Document e5mrOQdwaazrj2Dvvn0xqGjaq

INDUSTRIES PPG INDUSTRIES, INC. CHEMICAL DIVISION - U.S. P. 0. BOX 1000 LAKE CHARLES, LA. 70602 April 10, 1990 Mr. Tom Coerver Department of Environmental Quality Air Quality Division P 0 Box 44096 Baton Rouge, LA 70804-4096 Dear Mr. Coerver; Re: Quarterly Fugitive Emission Report In accordance with the provisions of LAC 33:III.2121.F, the PPG Industries Lake Charles Complex is hereby submitting its quarterly fugitive emission monitoring report for the period of 1/01/90 through 3/31/90. Attached for your review are the following tabulations and summaries for this quarter. The 0.34 percent of valves leaking value once again demonstrates that the PPG Complex is at the "good performance level" for the quarter. Attachment I Attachment II Attachment III Attachment IV Attachment V Attachment VI Attachment VII Attachment VIII Attachment IX Attachment X Attachment XI Attachment XII Attachment XIII Complex Performance Summary Test/Repair Summaries Delayed Repair Summary Turnaround Repair Summary EDC #1 Unit Data EDC #2 Unit Data VDCM Unit Data Tri-Ethane II Unit Data Ethyl Chloride Unit Data Per/Tri Unit Data Waste Treatment Unit Data CPC Unit Data VCM II Unit Data All other required monitoring not otherwise listed was performed. Items listed in Attachment IV, Turnaround Repair Summary, are SL 025490 those believed to risk higher emissions if repair is attempted without a unit shutdown. If you have any questions regarding this report, please call me at (318) 491-4326. Respectfully, lllfi'jb. O. Esther S. Liggicr Environmental Engineer Certified Mail/Return Receipt Requested les SL 025491 Attachment i DARBDNNE SERVICES. INC. PPG INDUSTRIES. INC. QUARTERLY REPORT SUMMARY AND GOOD PERFORMANCE ^or Perico Ended 03/31/TO Tot:;.I Number of Components Monitored "otal Number of Components Leaking: Total Number of Components Repaired: ^563 41 T.E GOOD PERFCRMANCE LEVEL umber of Valves Monitored: Number of Valves Leaking: 'dumber of Valves Repaired: Q307 71 30 7. of Valves Leaking: 7. of Valves Repaired: .3 93. All monitoring of fugitive emissions has been performed as required by -Tr- 11.11 of the Louisiana Air Qual ty Regulations. P"G INDUSTRIES, INC. riqna tu^'2 1ltle l?-7-90 finqiMtsA. Q Date to SL 025492 Attadnmnfcr II Page 1 DARBONNE SERVICES INC PPG INDUSTRIES. INC. p.O. BOX 1000 LAKE CHARLES LOUISIANA 70602 PLANT SUMMARY TEST ACTIVITY SUMMARY FOR THE PERIOD 01/01/70 through 03/31/90 COMPONENT TYPE SERVICE NUMBER OF COMPONENTS -----------IN UNIT TESTED LEAKING REFAIRED -------- PERCENT -------LEAKING REPAIRED V-T ) \'(= ; ^ 1 V'cr 3 AS 1778 IGHT LIQ 7536 1753 7462 5 26 5 25 Pump LIGHT LIQ. 251 250 9 9 Compress or GAS 66o0 FRV GAS 58 57 0 0 -`RV LIGHT LIQ. 33 o0 , C? .35 3.6 o 0 o 100 96.2 100 0 0 0 COMPONENT TYPE SERVICE Valve F ump Compress or -`RV = = 3SS= 1^=32==? ALL ALL ALL ALL GRAND TOTAL SUMMARY BY COMPONENT TYPES - NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED 9314 251 6 91 9215 250 6 90 3 9 0 0 xo 9 0 0 *9662 **9561 a j ***39 -------- percent --------LEAKING REPAIRED .34 _.* ti 6) 0 0 96.8 100 0 0 42 97.5 * 424 components were deleted from service and 37 were added. ** 100 components are out of service and 1 component is a previous shutdown item. 'Tt component went cn shutdown. !! It II II It II 11 it it ii It ll 11 II ll ll ll it 11 ll ll il ll 11 11 li II 11 11 ll li ll llIilI II 11 11 t! II li It II II 11 II It li !1 II II II ll i: ii II 11 II it II ll N II II II II II SL 025493 T 6G TYPE '.5D.:u' Remarks REPAIR DETAILS TEST DATE ATT.REP.DATE ANT.REP.DATE Attachment II Page 2 3729E Valve 01-26-90 01-26-90 TI3HTEN BACKING 3739 Pump 01-26-90 02-07-90 REPLACED PUMP SEAL 3322 Valve 01-26-90 01-26-90 TIGHTEN PACKING 3943 Valve 01-26-90 02-07-90 REPACKED VALVE 1BACKING 3943 Valve 01-26-90 01-26-90 CLOSED y'ALVE -310 Valve 01-13-90 01-18-90 TIGHTEN PACKING 4612 Valve 01-23-90 01-23-90 "ISHTEN PACKING 4613 Valve 01-23-90 01-23-90 TIGHTEN PACKING 4654 Valve 01-23-90 01-23-90 TIGHTEN PACKING -T-664 Valve 01-23-90 01-23-90 ^ TIGHTEN PACKING Pd20 "'ump TIGHTEN SEAL 01-26-90 02-09-90 * 6606 Valve 01-26-90 02-01-90 TIGHTEN PACKING 6332 Valve 01-23-90 02-07-90 REPACKED VALVE PACKING 6332 Valve 01-23-90 01-30-90 LIGHTEN PACKING 3 J" ty a I 01-23-90 01-23 '90 TIGHTEN PACKING/SHUTDOWN ITEM 1653 Valve 01-23-90 01-26-90 TIGHTEN PACKING 6333 Valve 01-23-90 01-23-90 TIGHTEN PACKING 1?A3 Pump 01-23-90 01-26-90 REPLACED SEAL "029 Pump 01-23-90 01-26-90 REFLACED SEAL "03 3 ~'ump REPLACES SEAL 01-23-90 01-30-90 Ti69 Pump REPLACED SEAL 01-23-90 01-30-90 . "355 u mp '! SHIER. SEAL 01-18-90 01-ln-90 01-26-90 02-07-90 01-26-90 02-07-90 02-07-90 01-18-90 01-23-90 01-23-90 01-23-90 01-23-90 02-09-90 02-01-90 02-07-90 02-07-90 04-30--" 0 01-26-90 01-26-90 01-26-90 01-26-90 D1-30-P0 01-30-90 01-19-90 St 025/v9^ '..0019 Valve 01-1 ?0 T" I GHTEN PACKING 5474 Valve 01-19-90 TIGHTEN PACKING 53.1 Valve 01-19-90 TIGHTEN PACKING 3594 yalvg 01-19-90 TIGHTEN PACKING - 5 74 - uit. p REPLACED SEAL 01-23-90 11399 Valve 01-29-90 REPLhCED VALVE 1234^ Valve 01-30-90 REPACKED VALVE PACKING 12346 Valve 01-30-90 TIGHTEN PACKING 12445 Valve 01-30-90 OVERHAULED 12430 Valve 01-30-90 rIGHTEN PACKING .2567 Valve 01-30-90 TIGHTEN VALVE CAP 12567 Valve 01-30-90 INSTALLED CAP 12593 Valve 01-30-90 TIGHTEN PACKING ...3062 Pump 01-30-90 SWITCH PUMPS 13105 Valve 01-30-90 A TIGHTEN PACKING W5230 Valve 01-30-90 REPACKED VALVE PACKING 13230 Valve 01-30-90 ~IGHTEN PACKING 13257 Valve 01-30-90 REPACKED VALVE PACKING 13257 Valve 01-30-90 TIGHTEN PACKING TIT; ''aive 01-30-90 TIGHTEN PACKING 13283 Valve 01-30-90 TIGHTEN PACKING 13294 Valve 01-30-90 TIGHTEN' PACKING 13294 Valve 01-30-90 TIGHTEN PACKING 13296 Valve 01-30-90 GHTEN PACKING T'30*T Tal /= 01-30-90 ~IGHTEN PACKING L33C7 Valve 01-30-90 TIGHTEN PACKING 13569 .'aive 01-30-90 TGHTEN PACKING a^K?69 Valve 01-30-90 3 --""C' pACKTNG 01-19-90 01-22-90 01-22-90 01-22-90 01-23-90 01-30-90 02-09-90 02-02-90 02-12-90 02--02--90 02-09-90 02-01-90 01-30-90 02-01-90 01-30-90 02-09-90 02-02-90 02-08-90 02-02-90 02-T2-90 02-02-90 02-01-90 01-30-90 02-02-90 02-01-90 01-30-90 02-01-90 01-30-90 SL 025495 01 -- -' ' '0 01-22-90 01-22-90 01-22-90 01-23-90 01-30-90 02-09--90 02--09--90 02-12-90 02-02-90 02-09-90 02-09-90 01-30-90 02-01-90 01-30-90 02-09-90 02-09-90 02-08-90 02-08-90 T2-02-90 02-02-90 02-01-90 02-01-90 02-02-90 01--01--90 02-01-90 02-01-90 02-01-90 Attachment II Page 3 Attachment III PPG INDUSTRIES, INC. Quarterly Report Listing of Items Not Repaired Within 15 Days For Period Ended 03/31/90 Page 1 Rag #\ Description Location Secondary Stripper Feed FCV Stream EC Uni tN Last Unit Shutdown Ethyl Chloride 6/39 Date Leak Located: Date Repair Completed: dumber of Days to Repair: 01/23/90 Date Component Rechecked: Readinc on Recheck: Da !;e Main tenance Attempted: 01/23/90 Date Repair Anticipated: 04/30/90 Reason for Repair Delay; Requires shutdown to repair SHIFT TANK PCV TOP DECK WTU CPC Date Leak Located: Date Repair Completed: Number of Days to Repair: 12/20/39 Date Component Rechecked: Reading on Recheck: Date Maintenance Attempted: Date Repair Anticipated: Reason for Repair Delay: 01/31/90 Shutdown Required for Repair 4; currently on Shutdown, due to be repaired within the next couple of weeks. Unit will be up again in June, 1990. Sl 2S496 Date: 03/01/''C- Attachaauf IV PPG INDUSTRIES. INC, Quarterly Report Items Awaiting Turnaround For Repair For -eriod Ended 03/31/90 Page I Lnat: Ethyl Chloride Tag #\ .Description_______________ 6S46 Valve in Gas Service Unt: WTU CPC Tag #\ .Description_______________ 11945 "V in Sas Service Last Unit Shutdown: 06/89 Next Turnaround: 04/30/90 __________ Location __________________ Secondary Stripper Feed FCV Last Unit Shutdown: Next Turnaround: 01/31/90 __________ Location _________________ Shift Tank PCV Top Deck Si 025 497 Attachment; V Page l 3ARB0NNE SERVICES INC, PPG INDUSTRIES. INC. F'.O. BOX 1000 LAKE CHARLES LOUISIANA 70602 EDC #1 'E5T ACTIVITY SUMMARY FOR THE ~'ERIOD 01/01/90 through 03/31/90 COMPONENT TYPE SERVICE - NUMBER OF COMPONENTS -----------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED 'O/vp GAS 25 s <vo _IGHT -IQ. 554 ~ump '_IGHT LIQ. . :-j "i pr0S5 o c lj hS jL PFV GAS 4 TV LIGHT LIQ. 5 *- =sas=;sias=5ss`S3 ==sc==as^sssss 544 ^ '"0 4 5 00 J5 00 o0 o0 00 srsss=sssss3sss3=s^sss o . *1 0 0 0 o 0 100 0 0 0 0 II II II II It II It ll II II II II II II IIII n ii ii n li ll ii ll II II II II II II II iIIlII II II II II II II II 11 II II II II II li II II II II II li II II t; il ii II il 11 ll II ll COMPONENT "TYFE SERVICE Va 1 ve "Limp Ccmpresso r FRV := = ^=: = = =s ALL ALL ALL ALL GRAND TOTAL ii II II II ll ll ll ll ll SUMMARY BY COMPONENT TYPES NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED 579 O 9 612 569 9 = =S = = = = = = *602 5 0 0 0 5 5 0 0 0 5 -------- PERCENT -------LEAKING REPAIRED .37 0 0 0 35 . S3 100 0 0 0 3ft = 31 =3 = 33SS = 3= = 100 10 components were out of service. St TYPE ~pai r Remark5 REPAIR DETAILS TES~ DATE ATT. ->:EP, DATE ANT,,REP.DATE Attachment V Page 2 4340 . Va;ve 01-18-90 TIGHTEN PACKING -16 L 2 Va 1 ve 01 -23-90 TIGHTEN PACKING 4613 Valve 01-23-90 TIGHTEN PACKING 654 Valve 01--23--90 TIGHTEN PACKING 664 Valve 01-23-90 TIGHTEN PACKING 01-18-90 01-23-90 01-23-90 01-23-90 01-23-90 01-18-90 01-23-90 01-23-90 01-23-90 01-23-0 SL 025^99 Attactaaentr VX Page 1 DARBQNNE SERVICES INC PPG INDUSTRIES. INC. =.0. BOX 1000 LAKE CHARLES LOUISIANA 70602 EDC #2 ~EST ACTIVITY SUMMARY FOR THE PERIOD 01/01/90 through 03/31/90 COMPONENT TYPE SERVICE ----------------- NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED GAS 66 66 1 1 .* -_* ' v e LI 3HT LIQ. 2^9 279 n LIGHT LIQ. 12 12 1 i -'Si GAS i 1 00 cr* qa iv, LIGHT LIQ. 0 1.5 .72 3.3 0 0 100 100 100 0 0 COMPONENT TYPE SERVICE Valve Pump ~'RV , ALL ALL ALL GRAND TOTAL SUMMARY BY COMPONENT TYPES ----------------- NUMBER OF COMPONENTS -----------IN UNIT TESTED LEAKING REPAIRED 345 .12 3 345 12 3 '3 1 0 3 i 0 360 360 4 4 -------- PERCENT -------LEAKING REPAIRED .87 8.3 0 100 100 0 1.1 100 0^ & Ao tvpe Repair Remarks REPAIR DETAILS Attachment VT Page 2 test date at-.ref.date ant.rep.date Valve 01-26-90 -1Sf-TEN PACKING Rump 01-26-90 REPLACED PUMP SEAL -322 Valve 01-26-90 TDGHTEN PACKING 794.5 Valve 01-26-90 REPACKED VALVE PACKING 7945 Valve 01-26-90 CwCSED VALVE 01-26-90 02-07-90 01-26-90 02-07-90 01-26-90 01-26-90 02-07-90 01-26-90 02-07-90 02-07-90 SL 025501 Attachment vir DARBONNE SERVICES INC. PPG INDUSTRIES, INC. P.C. BOX 1C00 LAKE CHARLES LOUISIANA 70602 VDCM TEST ACTIVITY SUMMARY FOR THE PERIOD 01/01/90 through 03/31/90 COMPONENT TYPE SERVICE ----------------- NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED Valve GAS S3 S3 0 0 Valve LIGHT LIO. 700 _ 700 0 o -'..imp LIGHT LIO. 28 28 0 0 PR*v GAS 9900 PRV LIGHT LIQ. 4 4 0 0 0o 00 00 oo 0o 1 1 1 t 1 1 1 COMPONENT TYPE SERVICE ye PRV ALL ALL ALL GRAND TOTAL SUMMARY BY COMPONENT TYPES ----------------- NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED 7S3 28 13 7S3 23 13 '0 O 0 0 0 0 824 824 O 0 -------- PERCENT -------LEAKING REPAIRED .0 0 0o 00 00 025502 SD Attachment Vlir Page l OARBONNE SERVICES INC. PPG INDUSTRIES. INC. =, 0 . BOX 1000 LAKE CHARLES LOUISIANA 70602 TRI-ETHANE II TEST ACTIVITY SUMMARY FOR THE PERIOD 01/01/90 through 03/31/90 COMPONENT TYPE SERVICE ----------------- NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED v' 3. ^ V =? GAS 175 171 0 0 '/a i vo LIGHT LIQ 1008 1007 1 l Pump LIGHT LIQ. 42 42 1 1 RV GAS 44oo PRV LIGHT LIQ. 2 2 0 0 0 . 09 2.4 0 0 0 100 100 0 0 ll ll ll ll tl II II II II It II II II II II II II II II ll II II II ll ll II ll ll II ll II II II II II II II II II II SUMMARY BY COMPONENT TYPES COMPONENT ^ TYPE SERVICE NUMBER OF COMPONENTS -----------IN UNIT TESTED LEAKING REPAIRED Valve Pump PRV ======== ALL ALL ALL GRAND TOTAL 1183 1178 42 42 66 ======:===:==;===: =5= 1231 *1226 1 1 0 2 1 1 0 -------- PERCENT -------LEAKING REPAIRED . 08 2.4 0 100 100 0 .16 4 oo * - components were out of service. SL 025503 Attadmentr IX Page l OARBONNE SERVICES INC. PPG INDUSTRIES P.O. BOX 1000 LAKE CHARLES LOUISIANA 70602 ETHYL CHLORIDE TEST ACTIVITY SUMMARY FOR THE PERIOD 01/01/90 through 03/31/90 COMPONENT TYPE SERVICE ----------------- NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED 1 e/ a / GAS 181 163 1 1 Valve LIGHT LIO. 374 374 O 1 Pump LIGHT LIO. 15 15 4 4 PRV GAS 3 00 PRV LIGHT LIG. 6 6 0 0 .61 _'-w* 26.7 0 0 100 50 100 0 0 COMPONENT TYPE SERVICE Valve Pump ='RV ALL ALL ALL GRAND TOTAL il II II II II It II II tl II tl II II II It II II II II ii ll ll II ll II ll ll ll ll II II It II ll ll ll ll ll II II II SUMMARY BY COMPONENT TYPES ----------------- NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED 555 15 9 /W Vi' 15 8 -3 4 0 4 0 H II II It II II II II II II ll II ll II ll ll ll 579 *560 7 **6 -------- PERCENT -------LEAKING REPAIRED . 55 26.7 0 1.3 66.7 100 0 =as k=ss=ss tss s: 85.7 # 19 components were out of service. 1 component went on shutdown. Ll u if il !l II tl ll il ll SL 025505 Attachment IX Page 2 AS TYPE Repair Remarks REPAIR DETAILS TEST DATE ATT.PEP.DATE ANT.REF.DATE 6832 Valve 01-23-90 REPACKED VALVE PACKING 6832' Valve 01-23-90 TIGHTEN PACKING 6846 Valve 01-23-90 TIGHTEN PACKING/SHUTDOWN 6853 Valve 01-23-90 TIGHTEN PACKING 6353 Valve 01-23-90 TIGHTEN PACKING 5C43 Pump 01-23-90 REPLACED SEAL "7029 Pump 01-23-90 REPLACED SEAL 7053 Pump 01-23-90 REPLACED SEAL 7169 Pump 01-23-90 REPLACED SEAL 02-07-90 01-30-90 01-23-90 ITEM 01-26-90 01-23-90 01-26-90 01-26-90 01-30-90 01-30-90 02-07-90 02-07-90 04-30-90 01-26-90 01-26-90 01-26-90 01-26-90 01-30-90 01-30-90 O^506 5^ Attachment X Pag 1 DARBONNE SERVICES INC PPG INDUSTRIES. INC. P.D. BOX 1000 LAKE CHARLES LOUISIANA 70602 PER TRI TEST ACTIVITY SUMMARY FOR THE PERIOD 01/01/90 through 03/31/90 COMPONENT TYPE SERVICE ----------------- NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED Val ve GAS 476 476 0 0 'alve LIGHT LIO 2258 2211 4 4 -ump LIGHT LIQ. 64 63 1 1 -RV GAS 5500 PRV LIGHT LIQ. 4 4 0 0 o . 13 1.6 0 0 0 100 100 0 0 SUMMARY BY COMPONENT TYPES COMPONENT SERVICE ----------------- NUMBER OF COMPONENTS--------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED Valve Pump PRV ALL ALL ALL il II U ll n ll ll ii . GRAND TOTAL II if ll tl II II ll ll ll 2734 2687 4 4 .15 64 63 1 1 1.6 9900 0 ssssstsms:=3==as=== ========== ==:ic==^3ii=^5S3=== tS = = =4 = = = = 2807 *2759 5 5 .18 100 100 0 r loo * 48 components were out of service. St 025567 Attachment X. Page 2 TAG_ TYPE Kepair Remarks REPAIR DETAILS TEST DATE ATT.REP.DATE ANT.REP.DATE 9358 Pump TIGHTEN SEAL 10019 Valve TIGHTEN PACKING 3474 Valve TIGHTEN PACKING 8531 Valve TIGHTEN PACKING 3594 Valve TIGHTEN PACKING 01-18-90 01-18-90 01-19-90 01-19-90 01-19-90 01-19-90 01-19-90 01-22-90 01-22-90 01-22-90 01-19-90 01-19-90 01-22-90 01-22-90 01-22-90 SL 025508 Attachment XX Pag 1 CARBONNE SERVICES INC. PPG INDUSTRIES. INC. P.D. BOX 1000 LAKE CHARLES LOUISIANA 70602 WASTE TREATMENT UNIT * TEST ACTIVITY SUMMARY FOR THE PERIOD 01/01/90 through 03/31/90 COMPONENT TYPE SERVICE ----------------- NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED Valve GAS 248 246 0 0 Va 1 v LIGHT LIQ . 847 831 0 0 Pump LIGHT LIQ . 27 27 1 1 Compressor GAS n 4a o 0 PRV GAS 4400 0 0 3.7 0 0 0 0 100 0 0 SUMMARY BY COMPONENT TYPES COMPONENT A TYPE SERVICE NUMBER OF COMPONENTS -----------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT --------LEAKING REPAIRED !1 H il II II II li II II II II II II II It II II It II Va 1 ve Pump Compressor PRV ======s= = ALL ALL ALL ALL GRAND TOTAL 1095 27 4 = ======S==;s 1077 27 2 4 1128 *1110 00 00 11 3.7 100 00 00 00 00 ======t===5S==; ======^==35ttl 11 .09 100 * IS components were out of service SL 025509 AG TYPE Repair Remarks REPAIR DETAILS Attachswa*r XI Page 2 TEST DATE ATT.REP.DATE ANT.REP.DATE 11574 Pump REPLACED SEAL 01-23-90 01-23-90 01-23-90 SL 025510 Attachment XII Pag I 3ARB0NNE SERVICES INC. PPG INDUSTRIES, INC. *.0. BOX 1000 LAKE CHARLES LOUISIANA 70602 WTU CPC TEST ACTIVITY SUMMARY POR THE PERIOD 01/01/90 through 03/31/90 COMPONENT TYPE SERVICE ----------------- NUMBER OF COMPONENTS -----------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED V*L v'=* 1 /e* Pumo PRV PRV GAS l.IGHT LIQ. LIGHT LIQ. GAS LIGHT LIQ. 117 361 10 2 5 117 361 10 2 5 0 1 0 0 0 0 0 0 0 0 u 0 COMPONENT TYPE SERVICE Valvs Pump "RV ALL ALL ALL GRAND TOTAL SUMMARY BY COMPONENT TYPES ----------------- NUMBER OF COMPONENTS ----------IN UNIT TESTED LEAKING REPAIRED 478 10 7 478 10 7 *1 0 0 1 0 0 495 495 1 1 -------- PERCENT -------LEAKING REPAIRED .21 100 00 00 20 100 SL 025511 Attachment XIIX Page 1 DARBONNE SERVICES INC. PPG INDUSTRIES, INC. P.0. BOX 1000 LAKE CHARLES LOUISIANA 70602 VCM II TEST ACTIVITY SUMMARY FOR THE PERIOD 01/01/90 through 03/31/90 COMPONENT TYPE SERVICE ----------------- NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED V *3* 1 V 0 GAS 407 407 -7 -r Valve LIGHT LIQ 1155 1155 11 11 Pump LIGHT LIQ. 31 31 1 1 Compressor GAS *7 *7 4* 0 0 PRV GAS 26 26 0 0 PRV LIGHT LIO. 5 5 0 0 a 74 * t w* -p ^ 0 0 o 1O0 100 100 0 0 0 ii II II II II II II II II II COMPONENT TYPE SERVICE Valve Pump Compressor PRV ALL ALL ALL ALL GRAND TOTAL SUMMARY BY COMPONENT TYPES ----------------- NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT --------LEAKING REPAIRED 1562 31 2 31 1626 1562 31 7 31 =a===a=s 1626 14 1 0 0 15 14 .39 1 T <-% '-a1 Jim 00 00 = ==A =S==S ========== 15 .92 100 100 0 0 100 II ll ll ll ll II tl It II tl if ll ll ll ll ll ll ll ll ll 1! II II II II SL 025513 TAG TYPE "epair Remarks REPAIR DETAILS Attachment: XIII Page 2 TEST DATE ATT.REP.DATE ANT.REP.DATE 12346 Valve 01-30-90 REPACKED VALVE PACKING 12346 Valve 01-30-90 TIGHTEN PACKING 12445 Valve 01-30-90 OVERHAULED 12480 Valve 01-30-90 TIGHTEN PACKING 12567 Valve 01-30-90 TIGHTEN VALVE CAP 12567 Valve 01-30-90 INSTALLED CAP 12598 Valve 01-30-90 TIGHTEN PACKING 13062 Pump 01-30-90 SWITCH PUMPS "105 Valve 01-30-90 TIGHTEN PACKING 3230 Valve 01-30-90 REPACKED VALVE PACKING 3230 Valve 01-30-90 TIGHTEN PACKING 13257 Valve 01-30-90 REPACKED VALVE PACKING 13257 Valve 01-30-90 TIGHTEN PACKING 13270 Valve 01-30-90 TIGHTEN PACKING 13283 Valve 01-30-90 TIGHTEN PACKING 13294 Valve 01-30-90 TIGHTEN PACKING 13294 Valve 01-30-90 TIGHTEN PACKING 13296 Valve 01-30-90 TIGHTEN PACKING 13307 Valve 01-30-90 TIGHTEN PACKING 13307 Valve 01-30-90 TIGHTEN PACKING .13569 Valve 01-30-90 TIGHTEN PACKING 13569 Valve 01-30-90 TIGHTEN PACKING 02-09-90 02-02-90 02-12-90 02-02-90 02-09--90 02-01-90 01-30-90 02-01-90 01-30-90 02-09-90 02-02-90 02-08-90 02-02-90 02-02-90 02-02-90 02-01-90 01-30-90 02-02-90 02-01-90 01-30-90 02-01-90 01-30-90 02-09-90 02-09-90 02-12-90 02-02-90 02-09-90 02-09-90 01-30-90 02-01-90 01-30-90 02-09-90 02-09-90 02-08-90 02-08-90 02-02-90 02-02-90 02-01-90 02-01-90 02-02-90 02-01-90 02-01-90 02-01-90 02-01-90 SL 025514