SUBJECT: Asbestos Removal-PDC . Hydrocarbon Changehouse and Firehouse
ADDRESS: BR Tower
DATE: . ; >V:r. 01/12/88
-
We have reviewed the.. job scope for the removalsofasbes;tos-; from the PDC changehouse and firehouse. The following:criteria?will give the contract ..workers..^maximum protection and wili,-,comp.ly4with the asbestos standard." We would appreciate several ^aysT.3ho`t;ice' prior to
the asbestos removal.-
1. Industrial hygiene will perform the initial-monitoring to determine airborne- concentrations of asbestos. .
2. These areas'must be established as,a regulated^area. Only
authorized personnel may enter regulated areas;.; No
smoking/ eating or drinking is permitted . in'^regulated areas. Warning signs must be posted at^ailJapproaches to
regulated/areas. The sections of changihouse^being.used for changing and showers must be sealed off /from .the
asbestos removal.
- ...s;
3. The use of wet methods and proper containment is required in preparing the lines for cutting. The ends of asbestos insulated lines must be encapsulated before removal from
the building.
4. Supplied-air respiratory protection is' required and the program must be in accordance with the General Industry Respiratory Protection Standard 29 CFR 1910.134.
5. The contract workers are required to wear disposable Tyvek clothing over disposable work clothing. The Tyvek clothing must be removed prior to smoking/ eating or drinking.
6. A changehouse facility must be provided with appropriate clean room and decontamination area facilities. Showers are mandatory at the end of the workshift.
ETH 00022?
.sbestos Removal - PDC Changehouse and Firehouse Page Two
7. The lunchroom must be in a separate area away from-the regulated area.
8. A training program on asbestos will be presented by industrial hygiene to all contract workers.
9. Asbestos waste, debris, .and contaminated clothing must be disposed of in sealed, labeled, impermeable bags.
-;/4
10. A medical surveillance program is required . prior to . . assignment for all .employees who will be required .to...wear'.
.negative pressure respirators or . who will be exposed?to'- ' 0/;\
airborne conceritrhtiqns ^of 'asbestos at or above the action .
t
i
t a w r i____________ /_
\ s: * 1^'.
n*
ji^AJJs- \'v*//':' ' '
-rcall if'
rour':-a.b& V:--/.
have
Jit"'
~v- '
'
^My?ew
-4- ' *
;y':' *J`
'*fV ^fW^v cDonham - PDC
^DfE^Goin's - PDC
-Grimes - PDC
;L. Guretsky - PDC
D.E. Johnson - BRT
? -
b.R. Lynam - BRT
G.B. Meyers/W.C. Hulon - BRT
P.J. Sanders - BRT
G.L. Ter Haar - BRT
File: PDC - Asbestos Removal
1594C
ETH 000228