date: ^une 13, 1991
from: Nora Jacobs
subject: VI Media Coverage
* Communications Committee Electrical Materials Council Pipe Resource Organization Vinyl Packaging Council VIGOR
copies to:
Roy Gottesman Bob Burnett Meredith Scheck Dave Meeker Pat Gallagher Dan Stanowick John Opdycke
Enclosed are a variety of items taken from the clips in the last few months. This will be the last shipment of clips in this format.
Effective next month, we will begin a new process for tracking news coverage related to vinyl recycling and other environmental topics, which will be included in a monthly monitoring report distributed to members of the Packaging Council, VIGOR and the Communications Committee.
In order to make sure that members of the three marketing task forces continue to receive coverage related to the pipe, electrical and packaging markets, I've asked Pat and Dan to forward these items to you directly.
Please call if you have any questions or concerns.
CTL027140
IB66A-24S
PLASTICS
WEEKLY
RAUCH 25, m
'tin*
Video demonstrates pressure pipe tapping
Dallas--Uni*BeII PVC Pipe Asso ciation offers a 15-minute video that directs construction field crews on proper procedures for
tapping PVC pressure pipe. Copies of the video are avail
able in English, French and Span ish. Uni-Bell works cooperatively with the Vinyl Institite's Pipe Re source Organization of Wayne, NJ. For information, call Uni-Bell
in Dallas at (214) 243-3902 7/
Bacon's
isA-II'.
PUBLIC HIS WISE
riCNTI-i.Y 25TH RISC.
Technical Information
Directory on PVC Pipe
-u
615. This publication lists nearly 70 research re ports and technical papers from various sources, covering topics such as specifications for highway drainage systems and thawing procedures for wa
ter mauls. PRO, The Pipe Resource Organization, The Vinyl Institute. Edison. NJ,
Bacon's
11A--540
67A-780
SEES JOWL,
21,500
MONTHLY 10TH
III in VII fill
3>* 7-
PVC Pipe Training Vid o Available to Contractors
WAYNE, N.J.--A new 15-minute video program directing construction field crews on procedures for tapping PVC pressure pipe, is being offered from Uni-Bell PVC Pipe Association, reported The Vinvl Institute.
The new video reportedly provides specific instructions for wet and dry direct, and saddle tapping of PVC pipe, announced the Institute. It also includes segments on proper equipment selec tion, site preparation and step-by-step procedures for actual tapping opera tions, it was added.
"Applications for PVC pipe are con tinuing to grow in both new and replacement piping systems," comment ed Robert Walker, executive director of Uni-Bel. "This video was produced to educate current and potential handlers and installers about the safety and ease with which PVC pipe can be tapped."
The Institute added that copies of the video are available in English, French and Spanish in VHS format. For more information contact Uni-Bell PVC Pipe Association at 2655 Villa Creek Drive, Suite 155, Dallas, TX 75234, or phone (214) 243-3902.
37.71ll
45,000 BI-HONIH'.Y 1SI
FEBRUARY 1??1
Associations
A new 15-minute video program that directs construction field crews on the proper procedures for tapping PVC (polyvinyl chloride) pressure pipe is available from Uni-Bell PVC Pipe Association, the international association of PVC pipe manufacturers. The video provides specific instructions for wet and dry direct and saddle tapping of PVC pipe. It includes segments on proper equipment selection, site preparation, and step-by-step procedures for actual tapping operations. For a copy of the video, contact: Uni-Bell PVC Pipe Association, 2655 Villa Creek Dr., Suite 155, Dallas, TX 75234: 214/2433-3902.
CTL027141
Sho h ne Municipal Wat r Supply Joint Pow rs B ard Project l.
lJ
The 45-inch pipe casing was designed to be supported by abut ments at each side of the river and by a single pier, and the carrier pipeline was reduced from 36- to 24-inch in diameter for the crossing. As a result, the rocky, narrow channel was spanned successfully and the aesthetic beauty of the area preserved.
The below-grade crossings of the Shoshone River were 500-ft. spans and each required two weeks to cross. Contrac tors used a "Port-a-Dam" to divert the flow of water to one side, so workers could install pipe on the protected side of the river channel. The pipeline was buried beneath eight inches of cover. Project specifications also required the use of several forms of cathodic protection on steel portions of the pipeline. Deep-well anodes installed along the length of the line were used on treated-water sections, and galvanic ribbon anodes were used on the other steel portions.
Stage II
High mountain construction and an extremely short work season confronted workers and engineers during con struction of the recently-completed Stage II water diversion project. The $115 million project, which includes a system of water diversion structures, two reservoirs and two under ground pipelines, provides water for Cheyenne, Wyoming's capital city.
A project of the Cheyenne Board of Public Utilities, Stage II takes water from the Little Snake River drainage and diverts it through a 3800-ft. tunnel under the Sierra Madre Mountains for release into Hog Park Reservoir. The reservoir was enlarged and is designed to hold 22,600 acre-ft. of water. The water in Hog Park Reservoir is then released into the Encamp ment River and eventually into the North Platte to replace water Cheyenne diverts from the North Platte drainage at
10 Pipeline Digest/March 1991
Douglas Creek to transfer to Cheyenne.
Trouble On The Little Snake River Diversion System
The biggest portion of the work - The Little Snake River Diversion System - ran up a cost in excess of $40 million and was five years behind its original 1985 completion schedule. Work at the site began in 1982 and was accomplished slowly due to a June-to-September construction season on its loca tion in the Medicine Bow National Forest. The job included cut and cover placement of reinforced concrete ranging from 72- to 15-inch in diameter, and improvement of the hydraulic characterisdcs of the tunnel under the Continental Divide.
Numerous water quality violations - including 97 in 1985 and 27 in 1986 - led the U.S. Forest Service to require more substantial reclamation of the area and mitigation for areas damaged as a result of the project. The work included replace ment of all 32 major diversion structures and a soil cementing process to stabilize the ground around the structures so they are less likely to be damaged during spring runoff.
The Douglas Creek water is stored in the 325,000 AF Rob Roy Reservoir, which also was enlarged as part of the project. From Rob Roy, water is transported through about 60 miles of 30-inch steel pipeline to Crystal and Granite Reservoirs near Cheyenne for use as municipal water.
Work on the pipeline from Rob Roy began in 1986, and cost the city about $47.3 million. Pipe installation was com pleted using three crews: trenching, pipe laying, and backfill and compaction. Wheel trenchers and track excavators were used to dig the pipe trench, and a Henry Pipe Laying Machine was used to install the pipeline. Crews averaged about 450-ft. of pipeline daily, but on maximum production days installed up to a mile of line.
CTL027142
k
n r--
II ^ -
ature Projects Sheridan Area Water System Project
pipeline ranging up to 16-inch in diameter. An additional phase of the project calls for construction
of about 16 miles of steel transmission line in diameters up to
Construction is expected to begin this summer on the $55 24-inch, from Big Goose Valley to the Sheridan Treatment
million Sheridan Area Water System Project, according to Plant. Other plans for the distribution system include the
Wally Koch, an engineer for the WWDC. The project, which expansion of Sheridan's water treatment plant and the combi
is scheduled for completion by 1995, is being built by the nation and enlargement of two reservoirs on Big Horn Moun
Sheridan Area Water Supply - Joint Powers Board comprised tain.
of three city councilmen and three county commissioners.
"It's basically a system serving a rural area," Koch says. Rock Springs
The distribution system was prompted by an Environmental
In southwest Wyoming, consulting engineers will soon
Protection Agency (EPA) ruling that showed more than 100 be hired to design the final version of a $23 million water
- rural tsps to be in violation of the agency's standards, Koch distribution system for Rock Springs, WY, Zelenka says.
says. The result will be the construction of a system that is Construction of the system is projected by the summer of
expected to meet the water needs of Sheridan County for the 1993. The project will divert water from the Green River
next 20 to 50 years.
through the city of Green River to Rock Springs. Construc
The Sheridan system has been divided into five phases. tion is expected to include placement of 13 miles of 30-inch
One phase, the $4 million Big Goose Valley Water Distribu steel pipeline and an additional eight miles of smaller diame
tion System, is being designed by Centennial Engineers and ter transmission line.
Research, Inc. of Sheridan. It will convert an existing 16-inch
Other phases include construction of an intake facility at
raw water transmission main to a treated water main that will the Rock Springs treatment plant, and erection of a booster
serve the taps currently in violation of EPA standards. The pump station and four water-storage tanks.
project involves cut and cover placement of about 23 miles ofJ With an eye to the future, WWDC engineers also will
Another water line section of the project, the Little GooseBig Horn Water Distribution System, will cost about $18 million and involves the placement of about 50 miles of
continue to study the feasibility of expanding Casper's distri bution system and will review many smaller projects that upgrade the water systems of townships within Wyoming.