of construction shall be equal to the pipe specs.
All rupture discs, except those in special applications shall be interchangeable with all safety head fittings for a particular size and shall have vacuum supports.
HONS 095520
Project Manual, fleet. CEAt.: 2415 Data: -.10/8/70 Authors C. R. Lappar Approved by; R. G. Corley Pago 18 of 23
VALVES (Continued) 7.3 Rupture Discs (Continued)
The selection of the disc type depends on the application involved (DV, PLVD - BS&B notations) . Where a material can be selected that is corrosion resistant to the process side and the venting side, the DV type disc is satisfactory, providing the materials are in the desired pressure range. Generally, the PLDV type is preferred since its construction features provide a superior resistance to corrosion. Maximum bursting pressure of the disc shall not exceed the maximum allowable working pressure of the protected system. '
in most cases, the rupture disc, is located such that the disc temperature remains at or near ambient, in these cases the disc shall be rated at 72F. When disc tempera ture is definitely above 72F, a design temperature selection is made which will be near and below the temperature of the fluid, when disc temperature is definitely below 72F, a design temperature is selected which will be near and above the fluid temperature.
A tapped opening and pressure gage will be installed on the outlet flange of a rupture disc used in series with a relief valve.
7.4 Solenoid Valves Solenoid valves will be of the continuous duty type with encapsulated coils, and shall meet the area.electrical classification.
MONS 095521
Project Manual, Seet.
CEA: - 2415
O7.OZ.-0/
Date: .10/8/70
Author: C.R. Lepper
Approved by: r. g. Corley
Page 19 of 23
VALVES (Continued) 7.5 vendor Preference
Instrument Relief valves Rupture Discs Control Valves Control Valves Butterfly
Manufacturer Consolidated/Farris BS & B/Carbone Fisher Fisher Continental
PNEUMATIC SIGNAL PIPING Individual pneumatic tubing may be V' 0.D X 0.030" wall copper tubing coated with 1/32" thick coating of polyethylene, or *j" O.D. X 0.040"*wall high density black polyethylene tubes enclosed in electrical conduit and terminating in a junction box. For vertical runs on towers where individual tubing support is difficult, the latter is preferred.
Polyethylene tubing shall not be used in hot locations or where localized hot spots occur.
Major instrument tubing runs shall be multiple bundles consisting of 4 to 9 high density black polyethylene V1 0.0 X 0.040" wall thickness contained in an asbestos wrapped extruded vinyl sheath of minimum 3/16" thickness. All tubing bundles shall contain approximately 15% spare tubes for future use.
Tubing bundle transitions from large to smaller size or to individual tube leads shall be made inside of galvanized steel junction boxes. Individual leids emanating from junction boxes shall employ bulkhead tubing fittings installed in the junction box wall.
Fittings will be Swagelock on SS, copper or plastic tubing. MONS 095522
Project Manual, Sact.
CEAs... 2415
02.0Z--0/
Data: -10/8/70
Author: C.-.R. Lepper
Approved by: R. G. Corley
Page 20 of 23
9. INSTRUMENT AIR SUPPLY The desired pressure for instrument air is 80 psig minimum and rated at 100 psig with a dew point of -40F. All air users shall operate satisfactorily if supply pressure drops to 60 psig.
Each air use will be provided with *3" pipe and cut off valves at the header. Connections from the instrument regulator to the instrument shall be tubing. Connections to the main air header are to be from the top.
An air supply pressure gage will be supplied at either the regulator or the instrument.
10. ' ELECTRIC SIGNAL WIRING 10.1 Wire Specifications Thermocouple extension wire shall be single pair #16 solid conductor, twisted pair with aluminum mylar shield, and PVC primary insulation and jacket, 80C minimum.
Multipair Cable - up to 24 pair #20 solid conductor, individually twisted pairs, shielded and insulated as above.
Analog signal wire other than thermocouples shall be single pair, #16 stranded copper wire twisted with aluminum-mylar tape shield, and PVC insulation, 80C minimum.
Multi pai r cable - up to 36 pairs, #20 stranded copper, individually twisted, shielded, and insulated as above.
MGNS 095523
Project Manual, Saot.
CEA. . 2415
Datat .10/8/70
'
Authors c. R. Lappar
Approved by: R. G. Corle>
Page 21 of 23
"
10. ELECTRIC SIGNAL WIRING (Continued)
10.2 Reducing Electrical Interference
All instrument signal and alarm circuit wire will be
in separate conduit from 115 VAC wiring runs, and will
be separated by at least 6".
Thermocouple and other low energy signals will be kept separate from alarm circuits and current signals.
10.3
Tagging All wires and cables will be tagged with an assigned number.
10.4
Instrument Connections Open 16 gage shielded cable will be run from rigid conduit near the instrument with water tight cable connectors at the conduit and instrument.
If used, blind transmitters will have a phone type jack act a 1 ohm resistor in series with the transmitter for checking and calibrating the transmitter. Indicators may be used for critical applications.
11. INSTRUMENT DECISIONS AND ELECTRICAL WORK ' Stand-by electric power is not required, however, fail-safe hookup should be used to guard against electrical failure.
Electric heat for instruments may be provided where necessary.
Noise-free power requires no special precautions.
HONS 095524
Project Manual, Sect.
DCaEtAets.. -214015/8/70
2"*2' _ **m'>
Authors C. .R. Lepper
Approved by: R. G. Corley Page 22 of 23
12. INSTRUMENT INSTALLATIONS All field instruments shall be installed in accordance with the R (instrument) Manual standards.
13. CONTROL ROOMS AND PANELS
No instrument connections from lines or vessels containing
process fluid or gases shall run directly into control
houses.
'
All conduits entering a control house from process areas will be sealed to prevent entry of hazardous materials.
An existing control house adjacent to the incinerator area will be utilized for installation of the required alarm annunciators.
The incinerator fabricator will provide any necessary field panels for local incinerator controls.
Electric power will be 115 VAC 10% at 60 Hz, supplied from a breaker panel used for instruments and control logic only.
Voltage regulators will be provided as required.
Power for 2 wire transmitters will be fxom individual isolated power supplies. These power supplies will be housed with the controllers, except for loop without control, then the power supply will be with a recorder or indicator.
Terminal strips for analog signal connections will be screw barrier, 7/16" centers.
MONS 095525
Project Manual, Sect.
CEAs - 2415
a 161.-a/
Datet -10/8/70
Authori C.--R. Lapper
__ Approved byi R. o. Corley
Page 23 of 23
CONTROL ROOMS AND PANELS (Continued) No. 16 twisted unshielded wire will be issued for analog signals and annunciators. No. 16 single wire will be used for relays and switches. All signal wire will be separated from 115 VAC wire.
DOCUMENTS The following schedules and drawings will be prepared!
Drawing I E I I I I E I E I E
I
E
-
Size 11 X 17
11 X 17 .
8*5 x 11 4 on D D 7 on D D D D D D D D D
D
D
8*3 x 11
Description instrument Performance Data instrument index instrument Specifications Instrument Schematics Annunciator Schematics Instrument Installation Details instrument Details Layout-Instrument Panel Layout-Annunciator Panel Electrical Interconnection Instrument Interconnection
Conduit Layout Tubing Layout Wiring Instrument Panels & junction Boxes
Tubing Instrument Panels & Junction Boxes
Electrical Details (Connection to Instrument) Nameplate List
NUNS 095526
at.g;a
Monsanto
COMPANY
INSTRUMENT SPECIFICATIONS
DlVISION AUTH NO-
l OCATION
.tslrumenl No. S,VIC_ _ _ _ _ _ _ _ _ _ _ <e*'//eCOOtir/A/X
MtSE for-or-^J___________
Cf OT7 /T 7 J3 ~/7 ?
PLANT
SPEC NO.
DENT ON AACA
1* 2%02~J/
SHEET HCV
- *#**
______ OF______
Enuipmr! N- - to No. R Size
/-gu/- ?. Add2- 'A. "
Piocm Material
c/T-r u/Arr?**
/&ASi /30AY_________________________ I__________
/ " SC/dEco.ero CO'Z/v scr/Q/O -r
AM* CSer/eA-r/fiJG A>/s?suAi .r'i/^SrE+i&/Jr//i c.
Saee /Soot' &>*o*r//u/z s%e**3`bU'G-
Q^/A/CB
f/e"
zoo A>r//?
edscr/s/cAc 'Sl/a^ly' /'S'/Ac 6<pAe
CLASS' A- <ro/<.
.Zsapj/g
_________ 'YZMA 4_____ EL.EcT/<OC*C C*M3/E-/r<AT/OAj
Manufacturer m Calaloc No.
P.0. No.
Price
A SAtc
fleefW/ev
?:
P2//d7
4S**____
vex & A A
4-i
HONS 0955*8
- f-- K--t
'fm*C7Z 0 2-0Z. -- 03
t # 4*
Monsanto
S*
LOCATION------
T OIVtllON DIFFERENTIAL PRESSURE Oasw/c
`INSTRUMENT
SPECIFICATIONS
?4/z
FLMT OCPT on AMA
f/4.2*
IMC HO. IS- !-f/r-3
SHUT
jLs>r___
. Instiumonl No.
Ts/7 -c
ATj&lL
Setvice
Zev&L
-tH
Equipmenl Wo. oi Line Mo. S Size
S'-iVAzF
T'rocess Material
m/jrf Auclor
Blind, Indicating, Record, Control, Tiansinit
//VlP/CMrttJci
Mounting. flush. Suilace Yoke
Size and Type
CHART
Range
Olive
Speed
SCALE Size A Type Range
How, Level, Pressure
8ellows. Diaphragm, Other
Span t Units ______ Range Limits ____ Body Rating SOT
O P'fcO"
Body Maleiial
Element Material Welted Pails Maleiial Extended Diaph. Length
E Ill'll .SL. fill PROCESS Liquid, Gas, Cord. Vapoi
INPUT Opeialing Piessuie INSTRUM. Range t Units OUTPUT fro
Powei Supply - Electrical, Pneumatic Eicctiical Aica Classification
sm/kxjrss
/. 3D //cv/o AZitL. A-aFfstf /rJD/c- e&At/ti PM&um&T/c
Proportional Band %_
Auto-Reset Mode
Rate Mode Auto-Manual By Pass
"On'dMWimMil InaHii lA.IWNAAl OlitAWl
Pipe &Mt*d Aii Supply Reg. Output Gage, 3)t* Site Accessoiics or Special Fealuies
YES NO YES NO YES NO YES NO
YES NO
YES NO
YES NO YES NO
INC. DEC INC. DEC INC. DEC INC. DEC
YES
YES NO
YES NO
YES NO
NO. "no YES NO YES NO
,o-j 2'o'j
-tH -uH
sro Mtr/U/veur DeTrtu.
Manulacluicr
Catalog No.
P.O. No.
.J-HJC-t.
Prica
7T
JfiSC /WsoM/faCOTj
A
tr-AC- FX /.IF ~~
-r^FTTC-----------
>08?e to J A
Minus n<aA`>;>`}
- A - - - - - - - 1- - - r
- - - - - - -- - -
\
Monsanto
COMPANY
LOCATION
.nstrumenl No. Service
,
'FLOW MEASURING ELEMENT
SPECIFICATIONS
01 VISION
Aecdo'c
AUTM NO.
rO/oz-/ M4<suertc PtfV
Mer&c.
PLANT DEPT OR AREA
9/4*24 a/c phmr*.
PuCeSm<tM Line No. line Sue, Schedule
Flowing Press. P| Flowing Temp Tr
*"/ HOL / P?IM10!
2" /eopSTc,
/io'r
/far 6AS /f6-b ptc / -
/" 2.0 PS! 6
tZfl/BL. On.
'-HP-/ /"
#0PS/rt
SERVICE |
Upstream Operating Conditions
Sp. Gr. Tr Viscosity CP . Ti Sp. Gr.. 60'F Supercompr. Factor Tf
0.37ct /o
_____ Q4
Steam Quality, %
Steam Superheat, F
Flow at Base
liquid. Gas or Steam
Conditions 60F & 14.73 PSIA
Minimum Flow Normal Flow -
Barometric Pressure Maximum Flow
at location ______ In. Hg.
Units of Row Meter Range
i'Sire Type - W.N., S.O., Scid., Van Stone"'
3 9 *Ri(in| 4 Facing
dS Material-FlaiiM&HT.J. Rincoi Gasket") Taps-Tvpe. Sire&Orientetion (R2.3 Std
)
09
70 ' it <S/>n
yW-S
'3.GT0 ___ Cpt/
UQ
0.7 L /jr
ORIFICE PLATE |
Typeol PI ate < R?. 3 Std
)
Piste Material 3 Thickness
Pine ID ID). In.
Orilice ID (d). In. t/D Ratio (>9) Meter Range - Inches Water Diy Type ol Meter
Drain or Vent Hole
Chart or Scale Range
Chart Factor
|
Calculation Sheet No.
*SWtC NO.
IS- 24/S-33
SHEET
REV
Of
All orilice handles to bo stamped on upstream
side with 'Inlet", bore dia, nom pipe ID. llange
rating, instrument number and plate material
k Manufacturer
rtsei&A ti*'Joe.
Catalog Number
k Puich ese Order Number -- -----------------
/on iMfi
Price
/ti. STtoo drmj r
-
A
e
A\
A
A
mto to. ft
A.
A
A
ex isr
------------------- -- 1
MQNS 0 95530
-----
TI
Monsanto
COMPANY LOCATION
DIRECT OPERATED
PRESSURE REGULATING VALVE
SPECIFICATIONS
DIVISION
AUTM NO.
z4/r
PLANT
UJ S'
DENT ON ANEA
ft Z- --a* ,
EAEC NO.
;
IS- Z4/r-+Z I
EMEET
RCV|
. nm
Valve No. Service
Line Ntimhw fc $i_ Process Material
Flow Temperaluie
PCP/Z3-C >'< Pyeuuse
C0AJTM4<-t
WZPusi. a, I
/3tS/Q?-Z PW/02-3 f*f/0>4-
*4ro'r>/v,ur. <srsra p/tnr jrmm stw
/k&sA 4m 8lijeiiEV C4QL/U +
/cJm-psvt-ftL /-f^-hPici-r ML-7-flttZ-fi'
gift? *7
/J4n>P<. <4Z JTS/tri
Operating Working Pressure (PSIG Ini el)
Data Valve to Close Against (PSIG.) Sp. Gt. Plow Temp,
Design
Normal Flow Max. Flow
Conditions
Units: SCFMJCFH, GPMor./Hr. GasfWF
Fluid 14.7 PSIA
Inner Valve Travel, % > Design Flow Liquid?
AP I Cu (Calc.) e Design Cond.
Flow Tamp.
Calculation Sheet No.
Valve Body Sire
Valve Pori Size
/>o
Zoo
so G/>ai
'J6PA1
3<bo
_____
*/P<-
LIQ. IXi^wQg^XTSTM
is:
<LL*
So*
_Ao.
, sepp BiigiMns^r PK&t*z\ ctm..
/no
/S'
io
//arc// ?//i/4ep
!Lux /gP
Body Ratmg A Conn. Size Body Material
3p[ic-r//pT <S/iS7 S76&L
3*w- /("ixr.
Valve Spacifications
Trim Material Type Inner Valve Seals (Double or Single) Valve actuator (Diaph or Pielew) Mall ol Const (Diaph w-Pi jlunV
S.TA(P</SS
DIAPH
SrA/z/t&sf
jh/^m\lusl
SP DIAPH ST/fiVOEZS
DIAPH A/tQ4/XJ9
-S7W/,vLkS. <r S7/) tJLe^ SP DIAPH
S)A/ULey**
Lubricator
Isolating Valve
PaskiDL. Guiding Spring Selling Swing Range On Increased Pressure Valve Typeol Regulator
SKIRT TOP BTM SKIRT TOP BTM SKIRT TOP BTM skirt | top | anT
/ao/S/S
/oo
zo
io
-<o_
teo SP__z_z_/_jd___ 2enSPzuj';
OPENS lIEftweg 55pa<e3 closes Dspwgl] closes JPgO CLOSES
/1st/err
Tt/UfmCA H<-i
D/APHZAZirt
Accessories or Special Features
Manufacturer Catalog No. P.0. No.
Price
~w S/Vc OurPA&eo
TA
45$ M
P/JC//e/ JJjfL.
r/suee. j.hL..
<Q'l70 Wr
M**-
If
A.
J?4_
JSE1
ns*cr-
-gA.
7?T
MQNS 095531
i
Monsanto
COMPANY
Insttumonl No. Service
`FLOW MEASURING ELEMENT
SPECIFICATIONS
\piauj /eesns.
DIVISION
<fle9rt//c
a4/f-0//Z-4.
s&cr 03L0?. -03
NLANT
*1FIC NO.
tOf<
is-^r-FCT
DIPT ON AREA
0. '??-3 ^ <27-4
Process Milena Line No.
ujcu kJJrea,
City n/ATric
Y-WW-/-/rSC4L Yuu)-3-nC4<. V-QV-S-FZCi y-cu-3-F*.et.
Line Sire, Schedule
Flowing Press. P(
/20 PC/fi
zesps/fj
Upstiean Operating Conditions
Flowing Temp Ti Sp. Gt. Ti Viscosity CP a Ti Sp. Gr. i Supercompr. Factor Ti
s-oer
/. o
HH
s
Sleam Quality, %
Sleam Supertieat, F
Flow al Base
Liquid,
Conditions 60F i 14.73 PSIA
Minimum Flow Normal Flow
Barometric Piessuie M Location ______ In. Ht
Maximum Flow Units ol Row MMw Range
'Size 8 Type - W.N., S.O., Scrd., Van Stone'
CZQV/O
(* g 70 <7>>/a
-tH
7o if O
-tH
-tH
_^L
<<T
Wating t Facing Material-FlaneAR.TJ. Rina oi Gasket*1*
cr<42S0*ifre<*
Taps-Type, Si zet Orientation (R2.3 Sid Typed Plate(R2.3Std ____ ]_ Plate Malarial t Tliicliness
Pipe IDO). In, OillicelD(d), In. d/0 Ratio (01 Meter Range - Indies Watei Dry
i4ooc*r
\3Msr- Hr"
2-Pi7
o~sLO-ZdZ
-H
c.sssQ.ZSO
/&/Q
0.72?
o,/so
-tH 0.320
Q.zoo
Type ol Meier
Drain or Vent Hole
Chat or Scale Range
Chat Factor
Calculation Sheet No.
\PbKBQAo Ahmee. Suoe /Sul*
-tH
All oiilice handles to be stamped on upstream side with "Inlet*, bote dia, nom pipe IP, llange rating, instrument number and plate materia
Manufacturer
'Catalog Number Purchase Orda Number
Price -Ccher. jj&manrnr.
nI7KsT-i ' 1-- '... ____ ~-----' n n.i* i ..................
*2
#f'7o C&
A /3`*
A A
-tH -------
/J~*
7-'"' ii
mtBEXSEfiiwmBKmmjmrsTBzrrr
Monsanto
COMPANY LOCATION ----- .
PROCESS ACTUATED * SWITCHES
SPECIFICATIONS
| OlVIilOW AU TM NO.
<?V/r
Instilment No.
PS7/0-1
Snvice
Eouipmenl No. or Line No. & Size
Process Material
Piess. Temp.-Level Flow Switch-Relay
i Temperature UJ Pressure 8 Fluid (Level Only)
Normal Normal Upper
Max. Max. Lower
Sb. Gr. Oper. Temp. 1 Upper
I Lower
`Rants A Units
.w"
Pressure Type Element & Materi at
Conn, Size
| Orientation
Fill - Gas, Mercury, etc. Cwill ary - Length | Material
mptzate
Hj7y u/Am/z
..Ml-. AX9CL0K
2BV&L.
1/4."
WiTK. Pie. ---:----------- "t>"
7SC. /o<s*Z
Mm _io__
-li____
137 / 4-7 Ao AO
O-bo PSJ& o-/r-pup,
SHLSfl- V*TCh4 sra M -tout* tfuer - SentM ----------------->-
11
Aimor Material
Bulb-Diameter | Length '
Temp. Bulb Type - Plain, Union
Bulb Com. - Size A Rating
Wall Material & s Wei! Conn. Size A Rating
LgthbdowThraador Flange"U` i"*,, d Lagging Extension ,T' ias -om
1
1
Level
Type A Material
Connection Size & Rating
Connection Arrangement
Cooling Fin or Extension
Float Material A Size
Connection or Body Size
Flow Type Element A Matl.
Disc or Paddle Size
Type - Morcurv. Micro, etc. Contact Anantemenl | Rating--Volts A Amps
s Set Point
i On Measurement Increase Switch Electrical Area Classification
Conduit Conn. Size A Hub or K.O.
Differential Range - Fixed, Adjustable
Accessories or Special Features
Sr/AP Acnoi* SPvrl//r/-/Jk
OPENS | CLOSES ustmh nr
A" MPT
/4a r
............... -f>--Oj --c-
~4- PSi6 .
OPENS | CLOSES
------------- .------------
---------------- >. ---------------- 1>-
t, art . PLANT D*PT OH AREA
1 1
OPe'nS T CLOSES
iPtC NO.
is
IMKCT NOW / OF___
1 1
OPENS | CLOSES
REMARKS I
Manufacturer
i Catalog No.
P.0. No.
PlilL
J/fcc
-K it
______
24/?Pxgp*isv>
__ 1__
,-r
fo
>_----------------------------
___ __________
Afaf <Xi A
A
zo"
'
M ONS 095533
_
---------------1-------- 1--3
Monsanto
COMPANY
Instrument No. Service
PROCESS ACTUATED SWITCHES
SPECIFICATIONS
/z 7-z. IsuJPienJ
OIVIIION
Qectvrc
AUTH NO.
?4/s
a7_.0z.-as
PLANT
* tPEC NO.
is- Z4/S-47
OEPT OR AREA
|H(I T
7/4 Z4
4_OW
fcauipment No. 01 Line No. A Site Process Malarial
Press. Temp.-Level Flow Switch--Relay
TemperAme
Normal
Pressure
Normal
Fluid (Level Only) Upper
Sp. Gr. nOper. Temp. I Upper
I Mat. Max. Lower
I tower
Range i Units
Pressure Type Element & Maloti A
Conn, Si ze
Orientation
Temp.
Fill - Gas, Mercury, etc. Capillary - Length I Material Armor Material Bulb-Diameter | Length Bulh Type - Plan, Union Bulb Conn, - Site A Rating Well Material Well Conn. Size A Rating LgthbelowThreaOorFlange"U* Lagging Extension '
Type A Material
Level
Connection Site & Rating Connection Arrangement Cooling Fin or Extension Float Material A Size
Connection or Body Si ze Flow Type Element A MAI.
Disc or Paddle Size
Type - Mercury. Micro, etc. Contact Arrangement I Rating-- Vol Is A Amps
Set Point
On Measurement Increase Switch Electrical Area Classitication
Conduit Conn. Size A Hub or K.O. Dillerenlial Range - Fixed, Adjustable
Accessories or Special Features
y-cubz-nm-tJ/i O/rr ware*.
floHJ
JJL jZ.
.AS\<n 'H.a
i'/i" urr S*AP. /jQ-tQAL spor iis/KJ
</3 GPP? OPENS CLOSES
OPENS
CLOSES
OPENS CLOSES
OPENS 1 CLOSES
JMaiutaeturor Catalog No. P.O. No.
"W S/kc ftsP/bierD
at
L
CJL AA -4-
MONS 095534
_J
Monsanto
COMPANY
PROCESS ACTUATED
* SWITCHES SPECIFICATIONS
Inslmmonl No. Service
Eouipmoni Iw. or Line No. & Size
Process Malarial
Press. Temp. - Level Flow Switch-Relay
Temperature
Normal Mat.
Pressure
Nomtal
Fluid (Level Only} I Upper
So. C<. t Opm. Tamp. I Upper
Mat. I Lower
| Lower
Range I Units
Type ElemenH Material Pressura
Conn. Size
Orientation
Fill - Gas, Mercury, etc.
Capillary - Length j Materia*
Armor Material Bulb-Diameter ] Length
Temp. Bulb T)pe- Plain, Union
Bulb Com. - Sze 8. Rating
Well Material
Well Conn. Size A Rating
AT //-/
Siact-Stop
SOMf PtW
MiPrdem CSVSL.
<f>'r \ mu
j/svr JjISl
..QtSGtlH'fL.
24n'
LS/JL?:.'-
S&CTl 02.4 2. --t?J
PLANT
onDIPT
ARIA
9/4.24
HT/a>/-/
H|C
Jo,
K/ATBaZ
Aeeaae-WMme
-t-H
AM3 AMS
/46/er
i4rr>
1-fi.Z. SL2JL U>- Li.
Lagging Extension *T*
Type A Material
Level
Connection Size A Rating Connection Arrangement Cooling Fin or Entension
Float Material & Size
Connection or Body Size Flow Type Elemenl A Matl,
Disc or Paddle Sire
Type - Mercury, Micro, etc Contact Arrangement | Rating- Volts t Ampi
Set Point '
On Measurement Increase Switch Electrical Area Classification
Conduit Conn. Size A Hub or K.O. Dillcrential Range - Fixed, Adjustable
Accessories or Special Features
lSejU- 3'A"
-PH
rro r**yj//rro,,`t
Mejtai/e-r \SP-ST l//sv-.toA
OPENS CLOSES YtoKtT)*T
V*`` DPT
.d&umm.4 4' <Zv/pes
W%af-w*S-U__>/**KaT.": ' OPENS CLOSES OPENS CLOSES AfrjtdrfJT
-L--I p, z-fvyt -MutfA
OPENS
closes
Mwiutacturer Catalog No.
P.0.1
Pl&ceoio
iis-lPAL 40/-/iV
JAiZlr-
t sm ftoMmu.. t
3
A
X
A/AA L'VK000 & Ago1
MONS 095535
--------- :------
Monsanto
INSTRUMENT INSTALLATION DETAIL
COMPANY
LOC A TlON
-.
Wll ................... ...
---------- . Atoaoe- unreal sc/*?/*
SB-er.
AU TM NO
<rf/.jr
01 VISION
is-
PLANT
-- *3
SPEC NO.
OIMT/AMA
//C kto<//*Mt/cH ?/*4
OTY /
/
2.
MK MATL HATING
DESCRIPTION
J?5E6_
Secars jM>i-.//*//c.
(M{ r-f/ />.-
OTY
MK
iuaMt
///ratfiAte /^coat
/St/rL Slu/rtsee
... . .
--------------1--------- --------------- --------------------------------------"B---------------- 1
H>- Z4/S--9-0OO3
MATL PATINO
DESCRIPTION
MGNS 095536
_L,
1 . "vai1 ...
'1 '
'j:v.
*1
MiTiii'i '
''*'*
--------------- "-------- " .
3-M.err 020JL. -- &&
Monsanto
COMPANY GENERAL NOTES
TCE969
'PRESSURE GAUGE SPECIFICATIONS
'JZf/M-l
DIVIIION
Cte3Atc
AUTM NO.
4AS
pr/rp- /
seer, 02.02. -1ra
*iaic no.
OtPT ON ANKA
K44/1T-41
IHCCT
9a4.a4
_Sor.__
Span l Units
Type
Element Material
Socket Mater! N
Connection Sin I Type
Connection Orientation
Oral Site Dial Color Scheme
Cna Material (Stylo Cruel
JfiStM. Mounting Type
CryatM Material Mictomolet Zero Adjustment
Saloty Releaae Type
Movement Material Guaranteed Accuracy
Body Malarial
Diaphragm Material
Fill Liquid
Cleanout Connection
Pioc. Temp C| AM8. Temp C
Process Connediona Sim S Typo Manutacturer's Type A Model
Accessories S Special Features
0-/60 AJA6 Soe/zeopAj
Sres-c. A/PL.
<5erroAn ~z%L
O-3O0/5/6 -tH
-tH
4XA<t/(*i.Jrk SaaAa* Sr&T*
Ter
-UH -CH
yMZtuZcKs.-ry
\C/i4!A0fl .JfcSL. jAi j&JLsr \SSuoaas\
r ^ /A)pJu*rr\ Vf/AJUfr-'n<&a? Jn
pz4 re l \fS7i3. /&0* P<si78-3oo*\
Manufacturer Calclog No. P.cTno. ' "
Price
s XA .Hire Aft4AtOTA>
p> A
w&eeear. l-^ezaaL
-OH
- zqv*-
MI-70 Ql XA A.
------Mon'S nS538
Monsanto
UOCATIPN.
.nstiument No. Sorvico
RECEIVER - CONTROLLER)
SPECIFICATION
j----- iur^a
ELECUWHK: - fWUHATIC I
LS//7-Z rtm&mtsz.
& sen --**** -0*
T j *PPKICC NO.
DEPT OR MtCA
^4/T-Xo
cj//y-z.
trTtH-<
ltteL on.
Location - Panel 01 Equipment No. Rocord InOicato Control Number ol Points Si zo ft Type
Chart
Olive
Speed
Size 4 Type
Scale
Range
Ratio. Cascade, Computet - Set
Aulo - Manual ByPass
Location
Ptoportionol Bam) *
Auto-Rasat Mode
Rale Modi n I. Wrilmnt Pin'em. Measurement
Range 8. Units
Input Ftom
Controller
Range A Units
Output Sot Point
To Range & Units
From
Powot Supply - Electric, Pneumatic
Electrical Area Classification Accessories or Special Features
jy/Jk-
JMUMlS-
JL-Ul
J-UA-
~4fc
O - /e>0VM
>-.2g<
YES NO YES NO YES NO YES NO INTEG. REMOTE INTEG. REMOTE INTEG. REMOTE INTEG. REMOTE
NO SLOW FAST YES NO INC. DEC
3-/r fiS/6 PZj/iiZ.
NO SLOW FAST NO SLOW FAST
YES
NO YES
NO
INC. DEC INC. DEC
-CH
ir //r-z LTUl-Z-
NO SLOWTFAST YES NO INC. DEC
Phsy</Ai
-iH
Manufacturer
`Receiver Catalog No. `Cuntroller Catalog No. P.O. No.
Poxtso-ti
A//Z-S
2-hi-'l -
Sf*c PkeMifn
A
X
rlH ex/jr 7
___ &>o -ScuyL.
MONS 095539
m
INDICATING THERMOMETERS -
THERMOWELL SPECIFICATIONS
OiCSAu/e.
3.cTt 0 3- i-Z. --aj
*LANT
.MK
DCAT on ARIA
ill
rr//(>/
TT/t 7-t
nriir-i
rr /o/-<
/OCAr/oAt
T)?
Spin i Units
Dial $i Cue Miterial Actuition Connection Si w& Typo Stem MAefiA
Sim Poiitlon Stem Length
.
Color
Will Matortal Construction
Proem Size & tilting Connection
Meteriel
Length Below Thiead or Quo *U*
Femaio Thread Size Leffing intension *T*
Plug t Chain Rep'll
Material
Stwiping
\fi>/np //* mZiU&Yi:
27* Iunmr
8ii*BT/4i2i C
&s-Zroer_ Sr ItStitts
r/iA/L&z /Co -H -CH
=&
Anr AnCLif 0"fiiAn* *+' Tsra*7c* tir
Runt t CA&U
.1171 Sr/huL&rs
At'lMMgTtnC. .fZAtfj.(esr.
r:' >/so r
AXAAujSri. /o,,
5," - !SV*
-t=H
r A/pr
MZ.utT-
rsLz_____ &.
teszaaerts Snpc
\aa.i'ZSuiiL
A/A/\+ tftl i iS
mammu
CA-UUf
ManulKturor
Cntelog No.
P.O. No.
ci/E- r-
Quintity Required
Price A1 SK* fitePMsen
JkU0&son
/h&MET5i>- (oDi,oe>i-f
rJttfJ
4m KT7Q OL A
A
ir
HONS 095540 ------------------------ 1_______ L
MONS 095541
. Monsanto
LOCATION
'(
INVnUMENT ACCESSORIES i/r>rt Aeearsur tt/MK^fiorxi.
PLANT
AU IN MO.
sejs5?P^2. -er&
\ZS-X4/S-J-*
IS8UKD IV
DAT! IAPP0
e*4Wfxc 04-70 \
*V NO. OATV
.
^<L#*lG /tertGS7X________________________ ____________xjo:___________ ^^V.^- *,,;/>- 3 _____________________________________-XG //7 -3
_____________________________ -xe//<r-3
.3 sam:// /Z'cMvSgq <g>*sAjffC7~/o*Jr
Aire sJc.*- <P/4sr -L/ec*J
M/gS ^GFtrrmcro /____ jpftfec_________________________________________________ __________________________________ Mootrc f>s6______________________________________ _________________________________ KJ,r*___crc^sgA/strjQAj Xs->or Sevrje* 4/z
/tegaifAfr' Se 7TifJ g___ 1__ Lh./\ //`j^.kL.fn___Serrr/^6... ....... i___ tJsfy/ih'r.
r --------- t.n. *jr
____ --M___,______
/?n 7 ; V*__________________________________ V
o/iYr
S "__ A
s
A_______ "-M
ccsrtMAAJter
PQ *- z+/r-i-____________________
srtra. />ee*x*B>______'& /i-7o cjl*
0955*2
moms
>SCcr. 4-2-0 3 --a a
J.2. SPECIFICATION
FOR
FIREBRICK LINING (2'V 0 R i * THICKNESS)
FIREBRICK LINING '
* FOR CYLINDRICAL VESSELS
JOHN ZINK COMPANY TULSA, OKLA.
MOWS 095543
i. ;jiu
Page 1 t- 3
s~/cr, <rz-U3 --c> a
I GCNERAJ.-- A Scope
* %
1 This specification is tor tire brick laid op in mortar.
It covers:
a The application and curing of the refractory sy applying con tractor. (Section II).
b The drying out procedure by operating staff. (Section III),
c or IV).Substitution
material. (Section
II Application ad Curing of the Refractory
A Materials
.-
* 1 Fire Brick
.
r.
*2 A. P. Green Mortar or equal
3 Water suitable tor drinking, unless it is known by test or exper ience that it is satisfactory.
4 SulTAOLE CASTABLE MIX FOR THE OPERATING TEMPERATURE.
'
B Preparation
1 All surfaces should be cleaned of foreign material.
2 Nozzle extensions, sleeve liners and other items within the limits
or THE lining, shall be wrapped with two layers of expansion
UATERIAL.
3 .All openings in the vessel shall be custd by means of hardwood or metal jacketed plugs, slightly tapered, and of such dimensions THAT THEY WILL EXTEND BEYOND THE FINISHED SURFACE OF THE LINING
' AND TIT SNUGLY INTO THE OPENINGS. ThEY SHALL EE LIGHTLY COATED WITH GREASE OR TAR. iJhERE FEASIBLE, THF. OPENINGS MAY BE COVERED WITH PLATE HELD IN POSITION BY LIGHT TACK WELDS.
C Application
.
1 Precautions
a During cold weather, the brick and the surface to which it is applied, shall pe kept at a temperature above 40 F during ap plication AND FOR AT LEAST 43 HOURS THEREAFTER. IF REQUIRED, suitasi.e means ron heating shall be pro;idee'; however, live STEAM SHALL NOT BE USED FC-R THIS PURE USE.
* Revised II. A. 1 1 II. A. 2, A.K.R., 6/15/70
HUNS 09 554*.
J.z. SPEC. 110 Page 2 or 3
S&c-r: 02-03-00
( I All TOOLS USED IN UIXIN6 AND APPLYING SHALL BE KEPT CLEAN AND FREE Or SUCH SUBSTANCES AS MAY COLLECT THEREON DURING APPLICA TION.
2 Mixing
a The mortar should se thoroughly mixed with water to the con
orsistency
thick cream.
aThe mixing should be done with
POWER MIXER.
When properly mixed, a new tire brick will tloat with three
or orquarters
its thickness out
the mixture.
3 Placement
'
.
a Only QUAiiriED personnel thoroughly familiar and experienced WITH BRICK REFRACTORIES, SHALL BE EMPLOYED FOR THIS WORK.
L or ay two rows
fire brick to the dimension specified on the
JOS DRAWING, LEAVING AN ANNULUS BETWEEN THE BRICK AND THE
VESSEL SHELL. FILL THIS ANNULUS WITH CASTABLE WITHIN 2" Or
The top or the brick and tamp castable with a 1" x 2" board
TO PREVENT AIR POCKETS. Lay TWO MORE ROWS Or BRICK AND FOL
LOW WITH THE CASTABLE. CONTINUE THIS PROCEDURE UNTIL THE
orSECTION IS LINED. One side and one end
THE brick should
, SE DIPPED IN THE SaIRSET. ThEN RAP THE BRICK WITH A BRICK
HAMMER TO" SECURE A BRICK JOINT NOT TO EXCED 1/16", PREFER
ABLY LESS.
o All nozzles and sleeves are to be grouted with suitable castable mix roR the temperature service.
d Special arch bricx are supplied to form the burner openings.
4 Interruption or Application
A-- Dur. "O PERIODS or INTERRUPTION or APPLICATION, ALWAYS REMOVE
EXCESS MORTAR ON EXPOSED SURFACE TO PREVENT UNEVEN JOINTS.
/'
5 Curing
-
A The lining shall se air cured ONLY during PRELIMINARY CURE.
OB nce started, the air curing small be continued without inter
ruption FOR AT LEAST 24 HOURS AFTER THE LAST PORTION Of THE
LINING HAS BEEN APPLIED.
"
MONS 095545
J.Z. SPEC. MO Page 3 or 3
siBcr, <3-z-o3 ~c70
( III Drying Out
A Procedure
1 Following the atmospheric drying period, the lining shall sc
TURThER DRIED eY RAISING THE TEMPERATURE WITHIN THE VESSEL TO
300 F OVER A PERIOD Or ONE HOUR. HOLD THIS TEMPERATURE FOR . six 50hours. Then raise the temperature, within the vessel, F PER HOUR UNTIL IT REACHES 1000 F. HOLD THIS TEMPERATURE
TOR TEN HCURS. ThEREAETER, THE TEMPERATURE MAY BE RAISED OR
LOWERED, WITHIN THE LIMITS OP Further heat up or cool down,
200 F PER HOUR.
THE NORMAL OPERATING RANGE, should be done at the rate or
IV Substitution or Materials
-
.
.......... .
A This speculation is based on the use or materials that are readily
. AVAILABLE IN THE UNITED STATES.
B It IS APPRECIATED THAT MATERIALS SPECIFIED HEREIN ARE NOT ALWAYS
OBTAINABLE OUTSIDE Or THE UNITED STATES AND QUITE OFTEN CANNOT BE
PROCURED WITHOUT UNDUE COST AND DELAY.
C In such cases, it may be rouNp advantageous to substitute retracTORIES FROM LOCAL SOURCES. HOWEVER, BErORE PROCEEDING .ON THIS 3ASiS,
THE CONTRACTOR SHALL SUBMIT TO JOHN ZlNK COMP*# TOR APPROVAL CR
COMMENTS, COMPLETE INFCRMATI ON AS TO THE PROPERTIES Of THE PROPOSED ' SUBSTITUTION, INCLUDING:
~ 1 Setting time
. 2 Maximum serviceable temperature'
3 Dried density
--
' -4 Fired density*
'.
.
5 Thermal conductivity*
6 Crushing strength (tired)*
7 Per cent linear change (fired)*
e
State temperature at which test ta made. 0 Contractor shall also furnish John Zink Company with information as
TO WHERE AND LENGTH Or TIME THAT THE PROPOSED SUBSTITUTE MATERIALS HAVE DEEN USED IN SIMILAR SERVICE.
095546 HONS
r
HONS 095547
IONS 095548
!
HONS 095549
' '?
------1----- S----- 1----- 5----- 1----- ------ 1----- !----- 1----- 5----- 1----- !----- !----- --3ti------!------ 1----- !___ 1___ !___ 1___ I l . i , , ,
--- 1|
t
r.
^ ...... --
J 2 SPEC f22
se-c-v, a 2-03
J.H. SPECIFICATION ,
fOR
MONOLITHIC LINING
(3^" THRU 6 THICKNESS)
GEEEN CRETE. V CASTAE>LL
FOR CYLINDRICAL VESSELS
0.2. SPEC. IZZ Page 1 or 6 ,
Jc^ri a
--ao
I GENEHAL
A Scope
`
1 This specification is tor pneumatically pplied &aEeNcntTt*c*
LINING TOR CYLINDRICAL VESSELS. Il COVERS:
i
A The INSTALLATION Of ANCHORS (SECTION II).
''
B The APPLICATION AND CURING OF THE CASTABLE BY APPLYING CON
TRACTOR (Section III).
.
c IV).The drying out procedure by operating siArr (Section
V).D Substitution or materials (Section
.,
II INSTALLATION OP ANCHORS
A Materials
or No. 8Anchors
gauge Gateway Erector Anchor or equal (individ
ual) as shown in Figure 120-1. Anchor shall be 316 stainless
steel unless specified elsewhere, cold drawn type 304 stainless.
in which case,
they shall se
' 2 Covered welding electrodes in accordance with thf latest edition
.
or Joint Spec ir icat ions AWS A51, ASTE A 233,
A,INCO-iVeld
type
310 (25 - 20) or typ$ 309 (25 - 12) in order of preference for
use WITH ALLOY ANCHORS.
9 Installation
. \
'
1 Weld the lini'ng anchors e the wall of the vessel as illustrated on page 2.
2 Prepare the surface for the lining by removing all loose scale , or other foreign materials. Power brushing followed by air jet
CLEANING IS RECOMMENDED. SANDBLASTING MAY BE SUBSTITUTED.
After the^e steps have been completed, the surface 3hall be inSPEOTED TOR CLEANLINESS.
Note: The above sequence is for new construction.
In the case
OF LINING REPLACEMENT, IN WHOLE OR PART, SANDBLASTING SHALL 3E
PERFORMED PRIOR TO INSTALLATION OF THE ANCHORS.
MQNS 09555T
LINING ANCHOC. SPACING AND AvC-E.ANGE.MSNT
MMMHBMIOaHBamaMMUMaMI
No. 8 GavOOC. \\ /,'
M.V/IBE --i---A\ //
Amchcb.
Ve.sse.v_
AS Eea'D. j,
--p Q-Vs.
1 <-WEtd On Ovat Svoe 0*sv_vf.-
gixtrs
FIG. 12.0-1 ANCHOR
:
ANCHOR. WELDING
SECTION
MONS 095552
1.J. SPEJ.Itt
. Page 3 or 0 5'c-r. a z.oJ' --t?e>
III APPt+6ATI0N A.'JD CURIflG OF REFRACTORY
A Materials
'
. ' .
v-
i. . i
1 GB6EMtBens."C' -- packed in bags containing 100p net weight.
2 Water suitable for drinking, unless it is known by test on EXPER IENCE Thai it is satisfactory,
Q Preparation
T Nozzle extensions, sleeve liners and other items within the limits
of the lining, shall be trapped with two layers of expansion ma
terials TO PHCiFNT The REFRACTORY FROM BECOMING BONDED TO THEM. This is to permit' such members to expand freely without rupturing
THE LIMIT.., .
'
A 2
ll openings in the vessel shall be closed by means of hardwood or
METAL JACKETED PLUGS, SLIGHTLY TAPERED, AMD OF SUCH DIMENSION THAT
THEY WILI EXTEND BEYOND THE FINISHED SURFACE OF THE LINING AND FIT SNUGLY IMO Ini OPENINGS. TmEY SHALL BE LIGHTLY COATED WITH HEAVY
GREASE CR IAR TO PREVENT BUNDING AND SHALL MOT BE REMOVED FROM THE
OPENINGS OR DISTURBED UNTIL InE REFRACTORY HAS DEVELOPED ITS FINAL
sti. Where feasible, the openings mat be covered with plaii held
I POSITION BY LICHt TACK WELDS.
.g Application
1 Precaution
a During cold weather, the refractory and the surface to which it
IS APPLIED, SHALL BE KEPT AT A TEMPERATURE ABOVE 60 F DURING
application and for at least 72 hops thereafter.
If required,
SUITA3LE MEANS FOR HEATING SHALL BE PROVIDED', HOWEVER, LIVE STEAM ' SMALL NOT BE USED FOR THIS PURPOSE.
a During hot, sunny weather, the refractory materials shall be STORED IN A ShaDT PLACE UNTIL-USED, AND THE EXTERIOR SURFACE OF THE VCSSEL SHALL BE 'EITHER SHADED OR COOLED 8V SPRAT I MG WITH
WATER WHILE The REFRACTORY IS, BEING APPLIED AND DURING THE CUR ING PERIOD.
C DO NOT ADD OTHER CEMENTS, LIME, ETC., TO THE MIXTURE. ALL TOOLS
.USED IN MIXING AND APPLYING SHALL BE KEPT CLEAN AND FREE OF SUCH
SUBSTANCE AS MAT COLLECT DURING APPLICATION.
.
2 Proportions
'
a The proportions shall be as follows:
C-L.ciuwcuu-n* V" -- 10CT'-' (one bag) ,V A 1 F R FLH MACHINE MANUFACTURER'S R LCOMME NDA T I CN 3 .
MONS 095553
1.J. SPEC. 122.
Page <1 or 6
3cr, e?z.0j-aa
Mixing
.i
Fob dry gun application, thoroughly vii the gun mix in a dhuw
TYPE CONCRETE MIXER, OR PRETCRABLY, A REVOLVING BLADE TYPE MORTAR MITER REPORT CHARGING THE HOPPER. PrEDAMPENING RATER
Or at least One ;uart per 100 pounds should se used.
,
b For ret gun application, the gun vix is charged without pre
mixing directly to THE machine with the required amount or WATER.
4a
Application shall be made by pneumatically operated equipment, THE SITE, SPEC IrI CAT IONS AND OPERATING PROCEDURE Or WHICH SHALL BE IN ACCORDANCE WITH THE RECOMMENDATIONS Or THE SUPPLIER Or THIS .EQUIPMENT .
b Only qualimed personnel thoroughly familiar and experienced WITH pneumatic application or INSULATING REERACTORY Shall be EMPLOYED TOR THIS work.
c The compressed air AND WATER shall be SUPPLIED AT A STEADY
pressure:
.
D The mix shall be applied in horizontal, narrow bands, working
UPWARD FROM THE BOTTOM OF THE SECTION TO BE LINED. The FULL
FINAL thickness SHALL BE DEVELOPED IN ONE BAND BEFORE PROCEED^
ING TO THE NEXT ONE.
-
IT IS IMPORTANT THAT THE BOTTOM Or each SUCCESSIVE BAND BE
SECURELY BONDED TO .THE TOP Or THE PRECEDING ONE 3EPORE THE
LATTER HAS DEVELOPED ITS INITIAL SET. THEREFORE, THE HEIGHT
OF THE BANDS WILL BE GOVERNED BY Th DIAMETER OF THE VESSEL AND BY ATMOSPHERIC CONDITIONS.
. A GENERAL RULE IN THIS REGARD IS THAT A BAND SHALL BE COMP LETED IN ABOUT four hours. In LARGE DIAMETER VESSELS this MAY REQUIRE TWO CREWS OPERATING SIMULTANEOUSLY. The CONTRAC
TOR APPLYING THE LINING SHALL TAKE SPECIAL NOTE OF THIS RE QUIREMENT.
e t
Screed the refractory to the final required thickness. This PPERATION SHALL BE PERFORMED DIRECTLY AFTER APPLICATION AND ANY DEFICIENCIES SMALL BE IMMEDIATELY CORRECTED. This SCREEDED FINISH IS ALL THAT IS REQUIRED. SMOOTHING, FLOATING OR TROWEL ING SHALL BE AVOIDED.
F No REBOUND MATERIAL SHALL BE ALLOWED TO ACCUMULATE ON THE COMP
LETED LINING.
.
g Under no circumstances watsoever, shall any resound material BE REUSED.
MONS 095554
5 1^1 ERRUP TI ON or Application
J.Z. SPED. Pane 5 or o
sect: 02-03- <70
a When the application is interrupted before completion or the ENTIRE LININ... thc concrete shall 9E cut back immediately to THE VESSEL (Nil A IT H A STEEL TROWEL. irtlS CUT SHALL BE MADE AT A RIGHT.A.iL* TO THE UAL. 0E TtlE VESTEL, AND SHALL BE MADE AT LOCATIONS AHCRE THE FUIl FINAL THICKNESS HAS AIREADT SEEN APPLIED. /,. MATERIAL 3 E TON D TmE CUT SHALL 3E DISCARDED.
'
o During ti-e pepiod of interruption in application, the water CURING SChED.IE TOR THE CONCRETE ALREADY APPLIED SHALL 9E STRICTLY rOi OWED IN ACCORDANCE WITH ITEM l> Or THIS SECTION.
c Immediately prior to resomiuc application, the exposed sur faces OF THE CTNCRET.E TO which A BOND MUST 9E MADE SHALL 9E `
THOROUGHLY WL' LD.
L, ..BRING
.
a The lining shall be cured by being kept mcisi during its per
oriod
hardening.
The curing shall consist uf light applica
tions or CLEAN, COOL WATER AMD shall 3E STARTED AS SOON A8
THE EXPOSED SURF AC E IS HARD ENOUGH TO PERMIT SPRAYING WITHTU
WASHING CUT THE CEMENT. f.ARE MUST BE EXERCISED IN AVOIDING A STREAM OF WATER THAT IS TOO HARSH. ThE SPRINKLING SHALL CON
SIST MERELY CF A FINE MIST.
s During hot, dry weather it may be found necessary io start
SPRAYING THREE OR FOUR HOURS AFTER THE UNINLiftS SEEN AP
PLIED. A' NO TIME DUR1M- ThE CURING PERIOD SMALL Ti-E INTER
30VALS BETWEEN SPRAYING BE GREATER THAN
MINUTES.
An inexpensive latex paint may be applied to the new retrac TORY TO INHIBIT DRYING OUT. This WILL REPLACE "a" AND "a"
ABOVE.
C Once started, the curing shall be continued without interrup TION TOR AT LEAST 24 HCURS ATTER the LAST PORTION OF THE LIN ING HAS BEEN APPLIED.
7 Pointing Up
'
a. If any pointing up is required, it shall be done immediately AFTER THE CORING PERIOJ WHILE THE SURF ACES ARE STILL TWIST.
a Mortar for pointing up shall be of the same mix as used in
THE ORIGINAL APPLICATION.
.
c SurriciENT water shall 9e added to give th mixture the de
sired CONSISTENCY.
.
D 3a!Cme3 Shall s-e in amu-nts .that can bt applied within a per-
tod of 20 minutes.
Do not use mortar that has taken an initial
SEI\
.
MONS 095555
1.0. SPi.C.
Page 6 or u
S/BCn 02.0*3 --00
IV DRY 1-fJS-Our
A Procedure
1 Afier the water curing has been completed, the lining shall oe
ALLOWED TO DRY UNDER ORDINARY ATMOSPHERIC CONDITIONS FOR AS LOlG
AS POSSIBLE, BUT NOT LESS THAU 24 HOURS.
'
2 Following the atmospheric drying period, the lining shall be
FURTHER DRIED BY RAISING THE TEMPERATURE WITHIN IHE VESSEL TO 300 F over a period of one hour. Hold this temperature for
six hours.
Then raise the temperature witmi. the vessel 50 F
per hour uni;il it reaches 1COO F. Hold this temperature for
ten hoirs.
Thereafter, the temperature may be raised or lowered,
within the limits'of the normal operating range. Further heat up
OR COOL DOAN SHOULD BE DONE AT the RATI OF 200 F PR HOUR.
V SUBSTITUTION CF MATERIALS
11
'
.
A The specification is based on the use or materials that are readily
available in the United Staies.
B It is appreciated Thai materials specified hcrein.arl not always ob
tainable OUTSIDE OF THE UNITED STATES AND SUITE OFTEN CANNOT BE PRO
CURED WITHOUT UNDUE COST AND DELAY.
C In such Casls, it may be found advantageous to sguSiit.uti mixes from
local sources.
H wever, before proceeding on I his basis, IHE con
tractor SHALL SOBMIT TO JOHN ZINK uOMPANY FOR APPROVAL OR COMMENTS,
COMPLETE INFORMATION AS TO THE PROPERTIES OF.The PROPOSED SUBSTITU- '
tion, including:
'
1 Setting time
.
2 Maximum serviceable temperature
3 Dried density
4 Fired density*
>
5 Thermal conductivity*
o Crushing strength (tired)*
P 7 er cent linear change (fired)*
State temperature at which test is made.
D Contractor small also furnish John Zink Company with information as TO WHERE AND LENGTH OF TIME ThAT THE PROPOSED SUBSTITUTE MATERIALS HAVE BEEN USED IN SIMILAR SERVICE.
MQNS 095556
Monsanto
T N0AO1
,
PIPINO MANUAL PIPING SYSTEM SPECIFICATIONS
-r<g 77 * Z. // -- d?J
HAN. IICT AAAT
P2.2 STO F1CI
ft 125 LI STEEL CLASS C SENERAl SERVICE
(('
Thrudtd t Buttwsld - Thrudtd Brin t Flinj<l IBBM Vilvts - 350 F
RAG* t
or
lili
1. APPLICATION This apaciflcation it intandad for us* In class C fluid srvicas ( P2.1 tTD 1). Fluids must D* non-oorroaiva and not aanaltive to copp*r. 1.1 Isrvics Ran** i Ss* Figura 1 t. Tabla I,
1.2 Usa Llmltanansi Systwn is limitsd by tha Taflon Sat ball valv, . Taflon trim bras*
9lobs valva. When Taflon trim valvas ar* onittad from systam, tha cast iron valvas limit th* systm to 400 r max
slvas, duett Is iron fittinga, a stosl flanks* . , and slip-on flangaa in sis* 2* and larger.
isos thru l 1/2*. Flanged
Put*. 6
lilt
j*|
!!i!
PIPING COMPONENTSi
M0MIMA! NPE N
PIrt! 0CN 00 WCICMT; MATERIAL 1 A*m specification
NIPn.fl: tCMEOIAE AND SPEC
H
Sch 60;ca bon itael AlOfa Grad xjl._
Gr 9
1M
-i. [
B B 10 12
Sch >0; Cb
Sch 0; CS
A53 ?vda E fin la B
f
H 14 11 2# Sch Oica bon itaal
24
FIITINtti RATING; MATERIAL SPECIFICATION, DIMENSIONS
OTVNPNM! SCHEDULE, W* rtciPiCAiioN
COJflINO*: RATING; MAT0UAL ASTM fPCCIflCAYtON
OUTLET* RATING, MAURIAL
' MIM SPECIFICATION VS* THEM %iN S'RS" ...... MUCH CONSTRUCTION
3001b,-ductile A44S.-BJ6.3
|
thrd Sch 40;CSlBH A234 Gradh WPB
1
Sch !0;CSjBW 51^ J____
Sch OiCS BW
1
3000luFCGj. thrd A161 Or 1]
L______
--
Std wt;fot-god :s, t ird Std /t;iotgsd :8, b ittwe dad
US5_ftK-i Os not usja
Jiisi Gr It Use As sh >wn i i Table IE or for th imowoll cbnnec ions
THMIADEO TEES
USE TABLE (A BRANCH CONSTRUCTION UNLESS OESIGN PRESSLAC CXCICOS
-4+ -4+ -4+-
ALLOWABLE PRESSURE SHOWN. FOR ANT SlCH BRANCHES USE FULL STRENGTH CONSTRUCTION TABLE IB.
full I
REDUCEO
TT
A... ..A- --1.
TO TC
5
Je, R
WT
-A-- WO
Ovw M
UNION* WING; MATERIAL
JO0\b)MX, thrd
1 ,A#W.rCl^Al9N ............ A197:a 11
:rim
FUUMC* AATINQ. MATERIAL
1501b;for iad c l, th
AtIM SPfC; USAS OIMINHONS A181 Gr 1 816.
1501 >1 for led C iTaTT i-on Mel Or I 016.
l PACINO.................. .. BOLTING: MATERIAl, ANO PIC
1/16" ral aLb
1/16
A307 Gr B honv ' hax bolt 1 wit
>ed f ice rv ha i nut
OAMT* MATERIAL AND DIM
1/0" thic ; com >rsao id as JOStO 9r iphit id, f at r ng;
8
ntcnioos* mk COATED
A559 Clas i 40 1-2 A233 860 laria i
larlo k 70 i it Dlcn )
PRESSURE - CONNECTION
S - VALVE VfNT-
i (MAIN - CONNECTION -VAlVt tuSeratvrc - n connection
Oat PI 1/2* BL10
Oat" VI net dTt
1/2* DAI Oat TX, * &
Oet 3/4-1 L107
Out |i>at~
51
wrl/4'-
r oAi Tii.l-m til,
LW * &A Tii, T33
OATi
thrd
Mil* Tm fig ff
OLOBI
(400 F m L> flfiil 1901 > thr
(40<? p ma (4 1" me i ai* Mil tdX 1251 > fig FF
l CMC* IffINQ IVCRTlCAL OR HO* UHt
ONEOtr' LIFT (HORIZONTAL USD
BALL
(350 F ma `L j DC3 2001b thrd (500 F ma `J, , figj 1501b thrd (400 F ma i) juai^on thr< (35Q T ma 1____
(400 F ma. i> _ 1Q2 1251 > fig (400 F mo ;) (3 i" ma i sir
D3X TTi r'Tg (499 F mo.*- 1
2" BJ 4
not 'or s Leem r cond neat R. 1 0 F- max
not cond
or s mat
i.'
1
0 F mam
iratu
4 SERVICE RESTRICTION i fiao Fi- urs pag 2 ic r pr
erat ( 1. mlts
t rvlca tamperatura and other lim ts ai pile bio 1 o sp cifii flu da.
Sc< ala< ths f lull dl r ctor] for
4 . 1 Water and Ain Wa nr tervic is i estr cted to tl o or a to tha aft < f thi sta- m vaj or pi SSSUi a cu va i> Figura 1. 1 it smTuld preferably b l lmituil O 12 psi< max
2 Steam and Condonsa t Steam is 1 mito< to 2S pi ig nw X AO urot d or jupei heati d to not < var 1 00 F 1 houla taTinulad to 12 pslg max
Coi danaata
pEfl^ON AND COHSTIIUC ;on pgnrgi J5S
Faciliti A fO
ing > Met > e vc lle< by hs Pj ojoc' Eng: naar on cli p o)ec . Bi nda and
itting required must b nltown on aaclt draw ny.
! 2 >
/l>VW.*n.' Unn weld nock ClanVm,U.i Vents *; ot roqii) r* () on
eir'
t to y nos
i>utt eld
Uti> ge or iy-
A ?Epa--Lftvt>t an<l be j_52il Sue 1-1 .2 JVO 2
.9 StamRMslnsi All ranchos t Ku-o t toj Of i toam main Or. p po< Aats with staai traj s sh< 11 bi p ro- idod avary
i tom of ri ors.
.4 Thrasd Lubricanti For thraa lad p ping Join a us Tef on T tread sasl ng td lu >rida ing ompo utd. Do n t
ackwald Taflon lubrlea :ad Joints Fo r bol . thr tads jsa - lolyk ta T 'pa U
tqusl
B3BjBSi,M lot normal Y ra [uira 1 up 0 35 ) f a leapt what i tha conf gura ion ugg* ts O r*t aaa.
: PJ.2
a Stia datalla for thasa connsctio is ar fou id in PS.5
fOUMCf CCA OSlOi Valvasr P4.3 STD8 0.9. 4. 9; Pip* a Fittingi P3.1 Stds. FI a F41.
MONS 095557
C
,5
Vi UV.vJS29tAM,<Mv.'>.A2L`ti.' - - *.__. .... ...
.. .
Monsanto
IT ANOAH0B \ *T
s.
VIPTNO MANUAL
PIPING SYSTEM SPECIFICATIONS
sactt az)J-Q3
MAN. SECT PART
P2.2 STD F2C2
150 IB STEEL CLASS C GENERAL SERVICE
THriWid, Mich, fluid l Buttweld - Threided 8rs & Flinged Steel Valves - 350 F
PAGE
-- applicationi Thia apeeifleation la inttnded for uaa In Claaa C fluid atrvicee (ate P2.1
ba non-eorroaive and not aonaitive to copper. 1.1 Barvlca Rangai 8aa Figure 1 < Table I. 1.2 Uaa Llmltatianai Byotmn ia limited by the Teflon alaava plug, and the Teflon teat ball velvee are omitted from ayatern, the piping components limit the eyatam to SOO F max.
STO 1). valve.
Fluida muat When Teflon trim
PPWBTRUCTIONi Threaded braea valves, ductile iron fittings in sizes thru 1 1/3". Flanged ateel valvaa, buttweld
fittings 2" and larger. Formed-on-pipe lape with elip-on back-up flangee in eitee 2" thru 4*. Threaded flangee
thru 11/2* and elip-on flangee 6" and over.
'zjKA . - CO\' i> .
C*W, -
NOMINAL PIPE SIZE
Hu
1
Pin; BCH CM WEIGHT; MATERIAL Sch 0Ojca bon teel
E fiMOB Or B MUfilli SCHEOlAE ANO PEC IBeTT 80TCS TT0t> Or
TM 2 S 4
Sch Oj C AS97 ERW
. 1___ .17
a TO u l* ia M ae 2
Sch U: c
Sch 0; c rbon etee
A53 rype Gra e B
1
0<> 14
FITTINOS: RATING MATERIAL
3001b:due He
SPECIFICATION: DIMENSIONS A44S: 016 3
.hrd Sch tOrCSlBW A2341Cr WPB:Bl S.9
Sch OiCS BW
Sch OiCS BW
BTUMNDBi SCHLOU.E: TYPE
SPECIFICATION
_
--
COUPLINGS: RATING: MATERIAL ToCoilfcs TKFd
1
M01 Or 1
OUlitU: MATING; MATERIAL
I ASTM SPECIFICATION
Std wt:fo ged _ AiOS Or Z
TSS not us
s, t ird
TTcT #t: fprgoa CS, >uttw sided
A105 Or 21
>wn 1
or t >r th rmow ]1 cbnnec iona
i WUWlgHMNtTAUCTION
THREADED TEES 1 1 H-^4-
USE TABLE tA BRANCH CONSTRUCTION UNLESS DESIGN PRESSURE EXCEEDS
ALLOWABLE PRESSURE SHOWN. FCA ANY SUCH BRANCHES USE FULL STRENGTH CONSTRUCTION TABLE <1.
--
fULl |
REOUCtO
TT
.A.. TO
-A.. TC
,1
S
-aL... -_L-- .A... R WT WO
UNIONS: RATING. MATERIAL
\ ASTM SPECIFICATION. ......... flAFnil: RATINO. MATERIAL
30001b:HI thr A197| All iron trim
l!>01b:for jed C l, th d
1501 ifor d C , ai p-on
AtTM VIC. USAS DIMENSIONS Aiei Or z B16 5
Aiei Gr I 816.
FACING
. ____ ___ _
ES.4.1 ll_
X/lSt
BOLTING: MATERIA^ AND SPE _ >30? Or R henv Oas
1 . :(lAMltt: MATERIAL ANO DIM
l7s"thic L com areas d
Gtii 1 he* aa iceto gr
phit IdTf
at
r
nq
ELECTRODES: BARS 3 COATED
:A559 Clae E60 3-2
A233 B60 lerie 1
rarlo k 70 Tit p'ic. T
--
--
si -mUIUK - CONNECTION VALVE
-1 ORAM CONNECTION -HUMDATUM 1* CONNECTION
GATE
Pi 1/2" IU0 VI---------------
Dli
1/2- 0A4 Tl. T25
3/4-1 L107
BA4 2001b thrd
PS
V21i 174^ BA4 oil
l" w 4
5.25 T11.IT25
TU.
>SMI 1501 fig RF
JUZ? " T29. T33
2" Bl 4
OLOM
BB4/BMF 1001b thrd
(750
i>
fill? XM1 1501 > fig RF
! CHECK) SWING (VERTICAL ORFRU CHECK: LIFT <HORIZONTAL UK) PLUG
BALL
(500 F ma BC3 2Q01b thrd
(500 F ma 1) DC4 2001b thrd
(500 F ma () DEI iSoib thrd
(350 F ma 1) 3001b thrd
(350 F ma i)
(7^0 F mn i} C4J i501 > fig RF (750 F me if
1501 > tig RF (350 P ma () PP4 3 1501 , lg RF (400 F ma 1}
--- -- -- --
l.i Seo Fi lure - pag 1 r ir pr esur r-tum lerat ro 1 mite ervTca tenpurature aiu other 11m ts a )plic ible x> ep rcifi : flu .da.
Se ala 1 the llul 1 dir ICtOI ' (ur
1 watc-i: 1 Wetui iv ice ia rea .rict d to the
:o th iRf . of .ho a team apor pree ura urva In F .gure 1.
.2 fttu.im add CPfUtemn
Steam is 1 .mi te 1 to LUO p >ig m ix an ;urat td 01 aupo heat <d to not <var 100 F Co idenaate
hould bo limited to 1 ) paig ma*
jaauwjtfpjsws^ur U.QH-tt&TU
JJrfLSlFl*
rr Lx.r.Os 1 (.;: lor,:
ua.re p
('lot ;rt 1
red
1 >r ct tnge tiled by t
f
di
cti >n wh tie 3eet r.n'll
a >ace
>enni * ipnda are :h pc .ject Do ida
limit id tp Hi fl .ti n7
jgm i .'J I .UUL bo f`!:0'vi, >11 onrh ,i wing
2 riiyUPt' Uue w.l< neck 11 in
1 U'.-O it to
.eld itti .JH O iy.
>.) yr-ntn 1 Vcnta am ic>t requi 1 d on air
.4 Pine Layout eurlJlc i<im See PI.2 Std !. .5 Steam Naina 1 Ml >cuitehae L ko^ :c to of iteam main
Dr P po kata with atea 1 tra a ah >11 b 1 pro <ided evary
000 foet and at the be item of c. ere. . Thread Lubricant) for three ed p ping Join e u 1 Tef on t read seal ng n d lu rice Lag aekweid Teflon lubriee .ad Joints Fo bo 1 thr ada ae *7 olyk te T pe U or qual
The detalla for theae connectlo e ar 1 fou d In F6.5
ompo nd.
Do nr t
10: Pipe and Fitting 1 P3.1 STDS FI. FU, fc F4
MONS 095558
ionsanto
EMSS^tv
IP1NO SVgfcM
-
in u srta cuuc mu* tamci.
Jm. mi mi------------P2.2STDF2C4
OATS f^70
tock*twM |fH"11 ftuttwtM (24") SoekfttWiti & Flui(H Vilm - MOP
JOLicATlPHi Title specification is intonded Xi Jk,, ibcTmTc fluid eerviees. Fluids must fra 001
mroitvi to ataol.
,,
1.1 service fanasi fat Figure 1, page 2. Typical
manga aca J7SPppaalg at -2-0- to 1-0--0 F and- 1- 95- psig
t iso F.
-............. j. >01FICATIONS
s&t^r. .Z-P- & 3
w. w.
1.1 liimillll Llmitltlon-i ThK ayatm la llmlead to ISO P by iinitatlona on ration aaatad ball valvaa.
:0NITSVCTI0N
Socketweld fitting and F2C4 valvaa. alip-on flange*
Sockeewald fitting and
F2C41 valvaa, alip-on flange*
MOMIMAl fiat lilt
i/i 1 1/. 1 1 1 ih
Buttwald fittings, flanged steel valvaa and slip-on flangaa.
fit# ftg.flgd.stl vlv mach-lapa A SO fig.
> lil.
Buttweld tittinga, tlanged steel valves, and alip-on flangaa.
4 1 B 1 10 | 12
14 | 16 | 18 | 29 1 24
Ifl
Nlfflll NT TIMM COtlFtlMM
F2C4
Carbon steal.A106 Or t
Schodult 40 CS Alts Or Sch 40
C.S..AS3.TFS. Or fi Cartoon stsal, A52, tp S. Cr B
CS.ASB7.BRW (nota 1 Carbon steel. A93 To S. Or b
Schadula 40
1 Schadula 20
Carbon steel,AS3.TbS.Ora Carbon steol.A53.TbS.OrB
Schadula 10
Carbor. steal,A1B1 Or X carbon staol, A234,Or MPa Carbon steal, A234 Gr KPB Carbon stool A234 Or WPB
2000in.aoekotvald.Bl6.11 Std. Wt buttwald,B16.9
Sch. 20, buttweld, 816.9 Sch 10, buttweld. B16.9
Carbon ataol. A181 Or X
UMIOM
Carbon .t*. l?AlOS OrTt
MIHIH
Carbon steel, Alii Or fi
Std. Wt. soekttvald
IR1UCH eWITtOCTieW-- Uaa aockotvald taea aa
par Tablo IB '
Carbon steeli A105 Or 11 Standard waiqht. buttwald, bora to match pipa
Uaa unrainforced a .ub-in branch csonnaetions unless design pressure exceeds Tabla 1A. Whan do ign pressure exceeds allowable (Table 1A) use Tabla IB.
ITUIINM
UUXMllNAWj FpaitSUIlfrMv^STpf ...
: .
_______________ ______________:__________
FUNttl
Carbon atotl, A1B1 Or I
'
ISO lb. alip-on (Boa Not* 2 a Far 2.2)
.
tOtTINS
Carbon stool, AJoT Orada
,'
.
GAI Compraaaad aabaatoa
intrwai '
barai AKS A5.18 Claaa E40S-3 Coatadi AWS AS.1 E60 Sarlaa
'
FftttMlieONN*
Datail ?2 " PTJ8
Dat.F2 2/4* PT3B
Datail F6 Valvai 3/4" FP38
Tran-----------
Datail V2
Detail V14 Valvai 3/4" PA33:
towp---------------------------- Datail DIO
Det.D14 bat. 022
I Datail D22
S- rA Velvet 1* FK37 i Velvet Ik- FA37
I Datail D22 1 Valve. 2" FA27
msmcriMn------------- Datail T2
Dat.T7 Detail Til Detail Til. T29. T32
DOt.T27 Detail T27
NOMINAL flfl 11X1
1/1 1 S/4 1 1 1 1H
2
61 i 1
10 | n | 14 | IS | 18 | !0 | ,4
CAT! VAIVI
FA37 400 lb aoekotweld (750 T max)
FA42 156 b flanged RF TPSO F max
TKOTTXWn'VttVl-------- FB37/1'1.37 600 lb aoekatwald
r|4J/PL42 ISO bl Clanged, RF
|.
WNeinctt'w CVI--------- 2A 600 lb aoekatwald
turn
LVI XS&t 600 lb aoekatwald
tHDRIM)
T7S0 r max)
FF33 300 lb aoekatwald
BALb VALVB
{230 r max)
FLUB VAbVB
rrC41 150 lb flanged, RF
77so max)_______________ _______________________________________
DSdl.lio.ib iianeed. AF (400 r max)
DB41 ISO lb flangad (250 F max)
`
1 '|
1 |
1 1____________
NOTB 1. If ASST MW pip# ia not availabla Procurmaent may autoatituta A106 HPT. 2. Use plato flanges (pec FJ.l STD 120 and 121) aa back up flanges Cor eachine fiaro*.
2. DftillON ANO CONSTRUCTION FEATURES
4. M&fUELQATlJMS
__
tfdlroceion atwrrapMa 'ptmlti t WalBvoiW*lwiiO>ilTiir# Umited too'4"'maximum-sie,** andex4meft*tttaMMW"**4M MAt.fre -atown on'eaeh drawings
2.2 pAnucai Uaa void nock flanges adjacent to buttwald
fitting* only. 2.1 Thread Lubricant!
^j^or ogunl. '
.. for bolt throada uaa "Melykote Typo
--
ftpf'afltMWl'`iR".1" "W `l1! ii*a;lf. Mt? ran VIS'
^sfc4aneNemedl-rp-pip*;
bee*:,.up flange*
Ml othat component* sat*o as F2C4.
.
;.
MGNS 095559
* T( CtTAIt* fOA TMMCONMCVtOI^ AM FOUNO IM PM. SOwact CBD OSISt M.jAM* * lOf P2.1 STlM4.
'
BTft F204 Xeaua 2. F2CS XsSue 1.
'
. . .1
Monsanto
PIPINO MANUAL
SBtLr? <32.//- & *
. MAN. IKCT PAM
____
150LB Still CLASS C OENERAl SERVICE
r uDwaM-Flenead Stodl Valvn 350F
1. application} This epacification is lntendad for tea in Clae* C fluid aarvicea. -
2. conithuctioMi Flanged viIvm, buttweld fitting*, nil eicaa.
iSSui i
|oati l0/,,
FAOC 1
Of 2
/^aoc.Lort U loa > r*j
3. F1PXM0 CQHFONBNTftl
NOMINAL PIN WO
K | * | 1 | TH \ Z | I J 4 |
HPt BCHOnWflOHT: MATSUAL Sch 40i carbon ataal
i AtlM OKClHCAIION
A104 Or ft
mmet kheolae and ipec
Ia53 to ft.Or 8
0
0 | TO | 12 sch 20} CS
14 | 11 | IB j f* | ]4 Seh 10; carbon ataal
OvS
riniWOO. AAtINO; UATfMAl specification. dimensions
STUOtNOI: SCHEOUlt TVPf SPECIFICATION
COUAINat: AATINO. MATERIAL
AtUI EPfClflCATION ounns rating; material
AtlM IPEClMCATlON
> mAncn construction
Seh 40 carbon atoel buttwelding A234 Or HPB; 816-9
8td wtt forged carbon steel* buttwelding A10S Or II
ISch 20; BW 1
|8ch 10} CS. bm
1 l.
1 [
....
.
e
UNIONS: RATING; MAIENAL l Aim nCIFICATION
Ctoe' flanges
. '
PtANGCI RATING, MATERIAL
Aim me. uut oimcnsioni A101 Or 1; 814.5
(bore WN to match pipa)
\ FACING
101TING MATERIAL AND SPEC A307 Or ft heavv hax bolts w/ heavy hax nuts
OAHU* MATERIAL AND DIM 1/8" thick compressed asbeeto*. graphited. flat rinoi Oarlock 7021 (tvoieal)
i
ELEC1R0MS: OAK COATfO
A5S9 Class 84Oft-2 A233 Class ft40 aeries
'
PRESSURE - CONNCCTION I - VAtVC
Dat P12 1/2- PA44
. lost f 14 b/4" PA44
Wl1 MAIN - CONNECTION
Dat D20 1/2- PA44
IDet 8 r pr44
ll 1/2- FA44 12" FA44
teipiaatuhi - nr connection Det T4
8.28 12r 2( T12. T32. T34
H | M | 1 | 1H | 2 5 *j*la | to | ii | u | in | in I 9 | m
ii
s
OAK
FA44 150 lb flG W
PA42 1501b fig RF
&OH
(750 t max) F844 1501b fig UP
FB42/FL42 1501b fig Rf
ii______________________________
1 OHCKi MtNG | VERTICAL OP HOR USD
CHECKi lift (H0RI20NTAL U
(750 f max) IC41 1501b fie AT----------------------
(750 t max)
(750 P max)
BAbbl PUWi
Mil llfllhila HI.................................
(40Q F max) DX41 1501b flo RF
"
-
tQ * **)------------------------------------------------------------------------------------------------------
J u
OhpM '"
4. 8KRV1CE RESTRICTIONS} Sea Figure 1 page 2 for preaiiure-temperature Unit*. See also the fluid directory for service temperature and other limit* applicable to apecific fluid*.
ft***- Mn<Vii Jd*
racilitiea for bending muet be vorified by the Project engineer on each project. Benda end fitting '
r>*tiiitrd wui't be fkiwn on each drawing. 5.2 i-uhflc*<- Uau "Molykote Typo U" lubricant or oquol for bolt throade. &.> atree*' Analysisi A etreee analyaia i requirod for all lxneo operating at 3S0F or above or for euy temperature
where the configuration auggaat* ov#r*tr**.
1.4 CBinttmUBf
* Th dafcdil* tor tti... oonndotion* r found in P6.S.
MCINS 095560
10UC
CM 0lll utitor M.2 dTO IQl llH Wttindl M.i TD Ml
'^tuuij4b:.4 ut*. .-
pipino manual FIRING SYSTEM SPECIFICATIONS
300 LB STEEL CUSS C GENERAL SERVICE Threaded i Buttweld - Ttviadid l flanged Valves - 000 F
SJE.^ri 02-n-*js
MAN, StCT VAST
P2.2 STD F3C11
issue l JoAli 1/70
FACC 1
Of 2
*X 1. APP1.;CAT^H> 'Ala specification i intondod (or us* in Class C fluid tervicos (von P2.1 STD 1). Fluid* mist
f s lx non-orrostve t? atoel.
'
1.1 *T'/jco Kanaoi 6*0 Figure 1 * Table 1.
1.2 Use Ln.n~tAtiur.st System J* limited by flanged joint to SOO p.
hi ifli lift
tfi;
{J;i
ill}
2ftji
2. OBSTRUCTIONi Threaded fitting*, flanges and valva* thru 1 1/2* si:
lip-on flanges aises 2" a largor.
.
Buttweld fittings, flangod valva* and
"bfM. -*bM
2. fifim coMFOHKrrSi
N0MINAI PIPI SKI . NFC: *CM0*l'tlGH>. MX-)HAL
If AI1M MCClNCAtlON wmtfr whttxju and >tc
H| % J 1 |
Sch 001 carbon *t*ol A106 Cr D Sch OO; carbon atool
IW 1 | J J 4 | | Sch 40; carbon atoal
)
#
f w | 11
l U | ) | w |
jo |
M
flTIINOI: RATING. MAUI Al
30001b; forged CS
1Sch 40; carbon steal, buttwnlding
VtCil:CAIiON, OiMlN*. ONS ASTM AlBlCrijUSAS 51A . U1 AS'iM A234 Cr WPB; USAS 016.9
StUMNOI 6CMC0UIC; Wf
SPCCIhr.ATlON COUPUNGI RATING, MAURIAt 10001b;forged CS
AStM IHClfiCATiQN QUtUtfc RATING. UAtlU4t
| AJTM SAtClOCAIION y TMlff SUN Sifts 'branch cotiiuwciioH
A101 Cr I;USAS B16.11 Xiiifocgad carbon atL . A.105 Cr 11
fi2.99L_M.ir.________________ ~~ Uso threaded tea
as par Table IB.
Std vti forged carbon atoel
U> unrainforced stub-in branch connections unless design prasaure axceeds allowable pioiturs s^-own (psig 9 -20 F
to lOO P) In Table XA. If design toKporature is higher
than 100 F, allowable pressures will be reduced by the
appropriate correction factor, figure 1. Khan design
proseure exceeds allowable pressure, use construction
msthods in Table ID.
1 |
0**M
lINtONt: RAIINQ; MATERIA:
30001b;forged CS
1 ASfM SFlCtflCAIlON TUNOft: NAhNO. UATiR'-l
ASTM A10S TWlbj lorgod C5, thrd
JUdlb; lorgod caroon otooi; slip-on (use WN w/ am* bora as
ASTM MIC; USAS OIWI.HONS A101 Or I; B16.5
A1B1 Or X; B16.5'
fittings sdjncant to DM
l FACING SClTtltO: MA7WAI AND J*C
raised face
raised face
heavy hex oteel bolt* w/ heavy hex nut*; ASTM,A307 Or B
fittines onlv)
OAlKllfc IMTCRIA1 AND CM
1/8" thick compressed a*ba*to* flat ring;3001h RF din; JM76, Oarlock 7021 typical
mCMOOIt! 8ARC
2 COATED
ASTM AS59 Cl K60H-2 ASTM A223 Cl B60 aerie*
PRlttUM - CONNCCTION
PI
S - VAVVt %T--------
1/2* m '___ VI
MAtN - CONNECTION
D17
i - VHVl
1/2* FA?
'TfMFtRATURC - TW CONNEXION Tl, T2&
, lV4* FP3
Ip5
|V21i 3/4" FA7 |021
Il" FA7 IS,25iTll. T25
.. ll 1/2- FA7 |T11. T29, TJ3
DATE OlOM/Angla
FA7 6001b, thrd
(750 F max) in7/Pi>7 6001b. thrd
FAS2 3001b fig, RF
(750 F max) (30* max also) FBS2/FLS2 3001b fie, RF
I CHtCR: WING IVIRTICAI 0AMCRUl
CHtCK! lift (MORIRUNIAl uan
(750 F max) SA 6001b, thrd
(750 F max) l GOOlbt thrd
(750 F max)
(750 F max) FC51 3001b fig. RF
(750 F max)
, b" FA7
' `.
,
i
0
JC
4. SERVICE HK-STRICriONSi Soa Figure l page 2 foe presRuca-temporaturQ limit*. Sea also the fluid directory foe nsivico temporature *nd other limit* applicable to specific .fluid*.
| * ptSlQS ANn COUPTr'UCTH'<N FFATURF.Sl
[ 5.1 p?i{osi rain
|,i|lllll ....................... .
>tii4nw 11lal|*4>M
F.tcilitioo frit bonding muat bo verified by tho Project Engineer on each project. Bend* and fitting
required Must bo nhewn on ench drawing.
5,2 T|>ru.>) Luliilcarti
"Molykoto Tyi>o U" lubricant or ogual for bolt tluondn. Uso TFE thrd cottpd for piping
I Joint*. 5.2 el;n _hnoVyt*J.
A itrooi analysis l* required for all linos operating at 3S0F or above or for any tmporature
whore tlu c.-iifi.jur,r.lon ruiggcot* ovoirstrees.
3.4 po.nutrnctlog.1 Sno PJ.2.
HONS 095561
* Tho dotallo for theoo connections aro found in P6.9>
Monsanto
X. mUA|frfa-^<d6dali"ifc m iidiTe || .mm.eMsfi
i
`"
'
Stzcr; 0*-//--/}^
_____ 125
CBA >415 pipino System specificatione
IB BOLYPRDPYLENC LIKED CLASS D PROJECT SPECMCATIOH
Hinted |8"]-Hnj<i Vilvei-225 F
PSP
5IS UI 1
PAG! 1
QP1M101
DU 10/70
2OF
1, appmcATI OH i Thi* npocl f ication ia Intended for uee in ciaae D"ervleee. 1.) firvvicc Ronqet See Figure 1, pagn 2. Typical
roting*Tor ITimyaa lined valves la 150 peig at 22$F.
[MOOIPICATI-'t!S Hon#
1.2 Temperature Ranoet Syston is limited to 225 f by the polypropylene firing.
|
7, PTPTNO COMPOWCKTSi
CONSTRUCTION
riangod fitting#, valvea, and pipe spools - all aisea. May be field flared.
All items lined < ith polypropylene.
NOMINAL PIPE UK fire
11
IS 1
2
3
carbon eteel. A507 ERW Polyprupylone 'lined par ASTH D-2146 Type 1 (Note 1.2)
1
NipntT FITTINGS COUPUNCi
Fchodulo 40
Duetllo iron. A445 150 lb. oaKrroDvlenc lined per 5-2)46 tvoe_I_ISOt 21_____
UNIONS
OUTtCTS
X0TW7tijliTifTIY15ir ` " Uso flanged tea with reducer.
STUPCNOS PUNCH
formed on pi; flaraa H Co P6.1 st; 3
carbon stool: plate flangee M Co. P3.1 879 120
BOLTING CASKETS EltCTROOES
carbon steel. A306 Grade B heav.- hex be.ta with hoavv hex nuta
`- .
.
'
4
4 1
CS.A53, Tp 8. Grade A or B PP lined, ASIM D-2146 Type J (Note 1,2)
' ''
*'
PRESSURi CONN
71HI-*"
`~
-'
TTOMtcfiA
NOMINAL PIPE WE GATE VALVE
&IoIT7akolc 7aC7e
swiWthreifVAtTi--
LIFT CHICK VALVE |M0 U!U
DlAPHR/oM
PLUG
Uaa tao with QPMO valve Use tea with QPB40 valve Use tea with QPB40 valve
Vmm
1 l IS
` 1
2
*
31
4
________ 6_________ 1_________|_______
QPC40 (harr).QPC4l (vert) 125 lb, flanged
T>25 F maxi_________________________________________________________________________________________________________________________
QPG4S ISO lb. flanged
'
(225 P max)
OPM_^ 125 lb. Flangod
-
(F.2S F max)
NOTE 1. 7.
All pipe and fitting lininga ahall have a wall thickness of not lasa than .015" and flaia faea thlckneee ahall not be laaa than .040". uaa stand;.rd field fabricating techniques, including uaa of cutting, thrcndii;}, heating and foraing tooia aa shown in vo.-.dor literature.
`5. DnSlON ANB..COHSTIWCTIPH FiATUAKfi.
,
3.1 H'hroqil l.lincnnti Uso "Mlyao^a Type U* lubricant
or *7iinl*'on bo"it thread*.
MUNS 095562
Project Manual Sect. MB'
CEA 2415
<3 2.1J-*t
Datai November 6, 1970 ,
Author: K. J. Johnston
Approved by: R. G. Corley
Page 1 of 7
ELECTRICAL DESIGN BASIS . FOR THE
ELECTRICAL FACILITIES WITHIN THE
, PROJECT BATTERY LIMITS
PROJECT: Aroclor Waste Disposal DIVISION: Organic PLANT: W. G. Krummrich PLANT LOCATION: Sauget, Illinois
Central Engineering Department Monsanto Company 800 N. Lindbergh
St. Louis, Missouri 63166
MONS 095563
PROJECT DESIGN MANUAL
Central Engineering Department
Monsanto
MCNS 095383
CEA No. 2415 AROCLOR WASTE DISPOSAL
W. G. Krummrich Plant
PROJECT DESIGN MANUAL
Central Engineering Department
MUNS 095384
\C
CENTRAL ENGINEERING DEPARTMENT MONSANTO COMPANY ST. LOUIS. MO.
PROJECT DESIGN MANUAL . . CEA NO. i-115
AROCLOR WASTE DISPOSAL AT WGK PLANT SAUGET, ILLINOIS
COPY NO. ?
DATE
DISTRIBUTION! 1. Project Manager 2, CED Central Files 3. Manufacturing Representative
Project Manage]
COMPANY
CONFIDENTIAL
This document is the property of Monsanto Company and the recipient is responsible for its safekeeping and
disposition. It contains Confidential Information which must not be reproduced, revealed to unauthorized persons or sent outside the Company without proper authorization.
MGNS 095385
CEA 2415
PROJECT DESIGN MANUAL
TABLE OF CONTENTS
SECTION 1 - PROCESS DESIGN 0101-00 - PROJECT SCOPE SUMMARY 0102-00 - PROCESS DESCRIPTION 0103-00 - FLOW DIAGRAMS -03 - Engineering Flow Diagrams
0104-00 - EQUIPMENT INFORMATION SUMMARY 0105-00 - EQUIPMENT ARRANGEMENTS 0106-00 - PLOT PLANS 0108-00 - UTILITIES
-02 - Utilities Summary SECTION 2 - ENGINEERING DESIGN
0201-00 - EQUIPMENT - General -01 - Master Equipment Numbering List
0201-00 - INDIVIDUAL EQUIPMENT ITEMS -01 - Performance Data Sheet -02 - Specification -03 - Test and Inspection Data -04 - Performance Curves
0202-00 - INSTRUMENTS - General -01 - Instrument Design Basis -03 - Instrument Specifications -05 - Control Schematics
0203-00 - SET AND TEST EQUIPMENT - Refractory Installation
0211-00 - PIPELINES -03 - Pipeline Specifications - System -04 - Pipeline Specifications - Materials -05 - pipeline Specifications - Construction
0213-00 - ELECTRICAL
-01 - Electrical Design Basis 02X5-00 - SEWERS, DRAINS, PLUMBING
-02 - Layout Drawing
SECTION 3 - REFERENCE 0301-00 - DRAWING INDEX 0302-00 - PURCHASE ORDER INDICES -01 - Equipment No./P,0. No./vendor -02 - P.O. No./Category/Equipment No./Vendor
M0NS 095386
Sect to tf 0/g/-an
X.___ PROJECT SCOPE SUMMARY
CEA 2415 By: WGN/HBW August 6, 1970
Page 1 of 7
A. Title
Aroclor Waste Disposal, Organic Division, w. g. Krummrich Plant, Sauget, Illinois, CEA 2415. Expected Cost $430 M. Expected Completion date May 1, 1971.
B. Objectives
The objectives of this project are to:
1. Thermally decompose essentially all the highly chlorinated used liquid Aroclors and Kontar fed to the incineration system to harmless bv-products.
2. Limit the non-decoroposed PC3's from the incinera tion system entering the plant sewer to 0.012 lbs./hr. or 0.29 lbs./day.
3. Provide for possible future incineration of other plant wastes.
4. Complete these facilities by May I, 1971 or sooner.
C. Project Tone
The primary objective of this project is to achieve the highest possible level of decomposition of the Aroclors and Montar fed to the incineration system. The allowable contribution of PC3's from the incin eration system to the total plant sewer stream has been set at ppb (0.012 lbs./hr. or 0.29 lbs./day).
Since this project is part of the "Monsanto Action Plan" to control PCB's, it is desirable to meet or better the expected completion date of May 1, 1971.
' Low capital cost and low operating costs arc required, for this non-earnings project.
D. Design capacity
The design capacity is 10 M lbs./yr. of waste Aroclors and Montar3.
E. Project Status
Engineering c::n proceed v:r th definitive design when approval is granted.
CNS 095387
SECrMf/ Qlof--Otf
CEA 2415 By: WGN/NBW August 6, 1970 page 2 of 7
F. Description of Facilities
The project will include facilities to:
1. Unload drums, tank cars and tank trucks of used Aroclors returned by customers,
2. Store the waste Aroclor and Aroclor-Montar mix ture in three existing 20,000-gallon steel storage tanks.
3. Receive Montar from the Aroclor Department and transport it back to the three waste Aroclor storage tanks.
4. Incinerate waste Aroclor-Montar liquid and scrub
the flue gas with water. The incinerator-scrubber
system includes: incinerator, quench pot, venturi
scrubber, packed column, demister pad, stack, air
blower, flame safeguard, temperature controls,
and water flow controls.
5. Adsorb non-docomposed PCB' s from the scrubber liquor and dissolved PCB1s in'the overflow water from the Aroclor-water sump with a carbon tower.
MONS 095388
S EC 77 O I OZ--- <30 Pago 1
CEA 2415 AROCLOR WASTE DISPOSAL X. PROCESS DESCRIPTION
Polychlorinated Biphenyls are decomposed by heat in the oxidizer into the following combustion products:
IICl, Clj, CO.,. HjO, particulate .matter (when burning Montar residue containing lime).
Approximately 0.001 'lb./hour of undestroyed pens are expected to get through the oxidizer at the design PCB feed rate of 1250 lb./hour.' This will go to the sewer in the scrubber effluent stream. This stream will be an HC1 solution of about 2% strength.
The hot combustion products leaving the oxidizer are cooled from oxidizer temperatures (2800F maximum) to approxiinately 180F by water sprays in the contactor tube before discharg ing into the quench pot. Somewhat less than 50% of the HCl is also removed here. Leaving the quench pot, the cooled gases pass through a high energy venturi section where approx imately 98% of the particulate matter is removed by a pumped stream of HCl solution from the quench pot and packed scrubber sumps. Additional HCl is also removed in the venturi.
The gases then enter the bottom of a packed scrubber (poly propylene packing) where the remaining HCl is scrubbed out with well water. Scrubber efficiency is calculated to be approximately 99.4%.
On leaving the packed section the gases pass through a monel demister pad and into the atmosphere.
Design specification3 for the contents of this stream at de sign waste feed rate are:
HCl Cl 2 Particulates
Nitrogen oxides
5 lb./hour maximum 50 ppm
<0.05 grains/SCF 20 micron size <200 ppm
MONS 095389
ct- oi a 2.- a a Page 2
IX PROCESS STUDIES
Independent calculations were made by w. b. Bolles of CED who
verified the efficiency claimed by John Zink Company for the packed scrubber.
Two series of destruction tests on various PCBs were con-
'
ducted by John Zink Company at their facility in Tulsa,
Oklahoma. These tests showed the PCBs could be successfully
decomposed to the aforementioned combustion products to a de
gree required to meet the WGK plant goal of 10 ppb maximum.
PCBs in the total plant waste stream. These test results
were the basis of the Zink design of the full scale unit. A
residence time in the oxidizer of approximately 3 seconds was
shown to be required.
R. A. Entrup conducted laboratory tests on the mixing of the Montar residues in heated Aroclor 1242. He concluded that mixing takes place quite easily and we should have no prob lems with the proposed collection system. (Pumping a hot Montar stream into a partially filled tank trailer of hot Aroclor 1242.)
III.
DESCRIPTION OP FACILITIES
1. Unloading Facilities
a. Tank Car
Returned tank cars will be unloaded at one of the existing phenol unloading docks (Dock No. 1) on Track
No. 7 at the southwest corner of the building BB-T. A new unloading pump (Item 1-110) has been provided,
and an unloading arm for top unloading of the cars. The material is pumped from the car to one of the three 20,000 gallon storage tanks (Items 1-116, 1-117
and 1-118) through a common 3" transfer line (1-110-2)
which also serves the unloading dock sump pump (Item
1-125), the Aroclor sump pump (Item 1-121) and the drum unloading sump pump (Item 1-119). Caro should be exercised when pumping to see that all valves from these other sources are closed.
b. Tank Truck
Return tank trucks of Aroclor wil.l be unloaded in the area just west of the storage tanks. The truck will be backed into position from the road south of the in cinerator area. A flexible hose will connect the bottom trailer outlet to unloading pump,'(Item 1-111) . which will pump the contents into one of the three t+ storage tanks.
MONS 095390
.
.
' ^
i c//oz. -?<?
Page 3
c. Drums
Most of the returned material will be in 55 gallon
drums. These will be deposited by straddle carrier
in the same area, west of the storage tanks as is used
to unload tank trucks. They will be sampled for sol
vent content and viscosity and then picked up one at a
time by fork lift with attachment (Item 1-134) and de-
posited on the south end of the drum conveyor (Item
1-107) . The conveyor consists of a south section for
receiving cold drums (three maximum). The center
section is a live steam drum heater (capacity 3 drums)
and the north section is a storage section for hot
drums. The drum heater section is an insulated cham
ber using live steam for heating. It has vertical
sliding counter-weighted doors. Each conveyor section
has a stop with a foot-operated escapement which allows
separation of the end drum so the drum crane (Item
1-128) can be attached.
The drum crane is a hand-operated hydraulic crane with
an adjustable boom length and a lifter dumper attach
ment .
.
The crane boom is swung over the drum on the conveyor and the lifter-dumper clamped around it. The drum is then raised several inches to clear the conveyor and then the boom is swung manually to a position north of the drum unloading sump. The chain-operated dumper is then used to tilt the drum to discharge into the sump.
2. Sump Systems a. Incinerator Area Sump
The entire incinerator area, including the truck un loading and drum unloading areas is curbed and drains to a sump at the west side of the area. A sump pump (Item 1-120) actuated by level switch I.S-120-1 pumps Aroclor spills and/or water to the 10,000 gallon Aroclor-water sump (Item 1-124) at the west side of the phenol pressure evaporation area.
b. Aroclor Water Sump
The Aroclor settles by gravity and the water flows off the top to the sewer, under a weir to prevent dischnrge of any floating material contaminated with Aroclor. When the Aroclor layer on the bottom reaches n poodolormi nod level (approximately 3 ft.), as measured by level indicator LI-lai-1, the waver layer .is pumped to the sewer .manually using Water Sump Pump (Item 1-122) .
MQNS 095391
S'C7t o/az. --act Page 4
Steam is then introduced to the sump heating coil to raise the Aroclor layer to a pumpnble temperature. The hot Aroclor is then pumped manually to one of the three storage tanks using the common line described
under Tank Car Unloading Facilities. Be sure all valves are properly positioned to pump to the storage
tank.
c. Unloading Dock Sump
.
The unloading dock sump pump (Item 1-125) is located in an existing sump at the phenol unloading docks be tween tracks No. 7 and 7D. This sump collects any spills associated with tank car unloading or unload ing punip or piping leakage. The pump is piped to both the common Aroclor transfer line to the storage tanks or to a phenol waste tank, since phenol is also un loaded in this area. Operation of this pump is manual and will be used to pump Aroclor only in the event of a spill or leak in the unloading area.
d. Drum Dumping Sump
The drum dumping sump receives the returned Aroclors which may contain contaminants such as mineral oil, solvents, etc. As these drums are dumped into the sump, pump (Item 1-119) actuated by level switch
LS-119-1, pumps the Aroclor into one of the storage
tanks.
Montar Collection System
Still residue, called "MONTAR" is collected in Dept. 246
and transported to the incinerator area by tank truck.
The procedure is as follows:
,
The truck is filled with approximately 2000 gallons of waste Aroclor from one of the storage tanks in the incin erator area, using tank truck unloading pump (Item 1-111). The trailer is then transported to Dept. 246 and parked in a designated area north of the still. Two connections, a Montar feed line and a fume collection line, are made at the top of the trailer. The hot "Montar" at approxi mately 300C is pumped from the still, using the existing still circulating pump, into the trailer, mixing with the Aroclor. When all the Montar has boon collected, the trailer is transported back to the incinerator area and unloaded into storage, again using the tank truck unload
ing pump (Item 1-111) .
MONS 095392
>S c-r, &/az. -00
Page 5
The ability of the Aroclor to dilute and disperse the . "Montar'' h.as been verified in the laboratory by R. A. Entrup. *
NOTE: THE NORTH STORAGE TANK (ITEM 1-117) WILL BE USED . EXCLUSIVELY FOR MONTAR.
The trailer should be moved to the incinerator area and unloaded as quickly as possible to prevent the lime solids from settling out.
4. Aroclor Storage Facilities
Aroclor materials to be incinerated will bo stored in three 20,000 gallon tanks, Items 1-11G, 1-117 and 1-118. The north tank, Item 1-117, will be reserved for Montar. Each tank is provided with a hgating coil to keep the contents pumpable (maximum 100 C). The steam to the coils is manually controlled. Local temperature indi cators TI-116-1, TI--117-1 and TI-118-1 have been pro vided. Each tank is also provided with an agitator to provide a homogeneous mixture and to keep lime solids from the Montar suspended. Each tank is' also provided with a local level indicator (LI-116-2, 1,1-117-2 and LI-lie-2).
Since the returned Aroclors may contain other materials some of which will be flammable solvents, a nitrogen blanket has been provided for the storage tanks. Con servation vents (XEgll6-3, XE-117-3 and XE-118-3) vpll relieve at 6 oz./in^ positive pressure or 1 oz./in negative pressure. Bottled nitrogen will be provided by portable trailers which will feed a regulator station at the south side of the area.
piping has been provided to allow transferring the con tents of any storage tank to any other storage tank. .. The storage tanks are tied together by 3" overflow lines at the tops.
A valve has been provided on a spare nozzle on the top of each tank so tank level can be checked by "sticking".
5. Vlaste Feed System
Waste Aroclors are fed to the incinerator by a MOYNO positive displacement pump (item 1-104). Normal pump discharge pressure at full feed rate (1250. lb./hour) will be approximately 80-100 psig. A pressure relief valve PSV-104-1 set at 150 psig relieves back to the
MONS 095393
S.cr. c?/c7z.-0o Page 6
. storage tanks if the feed to the incinerator is dead
headed. Item 1-104 can pump from either the middle (Item
1-117) or the north (Item 1-118) storage tank. The feed
rate is governed by a variable speed drive. Maximum rate
is approximately 3 GPM. Actual rates for various speed
`
settings should be determined by timing and weighing
'
samples collected at the pump discharge with the main
discharge valve closed. Drain valve opening can be regu-
' lated to provide a back pressure equivalent to normal
operating back pressure.
6 Incinerator-Scrubber System
The incinerator system consists of the combustion air blower (Item 1-150), quench column (Item 1-141), oxidizer
(Item 1-102) , quench pot (Item 132), venturi scrubber (Item 1-153), scrubber circulating pump (Item 1-106),
packed scrubber (Item 1-154) and mist eliminator (Item 1-155) .
The oxidizer is a refractory lined furnace where the destruction of the Aroclor takes place, resulting in
various gaseous products (HCl, Cl,, CO2i- H,0) . Also when burning material containing Montar, some particulate matter results.
The Aroclors require supporting fuel to maintain combus tion at the proper temperatures. This is provided by intorruptable natural gas normally, with a back-up fuel oil system.
The hot gases and particulates leaving the oxidizer pass through the Hastelloy "C" quench column into the poly ester lined quench pot where they are cooled and some HCl removed by two sets of water sprays. A water level is maintained in the quench pot and the gases impinge on ' the surface, and the loose brick lining on the walls. . Liquid level is maintained in the quench pot by control valve LCV-81. HCl solution from the quench pot flows to the packed scrubber sump. The scrubber circulating pump pulls solution from the line between quench pot and packed scrubber and foods the Hastelloy "C" venturi scrubber where most of the particulate matter and some additional HCl gas are removed. The gases then pass vertically up through the polyester lined packed scrubber, where the balance of the HCl is removed, through a monel demister pad and to the atmosphere. Well water flows down the packed scrubber countercurrent to the gas. The HCl solution from the scrubber sump (120 GPM) flows to till": sower through a loop which maintains a level in the sump. The loop has a siphon break. -
MUNS 095394
Scr, c7/cjz. -aa
Page 7
7. incinerator System Water Suoply
The primary water supply for the contactor tube sprays and the packed scrubber is well water. A booster purap (Item 1-112) supplies the required pressure. In addi- tion, city water from the break tank (Item 1-126) is pumped by (Items 1-127 or 1-132) to a weir at the top of the contactor tube (8 GPM) which cools the tube walls and two quench nozzles in the oxidizer (5 GPM). (This quench water is used only when burning Montar.) In addition, this city water supply is also an emergency back up for the well water to the contactor tube. If well water flow falls below' a preset point, the oxidizer furnace is shut down and city water flows to the contactor tube to pro
tect the polyester lining in the quench and scrubber systems.
As an additional protection, a failure of city water
automatically brings in fire water from the plant loop
system. This is the ultimate protection to cover such
things as plant power failure. The tie-in is underground
just south of the oxidizer.
V.'cll water is also supplied to two quench nozzles in the oxidizer. These are used to control burner outlet tem peratures when burning Montar. An 80 psig steam supply, reduced to 20 psig by PRV-102-4 is connected to the nozzles for use in cooling the nozzles when burning Aroclors.
8. Auxiliary Fuel Supplies
Natural gas is supplied from an existing 8" header above the storage tank walkway. It is reduced from a header pressure of approximately 60 psig to approximately 35 psig by pressure reducing valve PRV-102-3. It is fed , to the oxidizer through the normal FIA approved series of safety shut-off and double block and bleed valving. (See drawing D4) . Natural gas also feeds the pilot flame. The pilot gas supply will be non-intevruptable. This arrangement of valves and special hardware is located at ground level below the east side of the oxidizer. Gas flow is controlled by temperature controller TRC-15 to maintain the desired oxidizer temperature.
MONS 095395
'SBcr: a/a-z. ~aa
Page Q
Back-up fuel oil, for use when natural gas is interrupted, is contained in storage tank (Item 1-114) located north east of the incinerator area, just north of the Interim PNA department. Pumps. (Items 1-115 or 1-123) deliver fuel oil to the oxidizer, again through PTA approved arrange ment of safety valves and other hardware. Fuel oil flow is also controlled by temperature controller TRC-15.
9. Atomizing Steam .
100 psig steam is supplied to the waste Aroclor burner and the fuel oil burner for use as a fuel atomizer.
10. Other Required Utilities
Instrument air is supplied from an existing header located on the existing pipe bridge.
Plant air is supplied from an existing header located on the pipe bridge from Interim PNA.
Steam for pipeline tracing is from the existing 80 psig header. Tie-in point is on the pipe bridge running across the north end of the incinerator area.
Primary electric power feeder is from Substation No. 13
with an automatic switchover to Substation
in the event
of a NO. 13 failure. EMERGENCY POWER FEEDS THE CITY WATER
PUMPS AND THE LIGHTING AND INSTRUMENT TRANSFORMER ONLY.
11. Condensate Collection
All steam condensate discharges to a header which runs to
tank (Item 1-133), located on the east side of the control
building at ground level.
.
Liquid condensate is discharged to the sewer. Flashed . steam exits to the atmosphere through a Swartwout exhaust
head.
12. Purge Air System
plant air has been provided to the following with separate shut-off valves on each feed:
a. Oxidizer Sight Ports (On east, side and north end of oxidizer) - purge air should flow continuously when ever oxidizer is in operation.
MONS 095396
sscr.
aa
Page 9
b. Oxidizer Quench Nozzles (On either side at south end of oxidizer) - Purge air should be turned on when changing nozzles in a hot oxidizer.
c. Flame Scanner Assembly (On west side of Burner Plenum)
- Purge air should flow continuously whenever oxidizer
is in operation.
'
d. Waste Liquid Burner - Purge air should be turned on when replacing gun in hot oxidizer.
e. Fuel Oil Burner - Purge air should be turned on when replacing gun in hot oxidizer.
f. Thermocouple for TRC (In north end of the oxidizer) - Purge air should be turned on only when removing or installing the thermocouple in a hot oxidizer.
g. The Rayotube requires continuous cooling. This, how ever, may require water. (The vendor will be con sulted.)
13. Flame Safeguard system
A Honeywell system is provided with a flame scanner oper ating on the pilot flame. Loss of pilot flame shuts down all fuel to the oxidizer.
14. Interlocks and Alarms
Motor Interlocks
1-150 - Incinerator Air Blower
The following conditions must be satisfied before starting Item 1-150.
a. Water flow to contactor tube (FS-38).
b. Water flow to venturi (FS-37)
c. Water flow to weir (FS-127-2)
d. Power on at incinerator panel
I,oss of any of the above will stop the blower.
<*
MONS 095397
0/a z. -00
Page 10
1-104 - Incinerator Feed Pump
The following conditions must be satisfied before start
ing Item 1-104.
'
a. Incinerator temperature above 1600f (TS-15).
b. Atomizing steam to waste nozzle (PS-9).
c. Pilot flame proved.
d. Waste va.lve (FCV-30) open. Depress "start waste" button on control panel. To close valve depress "waste stop" pushbutton. Loss of any of the above will stop 1-104,
The following motors have no interlocks and are controlled by a local start-stop pushbutton station.
1-106 - Packed column circulating pump.
1-111 - Tank truck unloading pump.
1-112 - Well water booster pump.
'
1-110 - Storage tank agitator (stop pushbutton at motor, start-stop pushbutton on tank near grade).
1-116 - Storage tank agitator.
1-117 - Storage tank agitator.
1-122 - Water sump pump.
1-127 and 1-132 - City Water Break Tank Pumps.
These pumps have timed seal-in relays to auto
matically restart after short power outages (less than 3 seconds). To stop pumps hold stop button in for at least 5 seconds.
1-110 - Tank Car Unloading pump.
To start hold start button depressed until, dis charge pressure closes PS-110-1. Pump will stop when discharge pressure drops or when stop push button is depressed.
1-119 - Drum Unloading Sump Pump.
' Pump has 3 position control station located at motor.
Position 1 - Manual - pump runs continuously. Position 2 - off - pump stops.
Position 3 - Auto - pump starts upon high level ` in sump (I.S-119-1 closes) , pumping continues un
til low level is reached (LS-119-1 opens) stop
ping pump.
HUNS 095398
SB.C7: O/0-Z. --0 Page 11
1-120 - Incinerator Floor Drain
Same operation as 1-119. for LS-119-1.
Substitute LS-120-1
1-121 - Aroclor Sump Pump
To start depress start pushbutton, motor will seal-in if sump is above low level (LS-121-1 closed). When sump reaches low level pump will stop (LS-121-1 opens). To operate pump below low level depress and hold start pushbutton.
Alarms
.
The following conditions will sound alarm on burner con trol panel.
a. Flame failure (Honeywell safeguard).
b. Low level quench pot PS-12.
c. High level quench pot PS-11.
d. Low level city water break tank PA-126-1.
e. High Aroclor level Aroclor sump (LS-121-1) .
f. Low flow city water (FS-127-2).
(<* MONS 095399
Item K~j-r.ber
PS-6
PS-7
PS-9.1
-
PS-S
FS-10
FS-38
FS-37
FS-127-2
TS--15.1
TS-4 & TS-5
TS--15.2
PS-9.2
BE--1
LSO-65 LSO-73
'
LSO-67 LSO-68
NAME
INTERLOCKS INCINERATOR
FUNCTION .
High Gas Pressure Low Gas Pressure
Complete Shutdown (when using gas only) Complete Shutdown (when using gas only)
j
Low Fuel Oil Atom. Steam Pressure Complete Shutdown (when using oil .only)
Low Fuel Oil Pressure
'
Complete Shutdown (when using oil only)
Low Combustion Air Flow
Complete Shutdown
Low Contractor Water Flow
Complete Shutdown, Opens SV-64, Stops Blower
Low Venturi Water Flow
Complete Shutdown Stops Blower
Low City Water Flow
Complete Shutdown, Stops Blower, Starts Fire Water
High Incinerator Temperature
Complete Shutdown, Opens SV-64.
'
High Quench Pot Temperature
Complete Shutdown, Opens SV-64.
Low Incinerator Temperature
Stop Waste Pump Closes FCV-SO.
Low Waste Atom. Steam Pressure
Stops Waste Pump, Closes FCV-80.
Flame Scanner Pilot Only
Complete Shutdown
Gas Valve Limit Switches
Start Low Fire Timer (Gas)
Oil Valve Limit Switches
Start Low Fire Timer (Oil)
SECT. 0 /0
HONS 095400
IV. OPERATING IN5TRUCTIONS
1. Pro-Startup Checkout
Before feeding waste liquid to the oxidizer, the unit must be
brought up to operating temperature using auxiliary fuel
'
(natural gas or fuel oil). The auxiliary fuel is also re
quired to maintain operating temperature when burning waste.
The following pre-startup items should be checked before pro ceeding with initiating the startup procedure:
1. Well water and city water prmips are operable, well water pump suction valve is open and the valve between the city HjO break tank and the selected city water pump is open.
2, Electrical power is on to the control panel.
3. Instrument air is on and regulated at 20 psig.
4, Pilot gas manual valves are open, except last valve at
the burner.
,
5, Main gas manual valve, 73 at the burner is closed. 374"
Other main gas manual valves are open.
.6 Fuel oil manual valve^ at the burner is closed. Also
atomizing steam manual valve 70 at burner is closed.
17?"
All other fuel oil and atomizing steam manual valves are open.
7. Waste liquid manual valve _74 at .the burner is closed. 1"
Also atomizing steam manual valve 7_4 at burner is closed. , 1"
Manual valves at the incinerator feed pump (Item 1-104) suction and discharge should be open. Atomizing steam
supply valving should be open.
0. Manual reset safety valves, SV-65 on the main gas; SV-67 on the fuel oil are closed.
9, Fuel gas, fuel oil, atomizing steam and instrument air supplies are available at the required pressures:
Fuel gas - 30 psig
-
Fuel oil - (10 psig (minimum)
Atomizing Steam - 100 psig (minimum)
M0NS 095401
SEcr
Page 14
10. Set incinerator feed pump speed for desired waste feed rate (1250 lb./hr. Design, 400 lb./hr. minimum.
11. Shutdown pressure, flow and temperature switches are set at the following values:
3000f when burning Aroclor
< 2200 F when burning Montar
Oxidizer Low Temp.
- 1600C>F
(TS-4 & TS-5) Quench Pot Hi Temp. - 220C>F
(PSL-7) Low Fuel Gas Pressure - 7 psig
(PSH-6) Hi Fuel Gas Pressure
- 35 psig
(PS-8) Low Fuel Oil Pressure
- 7 5 psig
(PSI,-9) Low Atomizing Steam Pressure
- 90 psig
(FS-10) Low Combustion Air Flow - By John Zink
(FS-38) Low Well water Flow to
Contactor Tube
- 50 GPM
(FS-37) Low Recycle Flow to Venturi
- 50 GPM
(FS-127 -2) Low City Water Flow to Contactor Wier
-
7 GPM
2. Oxidizer Heatup Procedures
.
' When the oxidizer is brought on-stream for the first time a 40-hour heatup period is required in order to cure the
refractory properly and prevent damage. (See Page 4A of
the attached Appendices).
Subsequent heatups after the oxidizer has boon shut down
and allowed to cool require a 16-hour heatup period.
(See rage 411 of the attached Append! es) . Page 4D also
describes the heatup procedure when restarting the oxi
dizer after a short shutdown before the refractory has
completely cooled.
a
HONS 095402
S.7' 0/0 2 --00 Page 15
3. Normal Operation
Startup
1. Open discharge valve at well water booster pump
,
(Item 1--13.2) and start pump. Other well water valves
should have been previously arranged for proper flow
to the contactor tube sprays and the scrubber water
distributor.
Adjust flow through rotameter FI-87 for 60 GPM. (This can be slightly higher, but not lower.)
2. Turn on master power switch on the control panel to activate the system. The RED "Low oil Pressure" light, the RED "Flame Failure" light, the WHITE "Power On" light, and the RED "Quench Pot Low Water Level" lights will be lit. The remote flame failure alarm and panel alarm horn will be energized.
3. Depress "Alarm Silence" button to cut off alarm.
4. Start city water pump. Open discharge valve at city water pump (Items'1-127 or 1-132). Other valves should have been previously arranged for proper flow to the contactor tube weir and the oxidizer auench nozzles if preparing to burn Montar. (When burning straight Aroclors, water flow to the quench nozzles should be shut off and steam flow initiated to pro tect the nozzles.)
5. After liquid levels have been established in the quench pot and packed scrubber, start the scrubber circulating pump (Item 1-106) valves should have been previously arranged for proper flow.
Quench pot level is maintained by level control LS-92. . packed scrubber sump level is maintained by a trap
. leg in the outlet piping.
6. Start combustion air blower. The butterfly valve in the blower discharge line should have been preset to
. provide a flow rate to maintain approximately 25%
excess air to the oxidizer. Since the oxidizer will normally operate at design rate (1250 lb. waste/hr.) the combustion air Flow setting will remain constant
once it has been set. In order to be certain a fuel rich mixture is avoided at all times .air flow should bo Mif f 1.ci on t to cover maximum auxi liary fuel rate. A eombuuU oil gas analysis can be made, once in operutiun, to cheek percentage excess air.
MQNS 095403
SBC77
Page 16
Depress RED reset button on the "High Quench Pot Temperature" switch.
Turn the TRC switch on the control panel to "ON", push RED button on TRC until position meter reads 0%
(This is percent opening of the main fuel gas control valve) - Check Leeds and Horthrup TRC instruction booklet for details.
If all shutdown conditions described in Paragraph 11 of the Pro-Startup checkout are satisfied, startup may proceed.
Depress "Purge Start" button, .lighting the BLUE "Purging Light" and energizing the Purge Timer. (3 minutes). After timing out, tho AMBER "Purge Complete" light and WHITE "Relay Hot" lights come on and the BLUE light goes out. Power is now avail able to the burner system.
Allow a minimum of 10 seconds for the "Flame Scanner"
to warm up, then Open The Manual Pilot Gas Valve At
The Burner.
'
a. Firing on Natural Gas
12. Turn gas-oil-gas & oil selector switch to GAS. Be sure manual valve on the Main Gas Line is closed at the burner.
13. Depress the "Ignition" pushbutton.
14. If the pilot flame is established within 15 seconds, the GREEN"Pilot Proved" light is lit and the RED "Flame Failure" light goes out. Release the "Ignition" button imme diately when the GREEN light comes on. If depressed more than 15 seconds, the purge
cycle will have to be repeated.
15. When the Flame Scanner picks up the pilot flame the GREEN "Gas Burner Ready" light comes on.
16. Manually latch OPEN the first Main Gas Manual Reset Valve SV-65.
17. Also open the manual valve in the main gas lino at the burner. When both of these valves are ojo. n the Lev Fire Timor starts.
MBNS 095404
SBct, a/c.7*'.--da Page 17
18. When the Low Fire Timer times out. Latch "Open" low fire manual reset solenoid SV-60 on the air output line.
19. With the TRC on manua^ slowly bring oxidizer temperature up to 300 I' by depressing the YELLOW button on the TRC. Adjust the set ' point indicator until it aligns with the in dicator point.
20. Switch the TRC to "Automatic". The set point should now be advanced in accordance with the appropriate Oxidizer Heatup Procedure as described in Pages A- and A- of the Appendix.
21. When the temperature reaches the operating ' point (2000F for burning "Montar", 2800F
for burning Aroclors) the feeding of waste material can begin.
NOTES:
a) Somewhat lower temperatures may be adequate. This will be deter mined during initial operation.
b) For operating temperatures up to and including 1600F, the temper
ature sensor is thermocouple (Item 18). For operating temper atures above 100F, up to and
including 2800F, the sensor is the Leeds and Northrup Rayotube.
There is a 3-position selector switch on the control panel marked TC- LO RAY & HI RAY. This switch should be setQon TC when operating up to 1600 F, LO RAY from 1600F to 2000F and
HI RAY from 2000 F to 2800 F.
c) Before advancing the TRC set
point beyond 2000F, the thermo
couple which is located in the
north end of the oxidizer must
be physically removed since it
would be damaged by the higher
temperatures. Turn on purge air
at thermocouple well before re
moving to prevent hot gases es
caping.
'
d) Tiie oxidizer temperature must be above 1600F for waste material feed to flow.
MONS 095405
sncr: <7/07. - o'J Page 18
.22 De sure the .manual valve on the waste feed line at the furnace is closed. Then open the manual atomizing steam valve at the burner. Pressure on the gage should be 100 psig.
23. Depress the "waste start" pushbutton on the panel. This opens flow control valve FCV-80 in the waste line and makes waste liquid available at the manual valve.
24. Start waste pump.
25. Slowly open the manual valve admitting waste to the burner.
Firing on Fuel Oil
First eleven (11) stops are the same as when start ing up on natural gas.
12. Align fuel oil valves at storage tank (Item 1-114) and pumps (Items 1-115 or 1-123) for pumping to the oxidizer. Manual shut off valve at the burner should be closed.
13. TURN GAS-OIL-GAS & OIL selector switch to OIL. The AMBER "Fuel Oil Ready" light will come on. Oil pressure and atomizing steam pressure must
. be OK before switching or purge will reset.
14. Repeat steps 13 and 14 for "FIRING ON NATURAL GAS", to light and prove the pilot.
15'. When the Flame Scanner picks up the pilot flame the AMBER "Fuel Oil Ready" light comes on.
16. Start fuel oil pump. Then open manual valve at the burner admitting atomizing steam to the fuel oil burner. Pressure on the gage should be 100 psig. Steam must be on to satisfy startup conditions.
17. Manually latch OPEN the Manual Reset Fuel Oil Valve (SV-67) .
18. Open (die manual fuel oil valve at the burner. This activates the Low Fire Timer (2-TR) .
MONS 095406
O'/O'Z. ~t?cJ Pago 19
19 Repeat steps 19 thru 24 for "FIRING ON NATURAL GAS". Manually latch "OPKN" Instru ment Air manual reset fuel oil solenoid SV-61
on the air. output line from the 'l'RC. This makes oil available to the burner.
20. .
Combustion air must be manually adjusted to insure proper air-fuel ratio. The regulating butterfly valve should be set wide open initi
ally to assure excess air then adjusted in operation from exhaust gas analyses.
4. switching Auxiliary Fuels With Oxidizer in Operation
There are several ways to accomplish this. Method Ho. 1 (This is the easiest method and presents no danger of los ing temperature control of the oxidizer.
Switch From Natural Gas To Fuel Oil
1. Stop waste flow to burner by depressing WASTE STOP button.
2. Open the manual valve at the burner admitting atomiz ing steam. Set pressure at 100 psig.
3. Turn GAS-OIL-COMBINATION selector switch to COMBIN ATION position.
4. Be sure fuel oil pump is running and valving is set to deliver fuel oil to the burner. The manual valve at the burner should be "closed". Must have steam to PSL-9 also.
5. Manually latch OPEN the Manual Reset Fuel Oil Valve (SV-67) and open the manual fuel oil valve at the burner. This activates Low Fire Timer (2-TR).
6. When the timer times out the fuel oil starts feed to the burner. The oxidizer is now burning both Gas and
Oil.
7. Turn 3-WAY selector switch to "OIL". The AMBER "Fuel Oil Ready" light will come on, and natural gas flow will shut off. The oxidizer is now operating on OIL only.
8. Reestablish waste flow by depressing the WASTE START
button.
'
y. Close manual valve in naLural gas line at the burner.
MONS 095407
SC.a7r a/& 2. --ao Page 20
Switch From Fuel Oil To Natural Gas
1. Stop Waste flow to burner by depressing WASTE STOP button.
2. Turn GAS-OIL-COMBINATION selector switch to the COMBINATION position.
Check that the manual main gas valve at the burner is closed.
3. Manually latch OPEN the main gas Manual Reset valve SV-65. Also open the manual valve in the main gas line at the burner. When both these valves are open, the Low Eire'Timer 3tarts.
4. When the timer times out, latch "Open" low fire manual reset solenoid SV-60 starting gas flow to burner. The oxidizer is now on both GAS and OIL.
5. Turn 3-WAY selector switch to GAS. The fuel oil will shut off. The oxidizer is now operating on GAS ONLY.
6. Close manual fuel oil valve at the burner.
7. Close manual atomizing steam valve at the burner. 8. Shut off fuel oil pump.
Method No. 2 The switch can also be made from Gas to Euel Oil or Fuel Oil to Gas without using the (COMBINATION) position. However, there will be a period where there would bo no auxiliary fuel flow, which could result in a loss of temperature control if the operator delayed too long in making the switch.
5. Normal Shutdown Procedure
'
a. For Extended Downtime
1, Shut off flow of waste liquid to the oxidizer by depressing '"WASTE STOP" pushbutton on control, panel which closes valve FCV-BO in waste feed lino.
2. Close manual waste shut off valve at burner.
3`. The waste feed pump stops automatically when
FCV-GO closes.
'
4. Reduce a Lem.i zing steam flow to the waste burner (allow small flow to keep gun cool).
HONS 095408
oi<?z.-oa Page 21
5. Decrease oxidizer temperature gradually to 1000F
over a 2-hour period by periodically lowering the TKC set point.
6. Hold at 1000F for 30 minutes.
7. Close the fuel gas (or fuel oil) manual shutoff valve at the burner.
8. Close the manual atomizing steam valve at the burner if firing on fuel oil.
9. Cut back on combustion air flow by throttling butterfly valve to lowest position. Keep blower
running until the oxidizer temperature drops to 50DP. Then shut blower down.
10. Shut down fuel oil pump if running on fuel oil.
11. Shut off well water and city water to the system,
and shut down water pumps. Drain trapped piping
legs in winter.
12. Turn "Master Power Switch" on panel to OFF.
5. Normal'Shutdown Procedure
b. When Preparing For Short Term Downtime
1. Shut off flow of waste liquid same as for extended shutdown.
2. Close manual waste shutoff valve at burner.
3. Decrease oxidizer temperature to 1000F in 2 hours as for extended shutdown.
4. Allow unit to operate at 600 F on auxiliary fuel until ready to resume feeding waste liquid, if expected shutdown is 24 hours or more. Operate at 100QF if expected shutdown is less than 24
hours.
6. Resuming Operations After Short Term Shutdown
1. Advance TKC set point as follows:
SOOF to 1000"f - 30 minutes 1000F to 1200F 1200F to 1400F - 60 minutes MOO F to 1000 I:' - 60 minutes
If operating temperature required is about 2000 F allow an additional 60 minutes for each 200F increment.
M0NS 095409
'J'scr; oi02.~oJ Page 22
2. Open manual atomizing steam valve to the waste gun at the burner.
3* Depress the "Waste Start" pushbutton on the panel. Also start waste feed pump.
4. Slowly open manual waste valve at the burner. The oxidizer is now back on stream.
7. Emergency Shutdown
To shut down and render the wnit safe in any emergency situation such as a minor explosion, runaway oxidizer temperature condition, etc., cut electrical power to the unit by, .
1. Turn off "Master Power Switch" on control panel.
On loss of power all controls go to a fail safe condition as follows:
Main Gas
- Close and vent
Fuel Oil
- Close
Pilot Gas
Close and vent
Waste Liquid - Close and pump stops
Combustion Air Blower - Stops
Quench Pot Level Control Valve - Closes
Water Supply - Fire Water Starts.
If prevented from reaching control panel throwing
the disconnect at
will accomplish the
same results.
2. Close manual shut off valves on natural gas, fuel oil and waste liquid. The waste feed pump will stop automatically when waste feed is shut off.
V.' SAFETY
Aroclors have very low vapor pressures and do not constitute a fire or explosion hazard.
Some of the returned Aroclors will bo contaminated with sol vents. The following precautions have been taken:
1. The she].ter at the drum dumping sump has open wall areas to disperse any fumes quickly. '
2. The i lumedioLe dumping area li.v* a Class .1, Croup l), Division 1 electrical classif ica:.j.on.
3. The storage tanks will be blanketed with nitrogen. MONS 095410
se~c-77 o/a^-aa Page 23
Storage tank filling lines are provided with dip pipes to pre vent static charges. A weak seam on the north end of the oxidizer has been in corporated to provide explosion relief for a major explosion. FXA type safety approved combustion safeguards and process interlocks have been incorporated. Main well water and back-up city water quench and cooling systems are-on separate power feeders. In addition, a tie-in has been provided to the WGK plant firewater system if a plant-wide power failure shuts down both well water and city water pumps. All possible precautions must be taken to prevent escape of PCUs to the environment. Design has provided:
1. Curbed and sumped incinerator area. 2. Settling and separating basins. 3. Multiple scrubbing of incinerator combustion gases.
MQNS 093411
..oftsr.ir.g Point (ASTK E-23-51?)
Acidity
.
Chlorine Concent .
CaO
'
Fe
Benzene Insoluble
Plash Point /
restricted information
Moncars 1 ar.c 2 are the still residues from distillation of iroclors 1242
and 1248 respectively. Composition of these. Mor. cars la not controlled, bo it;
entirely dependent on conditions required to make acceptable cisoil-ed
product.
.`
Monter l 6--C-, - CC1 - 04 i 03/09 Moncar 2 o-.-li - CC2 - .04 - 03/0
f r< *
xrr-os^eo
W* .-l w * * -- - J -->
iMZL-ikzg?ji C.
""-v-- ------
BE~H
-iv-CUjSL;.
::G:
. w'
MONS T^r
4
",*' ,""t \..-f c* m ,w<*."r v. '- --1 /"'
wav-v*
- ............ ...
arcclor
'
\ O *'`*.. - *;* r? 'mm.
r trt ".
UZLt.3L
;.jJBtfy Z-?
_r
'.
..'!
i: .: >-
r. '
7.*r - ~ -.
r.-=
i >a- a? ._
C;'L^C:-.
' - v - i^cs ' ' ; * i . . c i ~
. ________ ____________________ : ______________
^........ ............................... i
_______ -
.
-
... _ ;
.
- yr. p, -
c:\.." # 5/ ij.rC. ,!i ;
0::;;::U-a: :;::...:cn .'i-ii'C
. v 'A C .
s... .
ini:; ;v v
<W^.i
_ ____
: ; .* y*. i.:'- - :. i;
1.
2
... '
!
7?c ... A
r^ ^ _<
. . .. '.'7.
:
- =
' . 1 :. ; : ............
vif'c-:r, <'>,}
o
CfTcc.
fi'- ' 1 ^ - %' q" (f) ' ^ tiVi.t- l-V.-ci;.'-;' W i0-c.
r,;.i;A' Ci-v.'/ C.o.c.
Fio
c.o._.-.
\ r* ~~ .T .
,-r
- I-; .
/; C ' cc_______
|
' 1
:.^c.
_ Ncr.c-
__
*::: * : 1
i -fr-.:./--/.-.;-.i
.l y... .i v-t c:.;::rr>. w. ' SC.
,V v --
f*r
.
^ ..
! )
o.
'4..J ' '
C. '
-?. '
. i
'
1
1
'/.
*
:
, '
. i., ,
'
' ..
>.gp^ .y:-.3.fCislsluraJ^rjal V-
...: Ls*i- -
v.. -V '
: \
-7L1. C"'..-. :..c-v
..
......
"___________ r. I -~
. ;. -
.
-V- '
....<.......... -
..
~^EEzmnznz SE^7lOm-ao^
'
3~~T
^iw.
il'i-iL
-1;,;.
J.Z_
? v .: . ri!L
HONS 095416
/IH'BffDIX
....................... ...
. S_C.T7<}A/ 0I02.-CC
V-.. :.;i
;c\\
cr v
ov
j 2 c. -:o
,f r ; '.'iy . v. . . *; *
:v.:. c.:
iii. :.
^
i ,
2y\z:. .-.c/
K;:\r; '';d R;.-<p He.':;: '
MONS 095417 L
/4f<* Fmp7x
jre_ct; 0/0 2.-00
.' i:: 'cc ;/ :.
' .; : //-O'cv 20 r:0'./:;s , crncO/.X.' 0..;r& Oh: -;-'.yar :.v.;:'c ' OX "
OX'.; -.X .: "c;.////-/
0 On;//. S/;,:/; .. :r- OOOO.V.
: :
Or; c./X X Or/rox.: ;; . .. ' '. /-nr : '/.: Or.- '/Xx..
On;-';,; `X 00.'-'.-'. Ox;/ s. cr.e h:/- - . X'X/X. .. Ore/: ; : /;. 00.X '
Xxi/X Onx-on;:; 0/ 0000 - 5.
re./- `xX;:. X. .
Or.;/;.;;.? XXC'5. ever t cm he./
5/nrXi;On;.. ./ 0; 25000 /X
; crx nr./ c/rOod. G/cc/sHy Or.;/::;- _0.-O.2~'.-. ever ; one
:;:/0c...
MOWS 095418
Jlohn
A DIIiI
' JO b-Ii Psl
'SeCK <716 2. ~oa
PoSEu'Sion Resear^
4401 SOUTH REOfl'
March Id, 1970
AIRMAIL
.
Monsanto Company 800 North Lindbergh Blvd. St. Louis, Missouri 63166
Attention: Mr. Art Pier, Central Engineering
Gentlemen:
Enclosed you will find' a table of the data that resulted from
the tests thatwe ran for you on March 10. lie managed to com
plete all nineof the tests that you asked for, finishing about
9 o' clock that night.
The Aroclor 1260 burned very nicely, but it did require a bit more fuel thanthe other two wastes in order to burn with a nice stable vortex. We also had no trouble at all pumping and hand ling the Aroclor 1260 once we had the pipes and gun parts hot.
The residence times we ended up with are in a very good range for comparison with analytical results. I feel these results will give us a good idea of what we need in the way of residence time in a commercial size unit in order to assure complete de struction of the waste material. I feel that the tests were quite sucessful and I hope you find the results useful.
If you have any questions about the tests or any future questions about the commercial size equipment involved, please feel free to call on us.
Yours truly
JOHN lINK COMPANY
AICP,:slc enclosure
A. Kim Reyburo
HONS 095419
Results of Thermal Oxidizer Tests Conducted for Monsanto on March 10, 1970
Haste Rate (com)
PROCLOR 1242
1600 F 1800 f 2000 F
0.94
1.00
0.89
INERTEFNPPO________
lfinnu F 1R00U F
F
1.03
1.03
0.84
APOCLOP 1260
1800 F 200o F
0.85
0.85 1 0.92
Fired Fuel Rate (Ctu/Hour)
0.5Vmn 0.62mm 0.97mm
1,95mm 2.15mm 2.4mm
3.4mm 4.0mm 4.3mn
Quench Water Rate (qpm)
2.3 1.8 ____
Stack Gas
Combustibles (vol. ?)
n.n
0.0
0.0
Excess Og (vol. %)
3.8 4.0 4.0
2.5 1.8 0.15
0.0 0.0 0.0 4.2 4.2 4.5
2.6 1.9
0.0 0.0 4.0 2.5
--
0.0 3.0
Gun Type
R RR
R P. R'
EA865 EA865
EA865
Residence Time (sec.) First Point Second Point Third Point
0.64 1.71 _ 2.61
0.57
1.52 2.32
0.67 1.78 2.71
0.58 , 0.56
1.56
1.48
2.37
2.26
0.76
2.04 3.10
0.52 1.40 2.13
0.51 1.35 2.06
0.51 1.36 2.07
Pressures (psia) ' Fuel
Waste Steam
cl <1 <1 9(1 85 85
95 92 91
<1
<1
<1 : i.5 2.5
3.5
100 95
85
97 100 95
no 104 94
125 124
124
Pressure (in. w. c.) Combustion Air
. 8.5 8.7 9.2
8.7 8.9 8.9
11:3
11.3
11.3
| Equipment: Horizontal Oxidizer with HI-10 Burner I
Personnel: Monsanto |
i i John Zink Co. ! i
Art Pier, Central Enqineerino Jeff Maldbeser, Central Ennineerinq Scott Tucker, Ornanic Chemicals Research
Bill Papaneoroe, Manaeer, Environmental Control A. Kim Revhurn, Pollution Control Gene McGill, Pollution Control Sam Napier, Test Furnace
HUNS 095420
Co
to
r>
N
HONS 095421
,r
Cbmtral
` iMIHItMtNt
Obpajitmbnt
PLANT-----------------------
DIVISION ...
Sect: o/az^-ao
SHBBT .... OP
VIEW
/ \\
/ 2? \ H O ~0
.
MONS 095422
....... ^ ^ '*>/y <Scsr. 0)o?-
Wilson Wright, I .nc < petroleum laboratories
BOX 2326
TULSA, OKLA. 74101 ...... 910 LU 4-6Q60
j W. HASKELL
John Zink Company P. 0. Box 7380 Tulsa, Oklahoma 74105
March 16, 1970 File 1142
.I
Attention! Mr. Gene McGill
Gentlemen: .
`
-
_
~
The following pages will report our sampling during the 9 oxidation tests using 3 Monsanto materials, on March 10, 1970.
The sampling was done following instructions given in our discussion with Mr. Art Pier and Mr. Jeff Waldbeser on March 9, 1970, and with Mr. Scott Tucker and Mr. Bill Papageorge during the test oxidations on March 10, 1970.
The liquid samples obtained were packaged in oil absorb
ent material and styrene beeds. The boxes were crated and
sent to Mr. E, S. Tucker, Monsanto Company, St. Louis, Mo.
on Friday March 13, 1970 by motor freight.
J;'
Six of the gas samples were analyzed. The remaining gas samples will be destroyed unless you request otherwise.
We enjoy serving you.
Yours truly
CCW:jw
Clair C. Wilson u
H. i'C. Ui.v.l
.. j . .r t- - i .:
(
MONS 095423
' vj *:
Jcc-t; o/cT2. - aa
WIlson-Wright, Inc. PETROLEUM LABORATORIES
BOX 2526
TULSA, OKLA. 74101
,918 LU 4-6060
7 W. HASKELL
JOHN ZI iIK COMPANY
EQUIPMENT
THERMO-0XIPTZER . , ;^
File 1142 March 10, 1970
Three quartz sampling tubes, 3/4 inches outside diameter by 6
feet long were made and .turned down 4 inches into a 2 8 x 15
-
Ground Glass ball joint. This jointed onto the inlet tube of
the pyrex gas scrubbing absorber. This absorbing bottle was
kept in a water bath.
. . . .r-
; .. i-
'
The gas was drawn through tygon tubing into the second gas absorp
tion tube; through a gas sampling tube and metered with a dry test
meter. Laboratory vacuum pumps were used to draw the gas through .
the sampling train.
.
.
PROCEDURE
.
..........
.
t. . . . .
WS. -y
Two of the quartz sampling tubes were inserted to the centerline
of the thermo oxidizer. The third tube was inserted until its
tip was even with the centerline of the exhaust stack. The samp
ling tube was connected to the primary absorber which had been
'
filled with 175 ml of 2 N Sodium Hydroxide solution. This was
then connected to the second scrubber which had been filled with
sufficient AR Grade Toluene to cover the sintered glajs tube. The
gas sample tube was connected in and the vacuum pump started.
Approximately 1 cubic foot of gas sample was drawn through the train in 8 minutes. The gas sample tube and train disassembled.
The caustic solution in the primary absorber was poured into a
glass, bottle and the absorber rinsed three times with distilled
water into the glass bottle. The absorber was then rinsed with
toluene and this rinse put into a second glass bottle. The toluene
solution in the second absorber was poured into the second-glass
bottle. The absorber was rinsed twice with toluene into this second
bottle.
. ........... j - ..
The quartz sampling tube was rinsed with water and poured into the caustic sample. The quartz tube was next rinsed with toluene and this poured into the toluene sample.
MONS 095424
<secr> o/a-2_-0a
Wilson.-Wright. Inc, PETROLEUM LABORATORIES
BOX 2526
, TULSA, OKLA. 74101
918 LU 4-6060
7 W. HASKELL
Monsanto Company
JOHN ZINK COMPANY
TltERM-OXIVUER
File 1142 March 10, 1970
, On the first run, the quartz tube could not be put in the second
j sampling point. A stainless steel tube 1/2 inch outside diameter
| was used, and this sample taken after the other two samples had
. been taken. The stainless steel tube was deformed by the heat and
was approximately 8 inches below the centerline. The quartz tube
at the first point also was deformed by the heat. It was broken
by its forced removal through the sampling port. On succeeding
runs, the quartz sampling tubes were inserted until the tips were
24 inches from the thermo oxidizer center line.
A stronger cuastic, 2 N was used after the first two runs. The washing of the sample tube was done after the third run. The caustic scrubbers were washed with toluene after the fourth run.
Throe materials were oxidized at three different temperatures. Gas
in the oxidizer was sampled at three different points. Twenty-seven (27) samples of each; caustic, toluene, and gas were taken, a total
of 81.
..
^y
The toluene samples were put in a polyethylene bag. This was packed"
into an oil absorbent material. The caustic samples were put in a
polyethylene bag and packed in styrene beeds.
.
I Three of the gas samples, runs 2, 5 and 8, at sampling point 2 were
analyzed and are reported. These are only indicative of conditions
j as the water vapor and some of the carbon dioxide have been deleted
from the sample.
.
The chloride content of three other.gas samples were measured to
check the efficacy of the scrubbing train. No chlorides (less than 10 ppm.) were detected in these samples.
The metered gas volumes were corrected for temperature and pressure to standard cubic feet at 60*F. and 14.7 psia. This was multiplied
by 1.196 and reported as gram mols of gas.
MQNS 095425
Scr 0/42.-04
Xt
Wilson- Wright, Inc. PETROLEUM LABORATORIES
BOX 2526
TULSA, OKLA. 7410)
918 LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
THERMO-OXIDIZER
'
Company: Monsanto
File No., 1142
Material: Aroclor 1242
.
Date: March 10, 1970
Barometer in. Hg. 29.38
Burn Temp. *F. 2000
, Ambient Temp. *F. 46.
RUN NO. 1
Sampling Point Inches from center line
1 2* 3 , o** 0** 8
inches from stack center plane
0
Scrubber solution, milliliters
First: AR Sodium Hydroxide 1 N.
175
175 .
175
Second: AR Toluene Malenkrodt
50 135
50
Meter Number
3 14
Calibration Factor
0.965
0.995
1.013
Initial Reading Cu. Ft.
0.000
0.000
0.000
Final Reading Cu. Ft.
- 1.052
1.294
1.365
Temperature "F. Vacuum millimeters Hg.
51 64 49
30 64 125
Absolute Pressure mm.Hg.
716 726 621
Gas Metered, Gram Mole
. 1.123 1.481 1.294
* Made about 10 minutes after other samples were taken
using a stainless steel probe
'
** Deformed by heat
m
MOMS 095446
rT ' N#
0 0Seer. / -3.-00)
Wilson-Wright. Inc. PETROLEUM LABORATORIES
BOX 2526
TULSA, OKLA. 74101
91B LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
THERMO-OXIDIZER
Companyt Mon s an to
File No. 1142
Material: Aroclor 1242
Date: March 10, 1970
.
'
Darometer in. Hg, 29.38
Burn Temp. *F. 1800
. Ambient Temp. *F. 46.
' RUN NO. 2
Sampling Point
123
Inches from center line
24 24
8
Inches from stack center plane
0
Scrubber solution, milliliters
First: AR Sodium Hydroxide 1 N.
175
175
175
Second: AR Toluene Malenkrodt
50 135
50
Meter Number
314
Calibration Factor
0.965
0.995
1.013
Initial Reading Cu. Ft. Final Reading Cu. Ft.
0.000 1.093
0.010 1.002
0.000 1.102
Temperature *F.
53 62 53
Vacuum millimeters Hg.
30 52 130
Absolute Pressure mm.Hg. Gas Metered, Gram Mols
716 1.171
694 1.069
616 0.968
V
MGNS 095447
vSCT~. 0/0 -3.-00
Wilsan-Wright. Inc. PETROLEUM LABORATORIES
BOX 2326
TULSA, OKLA. 74101
918 LU 4-6060
7 W. HASKELL
JOHN ZlilK COMPANY
TffERMO-OXIPIZER
Company t Mons anto
File No,. 1142
Materiali Aroclor 1242
Date: March 10, 1970
'
Barometer in. Hg.
29.34
Burn Temp. *F. 1600
Ambient Temp. F.
50
RUN NO. 3
Sampling Point
1 2 2.
.Inches from center line
.24 -24
8
Inches from stack center plane
0
'icrubber solution, milliliters
^First: AR Sodium Hydroxide 2 N.
175
175
175
Second: AR Toluene Malenkrodt
Meter Number
*
,50 3
.50 14
Calibration Factor
0.965
0.995
1.013
Initial Reading Cu. Ft.
0.000
0.000
0.000
Final Reading Cu. Ft.
1.100
1.015
1.099
Tempeiaturet *F.
52 58 52
Vacuum millimeters Hg. Absolute Pressure mm.Hg.
.52 . 693
52 693
135 610
Gas Metered, Gram Mols
1.139
1.096
0.957
I
m
MONS 095428
- A
Sb.ct. eta 2-e>a
I ,/ Wilsan-Wright, nc petroleum labdmtohies
BOX 2526
TULSA, OKLA 74101
918 LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
THERMO-OXI01ZER
Companyi Monsanto Material: Inerteen PPO
Burn Temp. *f. 2000
RUN NO.
Sampling Point 1 Inches from center line
inches from stack center plane irubber solution, milliliters !' First: AR Sodium Hydroxide 2 N.
Second: AR Toluene Malenkrodt
Meter Number * Calibration Factor
Initial Reading Cu. Ft. i Final Reading Cu. Ft. j Temperature *F. 1 Vacuum millimeters Hg. ! Absolute Pressure mm. Hg. ; . Gas Metered, Gram Mols
File No. 1142 : 1* `
Date: March 10, 1970 .. Ja
Barometer in. Hg. 29.34
Ambient Temp. F. 48.
12 24 24
3 8^
0
175 50 3 0.965 0.000 0.998 53 42
703 1.050
175 135
.1' 0.995 0.000 0.991 62 62 683 1.063
175 50 4'
1.013 0.000 ll092
53 138 607
1.042
!
i
i
MONS 095429
j.
Seer 0102.-00
W 5 > W , I ./ il bn right nc petroleum laboratories
BOX 2526
TULSA, OKLA. 74101
918 LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
TtfERMO-OXZPIZER
'`
Company!
Monsanto
File No. 1142
Material: Inerteen PPO
Date: March 10, 1970
;
i
Burn Temp. *F.
I
1800
. Barometer in. Hg. Ambient Temp. *F.
RUN NO. 5
29.36 46.
Sampling Point
Inches from center line
Inches from stack center plane
Scrubber solution, milliliters First: AR Sodium Hydroxide 2 N.
Second: AR Toluene Malenkrodt
Meter Number Calibration Factor
Initial Reading Cu. Ft.
Final Reading Cu. Ft.
'
Temperature *F.
Vacuum millimeters Hg.
Absolute Pressure mm. Hg.
Gas Motored, Gram Mols
1 24
175 50 3 0.965 0.000 1.000 51 42
704 1.050
2 24
175 13 S
1 0.995 0.000 1.005 61 51 695 1.095
3 8 0
175 50 4 1.013 0.000 1.084 53 138
608 1.03S
m
MQNS 095430
> S.cr: 0/a z. -a a
WiLseN* Wright, Inc. PETROLEUM LABORATORIES
BOX 2526
TULSA, OKLA. 7410)
918 LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
THERMO-0XIPJZER
Company)
Monsanto
File No. 1142
Material) Xnerteen PPO Burn Temp. *F. 1600
Date: March 10, 1970 Barometer in. Hg. 29.36 Ambient Temp. F. 46 RUN NO. 6
Sampling Point
Inches from center line
. . .
Inches from stack center plane
Scrubber solution, milliliters
-
First: AR Sodium Hydroxide 2 N.
Second: AR Toluene Malenkrodt
Meter Number
Calibration Factor
Initial Reading Cu. Ft.
Final Reading Cu. Ft.
.
Temperature *F.
Vacuum millimeters Hg.
Absolute Pressure mm. Hg.
Gas Metered, Gram Mols
1 24
175 50 3 0.965 0.000 1.006 50 35
711 1.064
2 24
175 135
1 0.995 0.000 0.992 60 48 698 1.083
3 8' 0
175 50 4 1.013 0.000 1.085 53
140 606
1.033
MQNS 095431
*SE.cr: <?/ t?z. -a a>
Wilson-Wright, Inc, PETflDLEDM LABORATORIES
BOX 2526
TULSA, OKLA. 74101
918 LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
THERMO-OXIPIZER
Cpmpany: Monsanto
File No. 1142
Material:, Aroclor 1260
Date: March 10, 1970
Barometer in. Hg. 29.36
Burn Temp., *F. 2000
Ambient Temp. *G. 46
RUN NO. 7
Sampling Point Inches from Center line
12 24 24
3 8
Inches from stack center plane
0
Scrubber solution, milliliters
Firsti AR Sodium Hydroxide 2 N.
175
175
175
Second! AR Toluene Malenkrodt
50 135
50
Meter Number Calibration Factor
3 0.965
1 0.995
4 1,
Initial Reading Cu. Ft.
0.000
0.000
0
Final Reading Cu. Ft.
0.792
0.992
1
Temperature *F.
48 59 52
Vacuum millimeters Hg.
33 52 142
Absolute Pressure mm. Hg.
713 694 604
Gas Metered, Gram Mols
0.837
1.075
1
HONS 095432
0'SGcr, o/<7 z. - a i
Wilson-Wright, Inc. PETROLEUM LABORATORIES
BOX 2526
TULSA, OKLA. 74101
918 LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
THERMO-0XT VIZER
1 Companyt Monsanto 'Material! Arocior 1260
File No. 1142 Dates March 10, 1970 Barometer in. Hg. 29.38
Bum Temp. *F. 1800
Sampling Point | inches from Center line
Ambient Ta mp. * F.
RUN NO. 8 ,
1 24
2 24
46
3 8
Inches from stack center plane 'scrubber solution, milliliters I Firsti AR Sodium Hydroxide 2 N.
Second: AR Toluene Malenkrodt 'Meter Number
Calibration Factor Initial Reading Cu. Ft. : Final Reading Cu. Ft. Temperature *P. Vacuum millimeters Hg. ' Absolute Pressure mm. Hg. Gas Metered, Gram Mols
175 50 3 0.965 0.000 1.000 48 33
713 1.057
175 135
1 0.995 0.000 1.000 62 51 695 1.092
0
175 50 4 1.013 0.000 1.110 52
140 606
0.950
MQNS 095433
. ; s'g.cr, a/az.-
_Whsbn-Wright, Inc. PETROLEUM LABORATORIES
' BOX 2526
TULSA, OKLA. 74101
910 LU 4-6060
7 W. HASKELL
'
JOHN ZINK COMPANY
TUERM-OXIPIZER
,'ompany: Monsanto
File No. 1142
tatariali Aroclor 1260
Date: March 10, 1970
Barometer In. Hg. 29.40
lurn Temp. *F. 1600
Ambient Temp. F. 45
.
: RON NO. 9
' ' .1 :
iampling Point
. 123
Inches from center line
.
. v.l'L
Inches from stack center plane
.
24
24
8' 0
Scrubber solution, milliliters
First: AR Sodium Hydroxide 2N 1 :. ' second: AR Toluene Malenkrodt
175 50 ........ .
175 135
175 50
Meter Number Calibration Factor Initial Reading Cu. Ft. Final Reading Cu. Ft.
3 0.965 0.000 . 0.999
1 0.995 0.000 0.995
4 1.013 0.000 1.107
Temperature.-**.
48 5'9 52
Vacuum mlllJyfnra Hg. Absolute Pressure mm. Hg.
35 51 144 712 688 603
Gas Metered, Gram Mols
1.054
1.069
1.046
HONS 095434
W -W , I .ilson hight nc Petroleum laboratories
BOX 2526
TULSA, OKLA. 74101
918 LU 4-6060
7 W. HASKELL
.
. Monsanto Company
JOHN ZINK COMPANY
THERM0-OX1V1ZER
GAS ANALYSIS
File 1142 March 10, 1970
Component Hydrogen Carbon Monoxide Carbon Dioxide Oxygen Nitrogen Totals
Sampling Point 2 Sampling Point 2 Sampling Point 2
Run No. 2
Run No. 5
Run No. 8
Mol. *
Mol. t
Mol.
. 0.00
0.00
0.00
0.00
0.00
0.00
5.79
6.91
4.45
4.22
' 4.36
3.56
89.99
88.73
91.99
100.00
100.00
100.00
MONS 095435
............................
&&.C-T* a/ea. ~oa
John Zink Pollution Research
A Dlvlilon of
JOHN Zl
June 5, 1970
AIRMAIL
Monsanto Company 800 North Lindbergh .Blvd. St. Louis, Missouri 63166
Attention: Mr. Jeff Waldbeser, Central Engineering
Gentlemen:
Enclosed you will find a table of the data resulting from the test conducted by John Zink on May 19, 1970. The particulate analysis
from Wllson-Wrlght Laboratories Is enclosed along with a data sum mary sheet of tne Information taken by John Zink Company.
General Discussion The Aroclor 1260 burned well. We were able to reach the three de
sired temperatures of 2000 F, 2400 F, and 2800 F. The latter temperature was taken with an optical pyrometer as the range of our thermocouple went only to 2400 F. The Aroclor 1260 fed well at an estimated temperature of 180 F to 200 F.
The particulate reading for the Montars on the first run showed an abnormally high value as the filter plugged during the sampling
run and was not noticed until after the run was completed. The
other two readings of particulate showed good agreement. As you can see from the test data, we were unable to reach 2800 F with Montar*. We feel this was due to the high calcium content In the
name* Me would like to discuss with you further the possibility oCHnwaburner" unit, (rotary kiln or like equipment) to remove thuMctum product In the Montars. The residence times seem to
agAt well with our predictions. It was necessary to estimate the molecular weight of the Montars for theorectlcal combustion cal
culations.
When you have had a chance to look over the data and If you have
further questions, please do not hesitate to contact us. We hope
to discuss a complete thermal oxidation system for both these wastes
with you at your early convlence.
Thank you for the opportunity to serve you with John Zink equipment.
Yours truly
MOMS 095436
RESULTS OF THERMA' OXIDIZER TEST CONDUCTED FOR MONSANTO ON MAY 19, 1970 AT
JOHN ZINK COMPANY, TULSA OKLAHOMA
- ,, /
Aroclor 1260 - Calc PH = 369.34
Montars: Calc. Mi = 334.08 |
2000F
2400F
2800 F
2000 F
2400 F
2400/ F
Waste Rate (qpa)
1.16
1.05
0.884
0.981
0.785
1.178
Fired Fuel (mm Btu/Hr.)
2.92
2.44
6.65
3.40
4.75
3.60
Quench Viator Rate (gom)
1.51
0
0
1.30
0 0'
Stack Gas Combustibles (Vol.i)
Excess 0? (Vol.X) Excess ATr (Vol.?)
0 . 3.0
15
0 3.0 15
0 2.5 12
0 00 3.5 3.5 3.5 17 17 12
Residence Time (Sec.) @ Sample Point .
1
2 3
Tv94 1.73 1.14
2tT6 1.92 1.27
1t36.
1.21 0.80
-2x06. 1.83 1.03
1.76 1.16
1.51 0.99
Pressure (psig) Fuel Waste Steam Quench Water
1.5 1.0 100 102 125 125
35 0
2.0 95
130 0
1.0 5.0 1.0 95 90 "105 130 135 130
25 0 0
Pressure (in WC) Combustion Air
10.0
9.4
9.8
10.8
10.2
16.8
Time
1353
1120
1435
1700 1555 1735
Gun Type Equi pxent: Personnel:
EA EA
EA
EA EA
Horizontal Thermal Oxidizer with HI-10 Burner
Monsanto John Zink
Jeff Waldbeser - Central Engineering
MONS 095437
Cliff Cantrell - Pollution Control estimated from optical pyrometer
Gene McGill Sam Napier
- Pollution Control - Test Furnace
EA
s < ? /p u v s s '
s ftcr.
crz- -- a a
0 r-
l
< Ip
l2
i
Q
^vr
v<T
y
$
MGNS 095438
f <nr
' V4 IH& :
^ ns*.**-f t. w / ^ 4.
L-//-70
/y x./j *
'
eo^, Ar
/93-0 s ^
9Vu
??.oo:
\,'Sc> nf jzMsL-' 2iir
L ?? r"h'/k
*7/r7
P
#oo;
"TTT
379iO .o?4iJ <r`^' ~ ;
m'
' 3 7/ "Va-
11 .OOOgC Ik/Jtr
9 00'
W! -&
3t7<* , a3*~**
" '
ATT'
_ " 3*1
: , Oo 0 i 3
9000:
,000 8fc
I**c Kf
li-OOOf/1 mooos* ' 0, pi
= , 0 a<50 0 (,
i> /a r
r:
, Ooofel
- . Oc 00 0 ^>y h
1 r r i -:rr
9000: ,OC>0%& A/ir
<?+y
ft** " 1 .06 P/.l
1 * J V'U/'Of*
jroo: ,ooota
,/n* ppk'. ,'r>
9000: . O00S E>
otoo; 000(0 ~
kr 404-Im
('* 'Jfenii
A>- jsiit Cit U> 3tv4lA
* .0057 rp^ irv. -C| L jOi
=.ooaw
rr^
f/;* Jof
p UdO '
,0om 1l,,i
0
oooiv
K.C__ O.'/U(J Fi1
~IC^r vf /**>'' < J
W*U
= , on 0 ?r^ iv set's bit*r /1`^ w 0 1 .013 V /7-v I1*. s<r*.Llor
MQNS 095439
vSBc-r.
W - W , I .ils n right nc petroleum laboratories
BOX 2526
TULSA, OKLA. 74101
918 LU 4-6060
7 W. HASKELL
John Zink Company
P. 0. Box 7388 Tulsa, Okla. 74105
June 1, 1970 File 1206
_
Attention: Mr. Gene McGill
Gentlemen:
The following pages report the data measured during sampling from your Horizontal Thermo-Oxidizer on May 19, 1970. Two
Monsanto materials, Aroclor 1260 and Montar were burned at three different temperatures.
Samples were taken at three points in the oxidizer, and the particulate matter in the stack was measured and sampled. The sampling was done following instructions given during the tests by Mr. Jeff Waldbeser.
The particulate matter results were reported to your Mr. Cantrell by phone May 25, 1970. The samples were packaged
and shipped to Monsanto in St. Louis, Mo. attention Mr. Scott Tucker May 28, 1970.
We enjoy serving you.
Yoi ' '
Clair C. Wilson
CCWtjw
MOWS 095440
'S&cr: 0/02.--<?0 f
Wilson-Wright, Inc. PETROLEUM LABORATORIES
BOX 2526
TULSA, OKLA. 74101
918 LU 4-6060
John Zink Company Thermo-Oxidizer Testa Monsanto - May 19, 1970
PROCEDURE
7 W. HASKELL
June 1, 1970 File 1206
'
Samples of the burning material in the horizontal oxidizer were pulled through two (2) sintered glass gas dispersion absorbers with a vacuum pump, and the gas volume discharged from the pump was metered. The solution in the first scrubber was approximately
one (1) normal sodium hydroxide and the second AR Grade Toluene.
Three (3) samples of the burning material were taken from the horizontal oxidizer at each burn temperature. The first sample. No. 1 was pulled vertical to the gas flow about 1 foot from the center of the oxidizer The second sample was pulled vertical to the gas flow approximately 1 foot from the centerline of the oxidizer and on the center plane of the stack. The third sample was pulled almost directly from the flow of the gas, 8 inches from the center line of the oxidizer and on the centerplane of
the stack.
On the Montar burns, a sample of the stack gas was pulled through a quartz tube and through a 5 micron teflon filter held at 250*F. to prevent condensation of water. The rate and amount of gas pulled through the filter was metered.
On Tuesday morning, May 19, 1970 the horizontal thermo-oxidizer was fired and brought up to temperature. The aroclor was started burning and after the temperature was stabilized, at 2400*?.,
samples of the burning material were taken. Before all three samples had been taken, a nozzle on the injector plugged. Re sampling was scheduled but only one point could be sampled as the
quartz sample tubes were broken.
The sampling tubes were repaired and after lunch, the aroclor burn was started. After the burn temperaure stabilized at 2000*F.,
three samples of the burning material was taken.
The thermo-oxidizer was heated to 2800*F. and after the aroclor burn stabilized at this temperature, three samples of the burning material were taken.
MOMS 095441
..,v"'-yv s&crr 0/0 z--a 0
Wilson-Wright, Inc, PETROLEUM LABORATORIES
BOX 2526
TULSA, OKLA. 74101
John Zink Company Thermo-Oxidizer Tests Monsanto - May 19, 1970
918 LU 4-6060
7 W. HASKELL
June 1, 1970 File 1206
'
PROCEDURE - continued
.
The Montar was fed into the thermo-oxidizer and after the temp erature stabilized at 2400*F. a sample of the particulate matter in the stack was taken. Approximately one cubic foot of gas was pulled through the filter. Examination indicated a possible leak
in the filter. . A second sample of the particulate matter was taken,After one tenth (0.1) cubic feet of gas was pulled through the meuer,the filter plugged. Three samples of the burning
material were taken.
Montar burning temperatures of 2000*F. was stabilized and approx
imately 1 cubic foot of stack gas was pulled through the filter
in three minutes. Three samples of the burning material in the
oxidizer were taken.
.
Burning conditions were adjusted to obtain maximum temperature with the Montar. After the temperature stabilized at 2400*F., approximately 1 cubic foot of stack gas was pulled through the filter in 3 minutes. Three samples of the burning material in the thermo-oxidizer were taken.
The data measured during sampling are on the following pages.
MOMS 095442
s&cr: <?/>. -00
Wilson-Wright, Inc. PETROLEUM LABORATORIES
BOX 2526
TULSA, OKLA. 74101
918 LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
Company: Monsanto
THERMO-OXIDIZER File No. 1207
Matarial: Aroclor 1260
' Date May 19, 1970
Barometer in. Hg 29.62
Burn Temp. *F. 2400 Sampling Point
Run 1
Ambient Temp. *F. 12
83 3
Sampler Inches from center line
Quarts 12
Ceramic 12
Quartz 12
Inches from stack center plane
00
Scrubber solution, milliters
First: 1 N. Sodium Hydroxide
150 150
150
Second: Toluene AR Grade
200 200
200
Meter Number
1 34
Time Initial Reading Cu. Ft. Final Reading Cu. Ft.
10:40 0.000 0.759
10:40 0.000 0.963
10:40 0.000 1.005
Time
10:50
10:50
10:43
Temperature *F.
12 4 122
104
Cu. Ft. 0 60*F. 760 MM
0.669
0.849
0.917
Gram MoIs
0.800
1.015
1.096
MQNS 09544J
Se-.er/*Ar f/sz. ~c>a
Wilson-Wright, Inc. PETROLEUM LABORATORIES
BOX 2326
TULSA, OKLA. 74101
918 LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
THERMO-OXIDIZER
Company! Monsanto
File No. 1206
Material) Aroclor 1260
Date May 19, 1970
Barometer in. Hg. 29.62
Burn Temp. F. 2400 Sampling Point
. Run 1
Ambient Temp. F. 85 1
Sampler Inches from center line
Ceramic 12
Incher from stack center plane
1
Scrubber solution, milliters
First: 1 N. Sodium Hydroxide
150
Second: Toluene AR Grade
200
Meter Number
1
Time
11:30
Initial Reading Cu. Ft.
0.812
Final Reading Cu. Ft.
1.811
Time
11:33
Temperature *F.
125
Cu. Ft. 0 60*F. 760 mm
0.880
Gram Mols
1.052
MQNS 095644
smcr 0/02.-00
Wilson-Wright, Inc. PETROLEUM LABORATORIES
BOX 2526
TULSA, OKLA. 74101
918 LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
THERMO-OXIDIZER
Company: Monsanto Material: Aroclor 1260
File No. 1206 Date May 19, 1970
Burn Temp. F. 2000
Barometer in. Hg. Ambient Temp. *F.
29.56 91
Run 2
Sampling Point Sampler Inches from center line Inches from stack center plane
Scrubber solution, milliters
1 Quartz
12
2 Ceramic
12 0
3 Quartz
12 0
First: 1 N. Sodium Hydroxide 150 150
150
Second: Toluene AR Grade
200 200
200
Meter Number
13
4
Time Initial Reading Cu. Ft. Final Reading Cu. Ft. Temperature *F. --
2:20 0.000 1.005
130
2:20 0.000 0.603
130
2:20 0.000 1.000
112
Cu. Ft. 6 60*F. 760 MM
0.875
0.525
0.898
Gram Mols
1.046
0.628
1.073
MOMS 095445
-Seen ott'z.-ao
W -W , I ,ilson right nc petroleum laboratories
BOX 2526
TULSA, OKLA. 74101
918 LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
THERMO-OXIDIZER
Company: Monsanto Material: Aroclor 1260
Burn Temp. F. 2800
Run 3
Sampling Point
Sampler
Inches from center line
Inches from stack center plane
Scrubber solution, milliters
First: 1 N. Sodium Hydroxide
Second: Toluene AR Grade
Meter Number
Time
Initial Reading Cu. Ft.
Final Reading Cu. Ft.
Temperature *F. Cu. Ft. 9 60*F. 760 MM
Gram Mols
File No. 1206 Date May 19, 1970 Barometer in. Hg. 29.54 Ambient Temp. 'F. 93
1 Quartz
12
2 Ceramic
12 0
3 Quzrtz
8 0
150 200
1 2:40
9.992 10.988 125
0.873 1.043
150 200
3 2:40
0.058 1.061 125 0.880 1.052
150 200
4 2:40
0.000 1.004 114 0.898 1.073
MONS 095446
&&iS7T OIQ't.-- Sa
Wilson-Wright, Inc. PETRQIJEUM LABORATORIES
BOX 2526
TULSA, OKLA 74101
918 LU 4-6060
JOHN ZINK COMPANY
7 W. HASKELL
THERMO-OXIDIZER
Company: Monsanto
File No. 1206
Material: Montar
Date May 19, 1970
Barometer in. Hg. 29.50
Burn Temp. "F. 2400
Ambient Temp. *F. 93
Run 4
Sampling Point Sampler
1 Quartz
2 Ceramic
3 Quartz
Inches from center line
12 12
8
Inches from stack center plane
00
Scrubber solution, milliters
First: 1 N. Sodium Hydroxide 150 150
150
Second: Toluene AR Grade
200 200
200
Meter Number
13
4
Time
4:15
4:15
4:15
Initial Reading Cu. Ft.
0.000
0.057
1.005
Final Reading Cu. Ft.
1.000
1.000
2.012
Temperature *F.
117 120
118
Cu. Ft. 9 60*F. 760 MM
0.893
0.834
0.894
Gram Mols
1.068
0.997
1.068
HONS 095447
Ge-cr, QiozL-ao
W -W , I .ilson right nc petroleum laboratories
BOX 2526
TULSA, OKLA. 74101
918 LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
THERMO-OXIDIZER
Company: Monsanto
File No. 1206
Material: Montar
Date May 19, 1970
Barometer in. Hg. 29.50
Burn Temp. *F. 2000 .
Ambient Temp. *F. 93
Run 5
Sampling Point
12
3
Sampler Inches from center line
Quartz 12
Ceramic 12
Quartz 8
Inches from stack center plane
00
Scrubber solution, milliters
First: 1 N. Sodium Hydroxide 150 150
150
Second: Toluene AR Grade
200 200
200
Meter Number
13
4
Time Initial Reading Cu. Ft. Final Reading Cu. Ft. Temperature *F. Cu. Ft. @ 60*F. 760 MM Gram Mols
5:05 0.000 1.000
112 0.894 1.071
5:05 0.000 1.000
117 0.889 1.062
5:05 1.032 2.038
118 0.897 1.072
s <
.
.
MONS 09544A
, ' 'v
-sec 77 0/0 2.-0 0
Wilsbn- Wright, Inc. PETROLEUM LABORATORIES
BOX 2526
TULSA, OKLA 74101
918 LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
THERMO-OXIDIZER
Company: Monsanto Material Montar
Burn Temp. 'F. 2400
Run 6
File No. 1206 Date May 19, 1970 Barometer in. Hg. 29.50 Ambient Temp. *F. 93
Sampling Point Sampler Inches from center line Inches from stack center plane
1 Quartz
12
2 Ceramic
12 0
3 Quartz
8 0
Scrubber solution, milliters
First: 1 N. Sodium Hydroxide
Second: Toluene AR Grade
Meter.Number
'
Time Initial Reading Cu. Ft.
Final Reading Cu. Pt.
Temperature *F.
Cu. Ft. 0 60*F. 760 MM
Gram Mols
150 200
1 5:25
0.000 1.007 115 0.898 1.073
150 150
200 200
34
5:25 ` 5:25
0.000
1.100
1.013
2.041
119 115
0.897
0.839
1.072
1.003
MQNS 095449
8.Scr.
W -W , I .ilson right nc petrdleum labdmtdries
BOX 2526
TULSA, OKLA. 74101
918 LU 4-6060
7 W. HASKELL
JOHN ZINK COMPANY
THERMO-OXIDIZER
File 1206
Monsanto - Montar Burns May 19, 1970
Run No.
45
6
Burn Temp. F.
2400
2000
2400
Cu. Ft. Sampled
0.1033 0.8923
0.8476
Rate Cu.Ft./Min.
0.091
0.297
0.356
Sampling Tip Velocity Ft./Min.
Gas at 60F. Gas at Run Temp. Marticulate Loading
312. 1752.
970. 4700.
1170. 6570.
Grams per cu. Ft. Grains per 100 Cu. Ft.
0.291 ^0
0.1114
9t>W / 72
0.1436
CTOW2 973
MONS 095450
Material ArocLor 1260
Aroclor 1260
Aroclor 1260 ,*
Montar 3
Montar 3
Montar 3 .
Teap* *F
2400
2000
2800
2400
2000
2400
TKERXAL OXIDATION OF AH-' CK. 1260 ABO SOSTAH 3
Run Sample
?t
i-i 1-2 1-3 1-1*
2-1 2-2 2-3
3-1 3-2 3-3
4-1 4-2 4-3
5-1 5-2 5-3
6-1 6-2 6-3
3 31. Sample: Size
0.019 . 0.024
0.026 0.025
C.025 0.015 0.025
0.025 0.025 0.025
0.025 0.024 0.025
0.025 0.025 . 0.025
0.025 0.025 0.024
BCL f?/m3
C12 n;?/*3
.104.2 9 2.o
97.3 84.4
23.2 14.6 296.8 29.6
77.2 84.0 69.2
65.6 73.7 ' 61.2
51.6 61.6 68.8
155.6 26.4 47.6
IS. 8 . 63.2
38.3
28.3
27.6
53.2
76.4 55.6 84.8
18.8 32.8 26.4
58.0 ' 52.4 61.3
278.0 38.4 69.2
I^tal Org.
Chlorine
= R/!=3
11.2 1.5 4.8 5.3
.. '
30.4 ND
3.6
. 98.8 3.2 1.4 .
ND 2'D 5.0
'
22.4 2"^ . 2
3.2
' 7.1 94.0
- 3.7
Estimated PCB's
ac/V *
S.OSi p.045 0.105 0.042
0.060 0.CS9 0.04S
0.038 ` 0.015 0.032
0.017' 0.020 ' 0.031
0.033 0.015 0.029
0.024 0.002 0.016
'
*?.cpeat Sample NO - None detectable above nornal blank
HONS 095461
0 /0
u
*rSrS60 SNOW
*_I
w
I PPg/WIX A
r\
EERING department
equipment information summary
OOCPAPCO it
V8Vf
CCA MO.
z*7sr-
COCA
4/ ,
/La a. <?#. ivAs7-& /p/r/>asAL
description op EQUIPMENT ITEM
size.. PATINO,
MODEL. ETC
.
MATERIAL. OF COHSTRUCTIOH
%J?/yo
OPB*unio
MEKSMT
(POUNDS)
RS-S/A^e 7a$K. Tk/HLAfi.
4aao $al.
snrey
miULXTEt wrfH H CATin s con.
Z*C.)/f AJ/TOK.-- sew/eecA. sysrGAt
<pC4SVCH Per, VSVTV/U, TAcKmp cetuA/if stAcr
'/ AIR 0Li> WA-f c*AO'ekS P saa0 <zi,4rp srsre/m.
BVRW fZ.'S-e Lb/j/R
or >Rocto OK M6/J7A*
VARiavs
TV t WAJZ/AA itze \4rS A rACKA&B.
z CJ)./rcj/-L.0
tA'c/A/e/t.pTzm. /=&{> PuMfi
mHoi-or/ rxarv/L |p - / .
Ifr-ov us
--TtyApr Atiyyp/l.
(t~S)4PM gf/P
TaoL st&izc Ror&eV'/Tsrt /) ar^roX
gxS'-fA) fffin-
tZ> rft
toiiRci: N-NK* * vriOMt mu .CO WITH MOCMAW CONTINTI O* TCCT MATCO'AL. OHtCHCVC* t MCAVtCM
A
c/iv&e^t-EP
'W F f,
'
-'
o vAppENDIX A
:ENTRAL ENGiNEERING DEPARTMENT EQUIPMENT INFORMATION SUMMARY
**OjCCT NME
4 CLOp^ WASTE D ISPf-S/tC
PREPARES
prew
APPROVED OY
Cl* NO
24 IS
'ITsTro
AREA
<7/
REV MO
6,
NIV IfSUlD
CEO EQUIPMENT IDENTIFICATION
NUMBER
DESCRIPTION OF EQUIPMENT ITEM
MATERIAL OF CONSTRUCTION
OPERATING WEIGHT
(POUNDS)
PRICE
(*>
Packed C0 L ttyfV ctticvi-ATfA/t? Pt/ri P
0 l-/a-o: /
PASTEU-J/ c LSiyaa PPM
A/ Dupca Txt-ia
/V
at- /a?
PfU/rt H&Sjr&i,
FV */4ff
PP-a yirrrpt--p L`#tp
SOtffi
C.VS7XM
m
TABt'CA/Vm Cfj
PAPCECLEP Vj
w\
... /
_ * G&SVV&-
t<3 G-fW-
CLAffG.e-t-ue>
^ 7 r, 0 ftr*-z -0 O
>0
0/ -//# - mt/K. cap.
'1 :
i/NLottotPf P(/PtP
$ i --//0 -<r6f I AlOTV/L
700 $PAI /drpp
Wap TP /7~E
\ 0/-//O
:
-r4-A/K_ 7~&UCK.
UPUJAPtA/e Pv/HP
/ao $fiA)
p/-/// -<yj/ sAonop.
Z0 HP
**
I tOUNCC NlNCN
C>OltTIN6
A TO AC RELOCATED
** EtriMATID NIKHT FILLED WTM NORMAL CON TENT* OR TET MATERIAL. WHICH
POCTtty /fi$y
WO&TH/fc T0/Z
rSELF RIPINS p`
RELOCAr^ b!
PuN-CO fiZ-A tLM.LtCATE
B
tz
APPENDIX p
DEPARTMENT EQUIPMENT INFORMATION SUMMARY
>Oj*CT N*UL
_________P /<.Q C.L.OA-
V/fi S7~B O IS P(7S4L-
CEO EQUIPMENT IDENTIFICATION
NUMBER
DESCRIPTION OF EQUIPMENT ITEM
SI ZE. RATING. MODEC. ETC
BNC0AAC9
ATS W
O.QOVCO BT
CCAie
24 fS
Iffio
OPERATING. WEIGHT
(POUNDS)
<?/
*3 * 6
Of -JJ2.
Wia-L. WAtt/Z. Boosts*a. AVMp
of -//*.-ca/ /^GTVA.
7SMP
pi-toy za.
DURjCO /? ~7o
P&L0C4TS.
kf--M3--
3g 0 G.4-L,r
CAfK&&
/tS/CLLEJ>
>-///
PVBL. 0U, S7VA4GB TfttfM.
/ ~//<r /-//5--0S/
Pl/ZL er/L. APAOp pu>tor_
S-//6
. SroftAcB rftsftc
/-//S-ao/ AOtrA-rofi~ J-//& -sz-Z- /VLO TVfL-
J-l/6-c*'2-
f3'o.t>. x ZO'm&H
CA*3o4 jstE
i^x i '4I'fHfj noofi-FM
CAST ffiPAi
2-0,000 (P/>C C4M0AT SrTeyJ
/M Pi-OC-E.
`/V Pt-ACJ*,
/y PL4 CL 4 n 'i *
(I e
S
V\
s e e r - . <0/0+
I *0^
' -. _
o9
M Mt*
CC*ITIM
T* M HCkdCATIO
. ....... ... . .r.
rOMTtMTt R TUT MATERIAL. WHICH
PRtPtBED T
CCA NO
:entral enc- : "HR!NG DEPARTMENT
EQUIPMENT INFORMATION SUMMARY
\VAo7~E. P to AoSAL
MOV/ iSPROYES '
24 /S' rMJTtAt. ISSUF.
2./5/70
ICDEEONTEIQFI'CJiATNIEOsN_
' NUVBcS
DESCRIPTION OF EQUIPMENT ITEM
SIZE. RATING. MOQEU, ETC
MATERIAL. OF CONSTRUCTION
OPERATING WEIGHT
(POUNDS)
67 REY NO
4- - e
PRICE (S)
7--77.7
STO/cAqE. 7~A///4
7-77-7
/t&rATv/L.
7--777 --002 A\'?TZ7f!-
/-//?
- 0.0 /i--
ZOjOea GAL, C/httaV 3rSL\
//T PUycBr // // 7/ //
77 //
7-/78
|ST0&//6&. TAUT!.
7 -// 8 -'&&/ /r<$/r/9 7~a&.
7-7/8 -00'*- M OTZ>P-*-
7-718--003
C-O (L,
/-//9
I-119- co
PR \JM \JNLOAP)H& Sl/M?
Me 7?A-
2U),O0O GAL. cp Mai/ sued
<So gw
Pvct/LC >Kcro
leocptM
/AS
77 77 //
'/ " //
*L4Cc^ VIK7:
77
l~'Z0
S VT
120 ~O0! V
1HC iNERATlOrt fLOfR 5L>nr POMP
MOTOR.
ioo am
304 -S.S.
S HP, / Boo RPM
72SC/1 c-z-Vcat)
IN FLACB
o / n -- ry //r> ' 7 3 9 0x
_L
MsNC
E(V1TIN
.TO (RELOCATCO
t*ClMT riL(.CeWTMMOMMU CONTENT# OR T##T MATERIAL. WHICHEVER I* MRAWIC
^ A^fENVlX A
Entral engineering department
equipment information summary
NOJICT name
A 2 O CLOP*
WA 5 TE
pji PCS/1L
aHEi*EO *
W.6. Al.
|*Pt*OV60 C
2 4 1ST 01 5 &
INITIAL. tSSUC
net issueo
Z/s/70
CEO EQUIPMENT I0ENTFICATION
NUMBER
DESCRIPTION OF EQUIPMENT ITEM
QTY.
SIZE. RATING. MODEL, ETC
1 - 12 1
AROCLOA SOMA PUMP
- \z\ -ooi Mo TOP
/ 1
jrs spm /0 HP
MATERIAL OF CONSTRUCTION
OPERATING WEJGMT
(POUNOS)
PlicT/LE IKOiJ
REMARKS
h n i
ITOI/Cps. irdDr-t.il ip
in Place
/A //
E
ESTIMATED PRICE (S
1:
1-122 1 -)2Z ~ CO!
Y/ATEA sump Pump Motor.
1 1
|00 GPri \s HP
pocr/LE )POaj
/- 123 / - !Z3- Oot
Fuel oil PUMP MO TOP
1 l'4* lV4
CAST IRON
/ 1.5HP, IZOoRPm
1-124
AK0C10K- WATER SOhP ) 10,000 SAL
concrete
1-1ZS /p- \ZS -QC *
* O
unloading, DOCK Sump PUMP
MOTOR.
1 Js- SPM
3IGSS.
1 7zHP^ izooRpn
I-I2G
S City matea speak tank 1
CARBON steel
1-127 1-12 7 - cc
<r/7r water speak tank PumP | Mo ToP
1 /
ilOUNCC *
MNlI
CSM$T1M
* TQ C MlOC A TKO
mchemt rtui.ee mtm mmac eamtknti r* tit matwial. imichcvsn is mavi
tpise/ cz. vmr E
TEFC
E
I/O Place h /i
E E
IN PLACE
IN PLACE H1
E E
IN place 1/ It
E E
II n E
i
BJ> . r ,C U I Q + -
Entral engineering department
EQUIPMENT INFORMATION SUMMARY
AOJCCT M AMC
.
A R ' CL OR WASTc DISPOSAL-
CEO EQUIPMENT
IDENTIFICATION
NUMBER
DESCRIPTION OF EQUIPMENT ITEM
SIZE. RATING. MOOEC.ETC
(PASCO ST
Vvf Q. N APPROVCO
CC* "O
Z4i5~
INITIAL issue Z/^/70
OPERATING WEIGHT
(POUNOS)
ARC* o/
I-IZ8 h be-9-
) ~ 13 0
h- f3 J
PRUM UhlLOAVIblC* HOIST
-tank CAn LiMi.r.AH)Mgj-
AR-tf-
.
VenT-Sk OWBPr
PLVAd--WASHBftr
/ TOfJ
CAKE OK) S 7EEL <TAR0CH STSfrt-
cfkkated \/Ayp/L4Vt-/c*
caN'c.eLubs>
C/lAKCE-LLtSO -R-c i_&{-jAT -
CA/SC.C.UL- K-C
PRICE . <*>
a A - -+ o ia 7 3 ?
4 source;
m*nc
-*--r# OR TUT MSTfMSC. RSUCNWER I* ***
MONS 095461
HONS 095462
MONS 095463
MOMS 095464
%
HONS 095465
i
Project Manual sect. M
CEA 2415
az.U-0/
Dates November 6, 1970
Author: K. J. Johnston
Approved by: R. G. Corley
Page 2 of 7
1. REFERENCES
Project Scope Report - August 6, 1970 Project Organization and Procedure - September 25, Master Project Schedule - October 14, 1970
Standard Code of Accounts - September 17, 1970 Process Flow sheets - October 27, 1970
1970
2. This Electrical Design Basis describes the in battery limits electrical systems (control, grounding, lighting, and power) that will be designed for the Arocolor Waste Disposal Project.
The appropriation for the electrical facilities is as follows:
Code Category
01 (Motors) 04 (Electrical only) 10 13
Total Capital for Equipment, Material and Labor
80 (Cost Center 45-46) 90, 92, and 93 (Expense)
Amount $ 500
2,000 0
29,500 $32,000
$ 8,000 2,000
3. GENERAL DESCRIPTION OF THE ELECTRICAL FACILITIES
This project consists of an incinerator from John Zink Company, storage facilities for used aroclor, tank truck and tank car
unloading stations, and a drum unloading station. Of the twenty motors required: eight are existing and require no change, two are existing but require rewiring of control circuits, the remaining
ten are new or relocated and require power and control wiring. The existing MCC's 8A2, 8C and 8D will be used for the new and relocated motors. Approximately six new light fixtures will be installed for the incinerator and area lighting. John Zink will supply the control panel for the incinerator. The existing lighting panel will be used to supply power to the new lighting and instrumentation.
4. PROJECT RISK
There is no project risk with the proposed electrical installation.
5. ELECTRICAL EQUIPMENT AND MATERIAL REMOVALS
One motor starter and one fusible disconnect will be relocated from
MCC 8A1 to MCC 8A2.
.
M0NS 095564
f r i -|1~ ~
.. *- -K. '''
JJ-- /.--. ,,*. .-
*r - .
Project Manual Saot. Mfe
CEA 2415
03.13-0/
Date: November 6, 1970 .
Author: K. J. Johnston
Approved by: R. G. Corley
Page 3 of 7
6. SCHEDULE
Electrical design and drawing completion - 8 February, 1971
Start construction on project
- 8 March, 1971
Startup date on project
- 10 May, 1971
7. ELECTRICAL DRAWINGS
This project will require approximately 15 new drawings and revisions to approximately 4 existing drawings. See attached drawing status report.
8. ELECTRICAL PURCHASING
CED will purchase all new motor starters^control stations, light fixtures, motors and cable.
Field construction will purchase all wire, conduit, conduit fittings, lamps, fuses, and motor overloads.
9. CONSTRUCTION AND STARTUP ASSISTANCE PROVIDED OR ARRANGED FOR BY THE DESIGN SECTION
The electrical installation should require minimal assistance. No vendor assistance is anticipated. Assistance will be provided at
the request of the project manager.
10. COMPLETION CRITERIA
This project will be considered to be electrically complete when all electrical equipment that was scheduled for modification has been properly modified or relocated and all new electrical equipment has been properly installed and the operation of the new and modified electrical equipment has been demonstrated to be satisfactory to the Project Manager and to the Plant Manager or his designee.
11. ELECTRICAL CODES
All electrical installations will be made in accordance with the
latest issue of the National Electrical Code and the National Electrical
Safety Code.
12. ^ 13.
ELECTRICAL STANDARDS
This project will use those electrical items and materials that are covered by the Monsanto Electrical Standards as applicable to the W. G. Krummrich Plant.
HAZARD CLASSIFICATION
The immediate area around the drum unloading sump is classified Class I Division I Group D due to the flammable material returned with the
used aroclor. The other areas of the project are non-hazardous.
MQNS 095565
Project Manual Sect. Ml
CEA 2415
02.(3 -0/
Date: November 6, 1970
Author: K. J. Johnston Approved by: r. g. Cotley
Page 4 of 7
14. SPECIAL SAFETY CONSIDERATIONS
None.
15. SPECIAL SAFETY CONSIDERATIONS
All conduit and fittings will be plasti-bond due to the HCL fumes and other corrosive chemicals present. All control stations to be corrosion resistant.
16. SPECIAL PROTECTIVE COATINGS AND EQUIPMENT PAINTING
All painted equipment is to have a paint system which is 5 mils thick.
17. POWER SUPPLY REQUIREMENTS AND SOURCE OF POWER
INSTALLED HP KVA
460 Volt 3 phase 60 hertz power for motors
320
460 Volt 3 phase 60 hertz power for heaters
120 Volt 1 phase 60 hertz power for lighting
120 Volt 1 phase 60 hertz power for instrument
0 2 3
ESTIMATED DEMAND
250 0 2 3
The loads will be divided among the existing MCC's.
MCC - 8A2 LOAD - 100 HP
8C 190 HP
8D 30
18. EMERGENCY POWER SYSTEMS
None.
19. SPECIAL ELECTRICAL EQUIPMENT
None.
20. WIRING SYSTEMS
All wire will be stranded copper. No conductor smaller than #14 will be installed. Control wire will be #14, lighting conductors will be #12 and above. Type THW 600 Volt insulation is specified.
.21. SUPPORTS FOR CONDUIT AND EQUIPMENT MOUNTING
Conduit will be supported from the building steel with trapeze type hangers. Individual control stations will be supported by the conduit. Light fixtures will be clamped to bhilding steel or hand rails.
MONS 095566
* '-- -i*_
. . : ' , ' ~ 'X .-tv.
Project Manual Sect. 4HP
CEA 2415
OL!3~a/
Data: November 6, 1970 .
Author: K. j. Johnston
Approved by: r. g. corlay Page 5 of 7
22. MOTORS
Approximately six new motors will be purchased for this project. All motors shall have TEFC enclosures, Allis-chalmers type rgz preferred. Approximately four existing motors will be relocated.
See attached list.
23. SPARE PRIME MOVERS
None.
24. MOTOR CONTROL CENTERS
The existing MCC's 8A2, 8C and 8D will be used.
25. INDIVIDUALLY MOUNTED MOTOR STARTERS
None.
26. MOTOR CONTROL CIRCUIT REQUIREMENTS
Motors will have local start-stop (Allen-Bradly type 4X) only. Control voltage will be 120 volts.
27. ELECTRICAL CONTROL PANELS
A combination instrument-electrical control panel will be built for the burner controls. This panel will be supplied by John Zink.
28. CONDUCTOR IDENTIFICATION
All wires will be labeled at all terminal blocks and devices using Brady 500 wire markers with the numbers and/or letters that are indicated on the appropriate electrical drawings.
29. POWER PANELS
None.
30. POWER RECEPTACLES Two welding receptacles will be provided near the incinerator.
31. POWER FACTOR CORRECTION EQUIPMENT
None.
32 LIGHTING SYSTEMS
Approximately six 175 watt mercury vapor light fixtures will be
* mounted on or around the incinerator platforms. Approximately four
light fixtures will be mounted on the packed column. All lights
will be 120 volt 60 hertz and be powered
from the existing
lighting panel.
MOMS 095567
Project Manual Sect.
CEA 2415
OZ 13 ~aj
Date: November 6, 1970
Author: K. J. Johnston
Approved by: R. G. Corley
Page 7 of 7
43. RAILROAD CAR PULLERS None.
44. EQUIPMENT NAMEPLATES Furnished by CED.
45. SKETCHES AND SCHEMATICS See attached typical motor schematics.
46. INTERLOCKS. See attached motor schematics. The incinerator will shutdown on flame-out, high temperature, low air flow and/or low water flow.
47. OPERATING INSTRUCTIONS Operating instructions for the incinerator will be supplied by John Zink.
48. FORMS USED WITH DESIGN BASIS ES 25 - Power and Motor Summary. CE-101 - Drawing Status Report.
*
MONS 095568
' ' t `*<&'.C.< -
ClNVlAL
iMItMICAIMt Db^aatmbnt
f" . . . -
SC///>]Af/cs ItPUIP. IPBNT. NO
.
CIA NO.,
. AforjLut MsT^A's/v&iL. A^f^MsrJAT~~
PNOJ/DBPT
nPLANT
W' W*flT _PIVIOM
QL-----------------
-
3/s.c.r; cr2.i3-<?/
.
*00 ^
-nzuj-
LaaaaaaJ i'YVYYvV'i
ryncAi all
staaters
Slop
HI ------------ a_l_g--------
I 1AM
RELAY
/Ay /wc/y^Eaa ToA
coyr/jc Paaei
start
_L -O o---
?. .. -
0/~ /dl- O ':t
A)
Z/UC/A/ERAToA
fD
R/A1P
xz
/<--.......
STOP flJ-0
START -o o- -
3
9------- (A
oLs
^ 6-
Aj
O/-//I-0OI 7'a/v/' TRUCK //A/AoaP /mg PUMP
0/-//P- Od WEIL WATER 8oosTER PUMP
0/-/3O-UOI
VE/JT E/OWEP
0/- /zz-uc/ water stf/vs Pump m*s 0955*9
it-i
CtNTflftk
V Immii
' 0Al
Jtanui SQtf&rmT/z*
VI*, IOMT. MO ,
'WUM'metj, MM^ "'IiMsZX&zEl
AMMIT
<SSCT. 0 2.13 --i? /
STop
' > -Hb
-O / O-
I OfA/ OA/ //>!< H/jrfA. /yU'li- n q(JA>CHA,
i'7>4/^T
-O O-
2-9---( >--
I
O/-/0Z-0O/
/>1
//VC/A/AA ro*
AM #ZJtv
O/-/06-O0/ /HC/<) COIV/VM CMC. AV/1/3
l MOMS 095570
.vYsBV.i5i*ki'.
ClMTKAt
Ihoniikini Dccaatmcnt
____/>}vT0K ScriESlAilC.4. -- llioum. idint wo ___________
i ]|e* mb. 4X0^ A ACA MO. _ */ -
oa</7ct
WA *Tb
OLAM^^^--------- ----------- >
&G.C.T7 <22^)3 -&/
/
l
i--
SrV>
start
....i___
J
O O----------- Cl
r,-v. -s -a /.."> !! TPS
O'- // O/ 7~4sJA` CAR Z/A/R0A/OA
STgP ----------------- -Q 1 Q
qPEa1 10TM Lm" lEVEl
o/- // - cot
IS ft1.1
2 CD--
M
ARaciM su,y/>
PI/RIP
i-SIZO-l(L) OA is //f./
. OP/V 8l o vv
MQNS 095571
low LEVEL
O/-/ZC-OO/ /R/C/A'^RA T/GA' /-'/r-OG PRAw <?/- //?-<?>/ jORU/A /A/AOA O/AS6 JU/R Pj/HA
HONS 0955V`
tins VAlfT NAME _ CA PROJECT NO.
MONSANTO CENTRAL ENGINEERING DEPARTMENT DRAWING SCHEDULE AND FORECAST SHEET
'
/V J
*" ^/ ________r>\ amt mo____________________
O/
. DEPARTMENT NO. . DESIGN CATEGORY KO._
ENGINEER SHEET ____
/
DMAWIN6 MO.
fV
iev NO
CM AMINS
TITLE
vj 'f-4 v- ' -
A
OMAMN V
ICMEOULC OATES
START
RELEASE
CMECKCO APMOVIO
RELCASEO
REVISED 12t
^ r-r A--^ ?
'. '
,
aa, . ** l
"----------1------------1--T------------1
1
i !1
1
/vorok CosSTAOL S<=tfucfAe
1
xV*/
/#,$ 7Oof goo
D- 2 IS- 801
Aam ora
c&vfxaZ
Sc//A>{A/
S/A*2
AAA 700^300 1-----------1 v 1-------------1
D-2.1f- 807 1 1 11
S/A/GA6 Zfsv &/AGAAA
1
i i ri i SCAS/VA r/C f OAJ
0-2^S-E3o?
ij
i
l
A//a
M/etf AAss. A/i/fi />?-!- 9/0. Ao - 205 1 1 ....T I I I I I 1
yVMI&A
- /7
-
----i-----------1--------------i-------------1-------------1 1 I I 1
a v1
-------------r*
i
ii
--i
i
i
3
!Z
r>
SVCC /too An
S,s4VOiSr
-------------1
i
i
ii
r^n
i
D <C
IT si
------------- 1
/ ?
1' i
1
j~ *v>vr - --
1 I
1I
X
" ' - -
~
-y`A? '
------- 1------ t------- i------- 1-------1------- 1 r~*--i
i i
1
~~ i
fc
t* t
3I
?
Nf ( 1
_ .....
MONSANTO CENTRAL ENGINEERING DEPARTMENT DRAWING SCHEDULE AND FORECAST SHEET
PROJECT TITLE
// -? J V- '/?
PLANT NAME _ CCA PROJECT NO.
S' 3 /
f/s
Z)/ SS<? 74 PLANT NO__
___________________
DEPARTMENT NO. _
o/
. DESIGN CATEGORY NO..
JL-
ENGINEER SHEET ___
S'. J o/s ; ,
/
OF 2-
os
,
DRAWINC * NO.
BEV NO
ORAW1N6
TITLE
'Z'/S
1 1 i- - '
--------------
1 1/^
/ii/'/Si zi l S1
.^c- y/y
' '3y.. ' - . ryss
--t------------1--------------1------------1----i ... j
ii
i
DRAWN ev
SCHEDULE OATES
START
RELEASE
CHECKED APPROVED
Revise RELEASED
12
4
y/6
r//7
/8
S--yi--u7il//: r--r i --i n iSi'#2.
//t/C/AJ /ZA
S<=//4TsK- s
i Joitf>i S/iSAfi
i
SA/rt /
li
i
/Azc/A/ y.A 04. -Tc h sn A <cX
1-------------
i i *- r1 i i rt-- --
s/scr Z.
---------- -- --------------
"
-----1 1 r-1 i 1/AS7Z/? coAy/Vc.77aS --i------------ ------------- -- -------------
nS
S
i
-
i------------- -------------1-------------1-------------1---------------------------1-------------1--:--1------------1---------------
i SNOK
1
i-----------1------------1-------------1-------------1--------------------------1--------------1------------ -------------1-------------
O LT
c
1
................-- ........
-- i " i
.
EA PROJECT
m MONSANTO CENTRAL ENGINEERING OEPARTMEN1
^'5
Drawing Status Report t f
PROJECT TITLE ^fVClOT D/CZStS D/SPOSCll
l\/. Q. Krommrich
g/4.24_ / y-r / yf r\ . OEPT. COOE
AREA TITLE -
3issue DATE .
- !- 7/
SHEET NO. __
ENGINEER __
ORAFTING ROOM Agg/g. Eszex> General /. Hansen
SQUAD
ORAWING NO.
i'l .
1-2
DRAWING TITLE
SCHEOULEO START COMRUCTC
ACTUAL
APPROV
ED
START COMFLE'E
SCHED ULED
ISSUE
actual/ REV.
ISSUE
NO.
EPopip- Arranp.-Peon-- Sh.J-b- (
v 1 n/24 V7/ /70 "'H. . - -r -r :!
"" -'
'fe 7o
12/ . /I7/,
ho
%/
%/->,
h~]0 a
!0
sh. Ho. 2L ?v/P Arrccrgr pion_
nK
'Ho
Hw
1or ,
`-ho
''Lh\L nz
1 0
T
Y, %
1-5 1-4
A-kr-.rjip- Anapg.-PleVP-Dcn
'
k- " "'T^-rTr-V..:
i-! .1; --
...
-v;
Ejuip- Aw<y.-Mleypztxp&-)
"do K/7/-, "/4/,, '%ho A.A/70 l *<
W
-1 1 ZAm/lo
i'77 2!//?r
"do B/Vr 'K Hn 1 Y\P/j1 /
12/ / / I*1 / 'VTo
'/ '7"fe
1-6 Frj'p.Arrang. - Drum nasi $ Ccod) `CL "do
'/z777I 2H, Ho Hi 0 %
I I I
1-6 'A-l M-ft M-9 vi/-IO M-H
Ccndenortic Receiver T---.. * ' = - y~ '"f
/'for/f/ic.z.'d .-}-r..r* u'
H,.
lz/7'//-<?
Ho H, 0 h
Sli/7 7a/>!< Modification
r
It.
1-1151, 1-117 it 1- llot ' *
'.*T
.-j i .
:-`l: I'/?/,n
L/ T.C/'C "Hi
Ho ; 1 5 0 7;
DItel1e-d1L16Sf,-1-S1.11lr,7.a..i-.aJ.cI..-..ITI-&ta-n--k- Jdac7tilicaiion -1/2 //"i *
K %/ ,2VW Ho ,2H 0 t
Equip. Arraps.-Load/ -'a Dialfor/// '^4, -I-.' --r-:- o\r
fid Vy; " // Ho ^/7, 0
Ls-latls f r /S..-I-I07
:; .: ^
HV11- ^/ ! 'd
Dr,&oi n' S/_. df r k//. r/ /.-/ ' ' " . ' . 7 ' **Tt TMFr V-`` **r*r 'Z -W \
i| ,* /7/7)
%
VW
0 24 H H, Ho Hi 0 ?4
HONS 095577
_i__ i i "i--:ti--
'
9 MONSANTO CENTRAL ENGINEERS DEPARTMEN.
issue oatc 3. !. 7/.
Drawing Status Report
sheet ho. _
:E project HO. 2415
4 K/asle DT1TLEPHOJECT
rector
/ _SfX&cd.
QeJ^l
ENGINEER
*LANT NAME. KtrU/T)fy)rf.C^l_______
PI amt no.
AREA TITLE -
^_____________OEPT. fnn
F3E/J2- xep
DRAFTING ROOM
......<Ser?&-Gl/. h'e/Tsa/7
SQU AO
DRAWING NO.
DRAWING TITLE
SCHEDULED
TAUT
COMPUTE
ACTUAL
TART
COMPLETE
APPERDOV
SUCLHEEDD ISSUE
actual) Irev. ISSUE 1 NO.
T
5-/ s-a S-3 -
General l/olc-z
....... V
! -.. - /
Poundcclion Picul
' . .
Pounclalie> i Del?.;/, e
Vl.U
Do
i2/,/ xc.no
7z/n7o
%n/o
'y% %y 0
%
vylc Do %l
b.b/0
%>
-vn
%n/o
ha 1 %
l!,> '"
r
!1C
Do
HD
t *'U
Pa! r!0
Ho HA
>
%
S-4 Loading PLallorni 4 L)eL.........j 1^z/jq % 'M H, H 'Ho Hu 0 Hi
5-5 S -6
Yeni Slack. Sane 'eejoper:. Paying Plan 4 Pncl. Del.
H, Do %,0
pa! i'J
Do
Ho
'Ho %h/o
0
12/
>'n
Do Do M1
H>
2/%
H
H,\
1.
?./ /to
5-7 5-5 S-9
Gie/lcrS/nS fer Dram Occ^yrxr
v-l : i H, Do H Hi Hi Ho Hi 1 l*' " -
.- -
- - -- -
.............
"J " .
c
SopparIn, - Plan 4 Dei. Hint
fi-ij.T.-J.- c- tt
H
Ho
Z.CoJlO
Hi 'Ho
Hh
UnLoadne Doc!'-Pinn 4. Sec.
! 1 }.-c>i~/ !~ Do dzdHi Ho
Hn Yy-h
'11
2/5
1,
vi0 \,i/
------ (------ 1------ 1------ H---- 1------ 1------ 1------ 1-----1------
"I
nuns 09si-i,, --1------ i------- 1------1--1------rzn_1 ~ 1 1 -i 1 L 1. 1 _
a-
:ea project no. >LART NAME.
J2J
KONSANTO CENTRAL ENGINEERING DEPARTMEN
Drawing Status Report
PPRROOJJEECCTTtTiItTuLEe .
Is/.::/A/cGATto/4___
_ PLANT HO. . O 3
.DEPT. cooe.
AREA TITLE -
ISSUE OATE 3- L-7.Y
SHEET NO._
ENGINEER _
ts/Pf's.-
DRAFTING ROOM /r-p-E '/--y-f; - --~C*
drawing NO.
XI
17
DRAWING TITLE o A\c C> ^ r.7. L~. \
X
SCMSMATICS
bH. 1
SCHCOULEO START COMPUETI
ACTUAL
ARPROV-
START COMPLETE
ED
SCHED ULED ISSUE
'h
L5 fc
1^
u_7/ *7n
~7o !-w
-7(5
7o
-?o
H_ RK. t
-70
-?!
l-7/
ACTuaJ ISSUE |
REV. NO.
T
* 2h
72}
!p t
r3
"iCHLMAT!C5
L+ .
=mcMA'l ICS
' AM. ?. : SH- 3
L*-7l
-7 A "-C Lc
-7/
V
''^7/
Z 77 JL l Z It
7/
|
I
* i.... i ' i r f f l iiu- iira f f iii- i- ir r ii l iS B R it t rii iiiiiim M i.
IS
------------- 1-------------1-------------1-------------!----------"I--------- n--------------1
1I
16
<G.r0A(SP
.-
-------------J------------|-------------1-------------]-----------|-------------[--------------|-------------(----------{--------------
17 IS T3
SPA
--------------1-------------1-------------1-------------1---------------------------1--------------1---------*1----------1---------
spare
--H-------------1-------------1-------------1---------------------------1 | SPARE
1 I
1
1
l l 1 l 1 1 1 11
np i S"PAe
-
ri
l
lii
i
iT
rf |
2 SPAieg
L. -------1--------------------------,-------------1-------------|-------------1--------------1-------------1----------I--------------
i
ri-2
SPACE
"~ i
i--i
i r~ i
i : i. -i
-
1r
/ l
7~
seer: 030/ -oo
. vP MONSANTO CENTRAL ENGINEERING DEPARTMENT
* . Drawing Status Report
.
EA PROJECT NO. O A.\^\
PROJECT TITLE 2-1' \ ' -> *a--------\tlKNl-Cv--.'' vx ' ------A----*--'-i---1--f-5V* J1---------------------
LAMT NAME
tCf-\____ PLANT NO.
Q ^ 14-,_________ DEPT. CODE----- 2~ ^ .
REA NO. ____
AREA TITLE .
ISSUE DATE
~ J - /J
SHEET NO.
OF
ENGINEER
ORAFTlNG ROOM ' SQUAD Ef I
1 _L
ORAWING NO.
V3
14-
DRAWING TITLE UWooT- TOE'NG,
LAVoUT- TUSiNGi
i. ... '
SH. |
. .. SH. Z,
SCHEOULEO START COMPLSTC
ACTUAL
APPROV-
EO
START COMPLETE
IZ 11 Rr.
'T-io -11
To
~~IO
%/
iq |Ci-"fo
V' -7 O
Ht!
SCHED ULED ISSUE
actual] REV. ISSUE 1 NO.
a
%/'1. lb i(s-7J
t
0
T
iS .
n
13
spars '
.
` " ' , : , i ||
1MS7R. INSrALU. PcTAILS
El4. \
' .
1.
Z! int-1 AGO DV.AlUS SH.
i -
io-lc '1c
I RsS.
"Z4 -TO
I k*-n
%, 1
37nr.
L^7J
' 1 lo
%1X7
______ l_____
1 l i?
?(
X o 2 Co
<0
01
" to c
--------------1 1 1 1 1 1 ,. 11 l l l l
-----1-----i-----1-----1-----1 ~i i i i i ri iiiiii
i i. i' i "i i
AC*- ATI
1 11 ' III
i ri i ii i ii i ii
&C7~. <7*3<y/ -- <70
MONSANTO CENTRAL ENGINEERING DEPARTKEN
2<t/b
^CA PROJECT NO.
Drawing Status Report : . PROJECT TITLE ^OC.LOl<?___"7 3 j T____ __ .SPosAc
'CANT NAME- /i*/-
:ci
-
v
- -. PLANT NO.
/-' r* * --*
OEPT. COOS ~f.i. ?-j-
AREA TITLE________________________:--------------------------------------------------------
ISSUE DATE
3-1
_PT . K'. JiHUiroM
o
DRAFTING ROOM
SOUAO z--^sT '-tL-
vj)
drawing NO.
-:/
DRAWING TITLE
-ZT-'-.MCiM-it. <S\AE.ETt
U
r-'-.- T -
- ?av ,
SCHEDULEO START COMPLETE
ACTUAL
APPROV-
START COMPLETE
SO
P'
/2?
S/
--7/
5-7o> -V
coc.^/Ay
-7o
SCHED ULED ISSUE
v7s
actual! ISSUE '
REV. NO.
!-7 -71
0
T
- -5 -4 -5
r-7
/!/>/- z-'crO
.
11
!
11
1
1 !!
`,->rp S'\'-iC<3.MTfo?L SC'.hD</l/c'..:-i,x 7 oo
. -?j
(Ft'w:r
f> -.?-! rf- So 1.) SU.-i
L* r
,"^"t.
; -.T' .:* - r . "T`- **'; ' '" '
-70
7,-,
CS't-lTKOL -acKetSOS-u A'-'c'A 7^-?-'
('Pt.AMT
- 7.;c- r
.0
- *>'
UUVtl U'.:.
- ?<?
7 0. r7c. *7>--\'C 1 C
' . C. [_'* l';--V'.'Ai' - .
:
. 0v-'--:5~ ^
ti
?- v-;
r*
J ~r : r -
!-'. .'tv r ^
- i-"
Moici-;M/a\o*A -
top
7cwr/?oc-
Sr/SPr^/
----r rs 1 -cn 1
. 1.-- - 1 I
;r-*------------.
JO
~2(> -70
U-7-70 -7o Coz-V/sJ
/S-7
(Z. -2/
~7o
`-9f 7o
4'`
~7o
/Z-Uo ^-3/
Co.C S/M ~7o
(Z. -`i~7 O
/z. ~l/
Cozsj/^J
- 7-'
!?
'5'
-7o
-<L-70
/2'3/
Col. v/aj
-7-*
"-7/ '7-7/ '7-7/ -7-7/
7/
1
!
i
li tl
|
li
f-s
------------r-9
r-/o ' ---------------U
A/or t/S&a
1 - 1 -
1 - -1 ' -I -I--'- -1: .-"I ~
x
To
-
/Sor // sro
11
~1 1 1 1 1 1
1 {- C T \/A} A / pas f*Ws&'.s'T- cfC
//
/Ci
_ I<0,
vr
; r'.--irrv'^-'-TS'T-r----------5-------- T3-r~:
- . yj"- C sm'jUI i
i
?r/~er -- /
'
'-7s>
t'-'M OUT -- COr*s(jiT S
TM mv. ,
'Vj
-?> *2
"'7o
I ?r -7i)
-uz/
/ - </
*- 7-
/ - . \. i
'-7/
^-7
' m?o
^-11
Coc L>/rJ
Si. w.7/ '-*-70 CaCw/A/
'-7-7/
*'7-7/ Ll-7J
----------- fj
1
'}
}
-7
~7i <
'7^7/ ->t7/
~7-7/
l-%7/
1
la, -7J
!~7-?/
6
4
6
5 fS
r
/ /j
>
0
I
\
V
ir
r/
r f
r
O/i
.e* project mo. \ LANT NAME
*CA MO. .
01
MONSANTO CENTRAL ENGINEERING DEPARTMENT
Drawing Status Report
AROCLOJZ UJA^'d jjfSPoSAt-
.PROJECT TITLE
__ PLANT NO.
O ~'
_ oept. pqpp
0'*
sj 'r~- r
_ AREA TITLE -
ISSUE DATE
` ____________________ _
SHEET NO.
/tSpp
**
ENGINEER X- ^oMMSon!_______________
DRAFTING ROOM r-z-s ("cstep) '7. C________
1
*--*
Drawing NO.
-13
-15
-J6
-17
DRAWING TITLE
SCHEDULED 5TAAT eoMPLtre
ACTUAL
APPROV-
STAftT COMPLETE
0
Sched uled ISSUE
X^VTAlt-S
<' ^
-----1 *,-'*.**;
CiTE^C^ViHitCYTOiAS
^ ' > , Ll.` .- J ' V | J-
a- |- ..
*'*'
i -A ; ; : -{
'.0
:-3J
'-7J
^-71
**-7,3 `
-7o ,-z7S ISss.
'-l,.
%/
-Jl
-70
"S' j " ?4>
1?-3' -7o
/7 ~,7
**70
r7 -t. it 7-y
f '-7-7!
IKTc'ScCJUMtaTON'i - /a/C/as'*A7'svy
- *.---------p-; /. ;-*rr' f--- Jl,.*. 7 * 'Jr''*'
\
Co
*
-7
< -7o
/*. "2
l
Cotl'/s" -
\ix -7)
sc i i e wa
. c 5 - i i'I c t:
Tiann iM< ca'i
--1-----------1 T 1 1
.c ATo r
,_
-.-uH
1 1 11
--
12
`"-70 '-70
ACTUAL REV. ISSUE 1 NO.
f ' ->/
0
yV4?/
-71
t
7
X
t i* -3u 7/
ZCHH.MA~VC.S-
0.'oUt4 !MK CO.">
Stt. 2
1-------------1
1
l1
1
1 11
o '-31
-70
-70
''
g I
,v:-
t'i ?*
1 1 1 1 1 1 1 11
-------------1-------------1 1 1 1 1
1 !1
2 'O
Z <A
U1
03 Kj
1 1 1 1 I 1 "1 ~1 1
1 1 ~l 1 1 1
1 1!
-------------1-------------1
1
1 1-------------1
1 11
1 1 1 1 1 1 1 11
~rr i
t
i
i i; l
i. i i -
,
^ er ^
/f s7/
S&CT 03*/ 00
CEA 24X5 AROCLOR WASTE DISPOSAL JOHN ZINK COMPANY DRAWING LIST
Drawing No.
CA-DH-421-1 D-DH-1016-1 D-DH-1008-1 A-DH-883-1
B-DH-1228-3(Sh B-DH-1228-3(sh B-DH-1229-1 B-DH-1230-1(Sh B-DH-1230-3(Sh B-DH-1231-1 B-DH-1232-1 B-DH-1233-2 B-DH-1234-2(Sh B-DH-1234-2(Sh B-DH-1235-2 B-DH-1236-2 B-DH-1240-2 B-DH-1260-2 B-DH-1263-3 B-DH-1271-0 B-DH-1272-0 B-DH-1273-0 B-DH-1336-0 B-DH-1350-1 7W-74466
1) 2) 1) 2)
1) 2)
Description
Detail Quench Water Gun Terminal Block Arrangement "YS" - Pilot Assembly TRC Section Panel Detail for John Zink Thermal Oxidizer schematic Ladder Wiring Diagram Schematic Ladder Wiring and Panel Details Schematic Piping Details John Zink Waste Disposal Assembly John Zink Waste Disposal Assembly Anchor Bolt Plan Combustion Air Duct Assembly John Zink Thermal Oxidizer Quench pot and 360 Platform Detail John Zink Quench Column John Zink Trimmable Venturi Assembly Vent Stack Oxidizer Platform Details Burner Plenum Details Hl-14 Burner Details Step Off, Rest and 360 Platform Design Drawings Platform Fabricated Parts Details Caged Ladder Details Mist Eliminator Center Supprt and Venturi Piping Buffalo Forge Co. Combustion Air Blower (45-3 "CB" - CW-UB-ARR. #8)
5/3/71 MQNS 095583
r
CENTRAL ENGINEERING DEPARTMENT - tX^SDtriNG STATUS REPORT
AHOCLOfL w'asTf Dr^PasfiU K 2)64,1 HoLorJEvC)
T <NtmgcTi
PURCHASE OROERS
o(K*ior tret*
IMl- J/3. a / lUL
\0o4-2 y to" U3_ el >Li
/'//SC i
Stetulxe /-/as
oo43yi't\i/3 ej- XdL SfAUlA/g-
2ex/eia //as/*
37.000t)f3 /
|Cu.sTo** f/,6#tCAT//*/r
sfT'j/j'P
DO`/S\ 3a>\ h
''TrffSA*a t-
i'f r/oJ
2>f/ou>?si
ojecr >u>eo
a/. vJaj.jt
APPROVAL DRAWINGS
34 .-/
3/
H3 1yt-j
&/4
tf/.
-&L
-2A - A C C U C ^ S -