Document eDkeL5GeBpa3X4NZQ770gaLM

HONS 095466 1 HONS 095467 Append rx F UTILITIES SUMMARY ITRAL ENGINEERING DEPARTMENT 4CCT NM*C ARoclor. WAsTZ disposal UTILITY SERYICE UNITS INITrIi,AL ISSUE (s/70 PCAACO T W. C. MIEMBYBR REV. | ARRMVID TPAH (l2pp;id TEAM (tops*) ltiA'HA 'oven. installed] HP 7 00 300 Soo IOOO !7S 250 lAYVHAL 6,AS SCFH 5000 4oo o VEL OIL JELL WATER crn ns GO 150 :ITY WATER GPH -0 CCA MO 24 IS REV. 2 ARC* RACE !~ REV. 3 / cr*w Xc z i *" ' EQUIPMENT LIST VI r ' APPENDIX 2 ^ Material of Construction 1-101 1-102 1-1 SI 1-152 1-153 1-154 1-155 1-150 1-104 Montar Tank Trailer Incinerator Quench Column Quench Pot Venturi Scrubber Packed Scrubber Column Demister Pad Coirbustion Air Blower Tncinerator Feed Pump Koyno Positive Displ. Carbon Steel Refractory-Lined Carbon Steel ' Hastelloy "C" Polyester-Lined Carbon Steel | | Hastelloy "C" Polyester Ductwork Polyester-Lined Carbon Steel Monel Carbon Steel Stator - Viton A . Rotor - Chrome Plated Tool steel Housing - Cast Iron 1-106 , Scrubber Circulating Pump Chlorimet 3 (Hastelloy "C") 1-107 1-110 Drum Heater Tank Car Unloading Pump Structural Steel Frame; Insulating Board Enclosure Worthington Self-Priming (Worthite) 1-111 Tank Truck Unloading Pump Durco A20 (Ductile Iron) 1-112 Well Water Booster Pump Durco A-70 (Alloy 20) 1-114 . Fuel Oil Storage Tank {20,000 Gallons) Carbon Steel 1-115, 1-123 Fuel Oil Pumps Roper Gear Cast Iron 1-116, 1-117, 1-118 waste Storage Tanks (20,000 Gallons) Carbon Steel 1-119 Drum unloading Sump Pump Taber Vertical Ductile Iron 1-120 Incinerator Area Sump Pump Taber Vertical (304 SS) 1-121 Aroclor Sump Pump Goulds vertical Ductile Iron 1-122 Water Sump Pump Taber Vertical (304 SS) 1-124 1-126 Settling Basin City Water Break Tank Concrete Carbon Steel 1-127, 1-132 City Water Pumps Patterson' (Semi-Steel and Bronze) . 1-12B Drum Crane Capacity 2000 lbs. Air Technical Industries' (7 U r? S '3 HONS 095469 y-i J C,NT*4l 1 ' BN.iM.ri.i~o Otr MiittNt ::imr t n,niiawi*h"Lliftitlm.i.`.i 1 Oxld.ifeor-ScrubJber Unit r.OJ/BtPT punt ErACT-^rj^h-..aiivc-~XiraairLc. et* no. 2415 .... ho. fll "V SPECIFICATION NO: 2415-01-103.000 1.1 The unit will oxidize waste liquid to CO2, HjO, HC1 and CaO with auxiliary fuel and-.cxcess air at sufficient resi- ' donee time and temperature to destroy the organic compo nents of the waste. The unit will quench and scrub the flue gases with water to remove IIC1 and particulates. 2. STREAM DEFINITIONS . .' . 2.1 The waste liquid will be Aroclor 1242, Aroclor 1260, Aroclors which are chlorinated at some level between 1242 and 1260, Inerteen PPO, the distillation residue in tho pro duction of Aroclor (Montar), or any combination of the Aroclors and Montars. Maximum waste rate will be 1250 ' pounds per hour. Vendor possesses analysis and testing recults on these materials. ' 2.2 Auxiliary fuel will normally he natural gas available at ` , , 35 psig. However, #2 fuel oil will be used when natural gas is not available in the viinter months. Natural gas will be available for the pilot at all times. 2.3 Atomizing steam will be available at 150 psig. 2.4 Hard well water will be provided at 100 psig to be used . for quench and scrubber liquor. Analysis of this water is attached. Specification 2415-01-102.000A. 2.5 ' ' ' Effluent gases from the oxidizer shall not. contain more than 0.001 pounds per hour of polychlorinated biphenyls and effluent stack gases shall not contain: more than 5 pounds of HC1 per hour, more than 0.05 grains of particulates per standard cubic foot, particles larger than 20 microns in diameter, more than 50 ppm of free chlorine for 1250 pounds per hour feed rate. 2.6 Scrubber liquor will be sewered without neutralization. 3. OPERATING CONDITIONS ' IS-7 3.1 Unit y.-ill be capable of operating from 2000 to 2800r' for the Aroclors and from a maximum of 2hO'>F- for the Montar at 1250 pounds of waste per hour and ten million pounds of waste per year. MONS 095470 3.2 Combined quench ar.d scrubber liquor makeup not to exceed 143 gpm (70 gpm to the packed bed. 68 gpm to the quench spray nozzles and weir in the'quench tube, 'and 5 gpm to the oxidizer quench spray nozzles. System to be designed to prevent scaling and plugging due to the well water. 'SMer, -- i U*v.V...,,4. 01-10 2 -OOP ei`A uA 2415 AM* Nft. fll t -'T-.. I... Wl.cll--o>r , O*Tf0/ I 1 /l/n lurr. V 4. MATERIALS TO DE SUPPLIED BY VEMDOR . 4.1 Equipment A. Thermal Oxidizer ' . . . , ... . . .. , : ' . a. b. c. d. e. f. g. h. i'. j. k. . 1. . . . m. . 9'-6" O.D. oxidizer furnace Flanged exhaust - Bolted access door Thermowell and sample connections at oxidizer outlet Sight ports Shop installed refractory anchors as required Control connections for items specified in Section 4..2 Flanged burner connection A283 carbon steel construction Lifting lugs Ladders and platforms to the burner on one end of the oxidizer and to the thermocouples and sprays on the other.end, hot dip galvanized according to Specification 2415-01-102.000E All external carbon steel surfaces which are not galvanized will be sandblasted and then painted with inorganic zinc primer in compliance with Monsanto Standards, Specification 2415-01-102.OOOB Weak seam welding on rear oxidizer head, weld thickness to be one fourth of head plate thick ness provided plate is three eighths of an inch . minimum thickness. . -*" B. Burner '. One high intensity fuel gas-fuel oil-waste liquid burner. The burner will include the following: a. Electric igniter . b. Gas pilot c. Raw (natural) gas auxiliary fuel burner d. Standby auxiliary fuel oil burner e. Adiustablo air register f. Forced draft, design g. Secondary waste liquid burner (steam atomized) h. Burner tile . Refractory . . ' The pxidizer furnace will be lined with 6" of B-40 brick, a special high duty .basic firebrick adequate for extreme tempora.turo service and the attack of the calcium to b# fouv.U Vir. the Mont^r*, backed with 4.5" Groonciyrome'fortac'is to b* used. The lined with v;All r*fraofcory . roh*! u|nt ofoviltage tarv-^y s o^lfor.Jfi*M i RONS 095471 I Cm****vVr. ` . OmmuiNt ton for thermal S<'rublber Unit MJ/OCPt i -- r---n~ .- .......... - . IIhamt Koo^rj.c:i.^o>viow.^r^i>u.a^i-. EEc-r* xx>/ |j..u,... 01-10?.000 ) *>. 241 5 . A..*--- fll 4. MATERIALS TO DE SUPPLIED BY VENDOR (Continued) 4.1 Equipment (Continued) D. Quencher The quencher consists of a water wall direct spray contactor flanged directly beneath the oxidizer followed by a vortical, cylindrical quench pot with a horizontal flanged exhaust. Features of the quenching system are as follows: a. 9'-6" O.D. quench pot b. 30" O.D. contactor tube of Hastclloy C construction c. Mechanically atomized water spray nozzles in the contactor tube capable of operating with hard well water. Specification 2415-01-102.000A. d. Glass flaked reinforced polyester lined carbon steel construction in the quench pot, Atlac 382 resin, 100 mils minimum thickness e. Suitable connections for a drain and the control items specified in Section 4.2 f. See Section 4.1.A.1, for procedure for painting - quench pot ,.................... ............ 3 B. Scrubbing System and Vent Stack '' A venturi type scrubber will be flanged directly to the exhaust of the quench pot. It will be fabricated from Hastelloy C. Water manifolds, jacketing and support structure will be included. The vent stack is a vertical, cylindrical, free-standing unit includ ing a packed bed to serve as the secondary scrubber for the scrubbing of hydrogen chloride in the effluent gases. The vent stack will be flanged directly to the diffuser section following the fixed throat venturi. Design features of the vent stack are: a. 5' O.D. stack base (packed bed diameter) b. 15' (minimum) packed bed of 2" Intalox saddles complete with overhead spray bar designed to pro vide absorption efficiency without plugging due . to particulates or scaling c. A lining of firebrick in the lower part of this stack to protect the shell from erosion d. The stack and its entrance duct complete fiberglass lined to protect the shell from corrosion e. Mesh type monel mint eliminator at the top of the stack f. 45' overall height . 0 g. Necessary connections for access and controls h. A283 carbon steel construction i. See Section 4.1.A.1. for procedure for paiabing. scrubber and stack external surface* MQNS 095472 4MC.ri 03LfS--{ c we. 2415 _ y 4. MATERIALS TO HE SUPPLIED BY VENDOR1 (Continued) 4.1 Equipment (Continued) E. Scrubbing System and Vent Stack (Continued) j. Two samples ports with access ladder and 180 plat form to be located .at top of stack. The ports will be located 90 apart at the same height. Access to , mist eliminator from the top platform is to be provided. Platform and ladders are to be hot dip galvanized. Specification 2415-01-102.000E. . k. Two 18" access doors located above and below pack ing with step-offs from the ladder are to be pro . vided F. Blower .. :\ A blower will be included complete with a TEFC motor to supply the combustion air. This blower will be a Buffalo Forge Model 45-3CB or equal, complete with a 100 HP motor which complies with Specification 2415 01-102.000D. ,, 4.2 Controls - `.............. All' controls must meet FIA standards and must be models acceptable to Monsanto Specification 2415-01-102.000C. Also, electrical work must be in compliance with Specifi cation 2415-01-102.000D. A list of the major items follows. A. Honeywell Model 4075B UV flame detection relay B. Honeywell Model 7012E UV scanner to scan pilot C. Time delay relays for purge and trial for ignition D. Ignition.transformer E. Safety shutoff solenoid valves for fuel gas, pilot gas, and fuel oil lines, manual'reset F. High and low fuel' gas pressure switches and parallel fuel oil controls G. High and low temperature switches with temperature recording controller on oxidizer . H. Auxiliary fuel gas control valve and parallel fuel oil controls I. Waste shutoff valve J. Prossuro gauges on waste liquid line, atomizing steam line, auxiliary fuel gas line, auxiliary fuel oil line, and pilot gas line ' tlnr.d tiring valves ' Necessary rotameters and their associated hand valves Level controls on th^ jumps of the quench pot and the vent stack . .. 1.s' ' Low prosfuro shutoff .on steam line 'Jligh.ton.pouoturo shutoff on quench pot gas phase u*lii>g bi-metallic switch on EIVS60 SNOW $ r'>'' , (yafVl * 4. ClMTAAl EHOlHKCniNO Dll* AATMENV II ' Specification for thermal Oxidizer-Scrubber Unit rnoj/oe*T - - [ ^L/.nt -- ,,Piyt>qu.Qrr-Tr; j_^ --j>&zr, P2~$> -`#2- OU|M. IDKMT MO 0 1 ~ X02 . OOiO ^ ee wa.:2413 n 0. (11 * -sIm__lb_Waldber-r OAti^Zll ' 7 A . i Mg r. t __5-- o r MATERIALS TO BE SUPPLIED DY VENDOR (Continued) 4.2 Controls (Continued) P. Low flow shutoff switch on water supply Q. Low flow shutoff switch on combustion air supply R. Solenoid shutoff valve on quench water line to . oxidizer S. A pre-wired control cabinet in weatherproof con struction and suitable for outdoor installation, NEMA 4, whicli contains all necessary instruments for operation of controls in Sections 4.2.A. through 4.2.R. 0 at-7 HONS 09547,4 Monsanto COMPANY LOCATION name:_____________ Performance__ Patm____ In OHttATS*. FEED Pt/MP_____ >roj-- Atoacp Waste disposal } 0 4>EQUIP. 1DENT NO. /"* AUTH NO. 24t? PLANT XtUMMJtltM ,, W.G. MlEMCffR Dit B/zs/po APPQ VI , H V/a-fA* SHEET j OP i Incinerator Feed Pomp ' description :______ IDS 1 TIPS PISPI ACC MENT PUMP NUMBER REQUIRED Function : ___ L___ LJ-Z-LEAX_______________________________________________________ TO PUMP__ A MIXTURE OF WASTE AROCIOP AND MMTAA F*0/M STOfiAte TANK {l-fl 8) 'TO TH WCtKA70A. WASTE Liquid BURNER. materials handled : - A MIXTURE OF WASTE AROCLOR And M0N7AR Mixture mat contain up to io'/. sr-MT.) soots SOL IPS ARE CALCIUM OX IOC { IRON CmonoE F CARSaxj PHYSICAL PPOPCPTIFS ! J . SPECIFIC ' GHAVITiv AT IQO-C - /.'SI TO /.4? DENSITY (L`ytXL'l AT ItO'C - lO.B ro 12.3 V/Scos/ty (<rN7ipffisej a* iOO*c z 8.6 to 37,9 YLCok. PRESSURE (PUA'i AT 100'C z NEC. L 1 & 18L E DESIGN capacity-. Design fun rate: izro lss/hrux 0, PM - LSI TO I.TO pin*. Fun.ZGPH pin. TLtuu :0Tgpm orekatins conditions: Duty: continuous D/s chars e Pressure:_______________________________________ _ normal: IPO Psig MAXIMUM! ISO PSIG MINIMUM: 100 PSIS T F PIPER A TURE ; normal : / OO'C. ________________ maximum: lOO'C__________________________________ _ MINIM U M ! 75 C SPECIAL DFS/GIU CONSIDERATIONS : 0 Pump must be able to handle solids AS SHOWN ABOVE 2) HAVE A TURUDnun Ratio of 3 To! CONSTRUCTION : MATERIALS OF CONSTRUCTION: CARBON STEEL " NITON A" RUBBER MAY BE USED IN VALUE SEATS DRIVER : ELECTRIC MOTOR'. ALLIS ChalHEXS TYPE RGZ , TEFC P P aiping on discharge of ump wui. t rsvipep with a ariif/ valve. REV NO. A S A REVISION Br | OAT( | APPO j OAT* MONS 095475 Monsanto company LOCATION-------------_ [\)ft MB: ~^<trr astaf-jg S-P.ECIELCRHQN [equip. IQtNT NO. /Oy -A24M0 __________ Inc.i*erafor Ftrd -tfojtyo/ ........ j |auth no. AlJiK PLANT IwKJJ/l \11 DisposeI InT.H.UlaiJittB^F n.rt n-J-fg tMI,T ` " ` Incinerator Fere/ Primp tytmae* rip limits.' QMS. tonieaiALt HttaiPLeti:______________________________________________ C h lot ihattci________________ Oria mi c. liquid r ftvlcjininy up in /n%ftf s&htil. r--la. Lai--at_--calctltra--Ovirle y irnn r h lnnrloi nnrt ration ______________ SpPrific artuTiy (> /0P*C s 1,3 ia //~ ___________ V >'t rn^i-ty fr. rr^iipoiro f)t/vfr s fe ______________ Vapor Ptoicatn rSl lanC ~ A A* _____________________________ CfiPALuy..: , .......... -........... .............. ........ , 'Z Q.t^icn_________________ Kaje . ___ JrQ gpjy_______________________________________ tJoranal_________________ Raft__ !__ h 0 j a ? O j pan________________________________ QPEflBTlMll /QMOiHoMa: Normal tJi ffrrmiial pressure ISOpiij Dg.'t/*.. rhU-Qr rn'iitj ymXtlrr a fSO p{irj___________________________________ _______________ Do i^n tPrrpQrojjrc_ loaH. C ____________________________________________________ ______________ _______blatmnI iompor oitne; /0a *C PUMF hexrRiPTtoA/:........ ................................... ... --- - ....... PnZl'ffyP Cati* itfin jjif Jcrpr fiix. plot fwlln "t CnnnLI* o-f af i?at+ A 3 j a I 'Jbfhg/aujtt jiurnp houi Inj________________________________________________________________________ /g< pQc. kinj_________________________________________ ?At HP -TEFC - U romp include major pulley -Far _________________________________ I____ capacity Genital1______________ RIV NO. A A fit* REVISION BV | DATE I ARPD | DAT! MUNS 095476 ROBBINS l MYERS, INC. MOYNO PUMP DIVISION ___________________________SprlnglUld, Ohio ' 9 CE&_j2dtL-- , JTa/& iMt-x-A 7vA. fr Q Pi/S>P MONS 095477 s&zrr o**/--a/ Monsanto COMPANY CENTRIFUGAL RUMP PERFORMANCE DATA Aboclbk VIAitt Dismal l-IO(,EQUIP. lOtNT NO-. AUTH NO. 24^5* PlANY [by W. Q. NIEHSygH^t 10/12/76 AFTO YL fi. sheet / OS 2 NAME ZtSAii ruNCTiON TQ PUMP POMP JmZZ1 no. REQO DILUTE Mrt>XOCHLO*tC AdD (2% 0Y wt.) from Te PAckcq Column to tuz veAirutKi sraussgft 0>g^T>0N COHT/H-VOVS FLOW TO ]/FfjTU*.l SCRuSee* - MANUAL FlO*j e0AJT*ai COMPONENT DUTY: INTERMITTENT ~^g^CON Tl NUOU S MATERIALS HANDLED UNITS NORMAL OESION HmoCHlO/UC AC!P(Z% Br WT.) 5 3PM 70 -SO-. KOuSPER TtiR REMARKS TOT A L SOU oyy ufjRrAcrea 0A Line 30 S4' PUMPINO T BMP gn A T URt >t,F 130 PROCESS DATA f 5POR ft P T Q, J Q ____ SO F f,00 Jc R Y ST A L L 1 Z INO . T CMP a F AftKi't J 0* viicomr, Ctun PtiSC iunitsi <?pt 0,3S' ^ 60 f /,/ VAPOR PRESSURE. PSlA, (PT 7, S'f 60 r 0.2&T JsOLIOS S ***0. >S V WT jj3ENSITT f>IZE CORROSION/ERO SION: NEGLIGIBLE ^MODERATE QSEvGPE ------ ESTIMATED PERFORMANCE REQUIREMENTS CAPACITY, USOPM: NORMAL 70 ; M** OESION BO _ CONTROL ALLOWANCE* PUMP RATEO CAPACITY (MAXIMUM OESION CAPACITY PLUS CONTROL ALLOWANCE). USOPM 8o STATIC HEAnG'PT, 12 FT 5*,/ PSI | EQUIPMENT LOSS. PSI: $2 normal PIPE OIA, NP$' SUCTION ;OlSCHAPOE piping loss, psi: NORMAL CONTROL VALVE PRESSURE DROP, PSI: NCRMAL Java L ABU E NP5H, FT. NORMAL RATEO TDH <*' PT: 273 rj UC PSI FBOM FUMP CALCULATION SHFT NO. 5 3f SYSTEM CUR VC CALCULATIONS FROM SHEET NO. DRIVER ^Xj'ELEC MOTOR [_J TURBINE iS 18,/ 0 T HER RAT RAT RAti PUMP DATA MATERIALS OF CONSTRUCTION: CASINO AND NOZZLES imp,,Lt Hn LINERS CMLP^lMtT "3 CHLOP.lHer -3 C#LetlMET-3 1 e Z| x\ MECHANICAL sea PACKING GLAND BASE PLATE CAay/t A'a. * a zz:~:________CONSTRUCTION FEATURES REQUIREO FOR PROCESS OR PERPQRMANCF. CONSIDERATIONS: _____ y--L*AMe _______________________________________ REMARKS. SPECS, TESTS. ETC._______________________________________________________ _______ ______ __________________ ____________________ ____ couru^a___ '&uaro to m?st wax plant srg___ iu^_srp 1 "Cwiicity in crlbss u< mammum dest^n lo contio* imposes. R(V NO. ! REVISION /h SI . ttftft fVBZ) BY | DATE I API-D | LI A !| ' MflNS 0954 COMPANY >ACKEP H PUMP CtHTKIFUGAL P0MP CALCULATION sheet PteiM n l AN T _ SQUtP. NO.. AUTM NO. OY W. hl06 _ _ g*r^ OAT> /0Zl . IHT__ 2 Spgfe I - >K CONDITIONS Matsual Pumped H'i&WCfftMlC ACfO. HF7j* P.T. Pumping Temperature 82, *C JAQ.. *r gpw" Flow Pats: Normal _ *7 0 CSlyw FiO S- Specific Gravity* 0. 9& Danltv -8*l6 Ih7gt (i - Viscosity*P-jT_______________________ Centlpofi* ' Vapor I AP: Control Valve rT.;^ f _psi; Equip. -PM Pipe (Material.. r, t^-Scn or Wall Thh . =Nominal Size_________J .Suction rf, Actual ID, inches. 2.49 .Suction _OHchet(m 7S _OtacNaiM *At Pumping Temperature )A S**y + MP"Aan V*vi*toru mac,Mire* j-znri EQUIVALENT LENGTHS Enter Type end Factor for each valve or fit* Suction Discharge ting. Enter Number of oech type, end line size Multiply Factor * Size x Num* Typo Factor C Number Feet Type Fsctoi e Number Feet bet and antar Fact equivalent length. Sea handbook for types not listed. Factors for Valves (open) and Fittings Qite 1.1 Plug Vslve l.S 90" 1.1. oi w*id ell 1.7 hvz l.S H Jll >' l 1-7 i V i i r ?"'> V 1.7 (V Z rti s /iii l,s 4N1l 1 7 Globe, Lift Chock 28.0 Butterfly (6" & up) 1.7 Std Tee (on run) 1.7 1! Z Wye, Angle, Dlaphr 14.0 90* Std Elbow Swing Cheek 11.0 45* Std Elbow Length of straight pipe In feet L Tout Equivalent Length, feet 2.S Std Too (side out) S.O 1.3 I ' z5 s JLt .5 i fP FRICTION HEAD LOSS (p.o^x^X-7^ V - (0.406) gpw/V', feet pet second Re (Reynolds Number) * (3162) . (o.AOBY&yytx- ('?/?J8Yc. 9fi^7</aJ0 Suction A,FI. 2&1 wo DIschMIB '<>49 A OS.OOP /- Friction Factor (See Appendix C of 014.2 Std 2) if Re <2100 omit this step.'V. ?y.P'T)|^9'*^ 5 A nHRWes'JjJglIW) 0.15f^riynti [(Re> 2100)- 16.63/V*/rf J ' O' 'Ml P' >0 '' equivalent r o.eir 2. n 0.0 >3 IF 8 Tots! Friction Head Loss - Aa * L/100 x is (safety factor), feet o( fluid Q.37 'r.4 SUCTION AND DISCHARGE HEADS Suction Discharge SYSTEM HORSEPOWER (ottlfflated) Voxel Pteuuto (p.'irb 2.S1/J) <> 3r.2 (4) Liquid Level (above pump *; below pump -) ) 1.0 Static Hoad (above pump 4; below pump -) Total Friction Head Leas (Plus Vsloelty Head. See Note 4.) (-) PUriSSil Valve (Aptl x 2.31/T) (Sea Notes 1 and 2) 10 Pj 1 (-) OA o (+) (+) (+) Ounce (Apil 2.31/S) (See Note 2) Equipment (Aptl 2.31/1) 9 2 7SI Suction Hoed Sum, foot of fluid, abs. M 0 (4) (-) 0 (+) TTf~l Discharge Head Sum, feat of fluid, abs. A 0.3 12.0 IS. 4 23 4 0 2/7. 0 i08.3 gpm * TDH * 5 39S0 x (Note 3| 80 * 273 0.9 8 3980 x 0. WO Aj<Pfo Mo;; ertiarwi DYNAMIC HEAD Discharge Head Sum Suetion Head Sum T!)ll" Total Dynamic Head, feet of fluid NPSH Suction Head Sum / \/ ^ \y 'VpImmHg* 0.0.5/S) 01 (p.l.x 2.31/S) (7, SIX7.31/0. 98 NPSH Available, feet of fluid, ab.__________________________ PUMP SELECTION MpitulKluiti OVP'CO .; Model _ ImH 3TOP fnm: Imp Sue. OPM - TDH------ 308.3 35-.8 L&. TV?" Tvn. 3 x I4 x to Ell 1. Assume control valve loss to be 70% to 100% ef piping plus equipment friction less for Initial calculation. Consult Instrument onglnoer foe final selection. 2. Control valves and orifices not normally weed In pump suction, 3. Use combined efficiency of pump and drive. 4. See D14.2 STD 2, a guide lor the use of thie calculation procedure. RRV NO. "IP eiviSroN av | DATS | Anmo | qati - X 'i ^MUNdANto a im .* CENTRAL EN.GIL..D6HL V MOMS 095480 ^ '0 '-/0 ~ Z O UL33S' SMc.r. 0 Monsanto COMPANY i&4U8SL nme TAhnC~CAR CmfolFUQAL MJMF TOtfORMANCE DATA 4*60.6* \JASTE PtiPPSAL EQUIP. fOfNT NO. I~ ) AUTH NO. 2Atf st W &. NIEMEYPR sri.nt&wU' _Z \JNLOAl>tN PVMP (TO BE RtLOCATtt) ) NO. RgQQ l function To PUMP WA6TE AKOO-OK FROM A TANK CAP. TO 7 HE WAiTtr AROCkOR_______________ ST0AA. . TAHKS. t-/lj Am.^Ii1I7- operation IMTEP.MITTENT PUMPlfJG. COMPONENT DUTY; "flgflNTeRMITTENT CONTINUOUS MATERIALS HANDLED UNITS NORMAL DESIGN AkOCLOK 5 6PM too id r> HOURS ^E# YEtlf REMARKS TOTAL SOLIOJrp^ ZL JlM- 100 GAS PROCESS DATA * F 2 12 ^PUMPING TEMPERATURE, PT, PR ffPT l~3J Tal,4 7 froV /, rg/^y*lcwv>T*LLIZ,NO. TtMf * r vi>contr, crtrnrotfc iun^w^pt 4 rt ;0 e0F 300 ro 100,000 ________________ VARQW PRESSURE, RSlA, f PT WECL. & * F NE&L. |QLIPS % W~t J DENSIT Y ~ ' ~ | tug COWROON/EROHON.' jg^NCOUQIGLE QMOOERATE Q SEVERE CARACITY. USORM: NORMAL ESTIMATEO PERFORMANCE REQUIREMENTS /oo ! 0 0 '; MAX OESION : CONTROL ALLOWANCE* PUMP RATED CAPACITY (MAXIMUM OESION CAPACITY PLUS CONTROL ALLOWANCE). USORM, STATIC MEApf'PT, PIPS DlA, NPS: SUCTION 2 E PT 3M 1 !T, 1 i DISCHARGE psi | equipment loss, psi; NONE 3 " 9.r|p|PlNG LOSS, psi OOTMNIS VALVE PRESSURE DROP, PSIr 29,3 NORMAL (available NPSH, PT: RATIO YDHpPT: J2 rT i-r.5- PSI PROM PUMP CALCULATION SHEET NO, 27. U NORMAL NORMAL NORMAL VST ttM CURVI C ALCUL* TIONS PROM SHEET NO. Tf* 4-fi^O' D*1 VE" Kfc L E C MOTOR [^TURBINE f^OTHER MATERIALS OP CONSTRUCTION: CASINO ANO NOZZl.lt WOR THITS WeATHITE SHAFT, SHAFT SL8EVC WOKTJft7 MECHANICAL SEAL PACKING GLAND BASE PLATE AMES TPS N0A/S Worthite CONSTRUCTION FEATURES RgQUtWEO FOR PROCESSOR PERFORMANCE CONSIDERATIONS:________ __________________ Pfit SSLlPE SWITCH To ' SHUT bDlV7I> Pl/MP AT lan> DlsPHAK&r rutstuKE MO70*~ ALUi-(P/AiPtfEf .TOT XSZ TfC REMARKS, SPECS. TESTS. ETC jffx ISTl/Ut PUMP : WOftTH)A>tTAJ SELT -- PRIM INC, Ut$ 2CNHX-84- = 2" suetipv ^ 2" DiscJiAme % 3 I ^ react ____________________ l2JP__KJJ-x'7^__nt (rutnpl Derr.__ tl*.. S3S)__________ Moyjri cat/ok)__ ggay/Arp : . chanc,e___7,s hp m?tc*. to t s up RAT RAT1 iRAT *C*pSCliy in xcota'ormaximum dtsign lot control purpesos. MV NO. ,A REVISION i,-,..Si.-. A ... HHirmi TIV 1 DATS A * MONS 095481 TAUK CAR uNlfiAbins, Purrp bct^ ozot-a/ CENTRIFUGAL PUMP CALCULATION SHEET - AROfi OA VJASTe tlSfPSAu EQUIP. IDCNT NO /- no |auth no. 24 )!> RV W APPQ SHEET 2 CONDITIONS Material Pumped \s/AST jAROCLO/! P.T. Pumping Temperature IZMZjc 2IZ gpm" Flow Rate: Normal --LQ.Q_____ Design . too _ 5- Specific Gravity* /3/fo A^/__ Density iO>% r*)?.Z m/gei (i - Viscosity*________4_T<?. / 0' Cnlma. <t '' "Vapor ~Piessuie`* Ak>/"fGL' . mmHg___ l\P'. Control Valve A/ 0AJ nsi: Equip. _ NAj Pipe {Material CMfigFw S7fei sch uiomww.lti .put -psi 46 \ Nominal Size______ 3_1!Suction___3 '____ Discharge rf, Actual ID, inches_]?.*Qh$.__Suction At Pumping Temperature Onrh*tg EQUIVALENT LENGTHS Enter Type and Factor to/ each valve or fit ting. Enter Numbor of each type, and line size. Multiply Factor x Size * Num Type |Factor ber and enter Feet equivalent length. See handbook tor types not listed. Factors for Valves (open) and Fittings G|p 1.1 Plug Valve Globe, Lift Chock 28.0 Butterfly (6" & up) Wye, Angie, Diopht 14.0 90 Std Elbow 1.5 90 1.1. oi Weld ell 1.7 1.7 Std Tee (on run) 1.7 2.S Std Tee (side out) 5.0 Swing Check n.o 45 Std Elbow 1.3 Length of straight pipe in feet wP.A.JiL TU if- I'l iLV. 2 /,,- Total Equivalent Length, feet FRICTION HEAD LOSS A/,.,.5/ V (0.408) gpm/ti*, feet per second ` ^ ffO- $ ^ , ' c Re (Reynolds Number) (3162) sp5/Wfi (/ *^>^7) /- Friction Factor (See Appendix C of D14.2 Std 2) if Re < 2100 omit this step. [(Re*1 gtOPV - friM \i A h feet of fluid per 100 feel equivalent length. (Re > 2100)- 18.63 /V7rf J Total Fiiction Head Loss ~ Aa x /,/100 x 1.15 (safety factor^ feet of fluid SUCTION AND DISCHARGE HEADS Suction Vessel Pressure (psia x 2.31/5) Liquid Level (above pump *; below pump -) 1+) 24.4 (f) /. o Static Hoad (above pump *; below pump -) Total Friction Head Loss (Plus Velocity Head. See Noto 4.) <-) HMUAi. ---- Vlv (Apn x 2.31/3) {See Non. 1 and 2)J*.CW (-) 2, 2 0 Oi ifice fAps. x 2.31/1) |Se Non 2) (-) 0 Equipment (Apsi x 2.31/3) (-> 0 Suction Head Sum, feet of fluid, abs. 77. U Discharge Head Sum, feet of fluid, abs._________________ -- DYNAMIC HEAD Discharge Head Sum Suction Head Sum 77)// - Total Dynamic Head, feet of fluid NPSM Discharge i*i 24,4 i+l ?S.O 1*1 IS. 8 <> 49.4 r> u *) c> SYSTEM HORSEPOWER (estimated) ///> . piI-u-h---T--O-H--x--5--- 3960 fc'(Nott 3) (CO , 9 2 - 1.39 3960 * X0. )s XO, 3 10, 3 ________ _ "TTaT > )4,C 92.0 NOTES 1. Assume contiol valve loss to be /U" to IUQ'joI piping plus equipment (notion loss for initial calculation. Consult instrument engineer for final selection, Suction Head Sum P,y* tmmHg - 0.04b'5' or (psia * 2.31/5) NPSH Available, foci ol fluid, abs. PUMP SELECTION l.tam'frctu'i-r 7**2. _f. ; Model Ja_?_4..; Type Speed / 7 > l''___ 'pm; 1nP Sire. ^/Z.. . Hr*.. _____ ; HI o. GPM (66; ioh_22_______________ ; NPSH Tffg/0 2 FT. 27. (n p.fn,wv* ' 2. Ccntiol valves ami orifices not normally used in pump suction. 3. Use combined efficiency ol pump and dnvo. 1. Sec DM.2 STD 7, ,t i-.uidc for U.,* use ol thu calculation piocortme. MQNS 095Adi ____ |Sjj^ cemiFuoAi.nMP PERFOMUNCC 6ATA Atone*. V/tiTf Disposal **c*t0-aL0/-0/ QUIP. (DINT NO._ /-/// rfy ruwcTiON L. ' TANK TKUCK UNLOAOINS PUM" 70 pump WAS re AQOCLOK. OUT OP STORAGE TAAiPS into Pesiour TRAiLta.-______________ To Pump a pone* -hmtak from Res/eue taailfa iuto stm TANKS- TO CIRCULATE_______________ STOAA&e TANKS Oft, RESIPUS T/UUr* operation interhitteiut___ PumpimA OUTYi tgf INTERMITTENT [^CONTINUOUS HOUWSPEWYEAW MATERIALS HANDLED COMPONENT UNITS NORMAL DESIGN AktCLOP. TO TRAILER 6Pm too too Anode*- MeNTAR -r2_70jWi JJLSl loo 5 ClfUVLAlf TAUKS OH TAAH.tR <jrn 100 JOJL ` REMARKS J TOTAL * BOLIMX''' y/oil TtM* PF PUMPino tMPgBATUB, pt7* f 200 SlQfrPROCESS DATA_____________________________________________ l*** {J2 ro l'4y ffsoF/.jy to/,$Y IcpVstaluxino. temp *r VISCOSITY, Cf*TfP0tS iunitK?pt 4 JO fQ eor $qq to 100,000 _____________________________ vapor psia,>t N6Lm......3** Nt&L. 1o-ips _________ % *t (density [mu COOWOSlOWPOSIONi KffNEOLlOIBLE__________QmOOEWATE ___ _________ ESTIMATED PERFORMANCE REQUIREMENTS eAPACITV. UBOfM: NORMAL ,/gjgL. i MAX DESIGN IOO ; CONTROL ALLOWANCE* PUMP RATIO CAPACITY (MAXIMUM OESlON CAPACITY PLUS CONTAOL ALLOWANCE). USGPM, STATIC NSAD0 PT. JZ1L IS. I jH EQUIPMENT LOIt, Ptl NOME PIPE OlA, NPSl SUCTION iNmii PATtO TOWfPYt ; DISCHAftOB PIPING LOSS. PSI: 21 L NCPMAL (AVAILABLE NPSh, XT: PTP FROM PUMP CALCULATION SWEET NO. 5 3S JLL 2tJ_ SYSTEM CURVE CALCULATIONS FWQM SHEET NO. pURCQ Mg 7i00V ; pW1 V 6 * R<? g*-* C MO T0 * QtuWBINE Q OTHER MATERIALS OP CONSTRUCTION: CASINO ANDNOXILIS ductile IMPILLKR SHAFT, SHAFT SLEEVE DUCTILE UNSPS IKON IKON_______ PACKING MECHANICAL SEAL PACKING GLANO BASE PLATE CONSTRUCTION FEATURES REQUIREO POR PROCESS OR PERFORMANCE CONSIDERATIONS: REMARKS, SPECS, TESTS. ETC. jtxtsr/Nc pump: bVRCO A-20 DUCTILE j.nuM.efi. p/a. __________________________ ( ZSO__KPM,_Z<) Ht.-CIPTP* Ifhmol 0err, item n. 6 / 7 q>- AP-o) IRON Sss(|A lot control purposes. DIVISION aBtutr. iiWA mi*nr r^a ro An sm liA Mgv/ \i/n/9j\ MONS 095483 'faILtAOm fUMt J SeCrTT *iW~ &/. BtQUIR. (DINT WO. I -- / I I . PIAHT. !* w. 6. NitMSve* _DTI ,MT * < * CONDITIONS Material Pumped. was r__e____ a Roclop. P.T. Pumping Temperature . S3 200 too S" Specific Gravity* L3 2 r L4 7 Density H>4 re 12,3 ih/*w 4 To pt* " .Yppor, Pressure* NC&l. mmHo N(mL. ,NP AXIS.,,. osii Eauin. NCAj Pine (Material CAKtON fUlL Sch or Weil Thk Nominal Size 3" Suction 2 * Diachate* d, Actual ID, inches 3.OCt Suction 2.0L7 At Pumping Temperatura EQUIVALENT LENGTHS Enter Type and Factor for each valve or fit Suction Discharge ting, Enter Number of each type, and Una size. Multiply Factoi * Size * Num Type Factor JS Number Feet Type Factor e Number Feet ber and antat Feat equivalent length. See handbook for types not listed; Factors foi Valves (open) and Fittings Gate LI Plug Valve 1.5 90 1. >. .1 Weld all . 1.7 Glebe, Lift Check 2B.0 Butterfly (6" A up) t.7 Std Tee (on tun) 1.7 Wye, Angle, Dlapht 14.0 90* Std Elbow 2.5 Std Tee (side out) 5.0 Swing Check 11.0 45* Std Elbow 1.3 eu 2,0 Wk 1.1 Tff/!/, rJSJU ) <5 Ie ___ ___ ZEO 5 z 1 37 H47C U 4 7 IS (Tiuthsj t.s <3 *> p 1 j 1 8 I Z Tt 1O 19 Length of etialfht pipe In feat SO m t. Total Equivalent Length, feet 109 MICTION HEAD LOSS {040^/10(^4,4} Vv-m (lu0.4e0u4e)rt&pmm/d*'l,, freaert per saeacondo ` _ s/ ./ Re (Reynolds Humbat) - {ilWtpmS/dp 1 (Wofytoetfajt. \ \s \s \s . x /c 2$/. 0 f/j) / Prlctton Factor (Sat Appends C of D14.2 Std 2) il Ra < 2100 omit this stap. feet 6f ,,u,d pei 100 f8#l *qulv>nl length0*\^'0t5)/S.07 Aa L(mRe.>> 21001 -* W.M/vVrf J pq ( Suction 434 ZO, 400 0.021 2/3 a Discharge 9.S* 3 6.400 0.02+ Total Ftlctlon Head Lass Aii x L/l00 x MS (safety factor), feet of fluid v 3.74 SUCTION AND DISCHARGE HEAOS y j Suction | Discharge | SYSTEM HORSEPOWER l.ltlmjlrt) Vassal Prassure (pslax 2.31/J) Q4,7*1 ' *{f(" Liquid Laval (above pump +; below pump -) () 24,A El 24.4 1 m i. O gpm x TDH S 3*2 Static Hoad (above pump *; below pump -) TotalPilcUon Hoad Lose (Plus Velocity Head. Sea Noi SSSSt Valve (Apsl X 2.31/S) {See Notes 1 and 2) Orifice (Apsl x 2.31/S) (See Nats 2) Equipment (Apsl * 2.31/S) Suction Head Sum, fast of fluid, abs. W 2 S.O 1 M 3.7 l|J| 3 3,21 (-) 0 () 4S-.0 (-) 0 (*) 0 (-) 0 () 0 immmrnmmm Dlschaige Hoad Sw% foot af fluid, obs.____________ DYNAMIC HEAD Discharge Head Sum II 3,6. \?9.L Suction Head Sum TDHm Total Dynamic Head, feet of fluid NPSH Suction Head Sum - ?l.7 ___ JQj.j. 21.7 Ptip (mmHg x Q.04S/S) or (psia x 2.31/S) NPSH Available, loot of fluid, ab>. 21.7 uMP SELECTION _ AVS Mjnuf.ciuic._____ P.H5J0________ . Modol__A 2 ______; Type .3 X 3--______ ; tpaad i7SO tom: Imp Size____ lj_ " HP 3 awi IPO ,, : TDH ' IIS NPSH__ 1. Assume contiol valve lets to be 70% to 100% of ptpmg plus equipment fiiction loss for initial calculation. Consult instalment enginoer for final selection. 2. Control valves and orifices not noimally used in pump suction. 3. Use combined efficiency of pump and drive. 4. Sec D14.2 STD 2, .1 guide loi the use of this calculation pioceduie. '.iti im HP* MUNS 095484 3 Monsanto c O M If * H r NAMg wait function 7*0 TO OP o-aejme-K cx-at -- 0/ WA7E*. PUMP inMALfUMP flOuir. IOSNT NO..--LrJlZ. LIANCE bATA Loj-- ArcfiM Wimr IVftinr -H.AHrWS.Jf W?6.%emey -PATS lO/tih* XHUT_ 7 q>2 BOOST?*. PUMP t TO gg AELOCAtYd no. RgQQ y WLLWAtER. FROM AN 1/PJC>Yrs,P0vkio well In/AT?* HCADPg THE COfJTACTO? Tt/gr fOA <3 UFN CH COOL /VS AND TO THE TO? TA/ PACKSP COAUMN FOR Hd ABSORPTION___________ _______________ opKWATioN___ CONTINUOUS.___ FL6W__ &4V.igLCP COMPONENT DUTY: IMTCRMITTENT....... ^CONTINUOUS__________ HOURS RtR TEAR MATERIALS HANDLED "" ~ UNITS NORMAL OESION REMARKS WELL WATER TO ONTACrct TUBE & PM (oO 14- 1 )MIL WATER TO IU CITED COLUMN 4iM .-14- 80 total soti &TMJ J1P - / S'0. TF.NCt IPUMPIMO TgMPKRATVRt. PT,* PROCESS DATA g........\LM~t"~ /,0~ frSOP i,~0 " jcRVSTALLI tlNC, T|M viscosity, CFT!poise iunitsiOpt /,3Qwr /./ VAPOR PRESSURE, PIA, g FT Qt / fl >tV # [SOLIDS T KAC % WT }oENSlTY |sUC CORROSlON/EROSIONt te?TNC0LI0IBLt QmODSRATE Q SEVERE ?2_ ............... ESTIMATED PERFORMANCE REQUIREMENTS ............... CAPACITY, MSQPMi NORMAL /3Q : MAX QUIQH ISO______ ; CONTROL ALLOWANCE* PUMP WAT CO CAPACITY (MAXIMUM PESION CAPACITY PLUS CONTROL ALLOWANCE?, USOPM, L STATIC HEAOS'PT, ^ FT j.J* / i3 | EQUIPMENT LOSS. PSIj____ ____ NORMAL f/Q ' m*Y PIPE OlA, NNi SUCTION 3* j PISCHARq 3" ^ g " | PlPINOCQIi,~PSl;NORMAL________7 AAT --SOMSOL VALVE PRESSURE ORQPi~PSIt /fl NC RMAt} AV AIL ABLE NPSH, PT: NORMAL 77.3 RRTEOTOnQPTi Z7C FT i 20 PSI FROM PUMP CALCULATION SHEET NO. es sr SYSTtM CURVE CALCULATIONS FROM SHUT NO. PV*Cfi Mff~7SO0V ' OWIVEW J^SLEC MOTOR Q TURBINE pOTHER WAT MATERIALS OP CONSTRUCTION: CASINO ANO NOZXLIS ^iior 2o IMPKLLCR Alloy so PUMP DATA _________________________________________________________________ RACKINO MECHANICAL scal LlNtRS BASE PLATE CONSTRUCTION FE*RURES REQUIRED POP PROCESS OR PERFORMANCE CONSIDERATIONS: REMARKS. SPECS, TESTS. ETC. exisriNC PUMP ; PUAtO A.7.0. Site : 4X3 XIO LOT 2 0 impeller dia. 8 7b 3500RPM 75 HP ~7r*ef)oil)kfr. item Wo7 (>05) modification aeomeTi Increase Imkuc* sme qm ~$W~ to__ $T_ *Pljlttrtiy IR Mem of miximum dotifn foi control purposts. MV NO. , . "TT~ REVISION | ST OATC | APPQ . OATS 777 TATT7"P 5'7a-.-.;--..--.-.-'--------------- : . '' ------------------- =------------ o---------------- HUNS 095485 -- ' MJE '&OOST** Pun? saer. o z.o/-0/ jDCNTRIFUQAt. PUMP CALCULATION SHEET Akoclo* WdSTf diSPaiAU IIIQUIP. JOINT N0. I-112 ||rau--t-m--nKoA.N. T W<Z |.y W. &. NlEMf'ffH oat, /<>//n /7o ' 2 0^-: Sm Soecific Gravity* _ /, 0 p m Viscosity* /. 3 Density .33 10/AM Ptm " Vapor Pressure* AP: Control Valve 9.3 mmHe 9. 1 P osi: Equips 1X9 BS tf, Actual ID, inches 3.FA8 -- ,v .. 1 - - Suction _*_y f Or echargr - Suction lAhl/^ALZCkscher* At Pumping Temperature # SMAf HOMHzItot Fit TO'. z IB f *0MftfTf/l 5 1 * EQUIVALENT LENGTHS Enter Type end Fectoi for eech valve or fit* Un|* Enter Number of eech type, end line size. Multiply Factor x Size x Num* Oischatge bet end enter Feet equivalent length. See handbook tor types not listed. factors for Velvet (open) end Fittings Get* 1.1 Plug Valve l.S 90 1. i. oi Wold oil 1.7 Globe, Lift Check 26.0 Butterfly (6" A up) 1.7 Std Tee (on run) 1.7 Wye, Angle, Diaphi 14.0 90 SU Elbow 2.5 Std Tee tstde out) 5.0 Swing Check 11.0 S* Std Elbow 1.3 Length of straight pipe in feet L Total Equivalent Length, feet FRICTION HEAD LOSS vw . c V-{0.S)pWrf*, teetper second ('-4*X,XV4,4) fte (Reynolds Number) - (Sl62)tp-.J/r^ (*er}'/,j) /* Friction Factor (See Appendix C of 014.2 Std 2) if Re < 2100 omit this step. A* [( > 21MI * m!h '*' ' nul<l *" 100 ,Ml '"!' ('S-1 Total Friction Heed Loss * Aa* L/100 * 1.1S (safety factor), feet of fluid SUCTION AND DISCHARGE HEADS ,, Vtssol Pressure (psiax 2.31/S) to nit Liquid Level (above pump ; below pump -) Static Hoed (above pump *; below pump -) HUMAAtf 1.4 ntt Volvo (Apai x 2.)i/i) (See Notot 1 end 2) tftl Orlfite (Apt! x 2.31/St (See Koto 21 Equipment (Apel * 2.S1/J) /to ft! SuctlpA Head SwqjploAIttiM, aba. Dleehatte Heed dal fluid, abe._________________ Suction Oischaige SYSTEM HORSEPOWER (estimated) (> Baz -> 33. S (l 0 . .tjj___ !AL- <-> 2.5 <*> 22.5- Up - ppm x TlVt v S -t------------------------- 3960 v /-(Note 3| iso , 3QQ. I.o (") 0 (+> 23.1 (-> O in o 3960 x 9.33 X 0. 3 (-) o 2 77. 0 . 77.2 ttiMmm 3Z4__________ DYNAMIC HEAD ^ Discharge Heed Sum Suction Hood Sum TDH* Total Dynamic Heed, feet of fluid NPSH 3 77.1 NOTES 1. Assume control valve loss to be 70* to 100* of piping plus equipment friction toss for initial calculation. Consult instrument engineer for linel selection. Swuscutiown Hnevewd Swumir .. . Pi* (mrnHR x 0.04S/S) or (psie x Z.31/SJ (p. I $[** V NPSH Avellnble, feet of fluid, abt.___________________ 2ZZ 7.3 2. Control valves and orifices not normally used in pump suctron. PUMf SELECTION Manufacturer_________________________ ; Model. A smmd 3500 rpm; Imp Size ft.* HP_ QfM I SO TOH_____ 312 70 AVS , Type ,4 *3 * ^0 Ell : 3. Use combined efficiency of pump and drive. 4. Soc DI4.2 STD 2, a guide (or Hie use ol ttus calculation procedure. 1- "VHP. 1Z v3>. Nr.- L `' AIVISION 1 PY | OAT( OAU MONi 095486 '____ m W'v -- TANK OR PRESSURE VEKa PERFORMANCE DATA Ihoj-- A2eq.it Waste Pis rosAi Seer, 02.0/ --a/ lltQUIf. IOINT NO. /~ /f4 AUTMNO. 24 IF MANT W.C.K. If W &. NlEMFYER NATf JO/, t?o NAME tvEL. OIL S70RA&E TANK (exhtwh /At PL Act) NO. REOO FUNCTION to *eegiy F-m oil ani___Heie as auxiliary back up fuel AMCLt*. INCINERATOR. 1 for. duration BATCH INPOT FROM 7P.VCK UNLOADING ( Remote stoaase FU1H/ TO INCINERATOR RUKutR Dotiwi SAS Curtailments MATERIAL UNITE Ht.lfun.OIL TO WCMEtASCA 3 PM MINIMUM MAXIMUM &ZA____ l.rjr HtAuhlOIL TO CIRCULATE & PM ____1^____ ______10. F WORKINO VOLUME CAPACITY TOTAL VOLUME tfRETENTION OR cvcu* TIMC INTERNALTEMPERATURE OCNMTT ARIA OP Q JACKET OR 1x1 COIL MCATINO OR COOUNO , PLUIO PLOW RATE TEMPERATURE UNITE NORMAL OPERATION &AL I8QZO CAL ________ s_iao_____________ SAL TVloo DAYS VARIES ______ ATMOSPHERIC______ AMPIFNT LiS/sAL 7.4 To 2T? FT* IN OUT DC SION OASIS J 8.120 980 - 12"ST. SIM 19 COO ft 3 AT mA*. eu tort ATMOSPHERIC APIlieNT 7.4 TO C..9 IN OUT C ____ freei. CONSTRUCTION falNTBRNAL COM* flEXTERNAL COIL NONE T j*we- flJACKET INTUMNT COMNNCTIOMt 0M[ LEVEL iNOlCA TOA ntnutHtt d<*. h*. c- issrsr oAn r/s/s-j NltfLATtON MOAIF n* (Avet n**t AS > IN C- 13 S7F VKMTB, IN1UW WKLIir ONE 2" YEA>T otmkh si[ reFeetnee tww< or this sr-f-NR vJ.C.A riAur. mwuol pfrr. item No. 20s rnyutJM-; -- :fvvi .`k -- NOZZLE. CORR ALLOW. CORR ALLOW. CORR ALLOW. SCHEOULE hpjjl: THIt "TANK U EAIS71NIL IN PLACE MODIFICATIONS -&SS.___Util___inteinal nr pipe to _f'H__ 2" NOZZLE Ft*.__ RfCiPcvUrre on, FRm i-IIS ON___tJH- sT HONS 095487 -- ' %,- SEC-T. 02-0/ --0/ Monsanto COMPANY Fvsl Oil Pvmps jjfQUIF. IOCNT MO. ! " ! PERFORMANCE DATA mAtoCLQK WASTE DISPOSAL I >Z3 PLANT W. &. K date IOflf7C >Httr ' JVSL 7/A/G /A/ ft ) NO. RCQQ 2 function -TP ruidr_ No, 2 pUEL <7/4.. FROM Fi/El OIL STOP ACE TAMM >-// TO A HO CL OR IMCIMEPATOA__________________________________________ J operation TO Be. USED POPINC, <*AS CURTAILMENTS /A/ WIMTEK MONTHS IN TEAM 1 TTEMT DUTY MATERIALS HANOLEO ' No. 2 FUEL OIL PfSCPIPTIOM POSITIVE DISPLACEMENT - ROTARY &EAR TVPE ' -- process PATA ________ MAXIMUM fiUA/LMJ/.M DENSITY viscosity FLOW____ r t.ss -&I*L TO BvAnfa. FLOW = CLSZ &PM ______ m___ B URNEP. OP N. Z Fuel -J/-U- 7.4 to 679 L/S/6AL OF N.. 2 FutL ou 2 FO'F : 48 to ?E SSO EQUIPMENT SPECS, MATL OF CONST, ETC. MATi. OF CfiA/SrfUCTJftuCORROSION ALLOWANCE * 1STUK POMPS'. ROPER. grPCIST ____ Case ; -CAST__ LAtOl________________________ VV* INLET fOUTLET Gears: STEEL 2 HP. 12.00 RPu1 shaft : STEEl NomihAL___CAPACITY - II & PM (Phenol diet. Item No. 204 / 205}. RCMARKI, TESTS, SPECIAL. FEATURES, BTC. A CESS___ FLOW____TA .M___ RECYCLEP TO STOKA&E TANK^ 1-114 THRU____A tgESSU&JE__ ClEXSe.L VALVE.______________ :_______ZZ__Z_ ~NOk M AL~ PuM P DISCHA PC E fke SSUP.E~- too fS/& ' MV NO, VA 1 -X. MVtSlON ST 1 OATS 1 AFFO 1 OATI MONS 095468 :Wi S>d cr, 3 Z.&S -- <?/ Monsanto TANK OR PRESSURE VESSEL PERFORMANCE DAYA ARKLOR WAIT/- DISPOSAL (Quip, ioiht no.___ l-UC. |AUTM no. \ByW. 6. 2N4/EfMEYffj BATE sfi&j 1J7L9. . AWP r\,tf, W'.'tfijL H!T I 0, I am STORAGE TANK (ex/ST/N& !AJ PLACE) function to Receive A Hoclor waste And holo for iNcirueRATiotj operation BA-TCM INPUT FROM) DRUMS TAfJK TRAILER ( TANK CAR unloABiNU Hatch Loading to tamk tKailek or trams fit* to qthfr MATERIAL UNITS Aroclcr th au e.B.-kerntts, (*< AP.OUOK TO TRANSFER AROCLOR TO CIRCULATE (SPM Jj? 0 100____________________________________________________ _ /o o C WORKINO VOLUME CAPACITY PREEBOARO TOTAL VOLUME 5rtcntion or n cycle time UNITS <3>AU &AL &AL DATS INTCRNAL TEMPERATURE DENSITY % 200*? ARgAOP JACKgT OR gj COIL H1ATINO <T S' PLOW RATI PRCSSURg TEMPERATURE F TTv5T FT* lbs/hk PS/& *F NORMAL OPgRATION IS 620 9$ 0 19,600 ~ VA HIE S atmos ?Hi*>e ZOO II. o to 12.3 ZS.& TJ5 80 324 in 324 out OISlON BASIS 18 620 9 80 = 12" ST. JIM 19. 600 ^7/ ATMOS PHtRIC ZOO 12.3 25.8 320 100 338 ,N 338 rw;, ~gi ~"B 'fi**h ' |t yTT DIVERT (--iHOW MATSRIALS CAgBO/O___ STSet-j SA-28S- 6RAPC e CONSTRUCTION jgpNTIRNAL COIL Q IXT IRNAL COIL Q JACKET " DIMENSIONS /3 0" OO 20'md" HlOH/D CONN ALLOW. CORN ALLOW. REVIEWED WITH MATLS ENQR Q T tt Jgfr I'-L" DIAUi, IttI Tt UvR^rNvS* QWF-PMV V-p fr/fTtC\*Hnj, t't'*y` 'SW, 0QvSji fj? >it>E aJTKIAJ<*. lONr. MlUCO SSfSP RfPVCfK Iff MQOBL 2JO VSE tOj 17S0 I 420 AfM INSTRUMENT CONNECTIONS ONE TUF/tHtVSELL V,W- ONt LCVti. iNPUAroA THIS TANK IS insulation jw THlfK K 11.2 S7D 100 WEAThEK RAR/llFO. K 11.7 S TP L? V1NTS, PRESSURE RELIEF OUZ & ^VEftj T SCHEDULE l. RtF*ENCC bRAKlVL EXISTINi IN PLACE oTHH ggg nrfftewce orawiml oa this Tajik . P Nsu_I>_r i <? AV~".t-)o. 749.10-4- IPS \MODIFICATIONS ; mpdiay 24" lot MANm-r et*n p-ok __ hCAHHS lk--<tM/-*'*.'UAL- mod icy Lfi'ft iHQiCxror._________________ MONS 095489 'I Monsanto TANK OR PRESSURE VESSa PERFORMANCE DATA -- AkoCLen WATTE Disposal EQUIP. JOINT NO. AUTH NO. 24 I S' t~ n7, PLANT _W 1^" QATt 3/18/76 function fa RtCEtve AlOLLOR WAiTf AND HOLD FOR iNONEFATiON e^tWATlON BATCH INPUT FROM DRUM TANK TRAIL ER ( TANK CAR uhlOADiijS BATCH LOADING, TO TANK TRAILER OR TRANSFER. TO OTNtp C T> A A/p )-/// A.< /_ / / Q MATERIAL UNITS AROCLtR trails*, loading, <S> PM too AROCLOR TO TRANSFER 6t Pfl too ._ AROCLOR TO dRCULAre 6 PM ,aoo_________________________ I__________________________ UNITS NORMAL OPERATION CHON OASIS WORKINO VOLUME CAPACITY FRCEOOARD TOTAL VOLUME &AL &AI &AL \8CoZo___________ 380 _ ._________1 ?6 0g____________ IRC.ZQ 9 80 - I2"ST. SIB* f 9feoo____________ DAYS Varies 7. / Atmospheric ATMOSPHERIC- INTERNAL TEMPERATURE *f zoo 2 oo acmirr a? ZOO'F Lt,AAl U.O to 12.3 12,3 ARIA OP JACKET OR (SICOIL. FT1 2 5. 8 2 5.8 L HKATINO Bpi PLOW RATE PRESSURE L BS/HF rstc, 140 HO 320 LOJO F 324 * 324 OUT 338 ' 33 8 [ttp gfvCWT HOW QtMgNSIONS /3'*0 ^QP-ig^g^HiqM/R patir.ali CAB86AJ STEEL^ *A - 2 fl T 6RAPC C CONN ALLOW. conn allow. CONSTRUCTION Pev.gwVo WITH MATLS tNOR QVESpftS* [(g INTERNAL COIL fcj EXTERNAL COIL, JACKET I'-V D/A L 'VCfUANS 9hj 4"rITCH, 4f>, STt?< ?/f* `NETTLE SCHiOUUE aoitator }/* EN7E*IN& IOHrMixCO~*ZtO VSElOAlORfH^ 4 9Afrits EQ. trACEt> J'-Q"X 18-k" LO* INSTRUMENT CONNECTION! QfjP THBkMPWfLL SC REFERENCE DRAyy/M ont. Lfyei jAt&c*Tp*_________________________ NQTe : insulation \W7HICK K\t,Z STD loo iNEATF/r.R 84 RR IE & K 11.3 STfi 6r THIS TANK IS EX/ST/Ng )H fLACt RIIURt MLUK ONE C" MfAJT othkh Sfp REFERENCE DRAWIA/S <?-* TVtS IJ.&U v/latank,._ p";_n_p.- yoi- - moz. AiTth. No. 74 2.10 -4-/0 i MCpifUAjlCMi: _m ^r-^Y__i erf l ..wr&f.ff'S.... (mt/ei pen, item No. zoi) HC wvwb. OATC APPO OATC -Id MGNS 095490 ' V1' ' ' -"1% -T'J 'f*' ' i Monsanto e b m *am v TANK OR PRESSURE VESSEL PERFORMANCE DATA ' ieen crke>J-J/ !OUIP. IOENT NO._ /- ue_________ UUuTH NO., 24/S- MNT.OT- vW. &,N MfYfiBA,. 9/16170 FUNCTION TO Rtce/vk A M/KTUf/E OF MIQNTAR ANO AKOCkoR WAS7C an D HOLD FOR INCINERATION operation batch INPUT FROM tank trailer. CONTINUOUS FBSD TO INCINERATOR BATCH 7RANSPER TO OTHER STORMS TANKS MATERIAL UNITS WAITS AROCLO*- MQAJTAd MIXTURE to tNCMtAAlt*. `*hh. WTAR H/KTVRS TO TRANSFER & PM !2so too 1-1/6. Ano 1-1/7 WORKINO VOLUME TOTAL VOLUME jg RETENTION ON Q CTCLE TIME INTERNAL TEMPERATURE a 2oo *f ~ ABBAOrQjACKBT OB gf COIL TBMPBNATUNB ,Ak_ &AL JiAL_ DAyS f --4HLts/HK rsio, NORMAL OPERATION iei2o 98 0 I9&00 VA Rif5 ATMOSPHERIC zoo, II.o TO 12,3 JS. g lCL 80 3 24 384 OESION BASIS I8(,2Q 980 = i?'ST Slot I 3 (>00 _Z_L 200 12.3 25, 8 32 0 too -338 .3,3.8 class JLL type carbon___sreei.; Ml f~3 HOB SA-2BS chape c 0DIMENSIONS_L3J^'f OP 2 Q CORR ALLOW. CORR ALLOW. HIOMQ CONSTRUCTION CORR ALLOW. _ INTERNAL COIL Q EXTERNAL COIL JACKET_____________________________________ ?-fe" DIA. II TURNS ON 4" PITCH I H "*<* 84 STEFe. PIPf aditatoi. TOP ENTERING /5 HP, /FALK RIOVCtR. URPM___________ 4 BAfFLlf E9. SRACEO' I'-O^H !-(,"CONS, INBTPUMBNT connbctionb ONE THERMOWELL ONE L gyf L INQlCATOR insulation 2 thick k II.2 K/J.3 STD 700 STD 6S~ MOTE: THIS tank BNT, PBBSSUPB SlUtF f> N E CVENT bl-OZ^LS SCHE0ULE~ SEE REFERENCE 0RANIN& IS EXISTINS IN AlacC A NEW EQUIPMENT.-. othbp iff REFERENCE ORAWINC OF THIS INTERNAL HEATltJi COIL AS srectntB \ nuST/Nt. TANK , t>W(No,...O - LQS - HI. 7.0 2__ 1LAYl>J,....NoJ^2.-12JP.s.zlS.. L--M.O.PlEKA-T.imV__________ ___ _____ (ruetoti t>en. Item hit. 210) Mod ify___ Li/El /vp-(A1S&. MV MO. . REVISION AM*P MEW MEATINC COIL , V DATE | ARfO \ DATE W.&.N. TMMJML MONS 095491 Monsanto company -----------3i-_A Jl CCNTRIFUQAL JMP PERFORMANCE DATA AROCkOfi WASTC DiSP&ML \ /-//? l>NLQji>N& lUMP PVMP J&UtL (exisr/fJt function TO PUMP WASTE AROCLOR FROM THE PR UM UNLOAOING, SUMP TO THE WASTE AROCltfX. S70RAHE TANKSJ l-//i *uo !-))7 OPERATION IK)Tr#MtTTA>7 fl/MPlHG* COMPONENT MINTERMITTENT ri CONTINUOUS MATERIALS HANDLED UNITS NORMAL DESIGN Zr'oclor | &PM SO SO HOURS PER YEAR REMARKS . 9*ML TOTAL SOLIOLX^ ' 4FM 201 So OAS _PROCESS DATA______________________________________________________________________________ _________________________ PUMPINO TEMPERATURE. PT, * P |40 ~ I>p c F P T /, Sf To / SO TO /, ffJcRYST ALL1Z1NO, TEMP * VISCOSITY, CtNTtntSt iunithEpt 7 r 7S 9 *r 300 T ICO. OOP________________________________ VAPOR PRESSURE, PSIA, g>PT bi(mL. g*0F NSfrnL. loups NQ/Jf ; WT OENSITY EM:CORROSION/ERO SIO NBQLIOIBLf Qmooerate severe ESTIMATED PERFORMANCE REQUIREMENTS CAPACITY, U*OPM: NORMAL So ; MAR OfiSlON SO ; CONTROL ALLOWANCE* PUMP RATIO CAPACITY (MAXIMUM OESlON CAPACIT 1 PLUS CONTROL ALLOWANCE!. USGPM, ST ATIC MEAD fi> PT, 12- PSI I EQUIPMENT LOSS. PSt: NOAJg___ PIPIOIA, NPSi SUCTION NflA/ : OlSCHAROE I PIPING LOSS, PSI: 'leal i VALVE PRESSURE OROP, PSI: tO.A NORMAL AVAILABLE NPSH, FT: 2L3- RATED TON <9 PT: _fe AO- PSI FROM PUMP CALCULATION SHEET NO. S * $S" SYSTEM CURVE CALCULATIONS FROM SWEET NO. TABER DW!VEI< J^tELEC MOTOR Q TURBINE OTHER PUMP DATA MATERIAL SOP CONSTRUCTION: CASINO AND NOZZLES IMPELLER t>VCTU OVCTllt SHAFT, SHAFT SLEEVE PUCTliS LINERS IRON mooj 1 ROM PACKING MECHANICAL SEAL PACKINO GLAND base Plate _RNE Nome NOME . .. CONSTRUCTION FEATURES BEQUIREO FOR PROCESS OR PERFORMANCE CONSIDERATIONS: Ift/fZ. SWtreH 76 TUArt 0A/ AMP OFF REMARKS, SPECS. TESTS, ETC. __ gx/;rwc PUMP, TABER SITE CZ - YtATKAL' suction I1/*" dischakoe !7 rp ROM 1 S' HP________________ 231. ppindication RE4PJAEJLi-2l4l-JL s nr motor 70 7 s hp V,.' ' / tCspKlly ifTtictst o( maximum design foi contiol pinposes, MV NO. . 1 I1 - _i k_ REVISION ;" :; : 1' j BY ( DAT! | APPQ | U A T t " mons 09549^ Monsarto eOM^A'MV Mm|- svnp tmF ifm&ir." **&/--*/ PUMP ''CALCULATION SHEET AfOCLOK wasix turesAL. Iiquip. totNT no.-- i-ltf Iauth mo. 24IJT Pt>WT ''iitsfri' |w W. NIEHftf* DATE CONDITIONS Materiel Pumpad \A/AS7^ ARC C L Oft P.T. - Pumping Temperature *C 140 gpmm Flow Rata: Normal. S O Otalgfl S"0 3- Specific Gravity* /?f tp I,SO Pentr* IL1 rp f?.f iu/j. P - Vlaco.lty*------Z--Tg 75* CenWpeie " vPt>r Pressure* NE(mL mmHa NE&L. AP: Control Valve 10.4 pmi Pipe (Material_C; Nominal Size. rf, Actual ID, Inchat _NPfl 2" Suction S.OL 7 Ditchery At Pumping Tamparatura C EQUIVALENT LENGTHS Enter Type and Factor for each valve or fit* Suction Discharge ting. Enter Number of each type, end line elze. Multiply Factor x Size x Num| Type jFector| jg|Numbar| Feat Type Praetor] ]Numbw FaoS bar and enter Feat equivalent length. Sea handbook for types not listed. Factor! for Valves (open) and Fittings Oat# t.l Plug Vatva l.S 90* I. r. or Wald all 1.7 Hfu 1,7 [smrIl.aUdgdr M, Globa, Lift Check 28.0 Butterfly (6" & up) 1.7 Std Tea (on run) 1.7 TeeY* ).7| l 4 Wye, Angle, Dlaphi 14.0 90* Sid Elbow Swing Check______ 11.0 45* Sid Elbow 2,5 Std Tee (side out) 5.0 1.3 ttree p5,d 13 Length of straight plpo in foot L m Totof Equivalent Length, foot FRICTION HEAD LOSS V- (0.408) tPm/J*, feet per second C- v v/ N_______________ "~ Vto (Reynolds Number) (3162) gjmS/d^ (3 / ( 0 t 7)^3^} - /- Friction Factor (Soo Appendix C of D14.2 Std 2) If Ro < 2100 omit this stop. Suction Discharge 4,79 JOJSL Aa (nor; 2100) OilMfiiV^F^' foot of fluid par 100 foot equivalent length Q B, .(Ro> 2100) " 18.63 fV'fd 39 SUCTION AND DISCHARGE HEADS Suction -2UL Discharge SYSTEM HORSEPOWER (estimated) Vessel Pressure (psle * 2.31/3) LlQUld Level (above pump ; below pump -) Static Hoad (abova pump *; below pump -) <) 23? <4> m i. 0 aw amm <M 20,0 fr_ gpm*TDH*S 3980 x fi(Note 3) Total Friction Head Lose (Plus Velocity Head. Sea Nate 4.) <-> O (-) 218 1.42 mmm Velve (Apsi * 2.31/3) ($e# Notes 1 and 2) H 0 i`> 17.0 HPCeM, Po<4 3960 x 0,40 *0.74 Orlflcs (Apsi x 2.31/3) (See Noto 2) H O () v'lf/eufY Equipment (Apsi * 2.31/3) (-) 0m O HP- 4,3 Suction Hood Sim, foot of fluid, aba. Discharge Hoad Sum, foot of fluid, abs. DYNAMIC HEAD Discharge Head Sum Suction Hoad Sum 7Dff* Total Dynamic Head, feat of fluid NPSH Suction Head Sum Ppp (mmH, x 0.005/S) or (csia x 2.31/S) NPSH Avolloblo, fool ol fluid, t. Jju J^Z. J1 24.9 2 4.3 MOTES 1. Assume control valve less to be 70% to 100% of piping plus equipment friction loss for Initial calculation. Consult instrument engineer for final selection. 2. Control valves and orifices not normally used fr pump .suction. FUMP SELECTION Menulsclurcr___________ Speed_____ .rpm; Imp Size_ : TDH ` _; Model _ ; HP____ ; NPSH. : Typo. ; EH___ 3. Use combined efficiency of pump and drive. 4. See DI4.2 STD 2, guide for tho use of this calculation procedure. mv wo. ~|~~~ OATS MQNS 095493 Tpw; Monsanto C O M FAN V CENtMl PERFORMANCE bATA Nijnire*, o*te. AQ Jf.fi.WM. SHEET / - IHdijrRATIOkl FLOOR -Wwift/Xf WWf tllUSr/A/& In PlMC't function TO PUMP A MIXTURE OP WATS* APOCLOr ( MeAt TAR _rtf T//f AkOUOR - WATCR. SOf-tr^ >-)Z4 no. reop / P ton Florr operation INTER M I TTEA/T PURlTtA/& WA 7FP FROM R At fJ AMD Flop* WASI/JAlS, AHOCLOn AKttt HovTAR FROM PVMF LEAKA&e AND Out y: YENT Q CONTINUOUS MATERIALS HANDLED COMPONENT WATER -AROC10R MIXTURE___ | ARocioa J UNITS NORMAL DESIGN _ C.PM too. 10 0 0 SPULS HOURS PER YEAR REMARKS TOTAL SOLIOlx^' GAS PROCESS DATA ROMRtNO TEMPERATURE, PT,*P _j6l2. vncoiiTv7~ffNTtPotse <unit Pat VAPOR PRESSURE, PSIA, PT Q,?& _L__ /, /_________ Pao a JLL gtor 0,2 G |sOUP T#ACE /. 0 CRYSTALL1ZINO, tEMP'f ? WT joENSITY 3H COR WO SI ON/EROSION: fig NEGLIGIBLE Qmooirati (3 SEVERE ESTIMATED PERFORMANCE REQUIREMENTS CAPACITY, UIORM: NORMAL loo i MAX DESIGN 1QJD- ; CONTROL ALLOWANCE* PUMP RATIO CAPACITY ^MAXIMUM OESION C.APACIT.Y ALUS CONTROL ALLOWANCE), USGPM. / gp T ATIC HEAO 9 PT, WIRE DIA, NWS: SUCTION 2 P. biONS VALVE PRESSURE PROW, WS: 8.7 PUCHAWOE f^QA/ Pfr | EQUIPMENT LOSS, PS|; NONE wiping loss, psi: NORMAL lAVAILABLE NPSH, FT ZA. 3 S' RATEQ TON ft PT: ,,.4iL- FT !9,ST PSl TROM PUMP CALCULATION SHEET NO. SYSTEM CURVE CALCULATIONS FROM SHEET NO. ; driver ^Jeuec motor Q turbine Qother MATERIALS OF CONSTRUCTION: CASINO AND NOZZLES IMPELLER SHAFT, SHAFT SLEEVE 304 30 4 3 04 LINERS ss ss ss PACKING MECHANICAL SEAL PACKING OLANO RASE PLATE AiOfi/E biOt^E NONE CONSTRUCTION FEATURES REQUIRED FOR PWOCESS OR PERFORMANCE CONSIDERATIONS LRXEl twnCH To ToRht fuPtT W /A>P OFF____________ iTEAM SPARSE INTO TlPPR SvHP REMARKS, SPECS, TESTS. ETC. exhtins pomp: ......................... ............ ~ ~taser s>zt cz - vertical / ,/i" svption . / '4 ..DiscHAta I 7fO RFM ~ f HP 7. L31 ^JLSAS. l PCFT. 7 rfM Me. 2 I tT Cspiclty In excess of mtiiimum^tsijn fOf control purposes, sty no. I ________ __ i>iv')s'ioi_ W^UMiL YACHT A f <1 Pfl' FM WAV* tn tfM~ Ltu. ai ff* . f* appcha p r <m MONS 095494 'i;V- Monsanto COMPANY **T-f2?*f~**$ IcenTmfugm. PUMP PERFORMANCE DATA i ------ ---------------- `AKPCLOK wasre dismal EQUIP. JOINT NO ___ AUTM NO.-.24 I S' :w, G.,K. > W, tZJti'JJiHtXf* oi siriJJo APPO II. B WnJjL. Shut j_ NwpAyMiE> wAfiMi'C/tALto/fk\ *SyUnMr? rPyUrM>Pr _ (hCmxpur>/wt/eii IpN/y PrtpiAnceev) _Lno, wtoa function to Pi/a-tp accumulated aroclok from the 80trt>/v ar t//e AkOCU* - WATfK SUMJ>. 1-IZ4. BACk'~INT(? WAST/r AtOClO* ST*a&m 7ANKS^ hJJC An tt J-J97.: ........... _................................. operation INTIXMITTEUT PVMFtN& ... ..... COMPONENT OUT Y: (^INTERMITTENT [^JCONTINUOUS MATERIALS HANDLED UNITS NORMAL OESION ARPCLOR ? <s rn 30 HOURSPERTgAR ' REMARKS TOTAL ' ' <sm 30 solidys* OAS PUMPINO TIMHIUTuVl. PT, * P ) 4Q PROCESS DATA | P 0 R g P T /, J, g'O 0 F /. 3 3 T /. " * T ALL I UNO. TEMP ' W ------ VISCOSITY, CtNVMtSi (UNITS! gPT J fff J ^Qir If APQR PRESSURE, PSI A, g RT tfEG,\_k Q to r ------------ ago To \PO.QOQ ____________________________ I^ZZIIZZZZ (so Lips f40hJE %WT~|'pEN5ITr |sne C 0 AAONON/ EROSlON: 'RfNeOllOItU "" ' j~") MODERATE [H SEVERE estimated performance requirements ~ CAPACITY, USQPM: NORMALj Q________________________ ; MAX PgSiQN________ g Q; CONTROL ALLOWANCE* ___________ < PUMP RATIO CAPACITY (MAXIMUM DESIGN CAPACITY PLUS CONTROL ALLOWANCE), USOPM, C STATIC HEAOPPT, PIPEPlA.NPSl SUCTION 2^ PT /f,3 NQN i OUCHAWPC Pl | EQUIPMENT LOSS. P SI: NONENORMAL 1 2y |p|PlNO LOSS, PSl:NORMAL/4 (2t3i BS^--1 VALVE PREMIE DROP, Ptl NCRMAL ) A V AIL A PLS NPSH, FT: "2 S. 3________NORMAL *Art RATS RATS RATlQTOH^PTi PT 40 Pll FROM PUMP CALCULATION SHEET NO. &OUI t>i C PS 1249-3 fUM? &* SYSTEM CURVE CALCULATIONS PROM SHE! T NO. .CM 1*49-3 i ORIVK" frgfELEC MOTOR Q) TURBINE Q OTHER PUMP DATA MATERIALS OF CONSTRUCTION: CASINO ANO NOZXLES P PCTue IA.PM IMPELLER PUCTUE >K/>\> SHAFT. SHAFT SLEEVE tTtei / ti-ISKOftOHt PACKING MECHANICAL SEAL PACKINO OLANO LINERS BASE PLATE none N6ME NONE CONSTRUCTION FEATURES REQUIRED FOR PROCESS OR PERFORMANCE CONS!DERATIONS: igygL Switch ip tvan Tump____Qh> amp. off ~ S7AM HFATtA/(L COik T0 BE APP*t> TO Sy/V/>. REMARKS, SPECS, TESTS, ETC.______________________ ; Ex/sr/w& Pvmp:____ dOULPt . VERTICAL EPHP , HoPEk 3171 ................. " ~ J/gc: / ? * 2 x 8 .Ducrue mm___ m ret. Left PM. ~ 8Jq_____________________________________________ irSOj Hl^TEFC M D TOR JU>SF*(ATtftN. -MAV.I* gp ; CHAN&e CHP JHO7P* TO to HP_____ T" '"~ ................ ' , Morea: Zi Li. IS CHALKer.}____ J3 ^_Lfe.__ Hen xj.ui-iji.___ (aisj. " tM* ol maximum dtal|n lot conuorpurposos. RVNQ. . . . REVISION . iW OATI 1 ARpn | OAT* A t v,al.` a.: $$!<" ------ :---- -------------- :----------------------- ^SCK >Z-o/-r/ Monsanto COMPANY centmfuqm. hump PERFORMANCE DATA AmciaaWaew D/spvai EQUIP. IDCNTNO. / *" / 2 2 AUTM NO. 24/^* PLANT iv W. <. NlEMCYER oat. LOCATION I AWO MIIT NAME WATft SUMP reloeateF) NO. BEQQ / FUNCTION TO RUMP THE WATCH LA TER OUT OP THE A ROCLOR - WATER SUMP J I-IZ4 TO A PlAtuT SEWER OPgwATiOM IH 7AMlTTe/>jr COMPONENT DUTY: ^INTERMITTENT pCONTINUOUS MATERIALS HANDLED UNITS NORMAL OESION WATCH. 0 6 PM too too HOUHIPKR HH REMARKS TOT AL SOLIDS**"'1' OA* PUMPlNO TEMPERATURE, FT, 0 F PROCESS DATA TQ \40 {** "* ~P~PT 1.0 TO Q 9 S 0* <> F /, Q ___~fcR Y ST ALU ZINO, TEMPV J2 viscosity, CfHTtretst iunitsiApt p,f 7o/,4 frgor VAPOR MIIWKI, PSIA, 9 PT QJj & SO T O.j^ I, )___________________________ _____________________________ ________________ |sOLIOS % WT |pKnITYj^E^ZZIZIII CORROHON/EROSION: JgfNEOLIQIBLK --*** Q MOOERAT 6 C1Sevg,*E ESTIMATED PERFORMANCE REQUIREMENTS CAPACITY. USOPM: NORMAL. I 00 ; MAX OESION 100 ; CONTROL ALLOWANCE* PUMP RAT tO CAPACITY IMAXIMUM OESION CAP AC IT Y PLUS CONTROL ALLOWANCE!. USQPM, STATIC MgAOffPT, I^ *r, z NONEEQUIPMENT LO 66, PSI: PIPEOlA, NPS: SUCTION NJflAjg Z" PIPING LOSS, P81: AWWlt 3,0 NORMAL . VALVE PRESSURE DROP, PSI: RATIO TOM 9 PTi 47- -- I 11.2 NORMAL (AVAILABLE NPSH, FT 5" PSI PROM PUMP CALCULATION SHEET NO. 2 Z.S________ NORMAL __________ SYSTEM CURVE CALCULATIONS FROM SHEET NO. CVRVC ; DRIVER ^tELC MOTOR [^j TURBINE Q~) OTHER RAT' RAT MATERIALS OF CONSTRUCTION: CASINO AND NOZZLES IMPELLER SHAFT, SHAFT SLEEVE 3 04 SS 3 04 SS 304 SS LINERS . PACKING MECHANIC AL SEAL PACKING GLAND BASE PLATE NONE NONE NONE CONSTRUCTION FEATURES REQUIRED FOR PROCESS OR PERFORMANCE CONSIDERATIONS: REMARKS. SPECS, TESTS, ETC. L ...TAB (JL-t JSj2S_CTZ..jtE_R)is__Ne, 2? 7 - yjEATHAL. _ J-Y* "JiKAiA&E__ }S~$"JA4-S.^_______ ____'750 __5L-H____________________l_________________ -fr/irNy.' pr?i;. "rr.-'n n?, r/jjL ......" * Capacity in excess ol maximum design lot contioi purposes. RIV NO. A REVISION -JS BY | OATt 1 APPO | 0At| MQNS 095496 * . ,.>. 1M1 o_ns,anito COMPANY ^Bc-A <**.*/'-57---------- 1 TANK 04 PRESSURE VESSEL I performance data eouif. IOINT NO. !" 12 4 AUTH NO^ 24 IE PLANT WS.IE. PlSPOSAL W6. NlEMEYEH date 10/6/70 name AR0CL6R - WATFP. SomP (EXIST/NC function TC PFCFH/E AM AK0CLOR- WATFA PuAscs sr Settj.//j& . And hold !AJ PLACE) NO. REOD M! XTUP F . SFPAPATF For PufipouT / THF OPERATION /N7C r MI7TfjT IN PUT FROM I/JOHCRATI0N FLOOR. P*A)M St/Mr POMP/-/70 Ih/TIRMITTF.NT Pt/MPOuT Op Apoclor LAYER, TO S70PA6E TA/U/CS !->) i-H7 internittf/ut Pumpout of- water layer to s/tyvex MATERIAL UNITS AROC LOP. WATER SPM <S PM. 30 I4 .... . .. WORK 1 NO VOLUME CAPACITY PRSCBOARO TOTAL VOLUME J^RETENTIONOR fl CYCLE TIME INTERNAL PRESSURE INTERNAL TEMPERATURE DENSITY areaopCIjacketorSI com. PLOW RATE COOtMMG _ FLUID PRESSURE TEMPERATURE UNITS NORMAL OPERATION G* A L TT75TU ' C.AL &AL 1 430 13.409 PAYS 'VARIES ATMOSPHERIC / "F 4 TO &6 / 4 Tp 140 Lf-/6Al U.C to 13.0 ___F T*___ lk^/hp. 34 2 SO PS 16 'cT'f .To ,. 1C.Z /JZ4 ICZ/224-^ DESION BASIS Ti.TfcT 1 430 - W ST, S/M T3aoo Varies ATMtStHflLlL 4 To CO / 46 T* 140 __ ___________ 34 2FO 100 /70/33B'" //o/333 type CONCRETE I6'-0"X 1 3'-0"h S'-O'OtrP INVERT o dimension --------- oo--r=Y hioh/lone material* OP RUNfORCfO CONCRETE CORR ALLOW. CORR ALLOW. IMCN IMCP CONSTRUCTION CORR ALLOW. INCH |j*I INTERNAL COIL 3] EXTERNAL COIL QjRCKBT F LAT HAIRPIN) 14 `~0 L ONC / 2 " OFF BOTTO.YI^ 6" APART 2* SCH. SO CARBON STEEl PIPE J . AOITATOR 'NOKJE ' NOZZLE SCH. SEE KFF. DRA NINES INSTRUMENT CONNECTIONS if, TCNPltATVAS INOICATOA INSULATION NONE (/X A^OCl&X POMP C." FROM BOTTOM NFW EQUIP. ___ _____ UEAJJH&.___ (PH As ..SPfcir'Et_____ vents, pressure relief other "r-//:-///.T " ........... ........* RrfERCuCC p,\ W/fe CtS OP 7HU ftsAiP ;... 3 .. s' - />??-/ /Oja- 3 -- E>- 310,4-0 S-i*Z-l . .tumm/njiv^m _____M cu/F t JTfCA_. F.i*B.-ei 4 T, IS. auon instaua tich of:______________ . WiArf<g___st/f/r rvM** _______________ HC;ijjA'6 <#; -Jv. TAl*r CI. OiE Tfi'rncn ENl**h:H j P<t*)Pt OVftHt* to ___ MONS 095497 ->Gc.r. Monsanto COMPANY | CENTRIFUGAL PUMP EQUIP. IDENT NO PERFORMANCE DATA AUTHNO. . 2 4 IS* KANT W. L.K. Aroclop Waste Disposal BY W. Q. NIEMETFRa.i, IO/lt/70 A'TO Wf+f> . SHUT J or 2 name vuloaoimc Dock JUMP PUMP (EXISTING, !H Pi A CP") NO. REOD 1 function 7`q Pump IA AOCU}K___ JRliL. to sroeAte tapaks /-//C. i~"U7 f., I-U.2l.1-.________ opgHATtoN ) h re Km i rrf/v T PUMPjAG COMPONENT OUT V;3$NTERMITTENT CONTINUOUS ' MATERIALS HANDLED UNITS NORMAL DFSlON AROtLOK afcww/7f i WITH PH[POL f WATER. 4*d_1 50 7sr HOURSPER <{* REMARKS TOT AL solioix'"' OAS PUMPINO~TMPgRATURC. PT, 9 f j 4 Q PROCESS DATA ) SP OR ' P T /, Jj* ffr / 5 Q fr SO f / 35 rp~J. 5~,i* } CR YST AL L > 7 INO, TgMPP VISCOSI T Y, C(NTtl*0l3G IUNITS1 ffl_PT _ 7 TO 7S' -*1 r___ 3 00 Tg /~00, <?0ff _ vapor pressure. psia. C* pt WE&L t/FGL f*oup> TA_____'V wr |densit y [sue CORROSION/ EROSION: ><j^EG LI 010 L V QmoOERATF. QsFVERE ~ ................ESTIMATED PERFORMANCE REQUIREMENTS --- -- ______________ c, IWUAl CAPACITY, USQPM. NORMAL " Q: MAX OESiQN _ _____________. CONTROL ALLOWANCE* RUMP RATED CAPACITY (MAXIMUM DESIGN CAP ACITY PLUS CONTROL ALLOWANCE). USOPM, STATIC MtAO ? PT, 30 PSI QUlPMLNT LOSS. FSI: hi 0 tJ Pipe DIA, NPS: SUCTION h/0Aj i OISCHAWOE ___3"____ jplPlNO LOSS, MSI:NORMAL __NORMAL_____ ___ RAT 9, /RATI VALVE PRESSURE DROP, PSl; 9. 3_________NC RMAl" | AV All. ABL E NPSM, FT'__ __ __________NORMAL 2A3________ RAT* RAT EO TON &'PT: 0 $FT 3^.8 P SI F ROM PUMP C A L C UL A T ION SHE K T NO. f $S"______________________ _____________ SYST EM CURVE CALCULATIONS FROM SHEET NO. CQfKVE DRIVER ^j^gLEC MOTOR TURBINE C^OTHER ___________________________________ PUMP DATA__________________________________________________________ MATERIALS OF CONSTRUCTION: CASING AND NOZZLES IMPELLER SHAFT, SHAFT SLEEVE 304 3D 4 10A LINERS SS. S.S. S.S.________ PACKING MECHANICAL SEAL PACKING GLAND BASE PLATE NOAJF N9N& W0AS& . CONSTRUCTION FEATURES REQUIRED FOR P^PCESS_C^* PERFORMANCE_CONSIOERATjON^^_ MAWAL........START __ !(??AT/___! REMARKS. SPECS, TESTS. ETC. _ T>TJJrfAJCj_____PUMP J7_.T^BpC>./ZE ...?:Z"~SkTFJ No. 227 - VFKT'ual "....~ "j ~~ - _ il/$"$vcriOAj I Va PJScharj^e^ 'zslKp'ZI1~ --___________________ ! ** Capacity in excess ol maximum design lot cotiuol (imposes. RIV NO. --S~ A ~lk R( VISION . OAT( appo DATS MONS 095498 Monsanto COMPANY rM*r -sjar. &-Z0/--0/ CENTWFUCWU. rUMP CALCULATION SHEET r Aroclok Waste Onretjt. IliQUIf. IOINT WO. 2 41? 1--125' W.6 K J9//9/70 CONDITIONS Material Pumped. WAiTE AKOCLQK P.T. - Pumping Temperature CO t~. TMl gpm" Flow Rate: Normal _ -SjB_ Design____ 7_ _f_,,_______ 5- Specific Gravity* LlfTO LSO Density 11,2 T I2*F ih/g^ P" Viscosity* _ 7 TO 7i~___________ ___Centipoiae Vapor Pressure* VfdtA mmHg *J&L.___ pm AP: ttipMalS/alve 9.3 otl: Equip. NOM p- Nominal Size. MBNE.. d, Actual ID, inchat__ At Pumping Temperature .Suction. .Discharge .Suction. 2JLZ .Discharge /iANVAL EQUIVALENT LENGTHS Enter Type end Factor for each valve or lit* Suction Discharge ling. Enter Number or each type, and line si ze. Multiply Factor x Size x Num* Type |)Factor | ejNumberl Fed Type (iFactoi Feet bar and enloi Feet equivalent length. See handbook for types not listed. Factors lor Valves (open) and Fittings Gate 1.1 Plug Valve 1.5 90 1. f. oi Wald ell 1.7 Globe, Lift Check 28.0 Butterfly (6" A up) 1.7 Std Tee (on run) 1.7 Wye, Angle, Diaphr 14.0 90 Std Elbow 2.5 Std Tee (side out) 5.0 lik- \\&ATf 1 1.1 mJsLM o SI _Lft_ AL 10 Swing Check 11.0 45 Std Elbow 1.3 Length ol straight pipe In leet t. Total Equivalent Length, lot FVRIC(0T.4I0O8N) gHpmEAtdD', LleOeSt Sper second j, s^* ^ ^ .w zn Discharge Re (Reynolds Number) - (3l62)gp5/</fi * H 1' * `7\`3 /- Friction Factor (See Appendix C ol 014.2 Std 2) if Re < 2100 omit this step. yrv*rf*S=] A* [L(iRnee >9 2u1w00i )-- 1w8..o83j /yV*//d Jj leet of fluid per 100 leet equivalent length / \/ \/ \ Toml Fric lion Head Loss AAx f./lQQ x l.is (safety factor), feet of fluid (*3.^5)^. fCjj /, )SJ 3AS_ Zilo_ 0,0 4 0 3.03 n:r SUCTION AND DISCHARGE HEADS Suction Discharge SYSTEM HORSEPOWER l.alimaled) Vessel Pressure (psla x 2.31/5) <) Liquid Level (above pump <; below pump -} W Static Head (above pump *; below pump ~) Total Friction Head Loss (Plus Velocity Head. See Note 4.) (-) Z3.3 /, 0 O (> Z7.9 ,'4' m m 8 o.o (*) 1 4. 0 am * TPII * S HP - --------------------------- 3960 * E|Not 3) ' 7E/1.1* ^94 1.4z DMt Valve (Apsi * 2.31/5) (See Notes 1 and 2) Jrt) (-1 Orifice (Apsi x 2.31/5) (See Note 2) (-) 0 () tt.2 O (+) 0 3960 . 0._4J? X 0,74x4.9 Equipment (Apai * 2.31/5) <-) o (*) 0 6. C Suction Heed Sum, feet of fluid, aba. Discharge Head Sum, feet of fluid, tbe._______________ .2.4.4 . `"Trg DYNAMIC HEAD Discharge Head Sum Suction Head Sum 7T>ff~ Total Oynarnlc Head, feet of fluid NPSH Suction Head Sum (minHg * 0.045/5) or (psiax 2.31/S) NPSH Available, feet ot fluid, abs. PUMP SELECTION 84,9 24.? C.0.0 24.3 24.9 1. Assume control valve loss to be 70S to 100% of* piping plus equipment friction loss for initial calculation. Consult instrument engineer for final selection. * 2. Control valves and orifices not normally used in pump suction. 3. Use combined efficiency of pump and drive. ____ _______________ Speed . . _ pin; Imp Size___ GPM_______ TDH J____ ; Typ; EH___ 4. See DM.? STD 2, j guide for the use of tins calculation piocedwe. HT i. MONS 095499 ~" Monsanto COMPANY !><AT. CENTRIFUGAL PUMP PERFORMANCE DATA AKPO-tA WAIlt DjtWAI. EOUtP. IOCNT NO. 1_ -127, )-)3Z AUtH NO. 24^________- .r W, G. NieMtreK HART. DATE MJi to/tohZr fSRSAK "TANK. . PMMPS C XU TIk/6, iJ PlAtr') TO ?UMP CITY WATffi TO THE CONTACTO* TUBE \A/IfK AHt> THE -TAf&ftMii- to rtoviPE frtrtaevCY waiek Svmr to rut cca/tactoh tube operation contiguous COMPONENT DUTY: INTERMITTENT__________^CONTINUOUS_____________________________ HOURS Eg* TEAR MATERIALS HANDLED UNITS MORMAlMRNMM PESiAN REMARKS Jn WA Tfft. TO CCfJTMCTOR WfIR WATf/t. Pectcie re Stcaktank WATER TO THERMAL OXIDliTF, a fit 8" &PM lE Grrt 0,1 T9 S' 8 0 F FHrMtAtfT MTM TO <9A>74i70fi, <k err O ?4 8 IF F 34 TOTAL SOL D|/ ' <kitl ?3 Tt?S 47 62 OAS PUMPINO TEMPERATURE, PT, 0 F $ (Q PROCESS PATA j SP 0 B PT /, Q<'60F ), Q [c R Y ST AL LI 2INO. T EMP * F VISCOSItT. ClM T! t*0li I UNI T SI (? P T yapor prehuri, p si a. pt Qf) Q /, 3 9 >o w g* 60 F f }________________________________ Q, 2 ipT [souqs ~NOfij * WT | PPmSIT V (size CORROSION' ERoYlON: ^TnEOLI 01 U Q MODERATE [~J SEVERE ' CAPACITY, USQPM. NORMAL ESTIMATED PERFORMANCE REQUIREMENTS 2 3 TO 2 $______, MAX DESIGN_________ ^ 2 CONTROL ALLOWANCE* PUMP RATIO CAPACITY (MAXIMUM OdlON CAPACITY PLUS CONTROL ALLOWANCE). USOPM, \ T ATIC HEAP 6' RT,_______g Q W T 8, 7 PSl {EQUIPMENT LOSS. PSI;(02, NORMAL102.RAT PIPE 01 A, NP I: SUCTION / f/Z U ; DISCHARGE [p^PlNO^-OSS. PSl:NORMAL 2 3,/RAT KlEffE MMwm MM PRESSURE DROP, PSl:j>7,f NCRMAL [ AV AIL ABLE NPSH, FT:NORMAL 2 /. 5 RATEO TPW (.*' FT: 4 7S' FT 2 O 6 PSt PROM PUMP CALCULATION SHEET NO. j % S~ SYSTEM CURVE CALCULATIONS FROM SHEET NO. ; DRIVER MOTOR 21 TURRINE [^OTMER RAY PUMP DATA MATEniAUSOF CONSTRUCTION: CASINO AND NOZZLES IMPELLER SHAFT, SHAFT SLEEVE LINERS seiri- S7FEL tRA12E STAtNLEiS STEEL ' PACKING MECHANICAL SEAL PACK INQ GLANO OASE PLATE CONSTRUCTION FEATURES REQUIRED FOR PROCESS OR PERFORMANCE CONSIDERATIONS: LW FLOVJ i*/!TCH OH Pi/nr DlSCHAKZ* IHTC/>.U>C-HT> TO &HVT DtfWM -Ltnm\*ATOJt._____SLMMfA, .srsTert-------------------------------------------------------------------------------------------------------------- REMARKS. SPECS, TESTS. ETC. $)OST)A)G, PUMP : PATTFR StJ .MAS. TYPE. nze: I 4" suction I 'A" ouchakU . _1',,_______ "_______ ifJiP.___________ ^__________ _ ~ ________ ' ~~~ ~ 3FFO KPM g Va "iMrtuef*. * 'CapscHy In excess of maximum design lot eontiol purposes. MV NO- REVISION . BY j OATI | APFO j U AT | I1 - HONS 095501 COMPANY M'#***W**t!K TA"K WHPJ S&C77 <? JLo/ --<?/ cEwminwALPUMP CALCULATION SHEET /tega.**- ^AiTf-HamAk ZOUlh. 10INT NO. 1-127, /-/JZ AUTH NO.,,H+--J--F--------- tfl /fl___________ |bt W. &. ^NlEM(T2nAtt W?o/7 0 2 o 2. CONDITIONS Material Pumped_ WATER, P.T. Pumping Temperature. ppm " Flow Rate: Normal ,, Sm Specific Gravity*___________ p Viscosity*___________ /. 3 Jb/gM Centipoise . _____ ^ ^ S psia d, Actual ID, inches _ i,st_ At Pumping Temperature psi; Equip.oat Sch t**h***m 40 > Suction____ / ^ ' Discharge Suction !i50 Omtwgfr JPAAV A/0Z7k('te* XMMEtf*. r t EQUIVALENT LENGTHS Enter Type and Factor for each valve of fit ting. Entlt Number of aach type, and line size. Multiply Factor * Size * Nvm* bet and enter Feel equivalent, length. See handbook for types not listed. Factors for Valves (open) end Fittings Gate 1.1 Plug Valve l.S 90 1. t. ot W,ld all 1.7 Glebe, Lift Check 23.0 Butterfly (6" A up) 1.7 Std Tee (on run) 1.7 Wye, Anglo, Diaphr 14.0 90* Std Elbow 2.5 Std Tee (side out) S.O Swing Chock 11.0 45* Std Elbow 1.3 Length ol straight pipe In foot Dischjifc Type flFactoi Number] Ft |qrqUL `7 JA unrn S m.2 IX LiL- -L5L loo L Total Equivalent Length, feet FRICTION HEAD LOSS V-(0.403) gp*/A feet per eecond Re (Reynolds Number) (1162) gpmS/dp ft>.4ot)(6t)4.2r ' ~\?r\ / (?/& iJi v2JL , i) / Friction factor (See Appendix C of 014.2 Std 2) if Re <2100 omit this step A h riAn.JWi Vue^rrff1^' l_(R> 2100) - W.6S/VVrf J feet of fluid per 100 teet equivalent length (iic ----------------.----- ---i jW. Suction j Discharge znnzjjrrz loi.ooo | L0Loo'i_ J>~. 02_3_ 0 02 3 3X7 Total Friction Mead Loot" AA* L/100 x 1.15 (aefety factor), feet of fluid SUCTION AND DISCHARGE HEADS Suction Discharge Veasef Pressure (pile * 2.U/S) Liquid Level (above pump ; below pump -) <) 3 4.0 (> 40,3 m I. o Static Naad (above pump *; below pump ~) W 2 0.0 12.7 SYSTEM HORSEPOWER (animated) ,,.TO).S 39C0 ITINot, }) Total Frletlon Hoad Lots (Plus Velocity Hoed. See Note 4.) Control Volvo (Apal * 2.31/5) (Sot Notes 1 and 2) Oilflce(Aptl* 2.31/3) (See Note 2) Equipment (Apsix 2.31/S) (tOlX***? I") Suction Head Sun, feet ef fluid, eba. Discharge Head Sum, feet of fluid, aba. UAL '-> S3A l<) <`> I 37.0 E&E (*> 23C.O "TSTf 2 .460. 1.0 up.------------------- ' V, -- 3960 x Q, ?f UP - / 4. / DYNAMIC HEAD Dischmga Head Sum Suction Hoad Sum 1VII - Total Dynamic Hood, foot of fluid NPSH Suction Hoad Sum Piy (mmHg x 0.045/S) or (psla * 2.31/S) NPSH Available, feat of fluid, abs. PUMP SELECTION (cm y7.Ti> 22,3 aA ZJJ 1. Assume control valve inss to be 70% to 100% elpiping plus equipment friction loss for Initial calculation. Consult instrument engineer lor final selection. 2. Control valves and orifices not normally used in pump suction. 3. Use combined efficiency of pump and drive. 4. See DI4.2 STD 2, a g-nde lei ti.e use or ur* calculation piocedure. o 095502 Monsanto COMPANY ^CATIOT N/AME: description:________ Huhber Refuin.ro : Function ;__________ SS.C.7T 0*-e>/ --0/ CQUIP. IOINT N0._ 1-1-30 ..V.*NT PhJtlVER . I autm wo. 24 IS' HIM W f. K I-- Aroclq/l Waste Disposal VENT BLOWER r.W.6. NtB*tfer-omMLh2lz*_ (TOp>0 BTE). B. Rl/EYL*4OACiAMTtEnD')! 0, i centrifugal Blower side inlet ' ______ C._____ i_________________________________ j C** >w 1 *1 To BtO*s A IF ConTaMinA rro wjtn solvent VAPOR FROM PROM UNLOADING SOME SHELTER TO ASMOSPNERB MATERIALS HANDLED ' Air contaminated with solvent vapor DESIGN CAPACITY: OPERATING conditions: AT LEAST Z AIR CHANGES PER MINUTE Putt; intermittent service C when dumpins. druptil AIR TEMPERATURE 0 TP / 0 O *A special desicn Considerations : Material of cohstrvctun : , BLOWER MUST BE ABLE TO HANDLE EJ.AMMARLE mixtures of air (solvents CARBON___ STEEL____________________________________________________ _ existing Slower : CHICAGO BLOWER No. SLS IB INCH DIAMETER Z HP motor (PHENOL SEPT. ITEM ' MODIFICATIONS No. 220) ' REQUIRED Jr......... ............... ................................... ... Motor mat heed to r EfiPLOJION PROOF. TO BE REVIEW Sr K. J. J'OHNSTON. -- MV NO. A. j 5> AIVIKON ' . V | OAT* ---- ' OAT| HONS 095503 &eLc^T: *2-o2r&/ Preset Manual, Sect. CBAi.. 2415 Date! 10/8/70 Author c. R. Lepper Approved byi R. g. Corley Page 1 of 23 INSTRUMENT DESIGN BASIS for the INSTRUMENT FACILITIES within the W. G. KRUMMRICH PLANT PROJECT: DIVISION: PLANT LOCATION: Aroclor Waste Disposal Organic Chemicals Sauget, Illinois INSTRUMENT DESIGN SECTION CENTRAL ENGINEERING DEPARTMENT MONSANTO COMPANY 800 N. LINDBERGH BLVD. ST. LOUIS, MISSOURI 63166 HUNS 095504 TABLE OF CONTENTS SBC.T 0 2-01--ft Project Manual, Sect. CEAs- 2415 Dates -10/8/70 . Authors C._R. Lepper Approved bys R. G. Corley Page 2 of 23 1. General Description of Project 2. Reference Documents 3. Scales, Charts, and Units of Measurement 4. Decisions and Selections Affecting Project Areas 4.1 Control Philosophy 4.2 Instrument Applications 5. Control Room instruments 5.1 General Comments 5.2 Panel Mounted Vendor Preference 6. Field Mounted Instruments 6.1 Flow 6.2 Pressure 6.3 Level 6.4 Temperature 6.5 Field Mounted vendor Preference 7. Valves 7.1 Control Valves 7.2 Safety Valves 7.3 Rupture Discs 7.4 Solenoids 7.5 Valve Vendor Preference 8. Pneumatic Signal Tubing 9... Instrument Air 10. Electrical Wiring 10.1 Wire Specifications 10.2 Reducing Electrical Interference 10.3 Tagging 10.4 instrument Connections 11. Instrument Decisions Effecting Electrical Work 12. Instrument Installations 13. Control Rooms and Panels 14. Documents MONS 095505 ____ .fB-c-r: ax-o 2. --a) Project Manual, Sect. CEA:- 2415 Data: .10/8/70 Author: C. R. Lepper Approved by: R. G. Corley Page 3 of 23 1. GENERAL DESCRIPTION OF PROJECT The primary objective of the project is to thermally decompose all used liquid Aroclors and Montar fed semi-continuoualy to the incinerator, at a capacity of 10M lbs./yr., producing harmless by-products which have sewer stream contamination less than 0.29 lbs./day of PCB's. Atmospheric effluent shall be less than 7.5 lbs./hr. of HCl. The secondary objective is to provide these same facilities for possible future incineration of other plant wastes. A package of an incinerator and scrubber column is to be provided by purchase. Storage, dumping, sump, and fuel oil storage is to be provided by utilization of as much existing ' equipment and instruments made available by dismantling of the Phenol process as possible. 2. REFERENCE DOCUMENTS The following documents have been used in the preparation of this design basis: Project Scope Report - dated 8/6/70 Notes Project Strategy Meeting - dated 8/14/70 Preliminary Process Flow Diagram "L" Manual for W. G. Krummrich Plant The Scope Report included an Equipment information Summary, as Instrument Information Summary, and a preliminary Plot Plan. 095506 HONS Project Manual, sect. CEA: 2415 Date: 10/8/70 Author: C. R. Lepper Approved by: r. g. Corley Page 4 of 23 . SCLAES, CHARTS. AND UNITS OF MEASUREMENT Ouantity Units Scale Chart Level pressure % 0-100 PS1G or inch of W.C. D.R. 0-100 D.R. Vacuum or Absolute Pressure Temperature mm Hg oc (3), (5) D.R. D.R. D.R.'6) D.R. Flow . Process Vapor Process Liquid Steam Utility Air Utility Water LBS/HR GPM LBS/HR SCFM GPM D.R. D.R. D.R. D.R. D.R. 0-101 (4) NOTES: (1) (2) (3) (4) (5) (6) D.R. - Direct Reading . Square Root or uniform as required by signal. 0-10 is uniform or 0-100 is uniform, depending whichever is standard with the manufacturer. Iron-Constantan or Chromel-Alumel preferred as applicable. with applicable multiplier on nameplate. Degrees F for power house or refrigeration service. When using IO thermocouples with instruments whose outputs are linear with millivolts a linear chart or scale is not satisfactory for spans of 100C, and above, and may not be considered "direct reading". For 50C spans, and smaller, the difference between the linear and direct calibration is almost negligible; and in most cases, the linear scale may be considered "direct reading". For spans between 50 and 100C the application will dictate whether the linear chart or scale may be considered D.R. M0NS 095507 Project Manual, Sect. CEA: 2415 Oiat-// Dates 10/8/70 Author: c. R. Lepper Approved bys R. G. Corle- Page 5 of 23 ' DECISIONS OR SELECTIONS AFFECTING PROJECT AREA 4.1 control Philosophy This project will utilize considerable existing and relocated equipment; for instance, the 3 waste aroclor storage tanks exist in place, the aroclor water sump exists but new interface detection instrumentation must be provided, also the water pump is to be relocated, and the existing fuel oil storage tank is to be used. In all cases existing or relocated equipment will be utilized where available. For used items each will be dismantled, inspected and refurbished if economically feasible. When new instrument items, are required, the preference lists included will be adhered to. 4.2 instrument Applications The degree of automation will be based on the premise that: 1. Full time coverage is required to set up and oversee the semi-continuous operations. 2. interlocks and alarms to the incinerator panels will be provided from critical process sensors and loops, 3. in general, the instrumentation will be pneumatic. The major exception will be the utilization of flow, level, and temperature switches, - 4. A panel for incinerator operation will be pro vided by the vendor. This panel will be externally located near the incinerator. 4.2.1 Aroclor-Water Sump Operation of the existing 10K gallon sump (item 1-124) provides for handling of a two phase (water/ heavy organic) collection system. Material will be collected from spills or from the incinerator floor sump (item 1-120). Water will overflow the sump until such time as the aroclor reaches the HONS 095508 Project Mutual, Sect. CEA: 2415 0 Z.OZ.-C?/ Dates 10/8/70 Author: C. R. Lepper Approved by: R. o. Corley Page 6 of 23 DECISIONS OR SELECTIONS AFFECTING PROJECT AREA (Continued) 4.2 instrument Applications (continued) . 4.2.1 Aroclor-Water Sump (Continued) set level, evidenced by local level gauge and remote alarm. When the full water sump pump (item 1-122) will be started amd the water layer pumped to the sewer. When water is gone, the steam will be introduced to the heater coil in the sump and the aroclor layer heated to a pumpable viscosity. The aroclor sump pump (item 1-121) will be turned on until the organic phase is pumped to storage tank 1-116 or 1-117. Steam to the heater will be turned off when the sump reaches minimum level interlock. 4.2.2 city Water Break Tank The level in the tank (item 1-126) is sensed by dis placer and used to operate a control valve to make up water as required. A pressure switch will 4.2.3 be used to signal low level. Packed Column Recirculation.The pressure and flow of well water to the packed column will be indicated to permit manual adjustment at such a rate to insure that the escape of HCL content from the packed column stack is less than 7.5 lb./hr. 4.2.4 Pressure Gages Local pressure gages are provided for indication on the discharge of all pumps. Where corrosion is no problem isolation valves with built in ball checks are provided. In areas where corrosion is a problem chemical seals will be.provided to isolate the gages from the process fluids. MONS 095509 Preset Manual, Sect. CEA:~ 2415 OZ.01. -a/ Date: ..10/8/70 Author: C. R. Lepper Approved by: R . G. Corley Page 7 of 23 4. DECISIONS OR SELECTIONS AFFECTING PROJECT AREA (Continued) 4.2 Instrument Applications (Continued) 4.2.5 Level Indication of Storage Tanks Local indication will be provided on the aroclor storage tank by the use of pneumatic differential pressure transmitters UBing a fluid specific gravity of 1.35. The existing varec level indicator on the fuel oil storage tank (item 1-114) will be cleaned, re calibrated and reused. 4.2.6 Incinerator Package The incinerator-scrubbler system includes: incinerator, quench pot, venturi scrubber, packed column, demister pad, and air blower. Controls to be provided are: flame safeguard, temperature controls, and water flow controls. All provided with fail safe feature to protect personnel and equipment. 4.2.7 Drum Unloading Station Due to the possibility of flamible contaminant* in the returned material drums, all electrical equipmei should be ClasB I, Division II electrical classifi cation. . 4.2.8 Pumps The drum unloading sump and the incinerator floor drain sump are both to be controlled with auto start of pump from level float, but will be provided with a manual-auto-off station to permit manual operation. MOMS 095510 t Project Manual, sact. CEA:-. 2415 Ol.aX'*O/ Date i .10/8/70 Authort C. R. Lepper Approved byj R. G. Corley Page 8 of 23 5. CONTROL ROOM INSTRUMENTS 5.1 Power supply to all instruments will be 115 VAC +1054 and 60 Hz. Instrument air pressure will be 20 +0.5 PSIG. All annunciator alarm circuits to be normally closed. Nameplates will be provided with a suitable title and instrument numbers for each panel mounted instrument. Nameplates shall be made from laminated plastic so that engraving through top layer will be a clear legend on a contrasting background. 5.2 Panel Vendor Preference List 1. Indicators pneumatic electronic 2. Indicating controllers pneumatic electronic 3. Recording controllers pneumatic electronic 4. Multipoint Recorders 5. Annunciators 6. Totalizers 7. MV/l converter 8. MV/P converter Foxboro Series 50 Foxboro ECI Foxboro MS2 No preference Foxboro M54 W M58 Foxboro ECI Honeywell 153 Series Tigerman Foxboro Foxboro Foxboro $ M0NS 095511 ____ Project Manual, Sect. CEAl.. 2415 93-02.-0/ Dates 10/8/70 Authors C. R. Lepper Approved bys R. G. Corley Page 9 of 23 6. FIELD MOUNTED INSTRUMENTS All field mounted instruments shall meet the electrical . classification of the area involved. All field mounted instruments will be installed in accordance with Monsanto Standards in the r (instrument) Manual. These are in Sections Rl.2 (instrument connections), R2.2 (flow instruments), R3.2 (level instruments), r4.2 (pressure, instru ments), R5.2 (temperature instruments), and R17.2 (instrument piping) . Due to atmospheric corrosion aluminum cased instruments are to be used only in the event that steel or epoxy coated instruments are not available. 6.1 Flow instruments A meter range shall In general be no greater than 100 inches W.C. Metering rangeability for d/p instruments shall not exceed 3 to 1 full scale. All flow meters shall generally be the dry type. Differential pressure transmitters for flow measurements ' are to be the forced balance type with 1500 psi stainless steel body, 316 stainless diaphragm, 1/2 inch NPT process connections, universal pipe mounting bracket, and have a continuously adjustable range. Transmitters shall with stand over-range pressure equivalent to meter body rating. Wetted parts will be compatable with piping specifications and process fluids. . MOMS 095512 Field mounted flow controllers shall be pneumatic, the indicating type, with a 10- 20094 proportional band with reset action. Meter shall generally be the bellows type ..with minimum 500PSIG carbon steel body with stainless steel Project Manuel, Sect. CEAs . 2415 O2~O7.--0/ Date; .10/8/70 Authors C.--R. Lepper Approved bys R. o. Corley Page 10 of 23 FIELD MOUNTED INSTRUMENTS (Continued) 6.1 Flow Instruments (Continued) Flow alarm switches shall generally be a pressure mounted on the output of d/p transmitter. Other types of line mounted flow switches may be used for "Flow-No Flow" service. Magnetic flow metera can be used for high temperature or other special services; shall be coal tar epoxy coated. Field mounted flow indicators to be a 6" receiver gage on the output of a d/p transmitter or a bellows type with a direct mechanical linkage to the 6" gage, integrators, where required, are to be of weather proof design. 6.2 Pressure instruments Indicating Pressure gages shall generally be of the bourdon tube type, bottom connected, with 4*5" nominal diameter dials. Dials of smaller sizes may be used in pneumatic instrument circuits and for auxiliary services on mechanical equipment. Dials should be white with black numerals and pointer. Damping devices shall be provided for gages subjected to pulsating service. Process gages shall be provided with safety blowout backs. Gages shall be provided with drawn alloy steel Bourdon tubes for pressure ranges of 1000 psig or less, and bored alloy steel, or drawn type 403 or type 4130 steel for ranges greater than 1000 psig. When required by service conditions, other materials may be used. Bronze tubes for steam, water, or air service under 400 psig. For operating pressures under 10 psig, bellows type pressure elements may be used. M0NS 095513 Project Manual, Sect. CEA: . 2415 *2-0Z.-0t Date: 10/8/70 Author: C. R. Lepper Approved by: R. G. Corley Page 11 of 23 FIELD MOUNTED INSTRUMENTS (Continued) 6.2 Pressure instruments (Continued) All pressure transmitters shall be the force balance type. Process connections to be V' or V female NPT and instrument to be equipped with pipe mounting yoke. Over range protection of 1.5 times the maximum scale range is the minimum requirement for pressure elements. Materials used for pressure elements shall be selected for compatability with process stream or otherwise be sealed. Fluid pressure transmitters should be provided with a 3V' output gage and 0-100% uniform scale. All instruments used for handling viscous or corrosive materials are to be sealed or purged - seals preferred. Seals may be of the liquid type employing seal pots, or the chemical type employing a diaphragm and a silicone fill between the diaphragm and the pressure element of the instrument. The bottom housing of the diaphragm sealing device shall be of a material suitable for handling the process stream. The diaphragm seals are preferred for applications within the temperature and pressure limitations of this type seal. Capillary tubing, if required, shall be armoured stainless steel with plastic covering. Pressure switches shall be DPDT (preferred) or SPDT with adjustable set point and suitable for the electrical classification of the area where used. Switches used in conjunction with transmitted air signals shall be SPDT. Pressure elements of bronze with switches having adjustable set points. MGNS 095514 Self-actuated pressure regulators (not including pilot operated) shall be used only on those services where a variation of 10% or more is not objectionable. Bypass . *>--not be used except where neoassary for Project Manuel, Sect. CEAr.. 2415 ^2./)? Date: .10/8/70 ' Author: C. R. Lepper Approved by.- R. g. Cories Page 12 of 23 . FIELD MOUNTED INSTRUMENT (Continued) 6.2 Pressure Instruments (Continued) . emergency operations. A local pressure indicator shall be provided at each regulator to facilitate control point adjustment. Mercury switches using mechanical linkage shall not be used in general. 6.3 Level Instruments Vessel mounted liquid level switches shall have 300 psig minimum steel float chambers and stainless steel float. Connections to be 1". Switches to be DPDT. Other alloys used as necessary to meet process requirements. Float type level indicators to be used where local indication on storage tanks required. Do not use fixed float guides on agitated vessels. Controllers shall have 5-100% minimum proportional band. If automatic reset selected use 200% PB. Both transmitters and controllers shall be provided with flanged rotable head for orientation. Radiation fins provide for service in excess of 450F. Differential pressure level transmitters shall be in accordance with flow transmitter standards. Range suppression provided, if required. Transmitter output shall increase with increase in level. MONS 095515 Project Manual, Sect. CEAt - 2415 02.02.-0/ Date: ..10/8/70 Author* C..R. Lepper Approved by: R. 6. Corley Page 13 of 23 FIELD MOUNTED INSTRUMENT (Continued) 6.4 Temperature Thermocouples may be either bare wire with ceramic insulators or metal sheathed type with magnesium oxide insulation. Couples shall be installed in thermowells except where excessive time lags cannot be tolerated. Sheathed type couples and resistance bulb assemblies shall be spring loaded. Duplex TC assemblies used where separate temperature indication is required for checking critical temperature controllers may be fabricated, using bare wire and 4 hole ceramic insulators or the magnesium oxide sheathed type may be used. Filled capillary systems liquid filled. Wherever possible bulbs are to be stainless steel 3/8" diameter, bendable neck, and adjustable union connection. Capillary to be copper with flexible bronze armour with overall plastic jacket or stainless steel with flexible SS armour and plastic coating. Filled systems shall not be used where startup or shut down conditions may exceed the normal over-range limits of these systems. Pneumatic transmitters shall be the narrow span force balance type. Spans of 50, 100 or 200 shall be used for temperature control applications, output 3-15 psig. M0NS 095516 Project Manual, Sect. CEAs - 2415 Date: ..10/8/70 Authors C. R. Lapper Approved bys R. G. Corlay Page 14 of 23 FIELD MOUNTED INSTRUMENTS (Continued) 6.4 Temperature (Continued) Electronic transducers, if used, shall convert a thermo couple input signal to a proportionate milliampere d-c output. Cold junction compensation shall be incorporated for TC inputs. Transmitters shall be fixed range type with upscale burnout protection. For spans less than 100F resistance thermometer type shall be used. Field mounted controllers shall be pneumatic, indicating type and shall have a minimum 5-50% proportional band. Reset and rate action included when required by process conditions. Temperature switches may be DPDT or SPOT, preferably DPDT, and shall be suitable for the area electrical classification. Bi-metallic and snap action switches should be used wherever possible, when filled systems are used they should conform to the paragraph on filled systems. Thermowell should be of 304 stainless steel with minimum of 1" screwed or flanged process connection, other material! are used as warrented by process conditions. Test wells shall be equiped with brass plug and chain. Dial thermometers should be of the bi-metallic or filled type and generally be the all-angle universal type. Dial size to be 5" diameter. Separable sockets should be provided to facilitate removal of thermometers. MONS 095517 Project Manual, Sect. CEAt . '2415 C7 2.(72-0/ Date: -10/8/70 Author: C...R. Leppor Approved by: R. G. Corley Page 15 of 23 6. FIELD MOUNTED INSTRUMENTS (Continued) 6.5 vendor Preference List Instrument 1. Filled temperature controllers/ transmitters 2. Pressure transmitters 3. d/p transmitters 4. Rotameters 5. In line flow switches 6. I/P transducers 7. Temperature transducers 8. Turbine flow meters 9. Magnetic flow meters 10. Level, displacer or float type 11. Level, d/p cell 12. Level, tank gage 13. Pressure gages, bourdon 14. Chemical gage seals 15. Dial thermometers bimetallic type filled type 16. conservation vents 17. Process pressure switches 18. Orifices Manufacturer Taylo r/roxbo ro Foxboro Foxboro Fisher-Porter McDona ld-Mi Her Fisher Rosemont Invalco Foxboro Fisher/Brooks Foxboro Varec Ashcroft Mansfield-Green Ashcroft Palmer Varec Mercoid/Ashcroft Daniel 7.0 VALVES 7.1 control Valves Diaphragm operated standard control valves will be flanged with 1" minimum body size, except for low flows. Piping specifications will be followed on body materials. Iron body will be restricted to utilities and 80 psi steam. Standard trim will be 316 SS and Hardened SS trim will be used on steam above 140 psi. M0NS 095518 T. pro5et Manual, Sect. CEA: . 241S 02JJ2--JI Dates -10/8/70 Authors C.-.R. Lepper Approved by: R. G. Corley Page 16 of 23 VALVES 7.1 Control Valves (Continued) Separable steel flanges will be used on all split body valves. Ball valves will be used in on-off service around filter and for throttling such as polymer slurry. Valves will be sized as per each manufacturer's recommen dations . Valve positioners will generally be side mounted, direct acting, with 3 gages and by-pass. Positioners will be supplied with control valves in the following service: 1. Temperature control valves 2. Valves with pressure drop 150 psl or more. 3. Valves operating at 450F or higher. 4. Valves in flashing service. 5. Valves in split range service (no by-pass). 6. Valves where solids may deposit on stem, or where deep stuffing boxes required. l/P transducers will have high volume pilots. Where multiple valves are used on one signal, one transducer only will be used. Transducers will be separate from the positioner, but will be mounted on the valve. 7.2 Safety Relief Valves Flanged relief valves construction in generaL shall be enclosed spring, bolted bonnet, screwed cap, full nozzle type with stainless steel nozzle, disc, guide and spindle and cast steel bodies. Alloy steel bodies and trim may be used when particular service dictates. Body pressure ratings for flanged valves shall bo the same as the MQNS 095519 Project Manual, Sect. CEAs - 2415 0 2^32. ~0J Date: .10/8/70 Authori C. R. tapper Approved by: R . G. Corley Page 17 of 23 VALVES (Continued) 7.2 Safety Relief Valves (Continued) rating of the inlet flange. Area of discharge opening shall not be less than four times the area of the valve seat. Screwed valves may have screwed bonnets and may be used where small orifice areas are required, if allowed by the piping specifications. No lifting levers are required for process valves, car bon steel springs are to be supplied for valves in service of 450F and below. Tungsten steel springs are to be supplied for valves in 450F relieving temperature service. Pressure balances valves shall be used for varying back pressure applications and where back pressure exceeds 10% of the set pressure of the relief valve. These valves shall have stainless steel bellows. A rupture disc may be installed between a relief valve and the vessel provided it meets all requirements set forth in paragraph UG-127(d), Section VIII of ASME code. 7.3 Rupture Discs Generally, the safety head fitting shall be of the type with a diameter that fits inside the bolt circle, such as the "BS&B Quick-Sert". This type of head shall be used on all flanged connections. Flange type safety heads may be used in screwed pipe where rupture of the disc is infrequent. Materials of construction shall be equal to the pipe specs. All rupture discs, except those in special applications shall be interchangeable with all safety head fittings for a particular size and shall have vacuum supports. HONS 095520 Project Manual, fleet. CEAt.: 2415 Data: -.10/8/70 Authors C. R. Lappar Approved by; R. G. Corley Pago 18 of 23 VALVES (Continued) 7.3 Rupture Discs (Continued) The selection of the disc type depends on the application involved (DV, PLVD - BS&B notations) . Where a material can be selected that is corrosion resistant to the process side and the venting side, the DV type disc is satisfactory, providing the materials are in the desired pressure range. Generally, the PLDV type is preferred since its construction features provide a superior resistance to corrosion. Maximum bursting pressure of the disc shall not exceed the maximum allowable working pressure of the protected system. ' in most cases, the rupture disc, is located such that the disc temperature remains at or near ambient, in these cases the disc shall be rated at 72F. When disc tempera ture is definitely above 72F, a design temperature selection is made which will be near and below the temperature of the fluid, when disc temperature is definitely below 72F, a design temperature is selected which will be near and above the fluid temperature. A tapped opening and pressure gage will be installed on the outlet flange of a rupture disc used in series with a relief valve. 7.4 Solenoid Valves Solenoid valves will be of the continuous duty type with encapsulated coils, and shall meet the area.electrical classification. MONS 095521 Project Manual, Seet. CEA: - 2415 O7.OZ.-0/ Date: .10/8/70 Author: C.R. Lepper Approved by: r. g. Corley Page 19 of 23 VALVES (Continued) 7.5 vendor Preference Instrument Relief valves Rupture Discs Control Valves Control Valves Butterfly Manufacturer Consolidated/Farris BS & B/Carbone Fisher Fisher Continental PNEUMATIC SIGNAL PIPING Individual pneumatic tubing may be V' 0.D X 0.030" wall copper tubing coated with 1/32" thick coating of polyethylene, or *j" O.D. X 0.040"*wall high density black polyethylene tubes enclosed in electrical conduit and terminating in a junction box. For vertical runs on towers where individual tubing support is difficult, the latter is preferred. Polyethylene tubing shall not be used in hot locations or where localized hot spots occur. Major instrument tubing runs shall be multiple bundles consisting of 4 to 9 high density black polyethylene V1 0.0 X 0.040" wall thickness contained in an asbestos wrapped extruded vinyl sheath of minimum 3/16" thickness. All tubing bundles shall contain approximately 15% spare tubes for future use. Tubing bundle transitions from large to smaller size or to individual tube leads shall be made inside of galvanized steel junction boxes. Individual leids emanating from junction boxes shall employ bulkhead tubing fittings installed in the junction box wall. Fittings will be Swagelock on SS, copper or plastic tubing. MONS 095522 Project Manual, Sact. CEAs... 2415 02.0Z--0/ Data: -10/8/70 Author: C.-.R. Lepper Approved by: R. G. Corley Page 20 of 23 9. INSTRUMENT AIR SUPPLY The desired pressure for instrument air is 80 psig minimum and rated at 100 psig with a dew point of -40F. All air users shall operate satisfactorily if supply pressure drops to 60 psig. Each air use will be provided with *3" pipe and cut off valves at the header. Connections from the instrument regulator to the instrument shall be tubing. Connections to the main air header are to be from the top. An air supply pressure gage will be supplied at either the regulator or the instrument. 10. ' ELECTRIC SIGNAL WIRING 10.1 Wire Specifications Thermocouple extension wire shall be single pair #16 solid conductor, twisted pair with aluminum mylar shield, and PVC primary insulation and jacket, 80C minimum. Multipair Cable - up to 24 pair #20 solid conductor, individually twisted pairs, shielded and insulated as above. Analog signal wire other than thermocouples shall be single pair, #16 stranded copper wire twisted with aluminum-mylar tape shield, and PVC insulation, 80C minimum. Multi pai r cable - up to 36 pairs, #20 stranded copper, individually twisted, shielded, and insulated as above. MGNS 095523 Project Manual, Saot. CEA. . 2415 Datat .10/8/70 ' Authors c. R. Lappar Approved by: R. G. Corle> Page 21 of 23 " 10. ELECTRIC SIGNAL WIRING (Continued) 10.2 Reducing Electrical Interference All instrument signal and alarm circuit wire will be in separate conduit from 115 VAC wiring runs, and will be separated by at least 6". Thermocouple and other low energy signals will be kept separate from alarm circuits and current signals. 10.3 Tagging All wires and cables will be tagged with an assigned number. 10.4 Instrument Connections Open 16 gage shielded cable will be run from rigid conduit near the instrument with water tight cable connectors at the conduit and instrument. If used, blind transmitters will have a phone type jack act a 1 ohm resistor in series with the transmitter for checking and calibrating the transmitter. Indicators may be used for critical applications. 11. INSTRUMENT DECISIONS AND ELECTRICAL WORK ' Stand-by electric power is not required, however, fail-safe hookup should be used to guard against electrical failure. Electric heat for instruments may be provided where necessary. Noise-free power requires no special precautions. HONS 095524 Project Manual, Sect. DCaEtAets.. -214015/8/70 2"*2' _ **m'> Authors C. .R. Lepper Approved by: R. G. Corley Page 22 of 23 12. INSTRUMENT INSTALLATIONS All field instruments shall be installed in accordance with the R (instrument) Manual standards. 13. CONTROL ROOMS AND PANELS No instrument connections from lines or vessels containing process fluid or gases shall run directly into control houses. ' All conduits entering a control house from process areas will be sealed to prevent entry of hazardous materials. An existing control house adjacent to the incinerator area will be utilized for installation of the required alarm annunciators. The incinerator fabricator will provide any necessary field panels for local incinerator controls. Electric power will be 115 VAC 10% at 60 Hz, supplied from a breaker panel used for instruments and control logic only. Voltage regulators will be provided as required. Power for 2 wire transmitters will be fxom individual isolated power supplies. These power supplies will be housed with the controllers, except for loop without control, then the power supply will be with a recorder or indicator. Terminal strips for analog signal connections will be screw barrier, 7/16" centers. MONS 095525 Project Manual, Sect. CEAs - 2415 a 161.-a/ Datet -10/8/70 Authori C.--R. Lapper __ Approved byi R. o. Corley Page 23 of 23 CONTROL ROOMS AND PANELS (Continued) No. 16 twisted unshielded wire will be issued for analog signals and annunciators. No. 16 single wire will be used for relays and switches. All signal wire will be separated from 115 VAC wire. DOCUMENTS The following schedules and drawings will be prepared! Drawing I E I I I I E I E I E I E - Size 11 X 17 11 X 17 . 8*5 x 11 4 on D D 7 on D D D D D D D D D D D 8*3 x 11 Description instrument Performance Data instrument index instrument Specifications Instrument Schematics Annunciator Schematics Instrument Installation Details instrument Details Layout-Instrument Panel Layout-Annunciator Panel Electrical Interconnection Instrument Interconnection Conduit Layout Tubing Layout Wiring Instrument Panels & junction Boxes Tubing Instrument Panels & Junction Boxes Electrical Details (Connection to Instrument) Nameplate List NUNS 095526 at.g;a Monsanto COMPANY INSTRUMENT SPECIFICATIONS DlVISION AUTH NO- l OCATION .tslrumenl No. S,VIC_ _ _ _ _ _ _ _ _ _ _ <e*'//eCOOtir/A/X MtSE for-or-^J___________ Cf OT7 /T 7 J3 ~/7 ? PLANT SPEC NO. DENT ON AACA 1* 2%02~J/ SHEET HCV - *#** ______ OF______ Enuipmr! N- - to No. R Size /-gu/- ?. Add2- 'A. " Piocm Material c/T-r u/Arr?** /&ASi /30AY_________________________ I__________ / " SC/dEco.ero CO'Z/v scr/Q/O -r AM* CSer/eA-r/fiJG A>/s?suAi .r'i/^SrE+i&/Jr//i c. Saee /Soot' &>*o*r//u/z s%e**3`bU'G- Q^/A/CB f/e" zoo A>r//? edscr/s/cAc 'Sl/a^ly' /'S'/Ac 6<pAe CLASS' A- <ro/<. .Zsapj/g _________ 'YZMA 4_____ EL.EcT/<OC*C C*M3/E-/r<AT/OAj Manufacturer m Calaloc No. P.0. No. Price A SAtc fleefW/ev ?: P2//d7 4S**____ vex & A A 4-i HONS 0955*8 - f-- K--t 'fm*C7Z 0 2-0Z. -- 03 t # 4* Monsanto S* LOCATION------ T OIVtllON DIFFERENTIAL PRESSURE Oasw/c `INSTRUMENT SPECIFICATIONS ?4/z FLMT OCPT on AMA f/4.2* IMC HO. IS- !-f/r-3 SHUT jLs>r___ . Instiumonl No. Ts/7 -c ATj&lL Setvice Zev&L -tH Equipmenl Wo. oi Line Mo. S Size S'-iVAzF T'rocess Material m/jrf Auclor Blind, Indicating, Record, Control, Tiansinit //VlP/CMrttJci Mounting. flush. Suilace Yoke Size and Type CHART Range Olive Speed SCALE Size A Type Range How, Level, Pressure 8ellows. Diaphragm, Other Span t Units ______ Range Limits ____ Body Rating SOT O P'fcO" Body Maleiial Element Material Welted Pails Maleiial Extended Diaph. Length E Ill'll .SL. fill PROCESS Liquid, Gas, Cord. Vapoi INPUT Opeialing Piessuie INSTRUM. Range t Units OUTPUT fro Powei Supply - Electrical, Pneumatic Eicctiical Aica Classification sm/kxjrss /. 3D //cv/o AZitL. A-aFfstf /rJD/c- e&At/ti PM&um&T/c Proportional Band %_ Auto-Reset Mode Rate Mode Auto-Manual By Pass "On'dMWimMil InaHii lA.IWNAAl OlitAWl Pipe &Mt*d Aii Supply Reg. Output Gage, 3)t* Site Accessoiics or Special Fealuies YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO INC. DEC INC. DEC INC. DEC INC. DEC YES YES NO YES NO YES NO NO. "no YES NO YES NO ,o-j 2'o'j -tH -uH sro Mtr/U/veur DeTrtu. Manulacluicr Catalog No. P.O. No. .J-HJC-t. Prica 7T JfiSC /WsoM/faCOTj A tr-AC- FX /.IF ~~ -r^FTTC----------- >08?e to J A Minus n<aA`>;>`} - A - - - - - - - 1- - - r - - - - - - -- - - \ Monsanto COMPANY LOCATION .nstrumenl No. Service , 'FLOW MEASURING ELEMENT SPECIFICATIONS 01 VISION Aecdo'c AUTM NO. rO/oz-/ M4<suertc PtfV Mer&c. PLANT DEPT OR AREA 9/4*24 a/c phmr*. PuCeSm<tM Line No. line Sue, Schedule Flowing Press. P| Flowing Temp Tr *"/ HOL / P?IM10! 2" /eopSTc, /io'r /far 6AS /f6-b ptc / - /" 2.0 PS! 6 tZfl/BL. On. '-HP-/ /" #0PS/rt SERVICE | Upstream Operating Conditions Sp. Gr. Tr Viscosity CP . Ti Sp. Gr.. 60'F Supercompr. Factor Tf 0.37ct /o _____ Q4 Steam Quality, % Steam Superheat, F Flow at Base liquid. Gas or Steam Conditions 60F & 14.73 PSIA Minimum Flow Normal Flow - Barometric Pressure Maximum Flow at location ______ In. Hg. Units of Row Meter Range i'Sire Type - W.N., S.O., Scid., Van Stone"' 3 9 *Ri(in| 4 Facing dS Material-FlaiiM&HT.J. Rincoi Gasket") Taps-Tvpe. Sire&Orientetion (R2.3 Std ) 09 70 ' it <S/>n yW-S '3.GT0 ___ Cpt/ UQ 0.7 L /jr ORIFICE PLATE | Typeol PI ate < R?. 3 Std ) Piste Material 3 Thickness Pine ID ID). In. Orilice ID (d). In. t/D Ratio (>9) Meter Range - Inches Water Diy Type ol Meter Drain or Vent Hole Chart or Scale Range Chart Factor | Calculation Sheet No. *SWtC NO. IS- 24/S-33 SHEET REV Of All orilice handles to bo stamped on upstream side with 'Inlet", bore dia, nom pipe ID. llange rating, instrument number and plate material k Manufacturer rtsei&A ti*'Joe. Catalog Number k Puich ese Order Number -- ----------------- /on iMfi Price /ti. STtoo drmj r - A e A\ A A mto to. ft A. A A ex isr ------------------- -- 1 MQNS 0 95530 ----- TI Monsanto COMPANY LOCATION DIRECT OPERATED PRESSURE REGULATING VALVE SPECIFICATIONS DIVISION AUTM NO. z4/r PLANT UJ S' DENT ON ANEA ft Z- --a* , EAEC NO. ; IS- Z4/r-+Z I EMEET RCV| . nm Valve No. Service Line Ntimhw fc $i_ Process Material Flow Temperaluie PCP/Z3-C >'< Pyeuuse C0AJTM4<-t WZPusi. a, I /3tS/Q?-Z PW/02-3 f*f/0>4- *4ro'r>/v,ur. <srsra p/tnr jrmm stw /k&sA 4m 8lijeiiEV C4QL/U + /cJm-psvt-ftL /-f^-hPici-r ML-7-flttZ-fi' gift? *7 /J4n>P<. <4Z JTS/tri Operating Working Pressure (PSIG Ini el) Data Valve to Close Against (PSIG.) Sp. Gt. Plow Temp, Design Normal Flow Max. Flow Conditions Units: SCFMJCFH, GPMor./Hr. GasfWF Fluid 14.7 PSIA Inner Valve Travel, % > Design Flow Liquid? AP I Cu (Calc.) e Design Cond. Flow Tamp. Calculation Sheet No. Valve Body Sire Valve Pori Size />o Zoo so G/>ai 'J6PA1 3<bo _____ */P<- LIQ. IXi^wQg^XTSTM is: <LL* So* _Ao. , sepp BiigiMns^r PK&t*z\ ctm.. /no /S' io //arc// ?//i/4ep !Lux /gP Body Ratmg A Conn. Size Body Material 3p[ic-r//pT <S/iS7 S76&L 3*w- /("ixr. Valve Spacifications Trim Material Type Inner Valve Seals (Double or Single) Valve actuator (Diaph or Pielew) Mall ol Const (Diaph w-Pi jlunV S.TA(P</SS DIAPH SrA/z/t&sf jh/^m\lusl SP DIAPH ST/fiVOEZS DIAPH A/tQ4/XJ9 -S7W/,vLkS. <r S7/) tJLe^ SP DIAPH S)A/ULey** Lubricator Isolating Valve PaskiDL. Guiding Spring Selling Swing Range On Increased Pressure Valve Typeol Regulator SKIRT TOP BTM SKIRT TOP BTM SKIRT TOP BTM skirt | top | anT /ao/S/S /oo zo io -<o_ teo SP__z_z_/_jd___ 2enSPzuj'; OPENS lIEftweg 55pa<e3 closes Dspwgl] closes JPgO CLOSES /1st/err Tt/UfmCA H<-i D/APHZAZirt Accessories or Special Features Manufacturer Catalog No. P.0. No. Price ~w S/Vc OurPA&eo TA 45$ M P/JC//e/ JJjfL. r/suee. j.hL.. <Q'l70 Wr M**- If A. J?4_ JSE1 ns*cr- -gA. 7?T MQNS 095531 i Monsanto COMPANY Insttumonl No. Service `FLOW MEASURING ELEMENT SPECIFICATIONS \piauj /eesns. DIVISION <fle9rt//c a4/f-0//Z-4. s&cr 03L0?. -03 NLANT *1FIC NO. tOf< is-^r-FCT DIPT ON AREA 0. '??-3 ^ <27-4 Process Milena Line No. ujcu kJJrea, City n/ATric Y-WW-/-/rSC4L Yuu)-3-nC4<. V-QV-S-FZCi y-cu-3-F*.et. Line Sire, Schedule Flowing Press. P( /20 PC/fi zesps/fj Upstiean Operating Conditions Flowing Temp Ti Sp. Gt. Ti Viscosity CP a Ti Sp. Gr. i Supercompr. Factor Ti s-oer /. o HH s Sleam Quality, % Sleam Supertieat, F Flow al Base Liquid, Conditions 60F i 14.73 PSIA Minimum Flow Normal Flow Barometric Piessuie M Location ______ In. Ht Maximum Flow Units ol Row MMw Range 'Size 8 Type - W.N., S.O., Scrd., Van Stone' CZQV/O (* g 70 <7>>/a -tH 7o if O -tH -tH _^L <<T Wating t Facing Material-FlaneAR.TJ. Rina oi Gasket*1* cr<42S0*ifre<* Taps-Type, Si zet Orientation (R2.3 Sid Typed Plate(R2.3Std ____ ]_ Plate Malarial t Tliicliness Pipe IDO). In, OillicelD(d), In. d/0 Ratio (01 Meter Range - Indies Watei Dry i4ooc*r \3Msr- Hr" 2-Pi7 o~sLO-ZdZ -H c.sssQ.ZSO /&/Q 0.72? o,/so -tH 0.320 Q.zoo Type ol Meier Drain or Vent Hole Chat or Scale Range Chat Factor Calculation Sheet No. \PbKBQAo Ahmee. Suoe /Sul* -tH All oiilice handles to be stamped on upstream side with "Inlet*, bote dia, nom pipe IP, llange rating, instrument number and plate materia Manufacturer 'Catalog Number Purchase Orda Number Price -Ccher. jj&manrnr. nI7KsT-i ' 1-- '... ____ ~-----' n n.i* i .................. *2 #f'7o C& A /3`* A A -tH ------- /J~* 7-'"' ii mtBEXSEfiiwmBKmmjmrsTBzrrr Monsanto COMPANY LOCATION ----- . PROCESS ACTUATED * SWITCHES SPECIFICATIONS | OlVIilOW AU TM NO. <?V/r Instilment No. PS7/0-1 Snvice Eouipmenl No. or Line No. & Size Process Material Piess. Temp.-Level Flow Switch-Relay i Temperature UJ Pressure 8 Fluid (Level Only) Normal Normal Upper Max. Max. Lower Sb. Gr. Oper. Temp. 1 Upper I Lower `Rants A Units .w" Pressure Type Element & Materi at Conn, Size | Orientation Fill - Gas, Mercury, etc. Cwill ary - Length | Material mptzate Hj7y u/Am/z ..Ml-. AX9CL0K 2BV&L. 1/4." WiTK. Pie. ---:----------- "t>" 7SC. /o<s*Z Mm _io__ -li____ 137 / 4-7 Ao AO O-bo PSJ& o-/r-pup, SHLSfl- V*TCh4 sra M -tout* tfuer - SentM ----------------->- 11 Aimor Material Bulb-Diameter | Length ' Temp. Bulb Type - Plain, Union Bulb Com. - Size A Rating Wall Material & s Wei! Conn. Size A Rating LgthbdowThraador Flange"U` i"*,, d Lagging Extension ,T' ias -om 1 1 Level Type A Material Connection Size & Rating Connection Arrangement Cooling Fin or Extension Float Material A Size Connection or Body Size Flow Type Element A Matl. Disc or Paddle Size Type - Morcurv. Micro, etc. Contact Anantemenl | Rating--Volts A Amps s Set Point i On Measurement Increase Switch Electrical Area Classification Conduit Conn. Size A Hub or K.O. Differential Range - Fixed, Adjustable Accessories or Special Features Sr/AP Acnoi* SPvrl//r/-/Jk OPENS | CLOSES ustmh nr A" MPT /4a r ............... -f>--Oj --c- ~4- PSi6 . OPENS | CLOSES ------------- .------------ ---------------- >. ---------------- 1>- t, art . PLANT D*PT OH AREA 1 1 OPe'nS T CLOSES iPtC NO. is IMKCT NOW / OF___ 1 1 OPENS | CLOSES REMARKS I Manufacturer i Catalog No. P.0. No. PlilL J/fcc -K it ______ 24/?Pxgp*isv> __ 1__ ,-r fo >_---------------------------- ___ __________ Afaf <Xi A A zo" ' M ONS 095533 _ ---------------1-------- 1--3 Monsanto COMPANY Instrument No. Service PROCESS ACTUATED SWITCHES SPECIFICATIONS /z 7-z. IsuJPienJ OIVIIION Qectvrc AUTH NO. ?4/s a7_.0z.-as PLANT * tPEC NO. is- Z4/S-47 OEPT OR AREA |H(I T 7/4 Z4 4_OW fcauipment No. 01 Line No. A Site Process Malarial Press. Temp.-Level Flow Switch--Relay TemperAme Normal Pressure Normal Fluid (Level Only) Upper Sp. Gr. nOper. Temp. I Upper I Mat. Max. Lower I tower Range i Units Pressure Type Element & Maloti A Conn, Si ze Orientation Temp. Fill - Gas, Mercury, etc. Capillary - Length I Material Armor Material Bulb-Diameter | Length Bulh Type - Plan, Union Bulb Conn, - Site A Rating Well Material Well Conn. Size A Rating LgthbelowThreaOorFlange"U* Lagging Extension ' Type A Material Level Connection Site & Rating Connection Arrangement Cooling Fin or Extension Float Material A Size Connection or Body Si ze Flow Type Element A MAI. Disc or Paddle Size Type - Mercury. Micro, etc. Contact Arrangement I Rating-- Vol Is A Amps Set Point On Measurement Increase Switch Electrical Area Classitication Conduit Conn. Size A Hub or K.O. Dillerenlial Range - Fixed, Adjustable Accessories or Special Features y-cubz-nm-tJ/i O/rr ware*. floHJ JJL jZ. .AS\<n 'H.a i'/i" urr S*AP. /jQ-tQAL spor iis/KJ </3 GPP? OPENS CLOSES OPENS CLOSES OPENS CLOSES OPENS 1 CLOSES JMaiutaeturor Catalog No. P.O. No. "W S/kc ftsP/bierD at L CJL AA -4- MONS 095534 _J Monsanto COMPANY PROCESS ACTUATED * SWITCHES SPECIFICATIONS Inslmmonl No. Service Eouipmoni Iw. or Line No. & Size Process Malarial Press. Temp. - Level Flow Switch-Relay Temperature Normal Mat. Pressure Nomtal Fluid (Level Only} I Upper So. C<. t Opm. Tamp. I Upper Mat. I Lower | Lower Range I Units Type ElemenH Material Pressura Conn. Size Orientation Fill - Gas, Mercury, etc. Capillary - Length j Materia* Armor Material Bulb-Diameter ] Length Temp. Bulb T)pe- Plain, Union Bulb Com. - Sze 8. Rating Well Material Well Conn. Size A Rating AT //-/ Siact-Stop SOMf PtW MiPrdem CSVSL. <f>'r \ mu j/svr JjISl ..QtSGtlH'fL. 24n' LS/JL?:.'- S&CTl 02.4 2. --t?J PLANT onDIPT ARIA 9/4.24 HT/a>/-/ H|C Jo, K/ATBaZ Aeeaae-WMme -t-H AM3 AMS /46/er i4rr> 1-fi.Z. SL2JL U>- Li. Lagging Extension *T* Type A Material Level Connection Size A Rating Connection Arrangement Cooling Fin or Entension Float Material & Size Connection or Body Size Flow Type Elemenl A Matl, Disc or Paddle Sire Type - Mercury, Micro, etc Contact Arrangement | Rating- Volts t Ampi Set Point ' On Measurement Increase Switch Electrical Area Classification Conduit Conn. Size A Hub or K.O. Dillcrential Range - Fixed, Adjustable Accessories or Special Features lSejU- 3'A" -PH rro r**yj//rro,,`t Mejtai/e-r \SP-ST l//sv-.toA OPENS CLOSES YtoKtT)*T V*`` DPT .d&umm.4 4' <Zv/pes W%af-w*S-U__>/**KaT.": ' OPENS CLOSES OPENS CLOSES AfrjtdrfJT -L--I p, z-fvyt -MutfA OPENS closes Mwiutacturer Catalog No. P.0.1 Pl&ceoio iis-lPAL 40/-/iV JAiZlr- t sm ftoMmu.. t 3 A X A/AA L'VK000 & Ago1 MONS 095535 --------- :------ Monsanto INSTRUMENT INSTALLATION DETAIL COMPANY LOC A TlON -. Wll ................... ... ---------- . Atoaoe- unreal sc/*?/* SB-er. AU TM NO <rf/.jr 01 VISION is- PLANT -- *3 SPEC NO. OIMT/AMA //C kto<//*Mt/cH ?/*4 OTY / / 2. MK MATL HATING DESCRIPTION J?5E6_ Secars jM>i-.//*//c. (M{ r-f/ />.- OTY MK iuaMt ///ratfiAte /^coat /St/rL Slu/rtsee ... . . --------------1--------- --------------- --------------------------------------"B---------------- 1 H>- Z4/S--9-0OO3 MATL PATINO DESCRIPTION MGNS 095536 _L, 1 . "vai1 ... '1 ' 'j:v. *1 MiTiii'i ' ''*'* --------------- "-------- " . 3-M.err 020JL. -- && Monsanto COMPANY GENERAL NOTES TCE969 'PRESSURE GAUGE SPECIFICATIONS 'JZf/M-l DIVIIION Cte3Atc AUTM NO. 4AS pr/rp- / seer, 02.02. -1ra *iaic no. OtPT ON ANKA K44/1T-41 IHCCT 9a4.a4 _Sor.__ Span l Units Type Element Material Socket Mater! N Connection Sin I Type Connection Orientation Oral Site Dial Color Scheme Cna Material (Stylo Cruel JfiStM. Mounting Type CryatM Material Mictomolet Zero Adjustment Saloty Releaae Type Movement Material Guaranteed Accuracy Body Malarial Diaphragm Material Fill Liquid Cleanout Connection Pioc. Temp C| AM8. Temp C Process Connediona Sim S Typo Manutacturer's Type A Model Accessories S Special Features 0-/60 AJA6 Soe/zeopAj Sres-c. A/PL. <5erroAn ~z%L O-3O0/5/6 -tH -tH 4XA<t/(*i.Jrk SaaAa* Sr&T* Ter -UH -CH yMZtuZcKs.-ry \C/i4!A0fl .JfcSL. jAi j&JLsr \SSuoaas\ r ^ /A)pJu*rr\ Vf/AJUfr-'n<&a? Jn pz4 re l \fS7i3. /&0* P<si78-3oo*\ Manufacturer Calclog No. P.cTno. ' " Price s XA .Hire Aft4AtOTA> p> A w&eeear. l-^ezaaL -OH - zqv*- MI-70 Ql XA A. ------Mon'S nS538 Monsanto UOCATIPN. .nstiument No. Sorvico RECEIVER - CONTROLLER) SPECIFICATION j----- iur^a ELECUWHK: - fWUHATIC I LS//7-Z rtm&mtsz. & sen --**** -0* T j *PPKICC NO. DEPT OR MtCA ^4/T-Xo cj//y-z. trTtH-< ltteL on. Location - Panel 01 Equipment No. Rocord InOicato Control Number ol Points Si zo ft Type Chart Olive Speed Size 4 Type Scale Range Ratio. Cascade, Computet - Set Aulo - Manual ByPass Location Ptoportionol Bam) * Auto-Rasat Mode Rale Modi n I. Wrilmnt Pin'em. Measurement Range 8. Units Input Ftom Controller Range A Units Output Sot Point To Range & Units From Powot Supply - Electric, Pneumatic Electrical Area Classification Accessories or Special Features jy/Jk- JMUMlS- JL-Ul J-UA- ~4fc O - /e>0VM >-.2g< YES NO YES NO YES NO YES NO INTEG. REMOTE INTEG. REMOTE INTEG. REMOTE INTEG. REMOTE NO SLOW FAST YES NO INC. DEC 3-/r fiS/6 PZj/iiZ. NO SLOW FAST NO SLOW FAST YES NO YES NO INC. DEC INC. DEC -CH ir //r-z LTUl-Z- NO SLOWTFAST YES NO INC. DEC Phsy</Ai -iH Manufacturer `Receiver Catalog No. `Cuntroller Catalog No. P.O. No. Poxtso-ti A//Z-S 2-hi-'l - Sf*c PkeMifn A X rlH ex/jr 7 ___ &>o -ScuyL. MONS 095539 m INDICATING THERMOMETERS - THERMOWELL SPECIFICATIONS OiCSAu/e. 3.cTt 0 3- i-Z. --aj *LANT .MK DCAT on ARIA ill rr//(>/ TT/t 7-t nriir-i rr /o/-< /OCAr/oAt T)? Spin i Units Dial $i Cue Miterial Actuition Connection Si w& Typo Stem MAefiA Sim Poiitlon Stem Length . Color Will Matortal Construction Proem Size & tilting Connection Meteriel Length Below Thiead or Quo *U* Femaio Thread Size Leffing intension *T* Plug t Chain Rep'll Material Stwiping \fi>/np //* mZiU&Yi: 27* Iunmr 8ii*BT/4i2i C &s-Zroer_ Sr ItStitts r/iA/L&z /Co -H -CH =& Anr AnCLif 0"fiiAn* *+' Tsra*7c* tir Runt t CA&U .1171 Sr/huL&rs At'lMMgTtnC. .fZAtfj.(esr. r:' >/so r AXAAujSri. /o,, 5," - !SV* -t=H r A/pr MZ.utT- rsLz_____ &. teszaaerts Snpc \aa.i'ZSuiiL A/A/\+ tftl i iS mammu CA-UUf ManulKturor Cntelog No. P.O. No. ci/E- r- Quintity Required Price A1 SK* fitePMsen JkU0&son /h&MET5i>- (oDi,oe>i-f rJttfJ 4m KT7Q OL A A ir HONS 095540 ------------------------ 1_______ L MONS 095541 . Monsanto LOCATION '( INVnUMENT ACCESSORIES i/r>rt Aeearsur tt/MK^fiorxi. PLANT AU IN MO. sejs5?P^2. -er& \ZS-X4/S-J-* IS8UKD IV DAT! IAPP0 e*4Wfxc 04-70 \ *V NO. OATV . ^<L#*lG /tertGS7X________________________ ____________xjo:___________ ^^V.^- *,,;/>- 3 _____________________________________-XG //7 -3 _____________________________ -xe//<r-3 .3 sam:// /Z'cMvSgq <g>*sAjffC7~/o*Jr Aire sJc.*- <P/4sr -L/ec*J M/gS ^GFtrrmcro /____ jpftfec_________________________________________________ __________________________________ Mootrc f>s6______________________________________ _________________________________ KJ,r*___crc^sgA/strjQAj Xs->or Sevrje* 4/z /tegaifAfr' Se 7TifJ g___ 1__ Lh./\ //`j^.kL.fn___Serrr/^6... ....... i___ tJsfy/ih'r. r --------- t.n. *jr ____ --M___,______ /?n 7 ; V*__________________________________ V o/iYr S "__ A s A_______ "-M ccsrtMAAJter PQ *- z+/r-i-____________________ srtra. />ee*x*B>______'& /i-7o cjl* 0955*2 moms >SCcr. 4-2-0 3 --a a J.2. SPECIFICATION FOR FIREBRICK LINING (2'V 0 R i * THICKNESS) FIREBRICK LINING ' * FOR CYLINDRICAL VESSELS JOHN ZINK COMPANY TULSA, OKLA. MOWS 095543 i. ;jiu Page 1 t- 3 s~/cr, <rz-U3 --c> a I GCNERAJ.-- A Scope * % 1 This specification is tor tire brick laid op in mortar. It covers: a The application and curing of the refractory sy applying con tractor. (Section II). b The drying out procedure by operating staff. (Section III), c or IV).Substitution material. (Section II Application ad Curing of the Refractory A Materials .- * 1 Fire Brick . r. *2 A. P. Green Mortar or equal 3 Water suitable tor drinking, unless it is known by test or exper ience that it is satisfactory. 4 SulTAOLE CASTABLE MIX FOR THE OPERATING TEMPERATURE. ' B Preparation 1 All surfaces should be cleaned of foreign material. 2 Nozzle extensions, sleeve liners and other items within the limits or THE lining, shall be wrapped with two layers of expansion UATERIAL. 3 .All openings in the vessel shall be custd by means of hardwood or metal jacketed plugs, slightly tapered, and of such dimensions THAT THEY WILL EXTEND BEYOND THE FINISHED SURFACE OF THE LINING ' AND TIT SNUGLY INTO THE OPENINGS. ThEY SHALL EE LIGHTLY COATED WITH GREASE OR TAR. iJhERE FEASIBLE, THF. OPENINGS MAY BE COVERED WITH PLATE HELD IN POSITION BY LIGHT TACK WELDS. C Application . 1 Precautions a During cold weather, the brick and the surface to which it is applied, shall pe kept at a temperature above 40 F during ap plication AND FOR AT LEAST 43 HOURS THEREAFTER. IF REQUIRED, suitasi.e means ron heating shall be pro;idee'; however, live STEAM SHALL NOT BE USED FC-R THIS PURE USE. * Revised II. A. 1 1 II. A. 2, A.K.R., 6/15/70 HUNS 09 554*. J.z. SPEC. 110 Page 2 or 3 S&c-r: 02-03-00 ( I All TOOLS USED IN UIXIN6 AND APPLYING SHALL BE KEPT CLEAN AND FREE Or SUCH SUBSTANCES AS MAY COLLECT THEREON DURING APPLICA TION. 2 Mixing a The mortar should se thoroughly mixed with water to the con orsistency thick cream. aThe mixing should be done with POWER MIXER. When properly mixed, a new tire brick will tloat with three or orquarters its thickness out the mixture. 3 Placement ' . a Only QUAiiriED personnel thoroughly familiar and experienced WITH BRICK REFRACTORIES, SHALL BE EMPLOYED FOR THIS WORK. L or ay two rows fire brick to the dimension specified on the JOS DRAWING, LEAVING AN ANNULUS BETWEEN THE BRICK AND THE VESSEL SHELL. FILL THIS ANNULUS WITH CASTABLE WITHIN 2" Or The top or the brick and tamp castable with a 1" x 2" board TO PREVENT AIR POCKETS. Lay TWO MORE ROWS Or BRICK AND FOL LOW WITH THE CASTABLE. CONTINUE THIS PROCEDURE UNTIL THE orSECTION IS LINED. One side and one end THE brick should , SE DIPPED IN THE SaIRSET. ThEN RAP THE BRICK WITH A BRICK HAMMER TO" SECURE A BRICK JOINT NOT TO EXCED 1/16", PREFER ABLY LESS. o All nozzles and sleeves are to be grouted with suitable castable mix roR the temperature service. d Special arch bricx are supplied to form the burner openings. 4 Interruption or Application A-- Dur. "O PERIODS or INTERRUPTION or APPLICATION, ALWAYS REMOVE EXCESS MORTAR ON EXPOSED SURFACE TO PREVENT UNEVEN JOINTS. /' 5 Curing - A The lining shall se air cured ONLY during PRELIMINARY CURE. OB nce started, the air curing small be continued without inter ruption FOR AT LEAST 24 HOURS AFTER THE LAST PORTION Of THE LINING HAS BEEN APPLIED. " MONS 095545 J.Z. SPEC. MO Page 3 or 3 siBcr, <3-z-o3 ~c70 ( III Drying Out A Procedure 1 Following the atmospheric drying period, the lining shall sc TURThER DRIED eY RAISING THE TEMPERATURE WITHIN THE VESSEL TO 300 F OVER A PERIOD Or ONE HOUR. HOLD THIS TEMPERATURE FOR . six 50hours. Then raise the temperature, within the vessel, F PER HOUR UNTIL IT REACHES 1000 F. HOLD THIS TEMPERATURE TOR TEN HCURS. ThEREAETER, THE TEMPERATURE MAY BE RAISED OR LOWERED, WITHIN THE LIMITS OP Further heat up or cool down, 200 F PER HOUR. THE NORMAL OPERATING RANGE, should be done at the rate or IV Substitution or Materials - . .......... . A This speculation is based on the use or materials that are readily . AVAILABLE IN THE UNITED STATES. B It IS APPRECIATED THAT MATERIALS SPECIFIED HEREIN ARE NOT ALWAYS OBTAINABLE OUTSIDE Or THE UNITED STATES AND QUITE OFTEN CANNOT BE PROCURED WITHOUT UNDUE COST AND DELAY. C In such cases, it may be rouNp advantageous to substitute retracTORIES FROM LOCAL SOURCES. HOWEVER, BErORE PROCEEDING .ON THIS 3ASiS, THE CONTRACTOR SHALL SUBMIT TO JOHN ZlNK COMP*# TOR APPROVAL CR COMMENTS, COMPLETE INFCRMATI ON AS TO THE PROPERTIES Of THE PROPOSED ' SUBSTITUTION, INCLUDING: ~ 1 Setting time . 2 Maximum serviceable temperature' 3 Dried density -- ' -4 Fired density* '. . 5 Thermal conductivity* 6 Crushing strength (tired)* 7 Per cent linear change (fired)* e State temperature at which test ta made. 0 Contractor shall also furnish John Zink Company with information as TO WHERE AND LENGTH Or TIME THAT THE PROPOSED SUBSTITUTE MATERIALS HAVE DEEN USED IN SIMILAR SERVICE. 095546 HONS r HONS 095547 IONS 095548 ! HONS 095549 ' '? ------1----- S----- 1----- 5----- 1----- ------ 1----- !----- 1----- 5----- 1----- !----- !----- --3ti------!------ 1----- !___ 1___ !___ 1___ I l . i , , , --- 1| t r. ^ ...... -- J 2 SPEC f22 se-c-v, a 2-03 J.H. SPECIFICATION , fOR MONOLITHIC LINING (3^" THRU 6 THICKNESS) GEEEN CRETE. V CASTAE>LL FOR CYLINDRICAL VESSELS 0.2. SPEC. IZZ Page 1 or 6 , Jc^ri a --ao I GENEHAL A Scope ` 1 This specification is tor pneumatically pplied &aEeNcntTt*c* LINING TOR CYLINDRICAL VESSELS. Il COVERS: i A The INSTALLATION Of ANCHORS (SECTION II). '' B The APPLICATION AND CURING OF THE CASTABLE BY APPLYING CON TRACTOR (Section III). . c IV).The drying out procedure by operating siArr (Section V).D Substitution or materials (Section ., II INSTALLATION OP ANCHORS A Materials or No. 8Anchors gauge Gateway Erector Anchor or equal (individ ual) as shown in Figure 120-1. Anchor shall be 316 stainless steel unless specified elsewhere, cold drawn type 304 stainless. in which case, they shall se ' 2 Covered welding electrodes in accordance with thf latest edition . or Joint Spec ir icat ions AWS A51, ASTE A 233, A,INCO-iVeld type 310 (25 - 20) or typ$ 309 (25 - 12) in order of preference for use WITH ALLOY ANCHORS. 9 Installation . \ ' 1 Weld the lini'ng anchors e the wall of the vessel as illustrated on page 2. 2 Prepare the surface for the lining by removing all loose scale , or other foreign materials. Power brushing followed by air jet CLEANING IS RECOMMENDED. SANDBLASTING MAY BE SUBSTITUTED. After the^e steps have been completed, the surface 3hall be inSPEOTED TOR CLEANLINESS. Note: The above sequence is for new construction. In the case OF LINING REPLACEMENT, IN WHOLE OR PART, SANDBLASTING SHALL 3E PERFORMED PRIOR TO INSTALLATION OF THE ANCHORS. MQNS 09555T LINING ANCHOC. SPACING AND AvC-E.ANGE.MSNT MMMHBMIOaHBamaMMUMaMI No. 8 GavOOC. \\ /,' M.V/IBE --i---A\ // Amchcb. Ve.sse.v_ AS Eea'D. j, --p Q-Vs. 1 <-WEtd On Ovat Svoe 0*sv_vf.- gixtrs FIG. 12.0-1 ANCHOR : ANCHOR. WELDING SECTION MONS 095552 1.J. SPEJ.Itt . Page 3 or 0 5'c-r. a z.oJ' --t?e> III APPt+6ATI0N A.'JD CURIflG OF REFRACTORY A Materials ' . ' . v- i. . i 1 GB6EMtBens."C' -- packed in bags containing 100p net weight. 2 Water suitable for drinking, unless it is known by test on EXPER IENCE Thai it is satisfactory, Q Preparation T Nozzle extensions, sleeve liners and other items within the limits of the lining, shall be trapped with two layers of expansion ma terials TO PHCiFNT The REFRACTORY FROM BECOMING BONDED TO THEM. This is to permit' such members to expand freely without rupturing THE LIMIT.., . ' A 2 ll openings in the vessel shall be closed by means of hardwood or METAL JACKETED PLUGS, SLIGHTLY TAPERED, AMD OF SUCH DIMENSION THAT THEY WILI EXTEND BEYOND THE FINISHED SURFACE OF THE LINING AND FIT SNUGLY IMO Ini OPENINGS. TmEY SHALL BE LIGHTLY COATED WITH HEAVY GREASE CR IAR TO PREVENT BUNDING AND SHALL MOT BE REMOVED FROM THE OPENINGS OR DISTURBED UNTIL InE REFRACTORY HAS DEVELOPED ITS FINAL sti. Where feasible, the openings mat be covered with plaii held I POSITION BY LICHt TACK WELDS. .g Application 1 Precaution a During cold weather, the refractory and the surface to which it IS APPLIED, SHALL BE KEPT AT A TEMPERATURE ABOVE 60 F DURING application and for at least 72 hops thereafter. If required, SUITA3LE MEANS FOR HEATING SHALL BE PROVIDED', HOWEVER, LIVE STEAM ' SMALL NOT BE USED FOR THIS PURPOSE. a During hot, sunny weather, the refractory materials shall be STORED IN A ShaDT PLACE UNTIL-USED, AND THE EXTERIOR SURFACE OF THE VCSSEL SHALL BE 'EITHER SHADED OR COOLED 8V SPRAT I MG WITH WATER WHILE The REFRACTORY IS, BEING APPLIED AND DURING THE CUR ING PERIOD. C DO NOT ADD OTHER CEMENTS, LIME, ETC., TO THE MIXTURE. ALL TOOLS .USED IN MIXING AND APPLYING SHALL BE KEPT CLEAN AND FREE OF SUCH SUBSTANCE AS MAT COLLECT DURING APPLICATION. . 2 Proportions ' a The proportions shall be as follows: C-L.ciuwcuu-n* V" -- 10CT'-' (one bag) ,V A 1 F R FLH MACHINE MANUFACTURER'S R LCOMME NDA T I CN 3 . MONS 095553 1.J. SPEC. 122. Page <1 or 6 3cr, e?z.0j-aa Mixing .i Fob dry gun application, thoroughly vii the gun mix in a dhuw TYPE CONCRETE MIXER, OR PRETCRABLY, A REVOLVING BLADE TYPE MORTAR MITER REPORT CHARGING THE HOPPER. PrEDAMPENING RATER Or at least One ;uart per 100 pounds should se used. , b For ret gun application, the gun vix is charged without pre mixing directly to THE machine with the required amount or WATER. 4a Application shall be made by pneumatically operated equipment, THE SITE, SPEC IrI CAT IONS AND OPERATING PROCEDURE Or WHICH SHALL BE IN ACCORDANCE WITH THE RECOMMENDATIONS Or THE SUPPLIER Or THIS .EQUIPMENT . b Only qualimed personnel thoroughly familiar and experienced WITH pneumatic application or INSULATING REERACTORY Shall be EMPLOYED TOR THIS work. c The compressed air AND WATER shall be SUPPLIED AT A STEADY pressure: . D The mix shall be applied in horizontal, narrow bands, working UPWARD FROM THE BOTTOM OF THE SECTION TO BE LINED. The FULL FINAL thickness SHALL BE DEVELOPED IN ONE BAND BEFORE PROCEED^ ING TO THE NEXT ONE. - IT IS IMPORTANT THAT THE BOTTOM Or each SUCCESSIVE BAND BE SECURELY BONDED TO .THE TOP Or THE PRECEDING ONE 3EPORE THE LATTER HAS DEVELOPED ITS INITIAL SET. THEREFORE, THE HEIGHT OF THE BANDS WILL BE GOVERNED BY Th DIAMETER OF THE VESSEL AND BY ATMOSPHERIC CONDITIONS. . A GENERAL RULE IN THIS REGARD IS THAT A BAND SHALL BE COMP LETED IN ABOUT four hours. In LARGE DIAMETER VESSELS this MAY REQUIRE TWO CREWS OPERATING SIMULTANEOUSLY. The CONTRAC TOR APPLYING THE LINING SHALL TAKE SPECIAL NOTE OF THIS RE QUIREMENT. e t Screed the refractory to the final required thickness. This PPERATION SHALL BE PERFORMED DIRECTLY AFTER APPLICATION AND ANY DEFICIENCIES SMALL BE IMMEDIATELY CORRECTED. This SCREEDED FINISH IS ALL THAT IS REQUIRED. SMOOTHING, FLOATING OR TROWEL ING SHALL BE AVOIDED. F No REBOUND MATERIAL SHALL BE ALLOWED TO ACCUMULATE ON THE COMP LETED LINING. . g Under no circumstances watsoever, shall any resound material BE REUSED. MONS 095554 5 1^1 ERRUP TI ON or Application J.Z. SPED. Pane 5 or o sect: 02-03- <70 a When the application is interrupted before completion or the ENTIRE LININ... thc concrete shall 9E cut back immediately to THE VESSEL (Nil A IT H A STEEL TROWEL. irtlS CUT SHALL BE MADE AT A RIGHT.A.iL* TO THE UAL. 0E TtlE VESTEL, AND SHALL BE MADE AT LOCATIONS AHCRE THE FUIl FINAL THICKNESS HAS AIREADT SEEN APPLIED. /,. MATERIAL 3 E TON D TmE CUT SHALL 3E DISCARDED. ' o During ti-e pepiod of interruption in application, the water CURING SChED.IE TOR THE CONCRETE ALREADY APPLIED SHALL 9E STRICTLY rOi OWED IN ACCORDANCE WITH ITEM l> Or THIS SECTION. c Immediately prior to resomiuc application, the exposed sur faces OF THE CTNCRET.E TO which A BOND MUST 9E MADE SHALL 9E ` THOROUGHLY WL' LD. L, ..BRING . a The lining shall be cured by being kept mcisi during its per oriod hardening. The curing shall consist uf light applica tions or CLEAN, COOL WATER AMD shall 3E STARTED AS SOON A8 THE EXPOSED SURF AC E IS HARD ENOUGH TO PERMIT SPRAYING WITHTU WASHING CUT THE CEMENT. f.ARE MUST BE EXERCISED IN AVOIDING A STREAM OF WATER THAT IS TOO HARSH. ThE SPRINKLING SHALL CON SIST MERELY CF A FINE MIST. s During hot, dry weather it may be found necessary io start SPRAYING THREE OR FOUR HOURS AFTER THE UNINLiftS SEEN AP PLIED. A' NO TIME DUR1M- ThE CURING PERIOD SMALL Ti-E INTER 30VALS BETWEEN SPRAYING BE GREATER THAN MINUTES. An inexpensive latex paint may be applied to the new retrac TORY TO INHIBIT DRYING OUT. This WILL REPLACE "a" AND "a" ABOVE. C Once started, the curing shall be continued without interrup TION TOR AT LEAST 24 HCURS ATTER the LAST PORTION OF THE LIN ING HAS BEEN APPLIED. 7 Pointing Up ' a. If any pointing up is required, it shall be done immediately AFTER THE CORING PERIOJ WHILE THE SURF ACES ARE STILL TWIST. a Mortar for pointing up shall be of the same mix as used in THE ORIGINAL APPLICATION. . c SurriciENT water shall 9e added to give th mixture the de sired CONSISTENCY. . D 3a!Cme3 Shall s-e in amu-nts .that can bt applied within a per- tod of 20 minutes. Do not use mortar that has taken an initial SEI\ . MONS 095555 1.0. SPi.C. Page 6 or u S/BCn 02.0*3 --00 IV DRY 1-fJS-Our A Procedure 1 Afier the water curing has been completed, the lining shall oe ALLOWED TO DRY UNDER ORDINARY ATMOSPHERIC CONDITIONS FOR AS LOlG AS POSSIBLE, BUT NOT LESS THAU 24 HOURS. ' 2 Following the atmospheric drying period, the lining shall be FURTHER DRIED BY RAISING THE TEMPERATURE WITHIN IHE VESSEL TO 300 F over a period of one hour. Hold this temperature for six hours. Then raise the temperature witmi. the vessel 50 F per hour uni;il it reaches 1COO F. Hold this temperature for ten hoirs. Thereafter, the temperature may be raised or lowered, within the limits'of the normal operating range. Further heat up OR COOL DOAN SHOULD BE DONE AT the RATI OF 200 F PR HOUR. V SUBSTITUTION CF MATERIALS 11 ' . A The specification is based on the use or materials that are readily available in the United Staies. B It is appreciated Thai materials specified hcrein.arl not always ob tainable OUTSIDE OF THE UNITED STATES AND SUITE OFTEN CANNOT BE PRO CURED WITHOUT UNDUE COST AND DELAY. C In such Casls, it may be found advantageous to sguSiit.uti mixes from local sources. H wever, before proceeding on I his basis, IHE con tractor SHALL SOBMIT TO JOHN ZINK uOMPANY FOR APPROVAL OR COMMENTS, COMPLETE INFORMATION AS TO THE PROPERTIES OF.The PROPOSED SUBSTITU- ' tion, including: ' 1 Setting time . 2 Maximum serviceable temperature 3 Dried density 4 Fired density* > 5 Thermal conductivity* o Crushing strength (tired)* P 7 er cent linear change (fired)* State temperature at which test is made. D Contractor small also furnish John Zink Company with information as TO WHERE AND LENGTH OF TIME ThAT THE PROPOSED SUBSTITUTE MATERIALS HAVE BEEN USED IN SIMILAR SERVICE. MQNS 095556 Monsanto T N0AO1 , PIPINO MANUAL PIPING SYSTEM SPECIFICATIONS -r<g 77 * Z. // -- d?J HAN. IICT AAAT P2.2 STO F1CI ft 125 LI STEEL CLASS C SENERAl SERVICE ((' Thrudtd t Buttwsld - Thrudtd Brin t Flinj<l IBBM Vilvts - 350 F RAG* t or lili 1. APPLICATION This apaciflcation it intandad for us* In class C fluid srvicas ( P2.1 tTD 1). Fluids must D* non-oorroaiva and not aanaltive to copp*r. 1.1 Isrvics Ran** i Ss* Figura 1 t. Tabla I, 1.2 Usa Llmltanansi Systwn is limitsd by tha Taflon Sat ball valv, . Taflon trim bras* 9lobs valva. When Taflon trim valvas ar* onittad from systam, tha cast iron valvas limit th* systm to 400 r max slvas, duett Is iron fittinga, a stosl flanks* . , and slip-on flangaa in sis* 2* and larger. isos thru l 1/2*. Flanged Put*. 6 lilt j*| !!i! PIPING COMPONENTSi M0MIMA! NPE N PIrt! 0CN 00 WCICMT; MATERIAL 1 A*m specification NIPn.fl: tCMEOIAE AND SPEC H Sch 60;ca bon itael AlOfa Grad xjl._ Gr 9 1M -i. [ B B 10 12 Sch >0; Cb Sch 0; CS A53 ?vda E fin la B f H 14 11 2# Sch Oica bon itaal 24 FIITINtti RATING; MATERIAL SPECIFICATION, DIMENSIONS OTVNPNM! SCHEDULE, W* rtciPiCAiioN COJflINO*: RATING; MAT0UAL ASTM fPCCIflCAYtON OUTLET* RATING, MAURIAL ' MIM SPECIFICATION VS* THEM %iN S'RS" ...... MUCH CONSTRUCTION 3001b,-ductile A44S.-BJ6.3 | thrd Sch 40;CSlBH A234 Gradh WPB 1 Sch !0;CSjBW 51^ J____ Sch OiCS BW 1 3000luFCGj. thrd A161 Or 1] L______ -- Std wt;fot-god :s, t ird Std /t;iotgsd :8, b ittwe dad US5_ftK-i Os not usja Jiisi Gr It Use As sh >wn i i Table IE or for th imowoll cbnnec ions THMIADEO TEES USE TABLE (A BRANCH CONSTRUCTION UNLESS OESIGN PRESSLAC CXCICOS -4+ -4+ -4+- ALLOWABLE PRESSURE SHOWN. FOR ANT SlCH BRANCHES USE FULL STRENGTH CONSTRUCTION TABLE IB. full I REDUCEO TT A... ..A- --1. TO TC 5 Je, R WT -A-- WO Ovw M UNION* WING; MATERIAL JO0\b)MX, thrd 1 ,A#W.rCl^Al9N ............ A197:a 11 :rim FUUMC* AATINQ. MATERIAL 1501b;for iad c l, th AtIM SPfC; USAS OIMINHONS A181 Gr 1 816. 1501 >1 for led C iTaTT i-on Mel Or I 016. l PACINO.................. .. BOLTING: MATERIAl, ANO PIC 1/16" ral aLb 1/16 A307 Gr B honv ' hax bolt 1 wit >ed f ice rv ha i nut OAMT* MATERIAL AND DIM 1/0" thic ; com >rsao id as JOStO 9r iphit id, f at r ng; 8 ntcnioos* mk COATED A559 Clas i 40 1-2 A233 860 laria i larlo k 70 i it Dlcn ) PRESSURE - CONNECTION S - VALVE VfNT- i (MAIN - CONNECTION -VAlVt tuSeratvrc - n connection Oat PI 1/2* BL10 Oat" VI net dTt 1/2* DAI Oat TX, * & Oet 3/4-1 L107 Out |i>at~ 51 wrl/4'- r oAi Tii.l-m til, LW * &A Tii, T33 OATi thrd Mil* Tm fig ff OLOBI (400 F m L> flfiil 1901 > thr (40<? p ma (4 1" me i ai* Mil tdX 1251 > fig FF l CMC* IffINQ IVCRTlCAL OR HO* UHt ONEOtr' LIFT (HORIZONTAL USD BALL (350 F ma `L j DC3 2001b thrd (500 F ma `J, , figj 1501b thrd (400 F ma i) juai^on thr< (35Q T ma 1____ (400 F ma. i> _ 1Q2 1251 > fig (400 F mo ;) (3 i" ma i sir D3X TTi r'Tg (499 F mo.*- 1 2" BJ 4 not 'or s Leem r cond neat R. 1 0 F- max not cond or s mat i.' 1 0 F mam iratu 4 SERVICE RESTRICTION i fiao Fi- urs pag 2 ic r pr erat ( 1. mlts t rvlca tamperatura and other lim ts ai pile bio 1 o sp cifii flu da. Sc< ala< ths f lull dl r ctor] for 4 . 1 Water and Ain Wa nr tervic is i estr cted to tl o or a to tha aft < f thi sta- m vaj or pi SSSUi a cu va i> Figura 1. 1 it smTuld preferably b l lmituil O 12 psi< max 2 Steam and Condonsa t Steam is 1 mito< to 2S pi ig nw X AO urot d or jupei heati d to not < var 1 00 F 1 houla taTinulad to 12 pslg max Coi danaata pEfl^ON AND COHSTIIUC ;on pgnrgi J5S Faciliti A fO ing > Met > e vc lle< by hs Pj ojoc' Eng: naar on cli p o)ec . Bi nda and itting required must b nltown on aaclt draw ny. ! 2 > /l>VW.*n.' Unn weld nock ClanVm,U.i Vents *; ot roqii) r* () on eir' t to y nos i>utt eld Uti> ge or iy- A ?Epa--Lftvt>t an<l be j_52il Sue 1-1 .2 JVO 2 .9 StamRMslnsi All ranchos t Ku-o t toj Of i toam main Or. p po< Aats with staai traj s sh< 11 bi p ro- idod avary i tom of ri ors. .4 Thrasd Lubricanti For thraa lad p ping Join a us Tef on T tread sasl ng td lu >rida ing ompo utd. Do n t ackwald Taflon lubrlea :ad Joints Fo r bol . thr tads jsa - lolyk ta T 'pa U tqusl B3BjBSi,M lot normal Y ra [uira 1 up 0 35 ) f a leapt what i tha conf gura ion ugg* ts O r*t aaa. : PJ.2 a Stia datalla for thasa connsctio is ar fou id in PS.5 fOUMCf CCA OSlOi Valvasr P4.3 STD8 0.9. 4. 9; Pip* a Fittingi P3.1 Stds. FI a F41. MONS 095557 C ,5 Vi UV.vJS29tAM,<Mv.'>.A2L`ti.' - - *.__. .... ... .. . Monsanto IT ANOAH0B \ *T s. VIPTNO MANUAL PIPING SYSTEM SPECIFICATIONS sactt az)J-Q3 MAN. SECT PART P2.2 STD F2C2 150 IB STEEL CLASS C GENERAL SERVICE THriWid, Mich, fluid l Buttweld - Threided 8rs & Flinged Steel Valves - 350 F PAGE -- applicationi Thia apeeifleation la inttnded for uaa In Claaa C fluid atrvicee (ate P2.1 ba non-eorroaive and not aonaitive to copper. 1.1 Barvlca Rangai 8aa Figure 1 < Table I. 1.2 Uaa Llmltatianai Byotmn ia limited by the Teflon alaava plug, and the Teflon teat ball velvee are omitted from ayatern, the piping components limit the eyatam to SOO F max. STO 1). valve. Fluida muat When Teflon trim PPWBTRUCTIONi Threaded braea valves, ductile iron fittings in sizes thru 1 1/3". Flanged ateel valvaa, buttweld fittings 2" and larger. Formed-on-pipe lape with elip-on back-up flangee in eitee 2" thru 4*. Threaded flangee thru 11/2* and elip-on flangee 6" and over. 'zjKA . - CO\' i> . C*W, - NOMINAL PIPE SIZE Hu 1 Pin; BCH CM WEIGHT; MATERIAL Sch 0Ojca bon teel E fiMOB Or B MUfilli SCHEOlAE ANO PEC IBeTT 80TCS TT0t> Or TM 2 S 4 Sch Oj C AS97 ERW . 1___ .17 a TO u l* ia M ae 2 Sch U: c Sch 0; c rbon etee A53 rype Gra e B 1 0<> 14 FITTINOS: RATING MATERIAL 3001b:due He SPECIFICATION: DIMENSIONS A44S: 016 3 .hrd Sch tOrCSlBW A2341Cr WPB:Bl S.9 Sch OiCS BW Sch OiCS BW BTUMNDBi SCHLOU.E: TYPE SPECIFICATION _ -- COUPLINGS: RATING: MATERIAL ToCoilfcs TKFd 1 M01 Or 1 OUlitU: MATING; MATERIAL I ASTM SPECIFICATION Std wt:fo ged _ AiOS Or Z TSS not us s, t ird TTcT #t: fprgoa CS, >uttw sided A105 Or 21 >wn 1 or t >r th rmow ]1 cbnnec iona i WUWlgHMNtTAUCTION THREADED TEES 1 1 H-^4- USE TABLE tA BRANCH CONSTRUCTION UNLESS DESIGN PRESSURE EXCEEDS ALLOWABLE PRESSURE SHOWN. FCA ANY SUCH BRANCHES USE FULL STRENGTH CONSTRUCTION TABLE <1. -- fULl | REOUCtO TT .A.. TO -A.. TC ,1 S -aL... -_L-- .A... R WT WO UNIONS: RATING. MATERIAL \ ASTM SPECIFICATION. ......... flAFnil: RATINO. MATERIAL 30001b:HI thr A197| All iron trim l!>01b:for jed C l, th d 1501 ifor d C , ai p-on AtTM VIC. USAS DIMENSIONS Aiei Or z B16 5 Aiei Gr I 816. FACING . ____ ___ _ ES.4.1 ll_ X/lSt BOLTING: MATERIA^ AND SPE _ >30? Or R henv Oas 1 . :(lAMltt: MATERIAL ANO DIM l7s"thic L com areas d Gtii 1 he* aa iceto gr phit IdTf at r nq ELECTRODES: BARS 3 COATED :A559 Clae E60 3-2 A233 B60 lerie 1 rarlo k 70 Tit p'ic. T -- -- si -mUIUK - CONNECTION VALVE -1 ORAM CONNECTION -HUMDATUM 1* CONNECTION GATE Pi 1/2" IU0 VI--------------- Dli 1/2- 0A4 Tl. T25 3/4-1 L107 BA4 2001b thrd PS V21i 174^ BA4 oil l" w 4 5.25 T11.IT25 TU. >SMI 1501 fig RF JUZ? " T29. T33 2" Bl 4 OLOM BB4/BMF 1001b thrd (750 i> fill? XM1 1501 > fig RF ! CHECK) SWING (VERTICAL ORFRU CHECK: LIFT <HORIZONTAL UK) PLUG BALL (500 F ma BC3 2Q01b thrd (500 F ma 1) DC4 2001b thrd (500 F ma () DEI iSoib thrd (350 F ma 1) 3001b thrd (350 F ma i) (7^0 F mn i} C4J i501 > fig RF (750 F me if 1501 > tig RF (350 P ma () PP4 3 1501 , lg RF (400 F ma 1} --- -- -- -- l.i Seo Fi lure - pag 1 r ir pr esur r-tum lerat ro 1 mite ervTca tenpurature aiu other 11m ts a )plic ible x> ep rcifi : flu .da. Se ala 1 the llul 1 dir ICtOI ' (ur 1 watc-i: 1 Wetui iv ice ia rea .rict d to the :o th iRf . of .ho a team apor pree ura urva In F .gure 1. .2 fttu.im add CPfUtemn Steam is 1 .mi te 1 to LUO p >ig m ix an ;urat td 01 aupo heat <d to not <var 100 F Co idenaate hould bo limited to 1 ) paig ma* jaauwjtfpjsws^ur U.QH-tt&TU JJrfLSlFl* rr Lx.r.Os 1 (.;: lor,: ua.re p ('lot ;rt 1 red 1 >r ct tnge tiled by t f di cti >n wh tie 3eet r.n'll a >ace >enni * ipnda are :h pc .ject Do ida limit id tp Hi fl .ti n7 jgm i .'J I .UUL bo f`!:0'vi, >11 onrh ,i wing 2 riiyUPt' Uue w.l< neck 11 in 1 U'.-O it to .eld itti .JH O iy. >.) yr-ntn 1 Vcnta am ic>t requi 1 d on air .4 Pine Layout eurlJlc i<im See PI.2 Std !. .5 Steam Naina 1 Ml >cuitehae L ko^ :c to of iteam main Dr P po kata with atea 1 tra a ah >11 b 1 pro <ided evary 000 foet and at the be item of c. ere. . Thread Lubricant) for three ed p ping Join e u 1 Tef on t read seal ng n d lu rice Lag aekweid Teflon lubriee .ad Joints Fo bo 1 thr ada ae *7 olyk te T pe U or qual The detalla for theae connectlo e ar 1 fou d In F6.5 ompo nd. Do nr t 10: Pipe and Fitting 1 P3.1 STDS FI. FU, fc F4 MONS 095558 ionsanto EMSS^tv IP1NO SVgfcM - in u srta cuuc mu* tamci. Jm. mi mi------------P2.2STDF2C4 OATS f^70 tock*twM |fH"11 ftuttwtM (24") SoekfttWiti & Flui(H Vilm - MOP JOLicATlPHi Title specification is intonded Xi Jk,, ibcTmTc fluid eerviees. Fluids must fra 001 mroitvi to ataol. ,, 1.1 service fanasi fat Figure 1, page 2. Typical manga aca J7SPppaalg at -2-0- to 1-0--0 F and- 1- 95- psig t iso F. -............. j. >01FICATIONS s&t^r. .Z-P- & 3 w. w. 1.1 liimillll Llmitltlon-i ThK ayatm la llmlead to ISO P by iinitatlona on ration aaatad ball valvaa. :0NITSVCTI0N Socketweld fitting and F2C4 valvaa. alip-on flange* Sockeewald fitting and F2C41 valvaa, alip-on flange* MOMIMAl fiat lilt i/i 1 1/. 1 1 1 ih Buttwald fittings, flanged steel valvaa and slip-on flangaa. fit# ftg.flgd.stl vlv mach-lapa A SO fig. > lil. Buttweld tittinga, tlanged steel valves, and alip-on flangaa. 4 1 B 1 10 | 12 14 | 16 | 18 | 29 1 24 Ifl Nlfflll NT TIMM COtlFtlMM F2C4 Carbon steal.A106 Or t Schodult 40 CS Alts Or Sch 40 C.S..AS3.TFS. Or fi Cartoon stsal, A52, tp S. Cr B CS.ASB7.BRW (nota 1 Carbon steel. A93 To S. Or b Schadula 40 1 Schadula 20 Carbon steel,AS3.TbS.Ora Carbon steol.A53.TbS.OrB Schadula 10 Carbor. steal,A1B1 Or X carbon staol, A234,Or MPa Carbon steal, A234 Gr KPB Carbon stool A234 Or WPB 2000in.aoekotvald.Bl6.11 Std. Wt buttwald,B16.9 Sch. 20, buttweld, 816.9 Sch 10, buttweld. B16.9 Carbon ataol. A181 Or X UMIOM Carbon .t*. l?AlOS OrTt MIHIH Carbon steel, Alii Or fi Std. Wt. soekttvald IR1UCH eWITtOCTieW-- Uaa aockotvald taea aa par Tablo IB ' Carbon steeli A105 Or 11 Standard waiqht. buttwald, bora to match pipa Uaa unrainforced a .ub-in branch csonnaetions unless design pressure exceeds Tabla 1A. Whan do ign pressure exceeds allowable (Table 1A) use Tabla IB. ITUIINM UUXMllNAWj FpaitSUIlfrMv^STpf ... : . _______________ ______________:__________ FUNttl Carbon atotl, A1B1 Or I ' ISO lb. alip-on (Boa Not* 2 a Far 2.2) . tOtTINS Carbon stool, AJoT Orada ,' . GAI Compraaaad aabaatoa intrwai ' barai AKS A5.18 Claaa E40S-3 Coatadi AWS AS.1 E60 Sarlaa ' FftttMlieONN* Datail ?2 " PTJ8 Dat.F2 2/4* PT3B Datail F6 Valvai 3/4" FP38 Tran----------- Datail V2 Detail V14 Valvai 3/4" PA33: towp---------------------------- Datail DIO Det.D14 bat. 022 I Datail D22 S- rA Velvet 1* FK37 i Velvet Ik- FA37 I Datail D22 1 Valve. 2" FA27 msmcriMn------------- Datail T2 Dat.T7 Detail Til Detail Til. T29. T32 DOt.T27 Detail T27 NOMINAL flfl 11X1 1/1 1 S/4 1 1 1 1H 2 61 i 1 10 | n | 14 | IS | 18 | !0 | ,4 CAT! VAIVI FA37 400 lb aoekotweld (750 T max) FA42 156 b flanged RF TPSO F max TKOTTXWn'VttVl-------- FB37/1'1.37 600 lb aoekatwald r|4J/PL42 ISO bl Clanged, RF |. WNeinctt'w CVI--------- 2A 600 lb aoekatwald turn LVI XS&t 600 lb aoekatwald tHDRIM) T7S0 r max) FF33 300 lb aoekatwald BALb VALVB {230 r max) FLUB VAbVB rrC41 150 lb flanged, RF 77so max)_______________ _______________________________________ DSdl.lio.ib iianeed. AF (400 r max) DB41 ISO lb flangad (250 F max) ` 1 '| 1 | 1 1____________ NOTB 1. If ASST MW pip# ia not availabla Procurmaent may autoatituta A106 HPT. 2. Use plato flanges (pec FJ.l STD 120 and 121) aa back up flanges Cor eachine fiaro*. 2. DftillON ANO CONSTRUCTION FEATURES 4. M&fUELQATlJMS __ tfdlroceion atwrrapMa 'ptmlti t WalBvoiW*lwiiO>ilTiir# Umited too'4"'maximum-sie,** andex4meft*tttaMMW"**4M MAt.fre -atown on'eaeh drawings 2.2 pAnucai Uaa void nock flanges adjacent to buttwald fitting* only. 2.1 Thread Lubricant! ^j^or ogunl. ' .. for bolt throada uaa "Melykote Typo -- ftpf'afltMWl'`iR".1" "W `l1! ii*a;lf. Mt? ran VIS' ^sfc4aneNemedl-rp-pip*; bee*:,.up flange* Ml othat component* sat*o as F2C4. . ;. MGNS 095559 * T( CtTAIt* fOA TMMCONMCVtOI^ AM FOUNO IM PM. SOwact CBD OSISt M.jAM* * lOf P2.1 STlM4. ' BTft F204 Xeaua 2. F2CS XsSue 1. ' . . .1 Monsanto PIPINO MANUAL SBtLr? <32.//- & * . MAN. IKCT PAM ____ 150LB Still CLASS C OENERAl SERVICE r uDwaM-Flenead Stodl Valvn 350F 1. application} This epacification is lntendad for tea in Clae* C fluid aarvicea. - 2. conithuctioMi Flanged viIvm, buttweld fitting*, nil eicaa. iSSui i |oati l0/,, FAOC 1 Of 2 /^aoc.Lort U loa > r*j 3. F1PXM0 CQHFONBNTftl NOMINAL PIN WO K | * | 1 | TH \ Z | I J 4 | HPt BCHOnWflOHT: MATSUAL Sch 40i carbon ataal i AtlM OKClHCAIION A104 Or ft mmet kheolae and ipec Ia53 to ft.Or 8 0 0 | TO | 12 sch 20} CS 14 | 11 | IB j f* | ]4 Seh 10; carbon ataal OvS riniWOO. AAtINO; UATfMAl specification. dimensions STUOtNOI: SCHEOUlt TVPf SPECIFICATION COUAINat: AATINO. MATERIAL AtUI EPfClflCATION ounns rating; material AtlM IPEClMCATlON > mAncn construction Seh 40 carbon atoel buttwelding A234 Or HPB; 816-9 8td wtt forged carbon steel* buttwelding A10S Or II ISch 20; BW 1 |8ch 10} CS. bm 1 l. 1 [ .... . e UNIONS: RATING; MAIENAL l Aim nCIFICATION Ctoe' flanges . ' PtANGCI RATING, MATERIAL Aim me. uut oimcnsioni A101 Or 1; 814.5 (bore WN to match pipa) \ FACING 101TING MATERIAL AND SPEC A307 Or ft heavv hax bolts w/ heavy hax nuts OAHU* MATERIAL AND DIM 1/8" thick compressed asbeeto*. graphited. flat rinoi Oarlock 7021 (tvoieal) i ELEC1R0MS: OAK COATfO A5S9 Class 84Oft-2 A233 Class ft40 aeries ' PRESSURE - CONNCCTION I - VAtVC Dat P12 1/2- PA44 . lost f 14 b/4" PA44 Wl1 MAIN - CONNECTION Dat D20 1/2- PA44 IDet 8 r pr44 ll 1/2- FA44 12" FA44 teipiaatuhi - nr connection Det T4 8.28 12r 2( T12. T32. T34 H | M | 1 | 1H | 2 5 *j*la | to | ii | u | in | in I 9 | m ii s OAK FA44 150 lb flG W PA42 1501b fig RF &OH (750 t max) F844 1501b fig UP FB42/FL42 1501b fig Rf ii______________________________ 1 OHCKi MtNG | VERTICAL OP HOR USD CHECKi lift (H0RI20NTAL U (750 f max) IC41 1501b fie AT---------------------- (750 t max) (750 P max) BAbbl PUWi Mil llfllhila HI................................. (40Q F max) DX41 1501b flo RF " - tQ * **)------------------------------------------------------------------------------------------------------ J u OhpM '" 4. 8KRV1CE RESTRICTIONS} Sea Figure 1 page 2 for preaiiure-temperature Unit*. See also the fluid directory for service temperature and other limit* applicable to apecific fluid*. ft***- Mn<Vii Jd* racilitiea for bending muet be vorified by the Project engineer on each project. Benda end fitting ' r>*tiiitrd wui't be fkiwn on each drawing. 5.2 i-uhflc*<- Uau "Molykote Typo U" lubricant or oquol for bolt throade. &.> atree*' Analysisi A etreee analyaia i requirod for all lxneo operating at 3S0F or above or for euy temperature where the configuration auggaat* ov#r*tr**. 1.4 CBinttmUBf * Th dafcdil* tor tti... oonndotion* r found in P6.S. MCINS 095560 10UC CM 0lll utitor M.2 dTO IQl llH Wttindl M.i TD Ml '^tuuij4b:.4 ut*. .- pipino manual FIRING SYSTEM SPECIFICATIONS 300 LB STEEL CUSS C GENERAL SERVICE Threaded i Buttweld - Ttviadid l flanged Valves - 000 F SJE.^ri 02-n-*js MAN, StCT VAST P2.2 STD F3C11 issue l JoAli 1/70 FACC 1 Of 2 *X 1. APP1.;CAT^H> 'Ala specification i intondod (or us* in Class C fluid tervicos (von P2.1 STD 1). Fluid* mist f s lx non-orrostve t? atoel. ' 1.1 *T'/jco Kanaoi 6*0 Figure 1 * Table 1. 1.2 Use Ln.n~tAtiur.st System J* limited by flanged joint to SOO p. hi ifli lift tfi; {J;i ill} 2ftji 2. OBSTRUCTIONi Threaded fitting*, flanges and valva* thru 1 1/2* si: lip-on flanges aises 2" a largor. . Buttweld fittings, flangod valva* and "bfM. -*bM 2. fifim coMFOHKrrSi N0MINAI PIPI SKI . NFC: *CM0*l'tlGH>. MX-)HAL If AI1M MCClNCAtlON wmtfr whttxju and >tc H| % J 1 | Sch 001 carbon *t*ol A106 Cr D Sch OO; carbon atool IW 1 | J J 4 | | Sch 40; carbon atoal ) # f w | 11 l U | ) | w | jo | M flTIINOI: RATING. MAUI Al 30001b; forged CS 1Sch 40; carbon steal, buttwnlding VtCil:CAIiON, OiMlN*. ONS ASTM AlBlCrijUSAS 51A . U1 AS'iM A234 Cr WPB; USAS 016.9 StUMNOI 6CMC0UIC; Wf SPCCIhr.ATlON COUPUNGI RATING, MAURIAt 10001b;forged CS AStM IHClfiCATiQN QUtUtfc RATING. UAtlU4t | AJTM SAtClOCAIION y TMlff SUN Sifts 'branch cotiiuwciioH A101 Cr I;USAS B16.11 Xiiifocgad carbon atL . A.105 Cr 11 fi2.99L_M.ir.________________ ~~ Uso threaded tea as par Table IB. Std vti forged carbon atoel U> unrainforced stub-in branch connections unless design prasaure axceeds allowable pioiturs s^-own (psig 9 -20 F to lOO P) In Table XA. If design toKporature is higher than 100 F, allowable pressures will be reduced by the appropriate correction factor, figure 1. Khan design proseure exceeds allowable pressure, use construction msthods in Table ID. 1 | 0**M lINtONt: RAIINQ; MATERIA: 30001b;forged CS 1 ASfM SFlCtflCAIlON TUNOft: NAhNO. UATiR'-l ASTM A10S TWlbj lorgod C5, thrd JUdlb; lorgod caroon otooi; slip-on (use WN w/ am* bora as ASTM MIC; USAS OIWI.HONS A101 Or I; B16.5 A1B1 Or X; B16.5' fittings sdjncant to DM l FACING SClTtltO: MA7WAI AND J*C raised face raised face heavy hex oteel bolt* w/ heavy hex nut*; ASTM,A307 Or B fittines onlv) OAlKllfc IMTCRIA1 AND CM 1/8" thick compressed a*ba*to* flat ring;3001h RF din; JM76, Oarlock 7021 typical mCMOOIt! 8ARC 2 COATED ASTM AS59 Cl K60H-2 ASTM A223 Cl B60 aerie* PRlttUM - CONNCCTION PI S - VAVVt %T-------- 1/2* m '___ VI MAtN - CONNECTION D17 i - VHVl 1/2* FA? 'TfMFtRATURC - TW CONNEXION Tl, T2& , lV4* FP3 Ip5 |V21i 3/4" FA7 |021 Il" FA7 IS,25iTll. T25 .. ll 1/2- FA7 |T11. T29, TJ3 DATE OlOM/Angla FA7 6001b, thrd (750 F max) in7/Pi>7 6001b. thrd FAS2 3001b fig, RF (750 F max) (30* max also) FBS2/FLS2 3001b fie, RF I CHtCR: WING IVIRTICAI 0AMCRUl CHtCK! lift (MORIRUNIAl uan (750 F max) SA 6001b, thrd (750 F max) l GOOlbt thrd (750 F max) (750 F max) FC51 3001b fig. RF (750 F max) , b" FA7 ' `. , i 0 JC 4. SERVICE HK-STRICriONSi Soa Figure l page 2 foe presRuca-temporaturQ limit*. Sea also the fluid directory foe nsivico temporature *nd other limit* applicable to specific .fluid*. | * ptSlQS ANn COUPTr'UCTH'<N FFATURF.Sl [ 5.1 p?i{osi rain |,i|lllll ....................... . >tii4nw 11lal|*4>M F.tcilitioo frit bonding muat bo verified by tho Project Engineer on each project. Bend* and fitting required Must bo nhewn on ench drawing. 5,2 T|>ru.>) Luliilcarti "Molykoto Tyi>o U" lubricant or ogual for bolt tluondn. Uso TFE thrd cottpd for piping I Joint*. 5.2 el;n _hnoVyt*J. A itrooi analysis l* required for all linos operating at 3S0F or above or for any tmporature whore tlu c.-iifi.jur,r.lon ruiggcot* ovoirstrees. 3.4 po.nutrnctlog.1 Sno PJ.2. HONS 095561 * Tho dotallo for theoo connections aro found in P6.9> Monsanto X. mUA|frfa-^<d6dali"ifc m iidiTe || .mm.eMsfi i `" ' Stzcr; 0*-//--/}^ _____ 125 CBA >415 pipino System specificatione IB BOLYPRDPYLENC LIKED CLASS D PROJECT SPECMCATIOH Hinted |8"]-Hnj<i Vilvei-225 F PSP 5IS UI 1 PAG! 1 QP1M101 DU 10/70 2OF 1, appmcATI OH i Thi* npocl f ication ia Intended for uee in ciaae D"ervleee. 1.) firvvicc Ronqet See Figure 1, pagn 2. Typical roting*Tor ITimyaa lined valves la 150 peig at 22$F. [MOOIPICATI-'t!S Hon# 1.2 Temperature Ranoet Syston is limited to 225 f by the polypropylene firing. | 7, PTPTNO COMPOWCKTSi CONSTRUCTION riangod fitting#, valvea, and pipe spools - all aisea. May be field flared. All items lined < ith polypropylene. NOMINAL PIPE UK fire 11 IS 1 2 3 carbon eteel. A507 ERW Polyprupylone 'lined par ASTH D-2146 Type 1 (Note 1.2) 1 NipntT FITTINGS COUPUNCi Fchodulo 40 Duetllo iron. A445 150 lb. oaKrroDvlenc lined per 5-2)46 tvoe_I_ISOt 21_____ UNIONS OUTtCTS X0TW7tijliTifTIY15ir ` " Uso flanged tea with reducer. STUPCNOS PUNCH formed on pi; flaraa H Co P6.1 st; 3 carbon stool: plate flangee M Co. P3.1 879 120 BOLTING CASKETS EltCTROOES carbon steel. A306 Grade B heav.- hex be.ta with hoavv hex nuta `- . . ' 4 4 1 CS.A53, Tp 8. Grade A or B PP lined, ASIM D-2146 Type J (Note 1,2) ' '' *' PRESSURi CONN 71HI-*" `~ -' TTOMtcfiA NOMINAL PIPE WE GATE VALVE &IoIT7akolc 7aC7e swiWthreifVAtTi-- LIFT CHICK VALVE |M0 U!U DlAPHR/oM PLUG Uaa tao with QPMO valve Use tea with QPB40 valve Use tea with QPB40 valve Vmm 1 l IS ` 1 2 * 31 4 ________ 6_________ 1_________|_______ QPC40 (harr).QPC4l (vert) 125 lb, flanged T>25 F maxi_________________________________________________________________________________________________________________________ QPG4S ISO lb. flanged ' (225 P max) OPM_^ 125 lb. Flangod - (F.2S F max) NOTE 1. 7. All pipe and fitting lininga ahall have a wall thickness of not lasa than .015" and flaia faea thlckneee ahall not be laaa than .040". uaa stand;.rd field fabricating techniques, including uaa of cutting, thrcndii;}, heating and foraing tooia aa shown in vo.-.dor literature. `5. DnSlON ANB..COHSTIWCTIPH FiATUAKfi. , 3.1 H'hroqil l.lincnnti Uso "Mlyao^a Type U* lubricant or *7iinl*'on bo"it thread*. MUNS 095562 Project Manual Sect. MB' CEA 2415 <3 2.1J-*t Datai November 6, 1970 , Author: K. J. Johnston Approved by: R. G. Corley Page 1 of 7 ELECTRICAL DESIGN BASIS . FOR THE ELECTRICAL FACILITIES WITHIN THE , PROJECT BATTERY LIMITS PROJECT: Aroclor Waste Disposal DIVISION: Organic PLANT: W. G. Krummrich PLANT LOCATION: Sauget, Illinois Central Engineering Department Monsanto Company 800 N. Lindbergh St. Louis, Missouri 63166 MONS 095563 PROJECT DESIGN MANUAL Central Engineering Department Monsanto MCNS 095383 CEA No. 2415 AROCLOR WASTE DISPOSAL W. G. Krummrich Plant PROJECT DESIGN MANUAL Central Engineering Department MUNS 095384 \C CENTRAL ENGINEERING DEPARTMENT MONSANTO COMPANY ST. LOUIS. MO. PROJECT DESIGN MANUAL . . CEA NO. i-115 AROCLOR WASTE DISPOSAL AT WGK PLANT SAUGET, ILLINOIS COPY NO. ? DATE DISTRIBUTION! 1. Project Manager 2, CED Central Files 3. Manufacturing Representative Project Manage] COMPANY CONFIDENTIAL This document is the property of Monsanto Company and the recipient is responsible for its safekeeping and disposition. It contains Confidential Information which must not be reproduced, revealed to unauthorized persons or sent outside the Company without proper authorization. MGNS 095385 CEA 2415 PROJECT DESIGN MANUAL TABLE OF CONTENTS SECTION 1 - PROCESS DESIGN 0101-00 - PROJECT SCOPE SUMMARY 0102-00 - PROCESS DESCRIPTION 0103-00 - FLOW DIAGRAMS -03 - Engineering Flow Diagrams 0104-00 - EQUIPMENT INFORMATION SUMMARY 0105-00 - EQUIPMENT ARRANGEMENTS 0106-00 - PLOT PLANS 0108-00 - UTILITIES -02 - Utilities Summary SECTION 2 - ENGINEERING DESIGN 0201-00 - EQUIPMENT - General -01 - Master Equipment Numbering List 0201-00 - INDIVIDUAL EQUIPMENT ITEMS -01 - Performance Data Sheet -02 - Specification -03 - Test and Inspection Data -04 - Performance Curves 0202-00 - INSTRUMENTS - General -01 - Instrument Design Basis -03 - Instrument Specifications -05 - Control Schematics 0203-00 - SET AND TEST EQUIPMENT - Refractory Installation 0211-00 - PIPELINES -03 - Pipeline Specifications - System -04 - Pipeline Specifications - Materials -05 - pipeline Specifications - Construction 0213-00 - ELECTRICAL -01 - Electrical Design Basis 02X5-00 - SEWERS, DRAINS, PLUMBING -02 - Layout Drawing SECTION 3 - REFERENCE 0301-00 - DRAWING INDEX 0302-00 - PURCHASE ORDER INDICES -01 - Equipment No./P,0. No./vendor -02 - P.O. No./Category/Equipment No./Vendor M0NS 095386 Sect to tf 0/g/-an X.___ PROJECT SCOPE SUMMARY CEA 2415 By: WGN/HBW August 6, 1970 Page 1 of 7 A. Title Aroclor Waste Disposal, Organic Division, w. g. Krummrich Plant, Sauget, Illinois, CEA 2415. Expected Cost $430 M. Expected Completion date May 1, 1971. B. Objectives The objectives of this project are to: 1. Thermally decompose essentially all the highly chlorinated used liquid Aroclors and Kontar fed to the incineration system to harmless bv-products. 2. Limit the non-decoroposed PC3's from the incinera tion system entering the plant sewer to 0.012 lbs./hr. or 0.29 lbs./day. 3. Provide for possible future incineration of other plant wastes. 4. Complete these facilities by May I, 1971 or sooner. C. Project Tone The primary objective of this project is to achieve the highest possible level of decomposition of the Aroclors and Montar fed to the incineration system. The allowable contribution of PC3's from the incin eration system to the total plant sewer stream has been set at ppb (0.012 lbs./hr. or 0.29 lbs./day). Since this project is part of the "Monsanto Action Plan" to control PCB's, it is desirable to meet or better the expected completion date of May 1, 1971. ' Low capital cost and low operating costs arc required, for this non-earnings project. D. Design capacity The design capacity is 10 M lbs./yr. of waste Aroclors and Montar3. E. Project Status Engineering c::n proceed v:r th definitive design when approval is granted. CNS 095387 SECrMf/ Qlof--Otf CEA 2415 By: WGN/NBW August 6, 1970 page 2 of 7 F. Description of Facilities The project will include facilities to: 1. Unload drums, tank cars and tank trucks of used Aroclors returned by customers, 2. Store the waste Aroclor and Aroclor-Montar mix ture in three existing 20,000-gallon steel storage tanks. 3. Receive Montar from the Aroclor Department and transport it back to the three waste Aroclor storage tanks. 4. Incinerate waste Aroclor-Montar liquid and scrub the flue gas with water. The incinerator-scrubber system includes: incinerator, quench pot, venturi scrubber, packed column, demister pad, stack, air blower, flame safeguard, temperature controls, and water flow controls. 5. Adsorb non-docomposed PCB' s from the scrubber liquor and dissolved PCB1s in'the overflow water from the Aroclor-water sump with a carbon tower. MONS 095388 S EC 77 O I OZ--- <30 Pago 1 CEA 2415 AROCLOR WASTE DISPOSAL X. PROCESS DESCRIPTION Polychlorinated Biphenyls are decomposed by heat in the oxidizer into the following combustion products: IICl, Clj, CO.,. HjO, particulate .matter (when burning Montar residue containing lime). Approximately 0.001 'lb./hour of undestroyed pens are expected to get through the oxidizer at the design PCB feed rate of 1250 lb./hour.' This will go to the sewer in the scrubber effluent stream. This stream will be an HC1 solution of about 2% strength. The hot combustion products leaving the oxidizer are cooled from oxidizer temperatures (2800F maximum) to approxiinately 180F by water sprays in the contactor tube before discharg ing into the quench pot. Somewhat less than 50% of the HCl is also removed here. Leaving the quench pot, the cooled gases pass through a high energy venturi section where approx imately 98% of the particulate matter is removed by a pumped stream of HCl solution from the quench pot and packed scrubber sumps. Additional HCl is also removed in the venturi. The gases then enter the bottom of a packed scrubber (poly propylene packing) where the remaining HCl is scrubbed out with well water. Scrubber efficiency is calculated to be approximately 99.4%. On leaving the packed section the gases pass through a monel demister pad and into the atmosphere. Design specification3 for the contents of this stream at de sign waste feed rate are: HCl Cl 2 Particulates Nitrogen oxides 5 lb./hour maximum 50 ppm <0.05 grains/SCF 20 micron size <200 ppm MONS 095389 ct- oi a 2.- a a Page 2 IX PROCESS STUDIES Independent calculations were made by w. b. Bolles of CED who verified the efficiency claimed by John Zink Company for the packed scrubber. Two series of destruction tests on various PCBs were con- ' ducted by John Zink Company at their facility in Tulsa, Oklahoma. These tests showed the PCBs could be successfully decomposed to the aforementioned combustion products to a de gree required to meet the WGK plant goal of 10 ppb maximum. PCBs in the total plant waste stream. These test results were the basis of the Zink design of the full scale unit. A residence time in the oxidizer of approximately 3 seconds was shown to be required. R. A. Entrup conducted laboratory tests on the mixing of the Montar residues in heated Aroclor 1242. He concluded that mixing takes place quite easily and we should have no prob lems with the proposed collection system. (Pumping a hot Montar stream into a partially filled tank trailer of hot Aroclor 1242.) III. DESCRIPTION OP FACILITIES 1. Unloading Facilities a. Tank Car Returned tank cars will be unloaded at one of the existing phenol unloading docks (Dock No. 1) on Track No. 7 at the southwest corner of the building BB-T. A new unloading pump (Item 1-110) has been provided, and an unloading arm for top unloading of the cars. The material is pumped from the car to one of the three 20,000 gallon storage tanks (Items 1-116, 1-117 and 1-118) through a common 3" transfer line (1-110-2) which also serves the unloading dock sump pump (Item 1-125), the Aroclor sump pump (Item 1-121) and the drum unloading sump pump (Item 1-119). Caro should be exercised when pumping to see that all valves from these other sources are closed. b. Tank Truck Return tank trucks of Aroclor wil.l be unloaded in the area just west of the storage tanks. The truck will be backed into position from the road south of the in cinerator area. A flexible hose will connect the bottom trailer outlet to unloading pump,'(Item 1-111) . which will pump the contents into one of the three t+ storage tanks. MONS 095390 . . ' ^ i c//oz. -?<? Page 3 c. Drums Most of the returned material will be in 55 gallon drums. These will be deposited by straddle carrier in the same area, west of the storage tanks as is used to unload tank trucks. They will be sampled for sol vent content and viscosity and then picked up one at a time by fork lift with attachment (Item 1-134) and de- posited on the south end of the drum conveyor (Item 1-107) . The conveyor consists of a south section for receiving cold drums (three maximum). The center section is a live steam drum heater (capacity 3 drums) and the north section is a storage section for hot drums. The drum heater section is an insulated cham ber using live steam for heating. It has vertical sliding counter-weighted doors. Each conveyor section has a stop with a foot-operated escapement which allows separation of the end drum so the drum crane (Item 1-128) can be attached. The drum crane is a hand-operated hydraulic crane with an adjustable boom length and a lifter dumper attach ment . . The crane boom is swung over the drum on the conveyor and the lifter-dumper clamped around it. The drum is then raised several inches to clear the conveyor and then the boom is swung manually to a position north of the drum unloading sump. The chain-operated dumper is then used to tilt the drum to discharge into the sump. 2. Sump Systems a. Incinerator Area Sump The entire incinerator area, including the truck un loading and drum unloading areas is curbed and drains to a sump at the west side of the area. A sump pump (Item 1-120) actuated by level switch I.S-120-1 pumps Aroclor spills and/or water to the 10,000 gallon Aroclor-water sump (Item 1-124) at the west side of the phenol pressure evaporation area. b. Aroclor Water Sump The Aroclor settles by gravity and the water flows off the top to the sewer, under a weir to prevent dischnrge of any floating material contaminated with Aroclor. When the Aroclor layer on the bottom reaches n poodolormi nod level (approximately 3 ft.), as measured by level indicator LI-lai-1, the waver layer .is pumped to the sewer .manually using Water Sump Pump (Item 1-122) . MQNS 095391 S'C7t o/az. --act Page 4 Steam is then introduced to the sump heating coil to raise the Aroclor layer to a pumpnble temperature. The hot Aroclor is then pumped manually to one of the three storage tanks using the common line described under Tank Car Unloading Facilities. Be sure all valves are properly positioned to pump to the storage tank. c. Unloading Dock Sump . The unloading dock sump pump (Item 1-125) is located in an existing sump at the phenol unloading docks be tween tracks No. 7 and 7D. This sump collects any spills associated with tank car unloading or unload ing punip or piping leakage. The pump is piped to both the common Aroclor transfer line to the storage tanks or to a phenol waste tank, since phenol is also un loaded in this area. Operation of this pump is manual and will be used to pump Aroclor only in the event of a spill or leak in the unloading area. d. Drum Dumping Sump The drum dumping sump receives the returned Aroclors which may contain contaminants such as mineral oil, solvents, etc. As these drums are dumped into the sump, pump (Item 1-119) actuated by level switch LS-119-1, pumps the Aroclor into one of the storage tanks. Montar Collection System Still residue, called "MONTAR" is collected in Dept. 246 and transported to the incinerator area by tank truck. The procedure is as follows: , The truck is filled with approximately 2000 gallons of waste Aroclor from one of the storage tanks in the incin erator area, using tank truck unloading pump (Item 1-111). The trailer is then transported to Dept. 246 and parked in a designated area north of the still. Two connections, a Montar feed line and a fume collection line, are made at the top of the trailer. The hot "Montar" at approxi mately 300C is pumped from the still, using the existing still circulating pump, into the trailer, mixing with the Aroclor. When all the Montar has boon collected, the trailer is transported back to the incinerator area and unloaded into storage, again using the tank truck unload ing pump (Item 1-111) . MONS 095392 >S c-r, &/az. -00 Page 5 The ability of the Aroclor to dilute and disperse the . "Montar'' h.as been verified in the laboratory by R. A. Entrup. * NOTE: THE NORTH STORAGE TANK (ITEM 1-117) WILL BE USED . EXCLUSIVELY FOR MONTAR. The trailer should be moved to the incinerator area and unloaded as quickly as possible to prevent the lime solids from settling out. 4. Aroclor Storage Facilities Aroclor materials to be incinerated will bo stored in three 20,000 gallon tanks, Items 1-11G, 1-117 and 1-118. The north tank, Item 1-117, will be reserved for Montar. Each tank is provided with a hgating coil to keep the contents pumpable (maximum 100 C). The steam to the coils is manually controlled. Local temperature indi cators TI-116-1, TI--117-1 and TI-118-1 have been pro vided. Each tank is also provided with an agitator to provide a homogeneous mixture and to keep lime solids from the Montar suspended. Each tank is' also provided with a local level indicator (LI-116-2, 1,1-117-2 and LI-lie-2). Since the returned Aroclors may contain other materials some of which will be flammable solvents, a nitrogen blanket has been provided for the storage tanks. Con servation vents (XEgll6-3, XE-117-3 and XE-118-3) vpll relieve at 6 oz./in^ positive pressure or 1 oz./in negative pressure. Bottled nitrogen will be provided by portable trailers which will feed a regulator station at the south side of the area. piping has been provided to allow transferring the con tents of any storage tank to any other storage tank. .. The storage tanks are tied together by 3" overflow lines at the tops. A valve has been provided on a spare nozzle on the top of each tank so tank level can be checked by "sticking". 5. Vlaste Feed System Waste Aroclors are fed to the incinerator by a MOYNO positive displacement pump (item 1-104). Normal pump discharge pressure at full feed rate (1250. lb./hour) will be approximately 80-100 psig. A pressure relief valve PSV-104-1 set at 150 psig relieves back to the MONS 095393 S.cr. c?/c7z.-0o Page 6 . storage tanks if the feed to the incinerator is dead headed. Item 1-104 can pump from either the middle (Item 1-117) or the north (Item 1-118) storage tank. The feed rate is governed by a variable speed drive. Maximum rate is approximately 3 GPM. Actual rates for various speed ` settings should be determined by timing and weighing ' samples collected at the pump discharge with the main discharge valve closed. Drain valve opening can be regu- ' lated to provide a back pressure equivalent to normal operating back pressure. 6 Incinerator-Scrubber System The incinerator system consists of the combustion air blower (Item 1-150), quench column (Item 1-141), oxidizer (Item 1-102) , quench pot (Item 132), venturi scrubber (Item 1-153), scrubber circulating pump (Item 1-106), packed scrubber (Item 1-154) and mist eliminator (Item 1-155) . The oxidizer is a refractory lined furnace where the destruction of the Aroclor takes place, resulting in various gaseous products (HCl, Cl,, CO2i- H,0) . Also when burning material containing Montar, some particulate matter results. The Aroclors require supporting fuel to maintain combus tion at the proper temperatures. This is provided by intorruptable natural gas normally, with a back-up fuel oil system. The hot gases and particulates leaving the oxidizer pass through the Hastelloy "C" quench column into the poly ester lined quench pot where they are cooled and some HCl removed by two sets of water sprays. A water level is maintained in the quench pot and the gases impinge on ' the surface, and the loose brick lining on the walls. . Liquid level is maintained in the quench pot by control valve LCV-81. HCl solution from the quench pot flows to the packed scrubber sump. The scrubber circulating pump pulls solution from the line between quench pot and packed scrubber and foods the Hastelloy "C" venturi scrubber where most of the particulate matter and some additional HCl gas are removed. The gases then pass vertically up through the polyester lined packed scrubber, where the balance of the HCl is removed, through a monel demister pad and to the atmosphere. Well water flows down the packed scrubber countercurrent to the gas. The HCl solution from the scrubber sump (120 GPM) flows to till": sower through a loop which maintains a level in the sump. The loop has a siphon break. - MUNS 095394 Scr, c7/cjz. -aa Page 7 7. incinerator System Water Suoply The primary water supply for the contactor tube sprays and the packed scrubber is well water. A booster purap (Item 1-112) supplies the required pressure. In addi- tion, city water from the break tank (Item 1-126) is pumped by (Items 1-127 or 1-132) to a weir at the top of the contactor tube (8 GPM) which cools the tube walls and two quench nozzles in the oxidizer (5 GPM). (This quench water is used only when burning Montar.) In addition, this city water supply is also an emergency back up for the well water to the contactor tube. If well water flow falls below' a preset point, the oxidizer furnace is shut down and city water flows to the contactor tube to pro tect the polyester lining in the quench and scrubber systems. As an additional protection, a failure of city water automatically brings in fire water from the plant loop system. This is the ultimate protection to cover such things as plant power failure. The tie-in is underground just south of the oxidizer. V.'cll water is also supplied to two quench nozzles in the oxidizer. These are used to control burner outlet tem peratures when burning Montar. An 80 psig steam supply, reduced to 20 psig by PRV-102-4 is connected to the nozzles for use in cooling the nozzles when burning Aroclors. 8. Auxiliary Fuel Supplies Natural gas is supplied from an existing 8" header above the storage tank walkway. It is reduced from a header pressure of approximately 60 psig to approximately 35 psig by pressure reducing valve PRV-102-3. It is fed , to the oxidizer through the normal FIA approved series of safety shut-off and double block and bleed valving. (See drawing D4) . Natural gas also feeds the pilot flame. The pilot gas supply will be non-intevruptable. This arrangement of valves and special hardware is located at ground level below the east side of the oxidizer. Gas flow is controlled by temperature controller TRC-15 to maintain the desired oxidizer temperature. MONS 095395 'SBcr: a/a-z. ~aa Page Q Back-up fuel oil, for use when natural gas is interrupted, is contained in storage tank (Item 1-114) located north east of the incinerator area, just north of the Interim PNA department. Pumps. (Items 1-115 or 1-123) deliver fuel oil to the oxidizer, again through PTA approved arrange ment of safety valves and other hardware. Fuel oil flow is also controlled by temperature controller TRC-15. 9. Atomizing Steam . 100 psig steam is supplied to the waste Aroclor burner and the fuel oil burner for use as a fuel atomizer. 10. Other Required Utilities Instrument air is supplied from an existing header located on the existing pipe bridge. Plant air is supplied from an existing header located on the pipe bridge from Interim PNA. Steam for pipeline tracing is from the existing 80 psig header. Tie-in point is on the pipe bridge running across the north end of the incinerator area. Primary electric power feeder is from Substation No. 13 with an automatic switchover to Substation in the event of a NO. 13 failure. EMERGENCY POWER FEEDS THE CITY WATER PUMPS AND THE LIGHTING AND INSTRUMENT TRANSFORMER ONLY. 11. Condensate Collection All steam condensate discharges to a header which runs to tank (Item 1-133), located on the east side of the control building at ground level. . Liquid condensate is discharged to the sewer. Flashed . steam exits to the atmosphere through a Swartwout exhaust head. 12. Purge Air System plant air has been provided to the following with separate shut-off valves on each feed: a. Oxidizer Sight Ports (On east, side and north end of oxidizer) - purge air should flow continuously when ever oxidizer is in operation. MONS 095396 sscr. aa Page 9 b. Oxidizer Quench Nozzles (On either side at south end of oxidizer) - Purge air should be turned on when changing nozzles in a hot oxidizer. c. Flame Scanner Assembly (On west side of Burner Plenum) - Purge air should flow continuously whenever oxidizer is in operation. ' d. Waste Liquid Burner - Purge air should be turned on when replacing gun in hot oxidizer. e. Fuel Oil Burner - Purge air should be turned on when replacing gun in hot oxidizer. f. Thermocouple for TRC (In north end of the oxidizer) - Purge air should be turned on only when removing or installing the thermocouple in a hot oxidizer. g. The Rayotube requires continuous cooling. This, how ever, may require water. (The vendor will be con sulted.) 13. Flame Safeguard system A Honeywell system is provided with a flame scanner oper ating on the pilot flame. Loss of pilot flame shuts down all fuel to the oxidizer. 14. Interlocks and Alarms Motor Interlocks 1-150 - Incinerator Air Blower The following conditions must be satisfied before starting Item 1-150. a. Water flow to contactor tube (FS-38). b. Water flow to venturi (FS-37) c. Water flow to weir (FS-127-2) d. Power on at incinerator panel I,oss of any of the above will stop the blower. <* MONS 095397 0/a z. -00 Page 10 1-104 - Incinerator Feed Pump The following conditions must be satisfied before start ing Item 1-104. ' a. Incinerator temperature above 1600f (TS-15). b. Atomizing steam to waste nozzle (PS-9). c. Pilot flame proved. d. Waste va.lve (FCV-30) open. Depress "start waste" button on control panel. To close valve depress "waste stop" pushbutton. Loss of any of the above will stop 1-104, The following motors have no interlocks and are controlled by a local start-stop pushbutton station. 1-106 - Packed column circulating pump. 1-111 - Tank truck unloading pump. 1-112 - Well water booster pump. ' 1-110 - Storage tank agitator (stop pushbutton at motor, start-stop pushbutton on tank near grade). 1-116 - Storage tank agitator. 1-117 - Storage tank agitator. 1-122 - Water sump pump. 1-127 and 1-132 - City Water Break Tank Pumps. These pumps have timed seal-in relays to auto matically restart after short power outages (less than 3 seconds). To stop pumps hold stop button in for at least 5 seconds. 1-110 - Tank Car Unloading pump. To start hold start button depressed until, dis charge pressure closes PS-110-1. Pump will stop when discharge pressure drops or when stop push button is depressed. 1-119 - Drum Unloading Sump Pump. ' Pump has 3 position control station located at motor. Position 1 - Manual - pump runs continuously. Position 2 - off - pump stops. Position 3 - Auto - pump starts upon high level ` in sump (I.S-119-1 closes) , pumping continues un til low level is reached (LS-119-1 opens) stop ping pump. HUNS 095398 SB.C7: O/0-Z. --0 Page 11 1-120 - Incinerator Floor Drain Same operation as 1-119. for LS-119-1. Substitute LS-120-1 1-121 - Aroclor Sump Pump To start depress start pushbutton, motor will seal-in if sump is above low level (LS-121-1 closed). When sump reaches low level pump will stop (LS-121-1 opens). To operate pump below low level depress and hold start pushbutton. Alarms . The following conditions will sound alarm on burner con trol panel. a. Flame failure (Honeywell safeguard). b. Low level quench pot PS-12. c. High level quench pot PS-11. d. Low level city water break tank PA-126-1. e. High Aroclor level Aroclor sump (LS-121-1) . f. Low flow city water (FS-127-2). (<* MONS 095399 Item K~j-r.ber PS-6 PS-7 PS-9.1 - PS-S FS-10 FS-38 FS-37 FS-127-2 TS--15.1 TS-4 & TS-5 TS--15.2 PS-9.2 BE--1 LSO-65 LSO-73 ' LSO-67 LSO-68 NAME INTERLOCKS INCINERATOR FUNCTION . High Gas Pressure Low Gas Pressure Complete Shutdown (when using gas only) Complete Shutdown (when using gas only) j Low Fuel Oil Atom. Steam Pressure Complete Shutdown (when using oil .only) Low Fuel Oil Pressure ' Complete Shutdown (when using oil only) Low Combustion Air Flow Complete Shutdown Low Contractor Water Flow Complete Shutdown, Opens SV-64, Stops Blower Low Venturi Water Flow Complete Shutdown Stops Blower Low City Water Flow Complete Shutdown, Stops Blower, Starts Fire Water High Incinerator Temperature Complete Shutdown, Opens SV-64. ' High Quench Pot Temperature Complete Shutdown, Opens SV-64. Low Incinerator Temperature Stop Waste Pump Closes FCV-SO. Low Waste Atom. Steam Pressure Stops Waste Pump, Closes FCV-80. Flame Scanner Pilot Only Complete Shutdown Gas Valve Limit Switches Start Low Fire Timer (Gas) Oil Valve Limit Switches Start Low Fire Timer (Oil) SECT. 0 /0 HONS 095400 IV. OPERATING IN5TRUCTIONS 1. Pro-Startup Checkout Before feeding waste liquid to the oxidizer, the unit must be brought up to operating temperature using auxiliary fuel ' (natural gas or fuel oil). The auxiliary fuel is also re quired to maintain operating temperature when burning waste. The following pre-startup items should be checked before pro ceeding with initiating the startup procedure: 1. Well water and city water prmips are operable, well water pump suction valve is open and the valve between the city HjO break tank and the selected city water pump is open. 2, Electrical power is on to the control panel. 3. Instrument air is on and regulated at 20 psig. 4, Pilot gas manual valves are open, except last valve at the burner. , 5, Main gas manual valve, 73 at the burner is closed. 374" Other main gas manual valves are open. .6 Fuel oil manual valve^ at the burner is closed. Also atomizing steam manual valve 70 at burner is closed. 17?" All other fuel oil and atomizing steam manual valves are open. 7. Waste liquid manual valve _74 at .the burner is closed. 1" Also atomizing steam manual valve 7_4 at burner is closed. , 1" Manual valves at the incinerator feed pump (Item 1-104) suction and discharge should be open. Atomizing steam supply valving should be open. 0. Manual reset safety valves, SV-65 on the main gas; SV-67 on the fuel oil are closed. 9, Fuel gas, fuel oil, atomizing steam and instrument air supplies are available at the required pressures: Fuel gas - 30 psig - Fuel oil - (10 psig (minimum) Atomizing Steam - 100 psig (minimum) M0NS 095401 SEcr Page 14 10. Set incinerator feed pump speed for desired waste feed rate (1250 lb./hr. Design, 400 lb./hr. minimum. 11. Shutdown pressure, flow and temperature switches are set at the following values: 3000f when burning Aroclor < 2200 F when burning Montar Oxidizer Low Temp. - 1600C>F (TS-4 & TS-5) Quench Pot Hi Temp. - 220C>F (PSL-7) Low Fuel Gas Pressure - 7 psig (PSH-6) Hi Fuel Gas Pressure - 35 psig (PS-8) Low Fuel Oil Pressure - 7 5 psig (PSI,-9) Low Atomizing Steam Pressure - 90 psig (FS-10) Low Combustion Air Flow - By John Zink (FS-38) Low Well water Flow to Contactor Tube - 50 GPM (FS-37) Low Recycle Flow to Venturi - 50 GPM (FS-127 -2) Low City Water Flow to Contactor Wier - 7 GPM 2. Oxidizer Heatup Procedures . ' When the oxidizer is brought on-stream for the first time a 40-hour heatup period is required in order to cure the refractory properly and prevent damage. (See Page 4A of the attached Appendices). Subsequent heatups after the oxidizer has boon shut down and allowed to cool require a 16-hour heatup period. (See rage 411 of the attached Append! es) . Page 4D also describes the heatup procedure when restarting the oxi dizer after a short shutdown before the refractory has completely cooled. a HONS 095402 S.7' 0/0 2 --00 Page 15 3. Normal Operation Startup 1. Open discharge valve at well water booster pump , (Item 1--13.2) and start pump. Other well water valves should have been previously arranged for proper flow to the contactor tube sprays and the scrubber water distributor. Adjust flow through rotameter FI-87 for 60 GPM. (This can be slightly higher, but not lower.) 2. Turn on master power switch on the control panel to activate the system. The RED "Low oil Pressure" light, the RED "Flame Failure" light, the WHITE "Power On" light, and the RED "Quench Pot Low Water Level" lights will be lit. The remote flame failure alarm and panel alarm horn will be energized. 3. Depress "Alarm Silence" button to cut off alarm. 4. Start city water pump. Open discharge valve at city water pump (Items'1-127 or 1-132). Other valves should have been previously arranged for proper flow to the contactor tube weir and the oxidizer auench nozzles if preparing to burn Montar. (When burning straight Aroclors, water flow to the quench nozzles should be shut off and steam flow initiated to pro tect the nozzles.) 5. After liquid levels have been established in the quench pot and packed scrubber, start the scrubber circulating pump (Item 1-106) valves should have been previously arranged for proper flow. Quench pot level is maintained by level control LS-92. . packed scrubber sump level is maintained by a trap . leg in the outlet piping. 6. Start combustion air blower. The butterfly valve in the blower discharge line should have been preset to . provide a flow rate to maintain approximately 25% excess air to the oxidizer. Since the oxidizer will normally operate at design rate (1250 lb. waste/hr.) the combustion air Flow setting will remain constant once it has been set. In order to be certain a fuel rich mixture is avoided at all times .air flow should bo Mif f 1.ci on t to cover maximum auxi liary fuel rate. A eombuuU oil gas analysis can be made, once in operutiun, to cheek percentage excess air. MQNS 095403 SBC77 Page 16 Depress RED reset button on the "High Quench Pot Temperature" switch. Turn the TRC switch on the control panel to "ON", push RED button on TRC until position meter reads 0% (This is percent opening of the main fuel gas control valve) - Check Leeds and Horthrup TRC instruction booklet for details. If all shutdown conditions described in Paragraph 11 of the Pro-Startup checkout are satisfied, startup may proceed. Depress "Purge Start" button, .lighting the BLUE "Purging Light" and energizing the Purge Timer. (3 minutes). After timing out, tho AMBER "Purge Complete" light and WHITE "Relay Hot" lights come on and the BLUE light goes out. Power is now avail able to the burner system. Allow a minimum of 10 seconds for the "Flame Scanner" to warm up, then Open The Manual Pilot Gas Valve At The Burner. ' a. Firing on Natural Gas 12. Turn gas-oil-gas & oil selector switch to GAS. Be sure manual valve on the Main Gas Line is closed at the burner. 13. Depress the "Ignition" pushbutton. 14. If the pilot flame is established within 15 seconds, the GREEN"Pilot Proved" light is lit and the RED "Flame Failure" light goes out. Release the "Ignition" button imme diately when the GREEN light comes on. If depressed more than 15 seconds, the purge cycle will have to be repeated. 15. When the Flame Scanner picks up the pilot flame the GREEN "Gas Burner Ready" light comes on. 16. Manually latch OPEN the first Main Gas Manual Reset Valve SV-65. 17. Also open the manual valve in the main gas lino at the burner. When both of these valves are ojo. n the Lev Fire Timor starts. MBNS 095404 SBct, a/c.7*'.--da Page 17 18. When the Low Fire Timer times out. Latch "Open" low fire manual reset solenoid SV-60 on the air output line. 19. With the TRC on manua^ slowly bring oxidizer temperature up to 300 I' by depressing the YELLOW button on the TRC. Adjust the set ' point indicator until it aligns with the in dicator point. 20. Switch the TRC to "Automatic". The set point should now be advanced in accordance with the appropriate Oxidizer Heatup Procedure as described in Pages A- and A- of the Appendix. 21. When the temperature reaches the operating ' point (2000F for burning "Montar", 2800F for burning Aroclors) the feeding of waste material can begin. NOTES: a) Somewhat lower temperatures may be adequate. This will be deter mined during initial operation. b) For operating temperatures up to and including 1600F, the temper ature sensor is thermocouple (Item 18). For operating temper atures above 100F, up to and including 2800F, the sensor is the Leeds and Northrup Rayotube. There is a 3-position selector switch on the control panel marked TC- LO RAY & HI RAY. This switch should be setQon TC when operating up to 1600 F, LO RAY from 1600F to 2000F and HI RAY from 2000 F to 2800 F. c) Before advancing the TRC set point beyond 2000F, the thermo couple which is located in the north end of the oxidizer must be physically removed since it would be damaged by the higher temperatures. Turn on purge air at thermocouple well before re moving to prevent hot gases es caping. ' d) Tiie oxidizer temperature must be above 1600F for waste material feed to flow. MONS 095405 sncr: <7/07. - o'J Page 18 .22 De sure the .manual valve on the waste feed line at the furnace is closed. Then open the manual atomizing steam valve at the burner. Pressure on the gage should be 100 psig. 23. Depress the "waste start" pushbutton on the panel. This opens flow control valve FCV-80 in the waste line and makes waste liquid available at the manual valve. 24. Start waste pump. 25. Slowly open the manual valve admitting waste to the burner. Firing on Fuel Oil First eleven (11) stops are the same as when start ing up on natural gas. 12. Align fuel oil valves at storage tank (Item 1-114) and pumps (Items 1-115 or 1-123) for pumping to the oxidizer. Manual shut off valve at the burner should be closed. 13. TURN GAS-OIL-GAS & OIL selector switch to OIL. The AMBER "Fuel Oil Ready" light will come on. Oil pressure and atomizing steam pressure must . be OK before switching or purge will reset. 14. Repeat steps 13 and 14 for "FIRING ON NATURAL GAS", to light and prove the pilot. 15'. When the Flame Scanner picks up the pilot flame the AMBER "Fuel Oil Ready" light comes on. 16. Start fuel oil pump. Then open manual valve at the burner admitting atomizing steam to the fuel oil burner. Pressure on the gage should be 100 psig. Steam must be on to satisfy startup conditions. 17. Manually latch OPEN the Manual Reset Fuel Oil Valve (SV-67) . 18. Open (die manual fuel oil valve at the burner. This activates the Low Fire Timer (2-TR) . MONS 095406 O'/O'Z. ~t?cJ Pago 19 19 Repeat steps 19 thru 24 for "FIRING ON NATURAL GAS". Manually latch "OPKN" Instru ment Air manual reset fuel oil solenoid SV-61 on the air. output line from the 'l'RC. This makes oil available to the burner. 20. . Combustion air must be manually adjusted to insure proper air-fuel ratio. The regulating butterfly valve should be set wide open initi ally to assure excess air then adjusted in operation from exhaust gas analyses. 4. switching Auxiliary Fuels With Oxidizer in Operation There are several ways to accomplish this. Method Ho. 1 (This is the easiest method and presents no danger of los ing temperature control of the oxidizer. Switch From Natural Gas To Fuel Oil 1. Stop waste flow to burner by depressing WASTE STOP button. 2. Open the manual valve at the burner admitting atomiz ing steam. Set pressure at 100 psig. 3. Turn GAS-OIL-COMBINATION selector switch to COMBIN ATION position. 4. Be sure fuel oil pump is running and valving is set to deliver fuel oil to the burner. The manual valve at the burner should be "closed". Must have steam to PSL-9 also. 5. Manually latch OPEN the Manual Reset Fuel Oil Valve (SV-67) and open the manual fuel oil valve at the burner. This activates Low Fire Timer (2-TR). 6. When the timer times out the fuel oil starts feed to the burner. The oxidizer is now burning both Gas and Oil. 7. Turn 3-WAY selector switch to "OIL". The AMBER "Fuel Oil Ready" light will come on, and natural gas flow will shut off. The oxidizer is now operating on OIL only. 8. Reestablish waste flow by depressing the WASTE START button. ' y. Close manual valve in naLural gas line at the burner. MONS 095407 SC.a7r a/& 2. --ao Page 20 Switch From Fuel Oil To Natural Gas 1. Stop Waste flow to burner by depressing WASTE STOP button. 2. Turn GAS-OIL-COMBINATION selector switch to the COMBINATION position. Check that the manual main gas valve at the burner is closed. 3. Manually latch OPEN the main gas Manual Reset valve SV-65. Also open the manual valve in the main gas line at the burner. When both these valves are open, the Low Eire'Timer 3tarts. 4. When the timer times out, latch "Open" low fire manual reset solenoid SV-60 starting gas flow to burner. The oxidizer is now on both GAS and OIL. 5. Turn 3-WAY selector switch to GAS. The fuel oil will shut off. The oxidizer is now operating on GAS ONLY. 6. Close manual fuel oil valve at the burner. 7. Close manual atomizing steam valve at the burner. 8. Shut off fuel oil pump. Method No. 2 The switch can also be made from Gas to Euel Oil or Fuel Oil to Gas without using the (COMBINATION) position. However, there will be a period where there would bo no auxiliary fuel flow, which could result in a loss of temperature control if the operator delayed too long in making the switch. 5. Normal Shutdown Procedure ' a. For Extended Downtime 1, Shut off flow of waste liquid to the oxidizer by depressing '"WASTE STOP" pushbutton on control, panel which closes valve FCV-BO in waste feed lino. 2. Close manual waste shut off valve at burner. 3`. The waste feed pump stops automatically when FCV-GO closes. ' 4. Reduce a Lem.i zing steam flow to the waste burner (allow small flow to keep gun cool). HONS 095408 oi<?z.-oa Page 21 5. Decrease oxidizer temperature gradually to 1000F over a 2-hour period by periodically lowering the TKC set point. 6. Hold at 1000F for 30 minutes. 7. Close the fuel gas (or fuel oil) manual shutoff valve at the burner. 8. Close the manual atomizing steam valve at the burner if firing on fuel oil. 9. Cut back on combustion air flow by throttling butterfly valve to lowest position. Keep blower running until the oxidizer temperature drops to 50DP. Then shut blower down. 10. Shut down fuel oil pump if running on fuel oil. 11. Shut off well water and city water to the system, and shut down water pumps. Drain trapped piping legs in winter. 12. Turn "Master Power Switch" on panel to OFF. 5. Normal'Shutdown Procedure b. When Preparing For Short Term Downtime 1. Shut off flow of waste liquid same as for extended shutdown. 2. Close manual waste shutoff valve at burner. 3. Decrease oxidizer temperature to 1000F in 2 hours as for extended shutdown. 4. Allow unit to operate at 600 F on auxiliary fuel until ready to resume feeding waste liquid, if expected shutdown is 24 hours or more. Operate at 100QF if expected shutdown is less than 24 hours. 6. Resuming Operations After Short Term Shutdown 1. Advance TKC set point as follows: SOOF to 1000"f - 30 minutes 1000F to 1200F 1200F to 1400F - 60 minutes MOO F to 1000 I:' - 60 minutes If operating temperature required is about 2000 F allow an additional 60 minutes for each 200F increment. M0NS 095409 'J'scr; oi02.~oJ Page 22 2. Open manual atomizing steam valve to the waste gun at the burner. 3* Depress the "Waste Start" pushbutton on the panel. Also start waste feed pump. 4. Slowly open manual waste valve at the burner. The oxidizer is now back on stream. 7. Emergency Shutdown To shut down and render the wnit safe in any emergency situation such as a minor explosion, runaway oxidizer temperature condition, etc., cut electrical power to the unit by, . 1. Turn off "Master Power Switch" on control panel. On loss of power all controls go to a fail safe condition as follows: Main Gas - Close and vent Fuel Oil - Close Pilot Gas Close and vent Waste Liquid - Close and pump stops Combustion Air Blower - Stops Quench Pot Level Control Valve - Closes Water Supply - Fire Water Starts. If prevented from reaching control panel throwing the disconnect at will accomplish the same results. 2. Close manual shut off valves on natural gas, fuel oil and waste liquid. The waste feed pump will stop automatically when waste feed is shut off. V.' SAFETY Aroclors have very low vapor pressures and do not constitute a fire or explosion hazard. Some of the returned Aroclors will bo contaminated with sol vents. The following precautions have been taken: 1. The she].ter at the drum dumping sump has open wall areas to disperse any fumes quickly. ' 2. The i lumedioLe dumping area li.v* a Class .1, Croup l), Division 1 electrical classif ica:.j.on. 3. The storage tanks will be blanketed with nitrogen. MONS 095410 se~c-77 o/a^-aa Page 23 Storage tank filling lines are provided with dip pipes to pre vent static charges. A weak seam on the north end of the oxidizer has been in corporated to provide explosion relief for a major explosion. FXA type safety approved combustion safeguards and process interlocks have been incorporated. Main well water and back-up city water quench and cooling systems are-on separate power feeders. In addition, a tie-in has been provided to the WGK plant firewater system if a plant-wide power failure shuts down both well water and city water pumps. All possible precautions must be taken to prevent escape of PCUs to the environment. Design has provided: 1. Curbed and sumped incinerator area. 2. Settling and separating basins. 3. Multiple scrubbing of incinerator combustion gases. MQNS 093411 ..oftsr.ir.g Point (ASTK E-23-51?) Acidity . Chlorine Concent . CaO ' Fe Benzene Insoluble Plash Point / restricted information Moncars 1 ar.c 2 are the still residues from distillation of iroclors 1242 and 1248 respectively. Composition of these. Mor. cars la not controlled, bo it; entirely dependent on conditions required to make acceptable cisoil-ed product. .` Monter l 6--C-, - CC1 - 04 i 03/09 Moncar 2 o-.-li - CC2 - .04 - 03/0 f r< * xrr-os^eo W* .-l w * * -- - J --> iMZL-ikzg?ji C. ""-v-- ------ BE~H -iv-CUjSL;. ::G: . w' MONS T^r 4 ",*' ,""t \..-f c* m ,w<*."r v. '- --1 /"' wav-v* - ............ ... arcclor ' \ O *'`*.. - *;* r? 'mm. r trt ". UZLt.3L ;.jJBtfy Z-? _r '. ..'! i: .: >- r. ' 7.*r - ~ -. r.-= i >a- a? ._ C;'L^C:-. ' - v - i^cs ' ' ; * i . . c i ~ . ________ ____________________ : ______________ ^........ ............................... i _______ - . - ... _ ; . - yr. p, - c:\.." # 5/ ij.rC. ,!i ; 0::;;::U-a: :;::...:cn .'i-ii'C . v 'A C . s... . ini:; ;v v <W^.i _ ____ : ; .* y*. i.:'- - :. i; 1. 2 ... ' ! 7?c ... A r^ ^ _< . . .. '.'7. : - = ' . 1 :. ; : ............ vif'c-:r, <'>,} o CfTcc. fi'- ' 1 ^ - %' q" (f) ' ^ tiVi.t- l-V.-ci;.'-;' W i0-c. r,;.i;A' Ci-v.'/ C.o.c. Fio c.o._.-. \ r* ~~ .T . ,-r - I-; . /; C ' cc_______ | ' 1 :.^c. _ Ncr.c- __ *::: * : 1 i -fr-.:./--/.-.;-.i .l y... .i v-t c:.;::rr>. w. ' SC. ,V v -- f*r . ^ .. ! ) o. '4..J ' ' C. ' -?. ' . i ' 1 1 '/. * : , ' . i., , ' ' .. >.gp^ .y:-.3.fCislsluraJ^rjal V- ...: Ls*i- - v.. -V ' : \ -7L1. C"'..-. :..c-v .. ...... "___________ r. I -~ . ;. - . -V- ' ....<.......... - .. ~^EEzmnznz SE^7lOm-ao^ ' 3~~T ^iw. il'i-iL -1;,;. J.Z_ ? v .: . ri!L HONS 095416 /IH'BffDIX ....................... ... . S_C.T7<}A/ 0I02.-CC V-.. :.;i ;c\\ cr v ov j 2 c. -:o ,f r ; '.'iy . v. . . *; * :v.:. c.: iii. :. ^ i , 2y\z:. .-.c/ K;:\r; '';d R;.-<p He.':;: ' MONS 095417 L /4f<* Fmp7x jre_ct; 0/0 2.-00 .' i:: 'cc ;/ :. ' .; : //-O'cv 20 r:0'./:;s , crncO/.X.' 0..;r& Oh: -;-'.yar :.v.;:'c ' OX " OX'.; -.X .: "c;.////-/ 0 On;//. S/;,:/; .. :r- OOOO.V. : : Or; c./X X Or/rox.: ;; . .. ' '. /-nr : '/.: Or.- '/Xx.. On;-';,; `X 00.'-'.-'. Ox;/ s. cr.e h:/- - . X'X/X. .. Ore/: ; : /;. 00.X ' Xxi/X Onx-on;:; 0/ 0000 - 5. re./- `xX;:. X. . Or.;/;.;;.? XXC'5. ever t cm he./ 5/nrXi;On;.. ./ 0; 25000 /X ; crx nr./ c/rOod. G/cc/sHy Or.;/::;- _0.-O.2~'.-. ever ; one :;:/0c... MOWS 095418 Jlohn A DIIiI ' JO b-Ii Psl 'SeCK <716 2. ~oa PoSEu'Sion Resear^ 4401 SOUTH REOfl' March Id, 1970 AIRMAIL . Monsanto Company 800 North Lindbergh Blvd. St. Louis, Missouri 63166 Attention: Mr. Art Pier, Central Engineering Gentlemen: Enclosed you will find' a table of the data that resulted from the tests thatwe ran for you on March 10. lie managed to com plete all nineof the tests that you asked for, finishing about 9 o' clock that night. The Aroclor 1260 burned very nicely, but it did require a bit more fuel thanthe other two wastes in order to burn with a nice stable vortex. We also had no trouble at all pumping and hand ling the Aroclor 1260 once we had the pipes and gun parts hot. The residence times we ended up with are in a very good range for comparison with analytical results. I feel these results will give us a good idea of what we need in the way of residence time in a commercial size unit in order to assure complete de struction of the waste material. I feel that the tests were quite sucessful and I hope you find the results useful. If you have any questions about the tests or any future questions about the commercial size equipment involved, please feel free to call on us. Yours truly JOHN lINK COMPANY AICP,:slc enclosure A. Kim Reyburo HONS 095419 Results of Thermal Oxidizer Tests Conducted for Monsanto on March 10, 1970 Haste Rate (com) PROCLOR 1242 1600 F 1800 f 2000 F 0.94 1.00 0.89 INERTEFNPPO________ lfinnu F 1R00U F F 1.03 1.03 0.84 APOCLOP 1260 1800 F 200o F 0.85 0.85 1 0.92 Fired Fuel Rate (Ctu/Hour) 0.5Vmn 0.62mm 0.97mm 1,95mm 2.15mm 2.4mm 3.4mm 4.0mm 4.3mn Quench Water Rate (qpm) 2.3 1.8 ____ Stack Gas Combustibles (vol. ?) n.n 0.0 0.0 Excess Og (vol. %) 3.8 4.0 4.0 2.5 1.8 0.15 0.0 0.0 0.0 4.2 4.2 4.5 2.6 1.9 0.0 0.0 4.0 2.5 -- 0.0 3.0 Gun Type R RR R P. R' EA865 EA865 EA865 Residence Time (sec.) First Point Second Point Third Point 0.64 1.71 _ 2.61 0.57 1.52 2.32 0.67 1.78 2.71 0.58 , 0.56 1.56 1.48 2.37 2.26 0.76 2.04 3.10 0.52 1.40 2.13 0.51 1.35 2.06 0.51 1.36 2.07 Pressures (psia) ' Fuel Waste Steam cl <1 <1 9(1 85 85 95 92 91 <1 <1 <1 : i.5 2.5 3.5 100 95 85 97 100 95 no 104 94 125 124 124 Pressure (in. w. c.) Combustion Air . 8.5 8.7 9.2 8.7 8.9 8.9 11:3 11.3 11.3 | Equipment: Horizontal Oxidizer with HI-10 Burner I Personnel: Monsanto | i i John Zink Co. ! i Art Pier, Central Enqineerino Jeff Maldbeser, Central Ennineerinq Scott Tucker, Ornanic Chemicals Research Bill Papaneoroe, Manaeer, Environmental Control A. Kim Revhurn, Pollution Control Gene McGill, Pollution Control Sam Napier, Test Furnace HUNS 095420 Co to r> N HONS 095421 ,r Cbmtral ` iMIHItMtNt Obpajitmbnt PLANT----------------------- DIVISION ... Sect: o/az^-ao SHBBT .... OP VIEW / \\ / 2? \ H O ~0 . MONS 095422 ....... ^ ^ '*>/y <Scsr. 0)o?- Wilson Wright, I .nc < petroleum laboratories BOX 2326 TULSA, OKLA. 74101 ...... 910 LU 4-6Q60 j W. HASKELL John Zink Company P. 0. Box 7380 Tulsa, Oklahoma 74105 March 16, 1970 File 1142 .I Attention! Mr. Gene McGill Gentlemen: . ` - _ ~ The following pages will report our sampling during the 9 oxidation tests using 3 Monsanto materials, on March 10, 1970. The sampling was done following instructions given in our discussion with Mr. Art Pier and Mr. Jeff Waldbeser on March 9, 1970, and with Mr. Scott Tucker and Mr. Bill Papageorge during the test oxidations on March 10, 1970. The liquid samples obtained were packaged in oil absorb ent material and styrene beeds. The boxes were crated and sent to Mr. E, S. Tucker, Monsanto Company, St. Louis, Mo. on Friday March 13, 1970 by motor freight. J;' Six of the gas samples were analyzed. The remaining gas samples will be destroyed unless you request otherwise. We enjoy serving you. Yours truly CCW:jw Clair C. Wilson u H. i'C. Ui.v.l .. j . .r t- - i .: ( MONS 095423 ' vj *: Jcc-t; o/cT2. - aa WIlson-Wright, Inc. PETROLEUM LABORATORIES BOX 2526 TULSA, OKLA. 74101 ,918 LU 4-6060 7 W. HASKELL JOHN ZI iIK COMPANY EQUIPMENT THERMO-0XIPTZER . , ;^ File 1142 March 10, 1970 Three quartz sampling tubes, 3/4 inches outside diameter by 6 feet long were made and .turned down 4 inches into a 2 8 x 15 - Ground Glass ball joint. This jointed onto the inlet tube of the pyrex gas scrubbing absorber. This absorbing bottle was kept in a water bath. . . . .r- ; .. i- ' The gas was drawn through tygon tubing into the second gas absorp tion tube; through a gas sampling tube and metered with a dry test meter. Laboratory vacuum pumps were used to draw the gas through . the sampling train. . . PROCEDURE . .......... . t. . . . . WS. -y Two of the quartz sampling tubes were inserted to the centerline of the thermo oxidizer. The third tube was inserted until its tip was even with the centerline of the exhaust stack. The samp ling tube was connected to the primary absorber which had been ' filled with 175 ml of 2 N Sodium Hydroxide solution. This was then connected to the second scrubber which had been filled with sufficient AR Grade Toluene to cover the sintered glajs tube. The gas sample tube was connected in and the vacuum pump started. Approximately 1 cubic foot of gas sample was drawn through the train in 8 minutes. The gas sample tube and train disassembled. The caustic solution in the primary absorber was poured into a glass, bottle and the absorber rinsed three times with distilled water into the glass bottle. The absorber was then rinsed with toluene and this rinse put into a second glass bottle. The toluene solution in the second absorber was poured into the second-glass bottle. The absorber was rinsed twice with toluene into this second bottle. . ........... j - .. The quartz sampling tube was rinsed with water and poured into the caustic sample. The quartz tube was next rinsed with toluene and this poured into the toluene sample. MONS 095424 <secr> o/a-2_-0a Wilson.-Wright. Inc, PETROLEUM LABORATORIES BOX 2526 , TULSA, OKLA. 74101 918 LU 4-6060 7 W. HASKELL Monsanto Company JOHN ZINK COMPANY TltERM-OXIVUER File 1142 March 10, 1970 , On the first run, the quartz tube could not be put in the second j sampling point. A stainless steel tube 1/2 inch outside diameter | was used, and this sample taken after the other two samples had . been taken. The stainless steel tube was deformed by the heat and was approximately 8 inches below the centerline. The quartz tube at the first point also was deformed by the heat. It was broken by its forced removal through the sampling port. On succeeding runs, the quartz sampling tubes were inserted until the tips were 24 inches from the thermo oxidizer center line. A stronger cuastic, 2 N was used after the first two runs. The washing of the sample tube was done after the third run. The caustic scrubbers were washed with toluene after the fourth run. Throe materials were oxidized at three different temperatures. Gas in the oxidizer was sampled at three different points. Twenty-seven (27) samples of each; caustic, toluene, and gas were taken, a total of 81. .. ^y The toluene samples were put in a polyethylene bag. This was packed" into an oil absorbent material. The caustic samples were put in a polyethylene bag and packed in styrene beeds. . I Three of the gas samples, runs 2, 5 and 8, at sampling point 2 were analyzed and are reported. These are only indicative of conditions j as the water vapor and some of the carbon dioxide have been deleted from the sample. . The chloride content of three other.gas samples were measured to check the efficacy of the scrubbing train. No chlorides (less than 10 ppm.) were detected in these samples. The metered gas volumes were corrected for temperature and pressure to standard cubic feet at 60*F. and 14.7 psia. This was multiplied by 1.196 and reported as gram mols of gas. MQNS 095425 Scr 0/42.-04 Xt Wilson- Wright, Inc. PETROLEUM LABORATORIES BOX 2526 TULSA, OKLA. 7410) 918 LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY THERMO-OXIDIZER ' Company: Monsanto File No., 1142 Material: Aroclor 1242 . Date: March 10, 1970 Barometer in. Hg. 29.38 Burn Temp. *F. 2000 , Ambient Temp. *F. 46. RUN NO. 1 Sampling Point Inches from center line 1 2* 3 , o** 0** 8 inches from stack center plane 0 Scrubber solution, milliliters First: AR Sodium Hydroxide 1 N. 175 175 . 175 Second: AR Toluene Malenkrodt 50 135 50 Meter Number 3 14 Calibration Factor 0.965 0.995 1.013 Initial Reading Cu. Ft. 0.000 0.000 0.000 Final Reading Cu. Ft. - 1.052 1.294 1.365 Temperature "F. Vacuum millimeters Hg. 51 64 49 30 64 125 Absolute Pressure mm.Hg. 716 726 621 Gas Metered, Gram Mole . 1.123 1.481 1.294 * Made about 10 minutes after other samples were taken using a stainless steel probe ' ** Deformed by heat m MOMS 095446 rT ' N# 0 0Seer. / -3.-00) Wilson-Wright. Inc. PETROLEUM LABORATORIES BOX 2526 TULSA, OKLA. 74101 91B LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY THERMO-OXIDIZER Companyt Mon s an to File No. 1142 Material: Aroclor 1242 Date: March 10, 1970 . ' Darometer in. Hg, 29.38 Burn Temp. *F. 1800 . Ambient Temp. *F. 46. ' RUN NO. 2 Sampling Point 123 Inches from center line 24 24 8 Inches from stack center plane 0 Scrubber solution, milliliters First: AR Sodium Hydroxide 1 N. 175 175 175 Second: AR Toluene Malenkrodt 50 135 50 Meter Number 314 Calibration Factor 0.965 0.995 1.013 Initial Reading Cu. Ft. Final Reading Cu. Ft. 0.000 1.093 0.010 1.002 0.000 1.102 Temperature *F. 53 62 53 Vacuum millimeters Hg. 30 52 130 Absolute Pressure mm.Hg. Gas Metered, Gram Mols 716 1.171 694 1.069 616 0.968 V MGNS 095447 vSCT~. 0/0 -3.-00 Wilsan-Wright. Inc. PETROLEUM LABORATORIES BOX 2326 TULSA, OKLA. 74101 918 LU 4-6060 7 W. HASKELL JOHN ZlilK COMPANY TffERMO-OXIPIZER Company t Mons anto File No,. 1142 Materiali Aroclor 1242 Date: March 10, 1970 ' Barometer in. Hg. 29.34 Burn Temp. *F. 1600 Ambient Temp. F. 50 RUN NO. 3 Sampling Point 1 2 2. .Inches from center line .24 -24 8 Inches from stack center plane 0 'icrubber solution, milliliters ^First: AR Sodium Hydroxide 2 N. 175 175 175 Second: AR Toluene Malenkrodt Meter Number * ,50 3 .50 14 Calibration Factor 0.965 0.995 1.013 Initial Reading Cu. Ft. 0.000 0.000 0.000 Final Reading Cu. Ft. 1.100 1.015 1.099 Tempeiaturet *F. 52 58 52 Vacuum millimeters Hg. Absolute Pressure mm.Hg. .52 . 693 52 693 135 610 Gas Metered, Gram Mols 1.139 1.096 0.957 I m MONS 095428 - A Sb.ct. eta 2-e>a I ,/ Wilsan-Wright, nc petroleum labdmtohies BOX 2526 TULSA, OKLA 74101 918 LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY THERMO-OXI01ZER Companyi Monsanto Material: Inerteen PPO Burn Temp. *f. 2000 RUN NO. Sampling Point 1 Inches from center line inches from stack center plane irubber solution, milliliters !' First: AR Sodium Hydroxide 2 N. Second: AR Toluene Malenkrodt Meter Number * Calibration Factor Initial Reading Cu. Ft. i Final Reading Cu. Ft. j Temperature *F. 1 Vacuum millimeters Hg. ! Absolute Pressure mm. Hg. ; . Gas Metered, Gram Mols File No. 1142 : 1* ` Date: March 10, 1970 .. Ja Barometer in. Hg. 29.34 Ambient Temp. F. 48. 12 24 24 3 8^ 0 175 50 3 0.965 0.000 0.998 53 42 703 1.050 175 135 .1' 0.995 0.000 0.991 62 62 683 1.063 175 50 4' 1.013 0.000 ll092 53 138 607 1.042 ! i i MONS 095429 j. Seer 0102.-00 W 5 > W , I ./ il bn right nc petroleum laboratories BOX 2526 TULSA, OKLA. 74101 918 LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY TtfERMO-OXZPIZER '` Company! Monsanto File No. 1142 Material: Inerteen PPO Date: March 10, 1970 ; i Burn Temp. *F. I 1800 . Barometer in. Hg. Ambient Temp. *F. RUN NO. 5 29.36 46. Sampling Point Inches from center line Inches from stack center plane Scrubber solution, milliliters First: AR Sodium Hydroxide 2 N. Second: AR Toluene Malenkrodt Meter Number Calibration Factor Initial Reading Cu. Ft. Final Reading Cu. Ft. ' Temperature *F. Vacuum millimeters Hg. Absolute Pressure mm. Hg. Gas Motored, Gram Mols 1 24 175 50 3 0.965 0.000 1.000 51 42 704 1.050 2 24 175 13 S 1 0.995 0.000 1.005 61 51 695 1.095 3 8 0 175 50 4 1.013 0.000 1.084 53 138 608 1.03S m MQNS 095430 > S.cr: 0/a z. -a a WiLseN* Wright, Inc. PETROLEUM LABORATORIES BOX 2526 TULSA, OKLA. 7410) 918 LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY THERMO-0XIPJZER Company) Monsanto File No. 1142 Material) Xnerteen PPO Burn Temp. *F. 1600 Date: March 10, 1970 Barometer in. Hg. 29.36 Ambient Temp. F. 46 RUN NO. 6 Sampling Point Inches from center line . . . Inches from stack center plane Scrubber solution, milliliters - First: AR Sodium Hydroxide 2 N. Second: AR Toluene Malenkrodt Meter Number Calibration Factor Initial Reading Cu. Ft. Final Reading Cu. Ft. . Temperature *F. Vacuum millimeters Hg. Absolute Pressure mm. Hg. Gas Metered, Gram Mols 1 24 175 50 3 0.965 0.000 1.006 50 35 711 1.064 2 24 175 135 1 0.995 0.000 0.992 60 48 698 1.083 3 8' 0 175 50 4 1.013 0.000 1.085 53 140 606 1.033 MQNS 095431 *SE.cr: <?/ t?z. -a a> Wilson-Wright, Inc, PETflDLEDM LABORATORIES BOX 2526 TULSA, OKLA. 74101 918 LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY THERMO-OXIPIZER Cpmpany: Monsanto File No. 1142 Material:, Aroclor 1260 Date: March 10, 1970 Barometer in. Hg. 29.36 Burn Temp., *F. 2000 Ambient Temp. *G. 46 RUN NO. 7 Sampling Point Inches from Center line 12 24 24 3 8 Inches from stack center plane 0 Scrubber solution, milliliters Firsti AR Sodium Hydroxide 2 N. 175 175 175 Second! AR Toluene Malenkrodt 50 135 50 Meter Number Calibration Factor 3 0.965 1 0.995 4 1, Initial Reading Cu. Ft. 0.000 0.000 0 Final Reading Cu. Ft. 0.792 0.992 1 Temperature *F. 48 59 52 Vacuum millimeters Hg. 33 52 142 Absolute Pressure mm. Hg. 713 694 604 Gas Metered, Gram Mols 0.837 1.075 1 HONS 095432 0'SGcr, o/<7 z. - a i Wilson-Wright, Inc. PETROLEUM LABORATORIES BOX 2526 TULSA, OKLA. 74101 918 LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY THERMO-0XT VIZER 1 Companyt Monsanto 'Material! Arocior 1260 File No. 1142 Dates March 10, 1970 Barometer in. Hg. 29.38 Bum Temp. *F. 1800 Sampling Point | inches from Center line Ambient Ta mp. * F. RUN NO. 8 , 1 24 2 24 46 3 8 Inches from stack center plane 'scrubber solution, milliliters I Firsti AR Sodium Hydroxide 2 N. Second: AR Toluene Malenkrodt 'Meter Number Calibration Factor Initial Reading Cu. Ft. : Final Reading Cu. Ft. Temperature *P. Vacuum millimeters Hg. ' Absolute Pressure mm. Hg. Gas Metered, Gram Mols 175 50 3 0.965 0.000 1.000 48 33 713 1.057 175 135 1 0.995 0.000 1.000 62 51 695 1.092 0 175 50 4 1.013 0.000 1.110 52 140 606 0.950 MQNS 095433 . ; s'g.cr, a/az.- _Whsbn-Wright, Inc. PETROLEUM LABORATORIES ' BOX 2526 TULSA, OKLA. 74101 910 LU 4-6060 7 W. HASKELL ' JOHN ZINK COMPANY TUERM-OXIPIZER ,'ompany: Monsanto File No. 1142 tatariali Aroclor 1260 Date: March 10, 1970 Barometer In. Hg. 29.40 lurn Temp. *F. 1600 Ambient Temp. F. 45 . : RON NO. 9 ' ' .1 : iampling Point . 123 Inches from center line . . v.l'L Inches from stack center plane . 24 24 8' 0 Scrubber solution, milliliters First: AR Sodium Hydroxide 2N 1 :. ' second: AR Toluene Malenkrodt 175 50 ........ . 175 135 175 50 Meter Number Calibration Factor Initial Reading Cu. Ft. Final Reading Cu. Ft. 3 0.965 0.000 . 0.999 1 0.995 0.000 0.995 4 1.013 0.000 1.107 Temperature.-**. 48 5'9 52 Vacuum mlllJyfnra Hg. Absolute Pressure mm. Hg. 35 51 144 712 688 603 Gas Metered, Gram Mols 1.054 1.069 1.046 HONS 095434 W -W , I .ilson hight nc Petroleum laboratories BOX 2526 TULSA, OKLA. 74101 918 LU 4-6060 7 W. HASKELL . . Monsanto Company JOHN ZINK COMPANY THERM0-OX1V1ZER GAS ANALYSIS File 1142 March 10, 1970 Component Hydrogen Carbon Monoxide Carbon Dioxide Oxygen Nitrogen Totals Sampling Point 2 Sampling Point 2 Sampling Point 2 Run No. 2 Run No. 5 Run No. 8 Mol. * Mol. t Mol. . 0.00 0.00 0.00 0.00 0.00 0.00 5.79 6.91 4.45 4.22 ' 4.36 3.56 89.99 88.73 91.99 100.00 100.00 100.00 MONS 095435 ............................ &&.C-T* a/ea. ~oa John Zink Pollution Research A Dlvlilon of JOHN Zl June 5, 1970 AIRMAIL Monsanto Company 800 North Lindbergh .Blvd. St. Louis, Missouri 63166 Attention: Mr. Jeff Waldbeser, Central Engineering Gentlemen: Enclosed you will find a table of the data resulting from the test conducted by John Zink on May 19, 1970. The particulate analysis from Wllson-Wrlght Laboratories Is enclosed along with a data sum mary sheet of tne Information taken by John Zink Company. General Discussion The Aroclor 1260 burned well. We were able to reach the three de sired temperatures of 2000 F, 2400 F, and 2800 F. The latter temperature was taken with an optical pyrometer as the range of our thermocouple went only to 2400 F. The Aroclor 1260 fed well at an estimated temperature of 180 F to 200 F. The particulate reading for the Montars on the first run showed an abnormally high value as the filter plugged during the sampling run and was not noticed until after the run was completed. The other two readings of particulate showed good agreement. As you can see from the test data, we were unable to reach 2800 F with Montar*. We feel this was due to the high calcium content In the name* Me would like to discuss with you further the possibility oCHnwaburner" unit, (rotary kiln or like equipment) to remove thuMctum product In the Montars. The residence times seem to agAt well with our predictions. It was necessary to estimate the molecular weight of the Montars for theorectlcal combustion cal culations. When you have had a chance to look over the data and If you have further questions, please do not hesitate to contact us. We hope to discuss a complete thermal oxidation system for both these wastes with you at your early convlence. Thank you for the opportunity to serve you with John Zink equipment. Yours truly MOMS 095436 RESULTS OF THERMA' OXIDIZER TEST CONDUCTED FOR MONSANTO ON MAY 19, 1970 AT JOHN ZINK COMPANY, TULSA OKLAHOMA - ,, / Aroclor 1260 - Calc PH = 369.34 Montars: Calc. Mi = 334.08 | 2000F 2400F 2800 F 2000 F 2400 F 2400/ F Waste Rate (qpa) 1.16 1.05 0.884 0.981 0.785 1.178 Fired Fuel (mm Btu/Hr.) 2.92 2.44 6.65 3.40 4.75 3.60 Quench Viator Rate (gom) 1.51 0 0 1.30 0 0' Stack Gas Combustibles (Vol.i) Excess 0? (Vol.X) Excess ATr (Vol.?) 0 . 3.0 15 0 3.0 15 0 2.5 12 0 00 3.5 3.5 3.5 17 17 12 Residence Time (Sec.) @ Sample Point . 1 2 3 Tv94 1.73 1.14 2tT6 1.92 1.27 1t36. 1.21 0.80 -2x06. 1.83 1.03 1.76 1.16 1.51 0.99 Pressure (psig) Fuel Waste Steam Quench Water 1.5 1.0 100 102 125 125 35 0 2.0 95 130 0 1.0 5.0 1.0 95 90 "105 130 135 130 25 0 0 Pressure (in WC) Combustion Air 10.0 9.4 9.8 10.8 10.2 16.8 Time 1353 1120 1435 1700 1555 1735 Gun Type Equi pxent: Personnel: EA EA EA EA EA Horizontal Thermal Oxidizer with HI-10 Burner Monsanto John Zink Jeff Waldbeser - Central Engineering MONS 095437 Cliff Cantrell - Pollution Control estimated from optical pyrometer Gene McGill Sam Napier - Pollution Control - Test Furnace EA s < ? /p u v s s ' s ftcr. crz- -- a a 0 r- l < Ip l2 i Q ^vr v<T y $ MGNS 095438 f <nr ' V4 IH& : ^ ns*.**-f t. w / ^ 4. L-//-70 /y x./j * ' eo^, Ar /93-0 s ^ 9Vu ??.oo: \,'Sc> nf jzMsL-' 2iir L ?? r"h'/k *7/r7 P #oo; "TTT 379iO .o?4iJ <r`^' ~ ; m' ' 3 7/ "Va- 11 .OOOgC Ik/Jtr 9 00' W! -& 3t7<* , a3*~** " ' ATT' _ " 3*1 : , Oo 0 i 3 9000: ,000 8fc I**c Kf li-OOOf/1 mooos* ' 0, pi = , 0 a<50 0 (, i> /a r r: , Ooofel - . Oc 00 0 ^>y h 1 r r i -:rr 9000: ,OC>0%& A/ir <?+y ft** " 1 .06 P/.l 1 * J V'U/'Of* jroo: ,ooota ,/n* ppk'. ,'r> 9000: . O00S E> otoo; 000(0 ~ kr 404-Im ('* 'Jfenii A>- jsiit Cit U> 3tv4lA * .0057 rp^ irv. -C| L jOi =.ooaw rr^ f/;* Jof p UdO ' ,0om 1l,,i 0 oooiv K.C__ O.'/U(J Fi1 ~IC^r vf /**>'' < J W*U = , on 0 ?r^ iv set's bit*r /1`^ w 0 1 .013 V /7-v I1*. s<r*.Llor MQNS 095439 vSBc-r. W - W , I .ils n right nc petroleum laboratories BOX 2526 TULSA, OKLA. 74101 918 LU 4-6060 7 W. HASKELL John Zink Company P. 0. Box 7388 Tulsa, Okla. 74105 June 1, 1970 File 1206 _ Attention: Mr. Gene McGill Gentlemen: The following pages report the data measured during sampling from your Horizontal Thermo-Oxidizer on May 19, 1970. Two Monsanto materials, Aroclor 1260 and Montar were burned at three different temperatures. Samples were taken at three points in the oxidizer, and the particulate matter in the stack was measured and sampled. The sampling was done following instructions given during the tests by Mr. Jeff Waldbeser. The particulate matter results were reported to your Mr. Cantrell by phone May 25, 1970. The samples were packaged and shipped to Monsanto in St. Louis, Mo. attention Mr. Scott Tucker May 28, 1970. We enjoy serving you. Yoi ' ' Clair C. Wilson CCWtjw MOWS 095440 'S&cr: 0/02.--<?0 f Wilson-Wright, Inc. PETROLEUM LABORATORIES BOX 2526 TULSA, OKLA. 74101 918 LU 4-6060 John Zink Company Thermo-Oxidizer Testa Monsanto - May 19, 1970 PROCEDURE 7 W. HASKELL June 1, 1970 File 1206 ' Samples of the burning material in the horizontal oxidizer were pulled through two (2) sintered glass gas dispersion absorbers with a vacuum pump, and the gas volume discharged from the pump was metered. The solution in the first scrubber was approximately one (1) normal sodium hydroxide and the second AR Grade Toluene. Three (3) samples of the burning material were taken from the horizontal oxidizer at each burn temperature. The first sample. No. 1 was pulled vertical to the gas flow about 1 foot from the center of the oxidizer The second sample was pulled vertical to the gas flow approximately 1 foot from the centerline of the oxidizer and on the center plane of the stack. The third sample was pulled almost directly from the flow of the gas, 8 inches from the center line of the oxidizer and on the centerplane of the stack. On the Montar burns, a sample of the stack gas was pulled through a quartz tube and through a 5 micron teflon filter held at 250*F. to prevent condensation of water. The rate and amount of gas pulled through the filter was metered. On Tuesday morning, May 19, 1970 the horizontal thermo-oxidizer was fired and brought up to temperature. The aroclor was started burning and after the temperature was stabilized, at 2400*?., samples of the burning material were taken. Before all three samples had been taken, a nozzle on the injector plugged. Re sampling was scheduled but only one point could be sampled as the quartz sample tubes were broken. The sampling tubes were repaired and after lunch, the aroclor burn was started. After the burn temperaure stabilized at 2000*F., three samples of the burning material was taken. The thermo-oxidizer was heated to 2800*F. and after the aroclor burn stabilized at this temperature, three samples of the burning material were taken. MOMS 095441 ..,v"'-yv s&crr 0/0 z--a 0 Wilson-Wright, Inc, PETROLEUM LABORATORIES BOX 2526 TULSA, OKLA. 74101 John Zink Company Thermo-Oxidizer Tests Monsanto - May 19, 1970 918 LU 4-6060 7 W. HASKELL June 1, 1970 File 1206 ' PROCEDURE - continued . The Montar was fed into the thermo-oxidizer and after the temp erature stabilized at 2400*F. a sample of the particulate matter in the stack was taken. Approximately one cubic foot of gas was pulled through the filter. Examination indicated a possible leak in the filter. . A second sample of the particulate matter was taken,After one tenth (0.1) cubic feet of gas was pulled through the meuer,the filter plugged. Three samples of the burning material were taken. Montar burning temperatures of 2000*F. was stabilized and approx imately 1 cubic foot of stack gas was pulled through the filter in three minutes. Three samples of the burning material in the oxidizer were taken. . Burning conditions were adjusted to obtain maximum temperature with the Montar. After the temperature stabilized at 2400*F., approximately 1 cubic foot of stack gas was pulled through the filter in 3 minutes. Three samples of the burning material in the thermo-oxidizer were taken. The data measured during sampling are on the following pages. MOMS 095442 s&cr: <?/>. -00 Wilson-Wright, Inc. PETROLEUM LABORATORIES BOX 2526 TULSA, OKLA. 74101 918 LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY Company: Monsanto THERMO-OXIDIZER File No. 1207 Matarial: Aroclor 1260 ' Date May 19, 1970 Barometer in. Hg 29.62 Burn Temp. *F. 2400 Sampling Point Run 1 Ambient Temp. *F. 12 83 3 Sampler Inches from center line Quarts 12 Ceramic 12 Quartz 12 Inches from stack center plane 00 Scrubber solution, milliters First: 1 N. Sodium Hydroxide 150 150 150 Second: Toluene AR Grade 200 200 200 Meter Number 1 34 Time Initial Reading Cu. Ft. Final Reading Cu. Ft. 10:40 0.000 0.759 10:40 0.000 0.963 10:40 0.000 1.005 Time 10:50 10:50 10:43 Temperature *F. 12 4 122 104 Cu. Ft. 0 60*F. 760 MM 0.669 0.849 0.917 Gram MoIs 0.800 1.015 1.096 MQNS 09544J Se-.er/*Ar f/sz. ~c>a Wilson-Wright, Inc. PETROLEUM LABORATORIES BOX 2326 TULSA, OKLA. 74101 918 LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY THERMO-OXIDIZER Company! Monsanto File No. 1206 Material) Aroclor 1260 Date May 19, 1970 Barometer in. Hg. 29.62 Burn Temp. F. 2400 Sampling Point . Run 1 Ambient Temp. F. 85 1 Sampler Inches from center line Ceramic 12 Incher from stack center plane 1 Scrubber solution, milliters First: 1 N. Sodium Hydroxide 150 Second: Toluene AR Grade 200 Meter Number 1 Time 11:30 Initial Reading Cu. Ft. 0.812 Final Reading Cu. Ft. 1.811 Time 11:33 Temperature *F. 125 Cu. Ft. 0 60*F. 760 mm 0.880 Gram Mols 1.052 MQNS 095644 smcr 0/02.-00 Wilson-Wright, Inc. PETROLEUM LABORATORIES BOX 2526 TULSA, OKLA. 74101 918 LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY THERMO-OXIDIZER Company: Monsanto Material: Aroclor 1260 File No. 1206 Date May 19, 1970 Burn Temp. F. 2000 Barometer in. Hg. Ambient Temp. *F. 29.56 91 Run 2 Sampling Point Sampler Inches from center line Inches from stack center plane Scrubber solution, milliters 1 Quartz 12 2 Ceramic 12 0 3 Quartz 12 0 First: 1 N. Sodium Hydroxide 150 150 150 Second: Toluene AR Grade 200 200 200 Meter Number 13 4 Time Initial Reading Cu. Ft. Final Reading Cu. Ft. Temperature *F. -- 2:20 0.000 1.005 130 2:20 0.000 0.603 130 2:20 0.000 1.000 112 Cu. Ft. 6 60*F. 760 MM 0.875 0.525 0.898 Gram Mols 1.046 0.628 1.073 MOMS 095445 -Seen ott'z.-ao W -W , I ,ilson right nc petroleum laboratories BOX 2526 TULSA, OKLA. 74101 918 LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY THERMO-OXIDIZER Company: Monsanto Material: Aroclor 1260 Burn Temp. F. 2800 Run 3 Sampling Point Sampler Inches from center line Inches from stack center plane Scrubber solution, milliters First: 1 N. Sodium Hydroxide Second: Toluene AR Grade Meter Number Time Initial Reading Cu. Ft. Final Reading Cu. Ft. Temperature *F. Cu. Ft. 9 60*F. 760 MM Gram Mols File No. 1206 Date May 19, 1970 Barometer in. Hg. 29.54 Ambient Temp. 'F. 93 1 Quartz 12 2 Ceramic 12 0 3 Quzrtz 8 0 150 200 1 2:40 9.992 10.988 125 0.873 1.043 150 200 3 2:40 0.058 1.061 125 0.880 1.052 150 200 4 2:40 0.000 1.004 114 0.898 1.073 MONS 095446 &&iS7T OIQ't.-- Sa Wilson-Wright, Inc. PETRQIJEUM LABORATORIES BOX 2526 TULSA, OKLA 74101 918 LU 4-6060 JOHN ZINK COMPANY 7 W. HASKELL THERMO-OXIDIZER Company: Monsanto File No. 1206 Material: Montar Date May 19, 1970 Barometer in. Hg. 29.50 Burn Temp. "F. 2400 Ambient Temp. *F. 93 Run 4 Sampling Point Sampler 1 Quartz 2 Ceramic 3 Quartz Inches from center line 12 12 8 Inches from stack center plane 00 Scrubber solution, milliters First: 1 N. Sodium Hydroxide 150 150 150 Second: Toluene AR Grade 200 200 200 Meter Number 13 4 Time 4:15 4:15 4:15 Initial Reading Cu. Ft. 0.000 0.057 1.005 Final Reading Cu. Ft. 1.000 1.000 2.012 Temperature *F. 117 120 118 Cu. Ft. 9 60*F. 760 MM 0.893 0.834 0.894 Gram Mols 1.068 0.997 1.068 HONS 095447 Ge-cr, QiozL-ao W -W , I .ilson right nc petroleum laboratories BOX 2526 TULSA, OKLA. 74101 918 LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY THERMO-OXIDIZER Company: Monsanto File No. 1206 Material: Montar Date May 19, 1970 Barometer in. Hg. 29.50 Burn Temp. *F. 2000 . Ambient Temp. *F. 93 Run 5 Sampling Point 12 3 Sampler Inches from center line Quartz 12 Ceramic 12 Quartz 8 Inches from stack center plane 00 Scrubber solution, milliters First: 1 N. Sodium Hydroxide 150 150 150 Second: Toluene AR Grade 200 200 200 Meter Number 13 4 Time Initial Reading Cu. Ft. Final Reading Cu. Ft. Temperature *F. Cu. Ft. @ 60*F. 760 MM Gram Mols 5:05 0.000 1.000 112 0.894 1.071 5:05 0.000 1.000 117 0.889 1.062 5:05 1.032 2.038 118 0.897 1.072 s < . . MONS 09544A , ' 'v -sec 77 0/0 2.-0 0 Wilsbn- Wright, Inc. PETROLEUM LABORATORIES BOX 2526 TULSA, OKLA 74101 918 LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY THERMO-OXIDIZER Company: Monsanto Material Montar Burn Temp. 'F. 2400 Run 6 File No. 1206 Date May 19, 1970 Barometer in. Hg. 29.50 Ambient Temp. *F. 93 Sampling Point Sampler Inches from center line Inches from stack center plane 1 Quartz 12 2 Ceramic 12 0 3 Quartz 8 0 Scrubber solution, milliters First: 1 N. Sodium Hydroxide Second: Toluene AR Grade Meter.Number ' Time Initial Reading Cu. Ft. Final Reading Cu. Pt. Temperature *F. Cu. Ft. 0 60*F. 760 MM Gram Mols 150 200 1 5:25 0.000 1.007 115 0.898 1.073 150 150 200 200 34 5:25 ` 5:25 0.000 1.100 1.013 2.041 119 115 0.897 0.839 1.072 1.003 MQNS 095449 8.Scr. W -W , I .ilson right nc petrdleum labdmtdries BOX 2526 TULSA, OKLA. 74101 918 LU 4-6060 7 W. HASKELL JOHN ZINK COMPANY THERMO-OXIDIZER File 1206 Monsanto - Montar Burns May 19, 1970 Run No. 45 6 Burn Temp. F. 2400 2000 2400 Cu. Ft. Sampled 0.1033 0.8923 0.8476 Rate Cu.Ft./Min. 0.091 0.297 0.356 Sampling Tip Velocity Ft./Min. Gas at 60F. Gas at Run Temp. Marticulate Loading 312. 1752. 970. 4700. 1170. 6570. Grams per cu. Ft. Grains per 100 Cu. Ft. 0.291 ^0 0.1114 9t>W / 72 0.1436 CTOW2 973 MONS 095450 Material ArocLor 1260 Aroclor 1260 Aroclor 1260 ,* Montar 3 Montar 3 Montar 3 . Teap* *F 2400 2000 2800 2400 2000 2400 TKERXAL OXIDATION OF AH-' CK. 1260 ABO SOSTAH 3 Run Sample ?t i-i 1-2 1-3 1-1* 2-1 2-2 2-3 3-1 3-2 3-3 4-1 4-2 4-3 5-1 5-2 5-3 6-1 6-2 6-3 3 31. Sample: Size 0.019 . 0.024 0.026 0.025 C.025 0.015 0.025 0.025 0.025 0.025 0.025 0.024 0.025 0.025 0.025 . 0.025 0.025 0.025 0.024 BCL f?/m3 C12 n;?/*3 .104.2 9 2.o 97.3 84.4 23.2 14.6 296.8 29.6 77.2 84.0 69.2 65.6 73.7 ' 61.2 51.6 61.6 68.8 155.6 26.4 47.6 IS. 8 . 63.2 38.3 28.3 27.6 53.2 76.4 55.6 84.8 18.8 32.8 26.4 58.0 ' 52.4 61.3 278.0 38.4 69.2 I^tal Org. Chlorine = R/!=3 11.2 1.5 4.8 5.3 .. ' 30.4 ND 3.6 . 98.8 3.2 1.4 . ND 2'D 5.0 ' 22.4 2"^ . 2 3.2 ' 7.1 94.0 - 3.7 Estimated PCB's ac/V * S.OSi p.045 0.105 0.042 0.060 0.CS9 0.04S 0.038 ` 0.015 0.032 0.017' 0.020 ' 0.031 0.033 0.015 0.029 0.024 0.002 0.016 ' *?.cpeat Sample NO - None detectable above nornal blank HONS 095461 0 /0 u *rSrS60 SNOW *_I w I PPg/WIX A r\ EERING department equipment information summary OOCPAPCO it V8Vf CCA MO. z*7sr- COCA 4/ , /La a. <?#. ivAs7-& /p/r/>asAL description op EQUIPMENT ITEM size.. PATINO, MODEL. ETC . MATERIAL. OF COHSTRUCTIOH %J?/yo OPB*unio MEKSMT (POUNDS) RS-S/A^e 7a$K. Tk/HLAfi. 4aao $al. snrey miULXTEt wrfH H CATin s con. Z*C.)/f AJ/TOK.-- sew/eecA. sysrGAt <pC4SVCH Per, VSVTV/U, TAcKmp cetuA/if stAcr '/ AIR 0Li> WA-f c*AO'ekS P saa0 <zi,4rp srsre/m. BVRW fZ.'S-e Lb/j/R or >Rocto OK M6/J7A* VARiavs TV t WAJZ/AA itze \4rS A rACKA&B. z CJ)./rcj/-L.0 tA'c/A/e/t.pTzm. /=&{> PuMfi mHoi-or/ rxarv/L |p - / . Ifr-ov us --TtyApr Atiyyp/l. (t~S)4PM gf/P TaoL st&izc Ror&eV'/Tsrt /) ar^roX gxS'-fA) fffin- tZ> rft toiiRci: N-NK* * vriOMt mu .CO WITH MOCMAW CONTINTI O* TCCT MATCO'AL. OHtCHCVC* t MCAVtCM A c/iv&e^t-EP 'W F f, ' -' o vAppENDIX A :ENTRAL ENGiNEERING DEPARTMENT EQUIPMENT INFORMATION SUMMARY **OjCCT NME 4 CLOp^ WASTE D ISPf-S/tC PREPARES prew APPROVED OY Cl* NO 24 IS 'ITsTro AREA <7/ REV MO 6, NIV IfSUlD CEO EQUIPMENT IDENTIFICATION NUMBER DESCRIPTION OF EQUIPMENT ITEM MATERIAL OF CONSTRUCTION OPERATING WEIGHT (POUNDS) PRICE (*> Packed C0 L ttyfV ctticvi-ATfA/t? Pt/ri P 0 l-/a-o: / PASTEU-J/ c LSiyaa PPM A/ Dupca Txt-ia /V at- /a? PfU/rt H&Sjr&i, FV */4ff PP-a yirrrpt--p L`#tp SOtffi C.VS7XM m TABt'CA/Vm Cfj PAPCECLEP Vj w\ ... / _ * G&SVV&- t<3 G-fW- CLAffG.e-t-ue> ^ 7 r, 0 ftr*-z -0 O >0 0/ -//# - mt/K. cap. '1 : i/NLottotPf P(/PtP $ i --//0 -<r6f I AlOTV/L 700 $PAI /drpp Wap TP /7~E \ 0/-//O : -r4-A/K_ 7~&UCK. UPUJAPtA/e Pv/HP /ao $fiA) p/-/// -<yj/ sAonop. Z0 HP ** I tOUNCC NlNCN C>OltTIN6 A TO AC RELOCATED ** EtriMATID NIKHT FILLED WTM NORMAL CON TENT* OR TET MATERIAL. WHICH POCTtty /fi$y WO&TH/fc T0/Z rSELF RIPINS p` RELOCAr^ b! PuN-CO fiZ-A tLM.LtCATE B tz APPENDIX p DEPARTMENT EQUIPMENT INFORMATION SUMMARY >Oj*CT N*UL _________P /<.Q C.L.OA- V/fi S7~B O IS P(7S4L- CEO EQUIPMENT IDENTIFICATION NUMBER DESCRIPTION OF EQUIPMENT ITEM SI ZE. RATING. MODEC. ETC BNC0AAC9 ATS W O.QOVCO BT CCAie 24 fS Iffio OPERATING. WEIGHT (POUNDS) <?/ *3 * 6 Of -JJ2. Wia-L. WAtt/Z. Boosts*a. AVMp of -//*.-ca/ /^GTVA. 7SMP pi-toy za. DURjCO /? ~7o P&L0C4TS. kf--M3-- 3g 0 G.4-L,r CAfK&& /tS/CLLEJ> >-/// PVBL. 0U, S7VA4GB TfttfM. / ~//<r /-//5--0S/ Pl/ZL er/L. APAOp pu>tor_ S-//6 . SroftAcB rftsftc /-//S-ao/ AOtrA-rofi~ J-//& -sz-Z- /VLO TVfL- J-l/6-c*'2- f3'o.t>. x ZO'm&H CA*3o4 jstE i^x i '4I'fHfj noofi-FM CAST ffiPAi 2-0,000 (P/>C C4M0AT SrTeyJ /M Pi-OC-E. `/V Pt-ACJ*, /y PL4 CL 4 n 'i * (I e S V\ s e e r - . <0/0+ I *0^ ' -. _ o9 M Mt* CC*ITIM T* M HCkdCATIO . ....... ... . .r. rOMTtMTt R TUT MATERIAL. WHICH PRtPtBED T CCA NO :entral enc- : "HR!NG DEPARTMENT EQUIPMENT INFORMATION SUMMARY \VAo7~E. P to AoSAL MOV/ iSPROYES ' 24 /S' rMJTtAt. ISSUF. 2./5/70 ICDEEONTEIQFI'CJiATNIEOsN_ ' NUVBcS DESCRIPTION OF EQUIPMENT ITEM SIZE. RATING. MOQEU, ETC MATERIAL. OF CONSTRUCTION OPERATING WEIGHT (POUNDS) 67 REY NO 4- - e PRICE (S) 7--77.7 STO/cAqE. 7~A///4 7-77-7 /t&rATv/L. 7--777 --002 A\'?TZ7f!- /-//? - 0.0 /i-- ZOjOea GAL, C/httaV 3rSL\ //T PUycBr // // 7/ // 77 // 7-/78 |ST0&//6&. TAUT!. 7 -// 8 -'&&/ /r<$/r/9 7~a&. 7-7/8 -00'*- M OTZ>P-*- 7-718--003 C-O (L, /-//9 I-119- co PR \JM \JNLOAP)H& Sl/M? Me 7?A- 2U),O0O GAL. cp Mai/ sued <So gw Pvct/LC >Kcro leocptM /AS 77 77 // '/ " // *L4Cc^ VIK7: 77 l~'Z0 S VT 120 ~O0! V 1HC iNERATlOrt fLOfR 5L>nr POMP MOTOR. ioo am 304 -S.S. S HP, / Boo RPM 72SC/1 c-z-Vcat) IN FLACB o / n -- ry //r> ' 7 3 9 0x _L MsNC E(V1TIN .TO (RELOCATCO t*ClMT riL(.CeWTMMOMMU CONTENT# OR T##T MATERIAL. WHICHEVER I* MRAWIC ^ A^fENVlX A Entral engineering department equipment information summary NOJICT name A 2 O CLOP* WA 5 TE pji PCS/1L aHEi*EO * W.6. Al. |*Pt*OV60 C 2 4 1ST 01 5 & INITIAL. tSSUC net issueo Z/s/70 CEO EQUIPMENT I0ENTFICATION NUMBER DESCRIPTION OF EQUIPMENT ITEM QTY. SIZE. RATING. MODEL, ETC 1 - 12 1 AROCLOA SOMA PUMP - \z\ -ooi Mo TOP / 1 jrs spm /0 HP MATERIAL OF CONSTRUCTION OPERATING WEJGMT (POUNOS) PlicT/LE IKOiJ REMARKS h n i ITOI/Cps. irdDr-t.il ip in Place /A // E ESTIMATED PRICE (S 1: 1-122 1 -)2Z ~ CO! Y/ATEA sump Pump Motor. 1 1 |00 GPri \s HP pocr/LE )POaj /- 123 / - !Z3- Oot Fuel oil PUMP MO TOP 1 l'4* lV4 CAST IRON / 1.5HP, IZOoRPm 1-124 AK0C10K- WATER SOhP ) 10,000 SAL concrete 1-1ZS /p- \ZS -QC * * O unloading, DOCK Sump PUMP MOTOR. 1 Js- SPM 3IGSS. 1 7zHP^ izooRpn I-I2G S City matea speak tank 1 CARBON steel 1-127 1-12 7 - cc <r/7r water speak tank PumP | Mo ToP 1 / ilOUNCC * MNlI CSM$T1M * TQ C MlOC A TKO mchemt rtui.ee mtm mmac eamtknti r* tit matwial. imichcvsn is mavi tpise/ cz. vmr E TEFC E I/O Place h /i E E IN PLACE IN PLACE H1 E E IN place 1/ It E E II n E i BJ> . r ,C U I Q + - Entral engineering department EQUIPMENT INFORMATION SUMMARY AOJCCT M AMC . A R ' CL OR WASTc DISPOSAL- CEO EQUIPMENT IDENTIFICATION NUMBER DESCRIPTION OF EQUIPMENT ITEM SIZE. RATING. MOOEC.ETC (PASCO ST Vvf Q. N APPROVCO CC* "O Z4i5~ INITIAL issue Z/^/70 OPERATING WEIGHT (POUNOS) ARC* o/ I-IZ8 h be-9- ) ~ 13 0 h- f3 J PRUM UhlLOAVIblC* HOIST -tank CAn LiMi.r.AH)Mgj- AR-tf- . VenT-Sk OWBPr PLVAd--WASHBftr / TOfJ CAKE OK) S 7EEL <TAR0CH STSfrt- cfkkated \/Ayp/L4Vt-/c* caN'c.eLubs> C/lAKCE-LLtSO -R-c i_&{-jAT - CA/SC.C.UL- K-C PRICE . <*> a A - -+ o ia 7 3 ? 4 source; m*nc -*--r# OR TUT MSTfMSC. RSUCNWER I* *** MONS 095461 HONS 095462 MONS 095463 MOMS 095464 % HONS 095465 i Project Manual sect. M CEA 2415 az.U-0/ Dates November 6, 1970 Author: K. J. Johnston Approved by: R. G. Corley Page 2 of 7 1. REFERENCES Project Scope Report - August 6, 1970 Project Organization and Procedure - September 25, Master Project Schedule - October 14, 1970 Standard Code of Accounts - September 17, 1970 Process Flow sheets - October 27, 1970 1970 2. This Electrical Design Basis describes the in battery limits electrical systems (control, grounding, lighting, and power) that will be designed for the Arocolor Waste Disposal Project. The appropriation for the electrical facilities is as follows: Code Category 01 (Motors) 04 (Electrical only) 10 13 Total Capital for Equipment, Material and Labor 80 (Cost Center 45-46) 90, 92, and 93 (Expense) Amount $ 500 2,000 0 29,500 $32,000 $ 8,000 2,000 3. GENERAL DESCRIPTION OF THE ELECTRICAL FACILITIES This project consists of an incinerator from John Zink Company, storage facilities for used aroclor, tank truck and tank car unloading stations, and a drum unloading station. Of the twenty motors required: eight are existing and require no change, two are existing but require rewiring of control circuits, the remaining ten are new or relocated and require power and control wiring. The existing MCC's 8A2, 8C and 8D will be used for the new and relocated motors. Approximately six new light fixtures will be installed for the incinerator and area lighting. John Zink will supply the control panel for the incinerator. The existing lighting panel will be used to supply power to the new lighting and instrumentation. 4. PROJECT RISK There is no project risk with the proposed electrical installation. 5. ELECTRICAL EQUIPMENT AND MATERIAL REMOVALS One motor starter and one fusible disconnect will be relocated from MCC 8A1 to MCC 8A2. . M0NS 095564 f r i -|1~ ~ .. *- -K. ''' JJ-- /.--. ,,*. .- *r - . Project Manual Saot. Mfe CEA 2415 03.13-0/ Date: November 6, 1970 . Author: K. J. Johnston Approved by: R. G. Corley Page 3 of 7 6. SCHEDULE Electrical design and drawing completion - 8 February, 1971 Start construction on project - 8 March, 1971 Startup date on project - 10 May, 1971 7. ELECTRICAL DRAWINGS This project will require approximately 15 new drawings and revisions to approximately 4 existing drawings. See attached drawing status report. 8. ELECTRICAL PURCHASING CED will purchase all new motor starters^control stations, light fixtures, motors and cable. Field construction will purchase all wire, conduit, conduit fittings, lamps, fuses, and motor overloads. 9. CONSTRUCTION AND STARTUP ASSISTANCE PROVIDED OR ARRANGED FOR BY THE DESIGN SECTION The electrical installation should require minimal assistance. No vendor assistance is anticipated. Assistance will be provided at the request of the project manager. 10. COMPLETION CRITERIA This project will be considered to be electrically complete when all electrical equipment that was scheduled for modification has been properly modified or relocated and all new electrical equipment has been properly installed and the operation of the new and modified electrical equipment has been demonstrated to be satisfactory to the Project Manager and to the Plant Manager or his designee. 11. ELECTRICAL CODES All electrical installations will be made in accordance with the latest issue of the National Electrical Code and the National Electrical Safety Code. 12. ^ 13. ELECTRICAL STANDARDS This project will use those electrical items and materials that are covered by the Monsanto Electrical Standards as applicable to the W. G. Krummrich Plant. HAZARD CLASSIFICATION The immediate area around the drum unloading sump is classified Class I Division I Group D due to the flammable material returned with the used aroclor. The other areas of the project are non-hazardous. MQNS 095565 Project Manual Sect. Ml CEA 2415 02.(3 -0/ Date: November 6, 1970 Author: K. J. Johnston Approved by: r. g. Cotley Page 4 of 7 14. SPECIAL SAFETY CONSIDERATIONS None. 15. SPECIAL SAFETY CONSIDERATIONS All conduit and fittings will be plasti-bond due to the HCL fumes and other corrosive chemicals present. All control stations to be corrosion resistant. 16. SPECIAL PROTECTIVE COATINGS AND EQUIPMENT PAINTING All painted equipment is to have a paint system which is 5 mils thick. 17. POWER SUPPLY REQUIREMENTS AND SOURCE OF POWER INSTALLED HP KVA 460 Volt 3 phase 60 hertz power for motors 320 460 Volt 3 phase 60 hertz power for heaters 120 Volt 1 phase 60 hertz power for lighting 120 Volt 1 phase 60 hertz power for instrument 0 2 3 ESTIMATED DEMAND 250 0 2 3 The loads will be divided among the existing MCC's. MCC - 8A2 LOAD - 100 HP 8C 190 HP 8D 30 18. EMERGENCY POWER SYSTEMS None. 19. SPECIAL ELECTRICAL EQUIPMENT None. 20. WIRING SYSTEMS All wire will be stranded copper. No conductor smaller than #14 will be installed. Control wire will be #14, lighting conductors will be #12 and above. Type THW 600 Volt insulation is specified. .21. SUPPORTS FOR CONDUIT AND EQUIPMENT MOUNTING Conduit will be supported from the building steel with trapeze type hangers. Individual control stations will be supported by the conduit. Light fixtures will be clamped to bhilding steel or hand rails. MONS 095566 * '-- -i*_ . . : ' , ' ~ 'X .-tv. Project Manual Sect. 4HP CEA 2415 OL!3~a/ Data: November 6, 1970 . Author: K. j. Johnston Approved by: r. g. corlay Page 5 of 7 22. MOTORS Approximately six new motors will be purchased for this project. All motors shall have TEFC enclosures, Allis-chalmers type rgz preferred. Approximately four existing motors will be relocated. See attached list. 23. SPARE PRIME MOVERS None. 24. MOTOR CONTROL CENTERS The existing MCC's 8A2, 8C and 8D will be used. 25. INDIVIDUALLY MOUNTED MOTOR STARTERS None. 26. MOTOR CONTROL CIRCUIT REQUIREMENTS Motors will have local start-stop (Allen-Bradly type 4X) only. Control voltage will be 120 volts. 27. ELECTRICAL CONTROL PANELS A combination instrument-electrical control panel will be built for the burner controls. This panel will be supplied by John Zink. 28. CONDUCTOR IDENTIFICATION All wires will be labeled at all terminal blocks and devices using Brady 500 wire markers with the numbers and/or letters that are indicated on the appropriate electrical drawings. 29. POWER PANELS None. 30. POWER RECEPTACLES Two welding receptacles will be provided near the incinerator. 31. POWER FACTOR CORRECTION EQUIPMENT None. 32 LIGHTING SYSTEMS Approximately six 175 watt mercury vapor light fixtures will be * mounted on or around the incinerator platforms. Approximately four light fixtures will be mounted on the packed column. All lights will be 120 volt 60 hertz and be powered from the existing lighting panel. MOMS 095567 Project Manual Sect. CEA 2415 OZ 13 ~aj Date: November 6, 1970 Author: K. J. Johnston Approved by: R. G. Corley Page 7 of 7 43. RAILROAD CAR PULLERS None. 44. EQUIPMENT NAMEPLATES Furnished by CED. 45. SKETCHES AND SCHEMATICS See attached typical motor schematics. 46. INTERLOCKS. See attached motor schematics. The incinerator will shutdown on flame-out, high temperature, low air flow and/or low water flow. 47. OPERATING INSTRUCTIONS Operating instructions for the incinerator will be supplied by John Zink. 48. FORMS USED WITH DESIGN BASIS ES 25 - Power and Motor Summary. CE-101 - Drawing Status Report. * MONS 095568 ' ' t `*<&'.C.< - ClNVlAL iMItMICAIMt Db^aatmbnt f" . . . - SC///>]Af/cs ItPUIP. IPBNT. NO . CIA NO., . AforjLut MsT^A's/v&iL. A^f^MsrJAT~~ PNOJ/DBPT nPLANT W' W*flT _PIVIOM QL----------------- - 3/s.c.r; cr2.i3-<?/ . *00 ^ -nzuj- LaaaaaaJ i'YVYYvV'i ryncAi all staaters Slop HI ------------ a_l_g-------- I 1AM RELAY /Ay /wc/y^Eaa ToA coyr/jc Paaei start _L -O o--- ?. .. - 0/~ /dl- O ':t A) Z/UC/A/ERAToA fD R/A1P xz /<--....... STOP flJ-0 START -o o- - 3 9------- (A oLs ^ 6- Aj O/-//I-0OI 7'a/v/' TRUCK //A/AoaP /mg PUMP 0/-//P- Od WEIL WATER 8oosTER PUMP 0/-/3O-UOI VE/JT E/OWEP 0/- /zz-uc/ water stf/vs Pump m*s 0955*9 it-i CtNTflftk V Immii ' 0Al Jtanui SQtf&rmT/z* VI*, IOMT. MO , 'WUM'metj, MM^ "'IiMsZX&zEl AMMIT <SSCT. 0 2.13 --i? / STop ' > -Hb -O / O- I OfA/ OA/ //>!< H/jrfA. /yU'li- n q(JA>CHA, i'7>4/^T -O O- 2-9---( >-- I O/-/0Z-0O/ />1 //VC/A/AA ro* AM #ZJtv O/-/06-O0/ /HC/<) COIV/VM CMC. AV/1/3 l MOMS 095570 .vYsBV.i5i*ki'. ClMTKAt Ihoniikini Dccaatmcnt ____/>}vT0K ScriESlAilC.4. -- llioum. idint wo ___________ i ]|e* mb. 4X0^ A ACA MO. _ */ - oa</7ct WA *Tb OLAM^^^--------- ----------- > &G.C.T7 <22^)3 -&/ / l i-- SrV> start ....i___ J O O----------- Cl r,-v. -s -a /.."> !! TPS O'- // O/ 7~4sJA` CAR Z/A/R0A/OA STgP ----------------- -Q 1 Q qPEa1 10TM Lm" lEVEl o/- // - cot IS ft1.1 2 CD-- M ARaciM su,y/> PI/RIP i-SIZO-l(L) OA is //f./ . OP/V 8l o vv MQNS 095571 low LEVEL O/-/ZC-OO/ /R/C/A'^RA T/GA' /-'/r-OG PRAw <?/- //?-<?>/ jORU/A /A/AOA O/AS6 JU/R Pj/HA HONS 0955V` tins VAlfT NAME _ CA PROJECT NO. MONSANTO CENTRAL ENGINEERING DEPARTMENT DRAWING SCHEDULE AND FORECAST SHEET ' /V J *" ^/ ________r>\ amt mo____________________ O/ . DEPARTMENT NO. . DESIGN CATEGORY KO._ ENGINEER SHEET ____ / DMAWIN6 MO. fV iev NO CM AMINS TITLE vj 'f-4 v- ' - A OMAMN V ICMEOULC OATES START RELEASE CMECKCO APMOVIO RELCASEO REVISED 12t ^ r-r A--^ ? '. ' , aa, . ** l "----------1------------1--T------------1 1 i !1 1 /vorok CosSTAOL S<=tfucfAe 1 xV*/ /#,$ 7Oof goo D- 2 IS- 801 Aam ora c&vfxaZ Sc//A>{A/ S/A*2 AAA 700^300 1-----------1 v 1-------------1 D-2.1f- 807 1 1 11 S/A/GA6 Zfsv &/AGAAA 1 i i ri i SCAS/VA r/C f OAJ 0-2^S-E3o? ij i l A//a M/etf AAss. A/i/fi />?-!- 9/0. Ao - 205 1 1 ....T I I I I I 1 yVMI&A - /7 - ----i-----------1--------------i-------------1-------------1 1 I I 1 a v1 -------------r* i ii --i i i 3 !Z r> SVCC /too An S,s4VOiSr -------------1 i i ii r^n i D <C IT si ------------- 1 / ? 1' i 1 j~ *v>vr - -- 1 I 1I X " ' - - ~ -y`A? ' ------- 1------ t------- i------- 1-------1------- 1 r~*--i i i 1 ~~ i fc t* t 3I ? Nf ( 1 _ ..... MONSANTO CENTRAL ENGINEERING DEPARTMENT DRAWING SCHEDULE AND FORECAST SHEET PROJECT TITLE // -? J V- '/? PLANT NAME _ CCA PROJECT NO. S' 3 / f/s Z)/ SS<? 74 PLANT NO__ ___________________ DEPARTMENT NO. _ o/ . DESIGN CATEGORY NO.. JL- ENGINEER SHEET ___ S'. J o/s ; , / OF 2- os , DRAWINC * NO. BEV NO ORAW1N6 TITLE 'Z'/S 1 1 i- - ' -------------- 1 1/^ /ii/'/Si zi l S1 .^c- y/y ' '3y.. ' - . ryss --t------------1--------------1------------1----i ... j ii i DRAWN ev SCHEDULE OATES START RELEASE CHECKED APPROVED Revise RELEASED 12 4 y/6 r//7 /8 S--yi--u7il//: r--r i --i n iSi'#2. //t/C/AJ /ZA S<=//4TsK- s i Joitf>i S/iSAfi i SA/rt / li i /Azc/A/ y.A 04. -Tc h sn A <cX 1------------- i i *- r1 i i rt-- -- s/scr Z. ---------- -- -------------- " -----1 1 r-1 i 1/AS7Z/? coAy/Vc.77aS --i------------ ------------- -- ------------- nS S i - i------------- -------------1-------------1-------------1---------------------------1-------------1--:--1------------1--------------- i SNOK 1 i-----------1------------1-------------1-------------1--------------------------1--------------1------------ -------------1------------- O LT c 1 ................-- ........ -- i " i . EA PROJECT m MONSANTO CENTRAL ENGINEERING OEPARTMEN1 ^'5 Drawing Status Report t f PROJECT TITLE ^fVClOT D/CZStS D/SPOSCll l\/. Q. Krommrich g/4.24_ / y-r / yf r\ . OEPT. COOE AREA TITLE - 3issue DATE . - !- 7/ SHEET NO. __ ENGINEER __ ORAFTING ROOM Agg/g. Eszex> General /. Hansen SQUAD ORAWING NO. i'l . 1-2 DRAWING TITLE SCHEOULEO START COMRUCTC ACTUAL APPROV ED START COMFLE'E SCHED ULED ISSUE actual/ REV. ISSUE NO. EPopip- Arranp.-Peon-- Sh.J-b- ( v 1 n/24 V7/ /70 "'H. . - -r -r :! "" -' 'fe 7o 12/ . /I7/, ho %/ %/->, h~]0 a !0 sh. Ho. 2L ?v/P Arrccrgr pion_ nK 'Ho Hw 1or , `-ho ''Lh\L nz 1 0 T Y, % 1-5 1-4 A-kr-.rjip- Anapg.-PleVP-Dcn ' k- " "'T^-rTr-V..: i-! .1; -- ... -v; Ejuip- Aw<y.-Mleypztxp&-) "do K/7/-, "/4/,, '%ho A.A/70 l *< W -1 1 ZAm/lo i'77 2!//?r "do B/Vr 'K Hn 1 Y\P/j1 / 12/ / / I*1 / 'VTo '/ '7"fe 1-6 Frj'p.Arrang. - Drum nasi $ Ccod) `CL "do '/z777I 2H, Ho Hi 0 % I I I 1-6 'A-l M-ft M-9 vi/-IO M-H Ccndenortic Receiver T---.. * ' = - y~ '"f /'for/f/ic.z.'d .-}-r..r* u' H,. lz/7'//-<? Ho H, 0 h Sli/7 7a/>!< Modification r It. 1-1151, 1-117 it 1- llot ' * '.*T .-j i . :-`l: I'/?/,n L/ T.C/'C "Hi Ho ; 1 5 0 7; DItel1e-d1L16Sf,-1-S1.11lr,7.a..i-.aJ.cI..-..ITI-&ta-n--k- Jdac7tilicaiion -1/2 //"i * K %/ ,2VW Ho ,2H 0 t Equip. Arraps.-Load/ -'a Dialfor/// '^4, -I-.' --r-:- o\r fid Vy; " // Ho ^/7, 0 Ls-latls f r /S..-I-I07 :; .: ^ HV11- ^/ ! 'd Dr,&oi n' S/_. df r k//. r/ /.-/ ' ' " . ' . 7 ' **Tt TMFr V-`` **r*r 'Z -W \ i| ,* /7/7) % VW 0 24 H H, Ho Hi 0 ?4 HONS 095577 _i__ i i "i--:ti-- ' 9 MONSANTO CENTRAL ENGINEERS DEPARTMEN. issue oatc 3. !. 7/. Drawing Status Report sheet ho. _ :E project HO. 2415 4 K/asle DT1TLEPHOJECT rector / _SfX&cd. QeJ^l ENGINEER *LANT NAME. KtrU/T)fy)rf.C^l_______ PI amt no. AREA TITLE - ^_____________OEPT. fnn F3E/J2- xep DRAFTING ROOM ......<Ser?&-Gl/. h'e/Tsa/7 SQU AO DRAWING NO. DRAWING TITLE SCHEDULED TAUT COMPUTE ACTUAL TART COMPLETE APPERDOV SUCLHEEDD ISSUE actual) Irev. ISSUE 1 NO. T 5-/ s-a S-3 - General l/olc-z ....... V ! -.. - / Poundcclion Picul ' . . Pounclalie> i Del?.;/, e Vl.U Do i2/,/ xc.no 7z/n7o %n/o 'y% %y 0 % vylc Do %l b.b/0 %> -vn %n/o ha 1 % l!,> '" r !1C Do HD t *'U Pa! r!0 Ho HA > % S-4 Loading PLallorni 4 L)eL.........j 1^z/jq % 'M H, H 'Ho Hu 0 Hi 5-5 S -6 Yeni Slack. Sane 'eejoper:. Paying Plan 4 Pncl. Del. H, Do %,0 pa! i'J Do Ho 'Ho %h/o 0 12/ >'n Do Do M1 H> 2/% H H,\ 1. ?./ /to 5-7 5-5 S-9 Gie/lcrS/nS fer Dram Occ^yrxr v-l : i H, Do H Hi Hi Ho Hi 1 l*' " - .- - - - -- - ............. "J " . c SopparIn, - Plan 4 Dei. Hint fi-ij.T.-J.- c- tt H Ho Z.CoJlO Hi 'Ho Hh UnLoadne Doc!'-Pinn 4. Sec. ! 1 }.-c>i~/ !~ Do dzdHi Ho Hn Yy-h '11 2/5 1, vi0 \,i/ ------ (------ 1------ 1------ H---- 1------ 1------ 1------ 1-----1------ "I nuns 09si-i,, --1------ i------- 1------1--1------rzn_1 ~ 1 1 -i 1 L 1. 1 _ a- :ea project no. >LART NAME. J2J KONSANTO CENTRAL ENGINEERING DEPARTMEN Drawing Status Report PPRROOJJEECCTTtTiItTuLEe . Is/.::/A/cGATto/4___ _ PLANT HO. . O 3 .DEPT. cooe. AREA TITLE - ISSUE OATE 3- L-7.Y SHEET NO._ ENGINEER _ ts/Pf's.- DRAFTING ROOM /r-p-E '/--y-f; - --~C* drawing NO. XI 17 DRAWING TITLE o A\c C> ^ r.7. L~. \ X SCMSMATICS bH. 1 SCHCOULEO START COMPUETI ACTUAL ARPROV- START COMPLETE ED SCHED ULED ISSUE 'h L5 fc 1^ u_7/ *7n ~7o !-w -7(5 7o -?o H_ RK. t -70 -?! l-7/ ACTuaJ ISSUE | REV. NO. T * 2h 72} !p t r3 "iCHLMAT!C5 L+ . =mcMA'l ICS ' AM. ?. : SH- 3 L*-7l -7 A "-C Lc -7/ V ''^7/ Z 77 JL l Z It 7/ | I * i.... i ' i r f f l iiu- iira f f iii- i- ir r ii l iS B R it t rii iiiiiim M i. IS ------------- 1-------------1-------------1-------------!----------"I--------- n--------------1 1I 16 <G.r0A(SP .- -------------J------------|-------------1-------------]-----------|-------------[--------------|-------------(----------{-------------- 17 IS T3 SPA --------------1-------------1-------------1-------------1---------------------------1--------------1---------*1----------1--------- spare --H-------------1-------------1-------------1---------------------------1 | SPARE 1 I 1 1 l l 1 l 1 1 1 11 np i S"PAe - ri l lii i iT rf | 2 SPAieg L. -------1--------------------------,-------------1-------------|-------------1--------------1-------------1----------I-------------- i ri-2 SPACE "~ i i--i i r~ i i : i. -i - 1r / l 7~ seer: 030/ -oo . vP MONSANTO CENTRAL ENGINEERING DEPARTMENT * . Drawing Status Report . EA PROJECT NO. O A.\^\ PROJECT TITLE 2-1' \ ' -> *a--------\tlKNl-Cv--.'' vx ' ------A----*--'-i---1--f-5V* J1--------------------- LAMT NAME tCf-\____ PLANT NO. Q ^ 14-,_________ DEPT. CODE----- 2~ ^ . REA NO. ____ AREA TITLE . ISSUE DATE ~ J - /J SHEET NO. OF ENGINEER ORAFTlNG ROOM ' SQUAD Ef I 1 _L ORAWING NO. V3 14- DRAWING TITLE UWooT- TOE'NG, LAVoUT- TUSiNGi i. ... ' SH. | . .. SH. Z, SCHEOULEO START COMPLSTC ACTUAL APPROV- EO START COMPLETE IZ 11 Rr. 'T-io -11 To ~~IO %/ iq |Ci-"fo V' -7 O Ht! SCHED ULED ISSUE actual] REV. ISSUE 1 NO. a %/'1. lb i(s-7J t 0 T iS . n 13 spars ' . ` " ' , : , i || 1MS7R. INSrALU. PcTAILS El4. \ ' . 1. Z! int-1 AGO DV.AlUS SH. i - io-lc '1c I RsS. "Z4 -TO I k*-n %, 1 37nr. L^7J ' 1 lo %1X7 ______ l_____ 1 l i? ?( X o 2 Co <0 01 " to c --------------1 1 1 1 1 1 ,. 11 l l l l -----1-----i-----1-----1-----1 ~i i i i i ri iiiiii i i. i' i "i i AC*- ATI 1 11 ' III i ri i ii i ii i ii &C7~. <7*3<y/ -- <70 MONSANTO CENTRAL ENGINEERING DEPARTKEN 2<t/b ^CA PROJECT NO. Drawing Status Report : . PROJECT TITLE ^OC.LOl<?___"7 3 j T____ __ .SPosAc 'CANT NAME- /i*/- :ci - v - -. PLANT NO. /-' r* * --* OEPT. COOS ~f.i. ?-j- AREA TITLE________________________:-------------------------------------------------------- ISSUE DATE 3-1 _PT . K'. JiHUiroM o DRAFTING ROOM SOUAO z--^sT '-tL- vj) drawing NO. -:/ DRAWING TITLE -ZT-'-.MCiM-it. <S\AE.ETt U r-'-.- T - - ?av , SCHEDULEO START COMPLETE ACTUAL APPROV- START COMPLETE SO P' /2? S/ --7/ 5-7o> -V coc.^/Ay -7o SCHED ULED ISSUE v7s actual! ISSUE ' REV. NO. !-7 -71 0 T - -5 -4 -5 r-7 /!/>/- z-'crO . 11 ! 11 1 1 !! `,->rp S'\'-iC<3.MTfo?L SC'.hD</l/c'..:-i,x 7 oo . -?j (Ft'w:r f> -.?-! rf- So 1.) SU.-i L* r ,"^"t. ; -.T' .:* - r . "T`- **'; ' '" ' -70 7,-, CS't-lTKOL -acKetSOS-u A'-'c'A 7^-?-' ('Pt.AMT - 7.;c- r .0 - *>' UUVtl U'.:. - ?<? 7 0. r7c. *7>--\'C 1 C ' . C. [_'* l';--V'.'Ai' - . : . 0v-'--:5~ ^ ti ?- v-; r* J ~r : r - !-'. .'tv r ^ - i-" Moici-;M/a\o*A - top 7cwr/?oc- Sr/SPr^/ ----r rs 1 -cn 1 . 1.-- - 1 I ;r-*------------. JO ~2(> -70 U-7-70 -7o Coz-V/sJ /S-7 (Z. -2/ ~7o `-9f 7o 4'` ~7o /Z-Uo ^-3/ Co.C S/M ~7o (Z. -`i~7 O /z. ~l/ Cozsj/^J - 7-' !? '5' -7o -<L-70 /2'3/ Col. v/aj -7-* "-7/ '7-7/ '7-7/ -7-7/ 7/ 1 ! i li tl | li f-s ------------r-9 r-/o ' ---------------U A/or t/S&a 1 - 1 - 1 - -1 ' -I -I--'- -1: .-"I ~ x To - /Sor // sro 11 ~1 1 1 1 1 1 1 {- C T \/A} A / pas f*Ws&'.s'T- cfC // /Ci _ I<0, vr ; r'.--irrv'^-'-TS'T-r----------5-------- T3-r~: - . yj"- C sm'jUI i i ?r/~er -- / ' '-7s> t'-'M OUT -- COr*s(jiT S TM mv. , 'Vj -?> *2 "'7o I ?r -7i) -uz/ / - </ *- 7- / - . \. i '-7/ ^-7 ' m?o ^-11 Coc L>/rJ Si. w.7/ '-*-70 CaCw/A/ '-7-7/ *'7-7/ Ll-7J ----------- fj 1 '} } -7 ~7i < '7^7/ ->t7/ ~7-7/ l-%7/ 1 la, -7J !~7-?/ 6 4 6 5 fS r / /j > 0 I \ V ir r/ r f r O/i .e* project mo. \ LANT NAME *CA MO. . 01 MONSANTO CENTRAL ENGINEERING DEPARTMENT Drawing Status Report AROCLOJZ UJA^'d jjfSPoSAt- .PROJECT TITLE __ PLANT NO. O ~' _ oept. pqpp 0'* sj 'r~- r _ AREA TITLE - ISSUE DATE ` ____________________ _ SHEET NO. /tSpp ** ENGINEER X- ^oMMSon!_______________ DRAFTING ROOM r-z-s ("cstep) '7. C________ 1 *--* Drawing NO. -13 -15 -J6 -17 DRAWING TITLE SCHEDULED 5TAAT eoMPLtre ACTUAL APPROV- STAftT COMPLETE 0 Sched uled ISSUE X^VTAlt-S <' ^ -----1 *,-'*.**; CiTE^C^ViHitCYTOiAS ^ ' > , Ll.` .- J ' V | J- a- |- .. *'*' i -A ; ; : -{ '.0 :-3J '-7J ^-71 **-7,3 ` -7o ,-z7S ISss. '-l,. %/ -Jl -70 "S' j " ?4> 1?-3' -7o /7 ~,7 **70 r7 -t. it 7-y f '-7-7! IKTc'ScCJUMtaTON'i - /a/C/as'*A7'svy - *.---------p-; /. ;-*rr' f--- Jl,.*. 7 * 'Jr''*' \ Co * -7 < -7o /*. "2 l Cotl'/s" - \ix -7) sc i i e wa . c 5 - i i'I c t: Tiann iM< ca'i --1-----------1 T 1 1 .c ATo r ,_ -.-uH 1 1 11 -- 12 `"-70 '-70 ACTUAL REV. ISSUE 1 NO. f ' ->/ 0 yV4?/ -71 t 7 X t i* -3u 7/ ZCHH.MA~VC.S- 0.'oUt4 !MK CO."> Stt. 2 1-------------1 1 l1 1 1 11 o '-31 -70 -70 '' g I ,v:- t'i ?* 1 1 1 1 1 1 1 11 -------------1-------------1 1 1 1 1 1 !1 2 'O Z <A U1 03 Kj 1 1 1 1 I 1 "1 ~1 1 1 1 ~l 1 1 1 1 1! -------------1-------------1 1 1 1-------------1 1 11 1 1 1 1 1 1 1 11 ~rr i t i i i; l i. i i - , ^ er ^ /f s7/ S&CT 03*/ 00 CEA 24X5 AROCLOR WASTE DISPOSAL JOHN ZINK COMPANY DRAWING LIST Drawing No. CA-DH-421-1 D-DH-1016-1 D-DH-1008-1 A-DH-883-1 B-DH-1228-3(Sh B-DH-1228-3(sh B-DH-1229-1 B-DH-1230-1(Sh B-DH-1230-3(Sh B-DH-1231-1 B-DH-1232-1 B-DH-1233-2 B-DH-1234-2(Sh B-DH-1234-2(Sh B-DH-1235-2 B-DH-1236-2 B-DH-1240-2 B-DH-1260-2 B-DH-1263-3 B-DH-1271-0 B-DH-1272-0 B-DH-1273-0 B-DH-1336-0 B-DH-1350-1 7W-74466 1) 2) 1) 2) 1) 2) Description Detail Quench Water Gun Terminal Block Arrangement "YS" - Pilot Assembly TRC Section Panel Detail for John Zink Thermal Oxidizer schematic Ladder Wiring Diagram Schematic Ladder Wiring and Panel Details Schematic Piping Details John Zink Waste Disposal Assembly John Zink Waste Disposal Assembly Anchor Bolt Plan Combustion Air Duct Assembly John Zink Thermal Oxidizer Quench pot and 360 Platform Detail John Zink Quench Column John Zink Trimmable Venturi Assembly Vent Stack Oxidizer Platform Details Burner Plenum Details Hl-14 Burner Details Step Off, Rest and 360 Platform Design Drawings Platform Fabricated Parts Details Caged Ladder Details Mist Eliminator Center Supprt and Venturi Piping Buffalo Forge Co. Combustion Air Blower (45-3 "CB" - CW-UB-ARR. #8) 5/3/71 MQNS 095583 r CENTRAL ENGINEERING DEPARTMENT - tX^SDtriNG STATUS REPORT AHOCLOfL w'asTf Dr^PasfiU K 2)64,1 HoLorJEvC) T <NtmgcTi PURCHASE OROERS o(K*ior tret* IMl- J/3. a / lUL \0o4-2 y to" U3_ el >Li /'//SC i Stetulxe /-/as oo43yi't\i/3 ej- XdL SfAUlA/g- 2ex/eia //as/* 37.000t)f3 / |Cu.sTo** f/,6#tCAT//*/r sfT'j/j'P DO`/S\ 3a>\ h ''TrffSA*a t- i'f r/oJ 2>f/ou>?si ojecr >u>eo a/. vJaj.jt APPROVAL DRAWINGS 34 .-/ 3/ H3 1yt-j &/4 tf/. -&L -2A - A C C U C ^ S -