Document e7NyOyQezozRwBX84YdNRY8my
Occidental Chemical Corporation
TO: Attendees - 1989 VCSA Meeting
DATE: September 22, 1989
FROM:
Jim Kachtick
SUBJECT: Summary of Feedback Questionnaires from Last Year's Meeting
At last year's VCSA meeting the attendees were asked to complete a question naire providing feedback on the individual presentations, proposed topics for next year, and comments on the arrangements/organization of the meeting. Forty one questionnaires (from nearly 2/3 of the attendees) were received.
Attachment 1 provides a summary of the evaluations and comments on the individual presentations.
Attachment 2 provides a listing of the general comments about the meeting.
Attachment 3 is a comprehensive listing of the topics suggested for future meetings.
Another feedback questionnaire will be completed by the attendees at the end of this year's meeting.
R&s 029109
(90-89) JWK:pbc attachments
OXY
PVC Resins and Compounds Division 4403 LaPorte Rd. P.O. Box 849 Pasadena, TX 77501 (713) 884-4000
ATTACHMENT I 1988 PRESENTATIONS - SUMMARY OF FEEDBACK QUESTIONNAIRES
1. Public Communications Well received Would like USA (or other county) experience next year
2. European Regulatory Update . Well received Provide handout . Emphasize new developments next year Cover impact of 1992 EEC consolidation next year
3. U. S. Regulatory Update . Well received Provide handout Highlights only next year
4. Risk Communication Well received Don't repeat (unless brief update on TRCP) Not specific to PVC/VCM
5. Drug & Alcohol Program Well received Don't repeat (for one company's program) Consider survey of member companies for next year
R&S 029110
R&S 029111
6. Ethylene Fire in Feed line to Oxy Reactor Well received Should have been in "true confessions"
7. OSHA Star Program Well received - new info for many attendees Don't repeat (unless brief update)
8. Emergency Reactor Kill System . Mixed reception . Consider survey of member companies to give update on industry operations for next year
9. EPA Litigation Update Well received by U.S. attendees; less so for non-U.S. Consider very brief update for next year (with handout)
10. VCM Containment Well received
. Don't repeat (unless review of Formosa's operating problems etc.)
11. Quality Control of Safety Equipment . Mixed reception Consider survey of member companies for next year
12. Vinyl Institute Presentation Generally well received Too long
. Condense next year's presentation to highlights Handout well received
Angiosarcoma Registry Update Generally well received Much too long/hard to follow Less medical details Need handout Condense next year's presentation to highlights
3J
fio
W o to (o
to
True Confessions Very well received; attendees consider this the heart of the meeting Consider a more standardized format Consider renaming "case studies"
. Consider broader definition to include: 1. Near misses 2. Situations not necessarily associated with incidents
ATTACHMENT 2
GENERAL COMMENTS
1. Have speaker announce at start of talk if he has handouts. 2. Try to provide copies of slides, copy of complete presentation or out
line/abstract for all presentations. 3. Move "true confessions" session to earlier in the meeting so it can
serve as a catalyst/thought-stimulator. 4. Redirect thrust of meeting back to more "nuts S bolts" safety/environ
mental issues 5. Furnish name tags for attendees on first day 6. Provide blank overheads and pens for on-the-spot drawings etc.
R&S 029113
ATTACHMENTS
PROPOSED FUTURE TOPICS
1. Waste handling/PVC disposal 2. Changes in the labor force 3. Thickness testing on metals in critical services 4. Survey on shortstop systems 5. Materials of construction/corrosion experiences 6. Survey on gasket materials 7. Detection systems for fugitive VCM emissions 8. Waste water treatment 9. VCM incineration 10. Superfund project experience 11. PVC dust exposure programs 12. Legal aspects of drug testing 13. Resin dust explosions 14. Tattletales on RD/RV systems 15. Impact of TCLP/TOC regulations 16. Environmental audits 17. Hurricane preparation 18. Specifications for valves, pumps etc. in VCM service 19. VCM emissions reported under SARA (Title III) 20. Survey on progress in reducing VCM emissions 21. Erosion testing/prevention of erosion 22. Performance of seal-less pumps in VCM service 23. Survey on company drug programs 24. Innovative company safety programs
R&S 029114