Document e7zEbb85mQDpbk1b70KaQO19g
Schedule for 8th REOHH Course November 16-19, 1982 Case: 48106-7
Befl Laboratories
dam September 22, 1982
hone C. P. Lichterwalner MP 78691 1F-110 X5399
TO: j. M. Degen R. N. Deitchman
M. M. Condie T. J. Hartman P. A. Huggins
P. C. Payne
AT&T NYT
AT&T
R. C. Petersen D. Rainer W. J. Schreibeis M. M. Weiss
F. X. Worden - WECo
Attached is a proposed schedule for the 8th RFORH Course scheduled for November 16-19, 1982, in Lisle, Illinois. Please let me know any suggestions you have for changes or corrections. I would also like to remind you that we are preparing course notes for this session, so I will need your "extendended abstracts" (1 to 2 pages) by October 15, 1982.
If there are any questions, I can be reached at (201) 582-5399.
13f- 78691-CPL-mpb
Charles P. Lichtemcalner
Attachment As Above
Copy to R. W. Stone, M.D. - AT&T
J. E. Reese
S. H. Wilkening
LLA 00166?
t
RECOGNITION AND EVALUATION OF OCCUPATIONAL HEALTH HAZARDS BSCTE- Uak, Mttoit
November 16-19, 1993
8:30-9*3 9*3-9*$ 9:43-10:30 I0c30-I0t50 10-30-11:13 11:13-1300 12:00-1 JO 1:30-2:30 3:30-2:30 2:30-3:30
6:30
8:304:10 9:10-1030
iojo-iojo 10:30-12*0
12*0-130 1:30-1:43 1:45-3:13 2:13-3*0 3*0-3:30 3:30-4:13 4:15-3:00 6:00
Gnetitiaa. Pmaota General Ptiodvka Bapoiure Criteria BREAK Exposure Criteria (contd.)
Current Direction* ofOSHA
LUNCH Air Contaminant*
BREAK Air Contaminants Laboratory (Personal Sampling Pomps, Detector Tubes, Combustible Gas Indicators)
DOWER
ignis;! CPL FXW
FXW JMD
PAH
TJH, PAH, ,CM, PC?
Wedaasdas 11/17/13 Comal BTL L H. Studies Air Contaminant* Laboratory (coaid.)
BREAK Air Contaminants Lob. (coatd.)
LUNCH ATAT / OSHA Ameament oa Lea4 Standard Indoor Air Pofletioe Asbestos BREAK Respirators Medical Management DINNER
WJS TJH, PAH. CPL.PCP
TJH, PAH, CFL.PCP
JMD DR JMD
DR JPD
--- J
LLA 001668
130-9:30 9*.30-1000 1000-10:20 10:20-10:40 10:40-11.-00 11:10-11:30 11:301200 12001:30 1130100 2003:30
3:303:30 3:303:30
630
8:309:30 9:3010:13 10:15-10:30 10.3011:13
11:13-11:43
11:43-11-00 1100
Titnday 11/18/M Air Coatnminania Review Radiation Photomet k Fiber Optics BREAK RF / Microwaves Video Display Terminal! Effects of Noise LUNCH Noise Measurements Noise Lab. (Sound Level Meten, Noise Dosimetry)
BREAK Noise Lab (eoatd.)
DINNER
Friday nn9jn
Noise k Radisiion Review 1. H. Chat Histories BREAK Indoor Air Pollution Lab
Course Wrapup (Post course assignment. Where to get assistance. Suggested iestroments. References) Conclusion. Evaluation LUNCH
CPL MMW RCP
RCP MMW CPL
CPL TJH, PAH. CPL, PCP
TJH, PAH, CPL. PCP
CPL RWD
RWD, TJH. PAH, CPL. PCP CPL
JMD
RECOGNITION AND EVALUATION OF OCCUPATIONAL HEALTH HAZARDS BSCTE - Lida, Moots November 16-19, 1982
8:30-8:45 8:45-9:45 9:45-10:30 10:30-10:50 10:50-11:15 11:15-1230 12.00-1JO 1J0-130 1-30-2:50 150-530
6:30
830-9:10 9:10-1030
1030-10:50 1030-1230
11-00-1:30 1:30-1:45 1:45-115 115-3:00 3:00-3:30 3:30-4:15 4:15-5:00
Taeaday 11/16/82 Greetings, Parpose General Principles Exposure Criteria BREAK Exposure Criteria (contd.) Coireot Directions of OSHA LUNCH Air Contaminants BREAK Air Contaminants Laboratory (Posonal Sampling Pomps, Detector Tabes. Combustible Gas Indicators) DINNER
JMD, CPL CPL FXW
FXW JMD
PAH
TJH.PAU, CPL.PCP, DR
Wednesday 11/17/88 Current BTL1. E Studies Air Contaminants Laboratory (contd.)
BREAK Air Contaminants Lab. (contd.)
LUNCH AT&T / OSHA Agreement on Lead Standard Indoor Air Pollution Asbestos BREAK Respirators Medical Management
WiS TJH, PAH, CPL.PCP. DR
TJH, PAH, CPL, PCP. DR
JMD DR JMD
DR JS------------
LLA 001670
8JO-9:30 9:36-I04P 1040-1030 1030-10:40 10:40-11."00 11:10-11 JO 11:30-1240 12:00-1 JO 1:30-2:15 2:15-3:00
3:00-330 3:20-5:30
6:30
8:3O-9J0 9:30-10:15 10:15-10:30 10:30-11:15
11:15-11:45
11:45-1240 12.-00
Thursday 11/18/83 Air Contaminants Review Radiation Lightwave BREAK RF / Microwaves Video Display Terminals Effects of Noise LUNCH Noise Measurements Noise Lab. (Sound Level Meters, Noise Dosimetry)
BREAK Noise Lab (contd.)
DINNER
FiMw 11/19/81 Noise A Radiation Review 1. H. Case ISstoria BREAK Indoor Air Pollution Lab
Course Wrapup (Post course assignment. When to get assistance. Suggested instruments. References) Conclusion, Evaluation LUNCH
PAN MMW RCP
RCP MMW AHK
CPL TJH, PAH. AHK, CPL, PCP
TIH, PAH, AHK. CPL. PCP
CPL RWD
RWD.TJH, PAH, CPL, PCP CPL
JMf>
LLA 001671