Document e7zZ42jwBM1pkBB5Znd686Rpg
imutes the unuc
of the ASBESTOS STUDY CD? PUTTEE Monday, April 2S, IS75, at 9:30 AM Institute Office, E-210 Route 4, Paranus, H.J.
MEMBERS PP.ESE.rr
I. H. Meaver, Chaiman H. Magner A. StJohn (For D. E. Stone) J. Dunderdale E. Feierabend
Raybestos-Manhattan, Inc. Carlisle Corporation Bendix Corporation Royal Industries Abex Corporation
FOR TEE INSTITUTE
E. 17. Drislane yjx PRETEST
Friction Materials Standards Institute
E. P. Stefl M. Jacko
H. K. Porter Co. Bendix Corporation
The meeting was called to order by Mr. Meaver, Chairman, at 9:30 A.H.
mimutes of previous meeting
The Secretary read a summary of the Minutes of the Meeting held June 14, 1974. These cinutes had been released and a notion for their acceptance had been obtained.
Upon notion duly aade, seconded and unaninously passed, it was
RESOLVED: To accept the ninutes of the June 14, 1?74 meeting as distributed.
SUGGESTED t-'OPJC PRACTICES FOR OS'dA STANDARD
In late 1974 the Asbestos Information Association submitted some recommended work practices for manufacturers and fabricators using asbestos friction materials. These were to be sent to 0S7LA for their consideration. OSHA has been considering a new or revised standard in which work practices might be emphasized. Mr. Drislane reviewed the AIA suggested work practices, before they were submitted and made some suggestions for change. A draft on the suggested work practices -was circulated to the membership of this committee.
Raybescos-?Manhattan had cone work on the subject entitled, "Asbestos Dust Control in Brake Service "Centers." It was suggested that these procedures might be applicable for fabricators. There were several suggestions on how