Document e7rvK18n6oy9NkM5Lx68vBOg9

/ I N T ERt or F ' c c MEMO TENNECO CHEMICALS, INC To G. I. Rozand at Piscutaway J. T. Sweeney at Flemington Bendix VCM Monitoring Data Analysis Flemington Plant October 11, 1975 to 0ctober24 , 1975 DATt November 6, 1975 Copy to W,, D. Bord De M, Hcrshkowitz P. A,, Lobo W. Hiringoff F,, X,, Ritter M, K. Rosen P,, R* S carl to F. Toca Attached is the subject analysis. COLOR!TE 006427 'oint No. RE-1 RE-2 RE-3 Bendix Monitoring Data Analysis Flemington Plant October 11, 1975 - October 24, 1975 Readings (PPM VCM) Point Location Center Aisle, Fiist Floor Remarks: Problem is believed to be the result of reactor washouts - washing frequency has been reduced by 507,. Total 966 >5 13 >25 3 RE-4 No. 1 and 2 Slurry Pumps, First Floor 966 16 z RE-5 RE-6 Remarks: problem is believed to be the result of chip basket washouts - more data is being generated. RE-7 RE-8 Recovery Compressor Room Remarks: Intermittent leaks in vacuum pump and compressor systems. 992 93 RE-10 RE-11 RE-12 Center Aisle, Second Floor i Remarks: General ventilation problem related to reactor ventilation, reactor washout and vent condenser discharge. Engineering estimate is now being prepared covering relocation of reactor ventilation. Vent condenser discharge has been relocated, data being generated 970 46 6 RE-13 RE-14 RE-15 Stripper Platform, Panel board area Second Floor Remarks: General ventilation problem . as for RE-10, RE-11, RE-12. 975 75 7 RE-16 Knock-out Tanks, Second Floor Remarks: No defined source as yet. 325 23 3 >100 1. 0 0 0 0 0 i COLORITE 006428 'oint No. !E-17 Bendix Monitoring Data Analysis Flemington Plant _ October llj 1975 - October 24 1.975 Readings (PfM VCM) Point Location West Wall Between Styrene Tank, Se.cond Floor Remarks: No defined source as yet possibly vent condenser or compressorroom. Vent condenser discharge has been relocated. Total 360 >5 20 >25 1 IE-18 Gelatin Make-Up Area, Second Floor 650 44 4 IE-19 Stairwell, Second Floor Remarks: No defined source as yet possibly vent condenser or compressor room. >10 1 0 GENERAL AREA ) Quality Control Labs Westj Remarks: Inadequate ventilation Engineering re-design in work Priority 1 project. 1-9 VCM Pumps Remarks: Pump seal leakage - ultimate solution is conversion to "canned" pumps. Engineering is working on the development of a suitable pump. 1-10 Tank Car Unloading Remarks: Ilose disconnect operation Engineering is currently working on re-design - priority 2 project. 253 313 313 2 52 44 00 80 51 COLOR!TE 006429 Bendix Monitoring Data Analysis Flemington Plant . October 11, 1975 - October 24 , 1975 Readings (PPM VCM) COLORITE 006430