Document e5EwEq6X3v6DbeNKN56d3xoVg

Report Date: Clean Air Act Inspection Report June 2, 2025 I. Background Inspection Date: May 22, 2025 Inspection Type: Partial Compliance Evaluation EPA Inspector: EPA Reviewer: Facility Name: Davianna Vasconcelos, Enforcement and Compliance Assurance Division, Air Compliance Section DAVIANNA VASCONCELOS Digitally signed by DAVIANNA VASCONCELOS Date: 2025.06.02 15:07:11 -04'00' John Melcher, Senior Enforcement Coordinator, Air Compliance Section Digitally signed by JOHN JOHN MELCHER MELCHER Date: 2025.06.04 10:08:20 -04'00' Westside Wastewater Treatment Plant ICIS Air ID#: CT0000000900109107 Facility Location: 205 Bostwick Avenue, Bridgeport, CT 06605 Mailing Address: 695 Sea View Avenue, Bridgeport CT 06607 Disclaimer: Unless otherwise noted, this report describes conditions at the facility/property as observed by EPA inspector(s), and/or through records provided to and/or information reported to EPA inspector(s) by facility representatives and as understood by the inspector(s). This report may not capture all operations or activities ongoing at the time of the inspection. This report does not make final determinations on potential areas of concern. Nothing in this report affects EPA's authorities under federal statutes and regulations to pursue further investigation or action. Inspection Attendees: Name Davianna Vasconcelos John Marcin Lauren Mappa John Pereira Dan Gibran Title Environmental Engineer Project Director General Manager Head of Maintenance Plant Electrician Organization EPA R1 InfraMark, LLC Water Pollution Control Authority Bridgeport InfraMark, LLC InfraMark, LLC Facility/Process Description: The Westside Wastewater Treatment Facility (WWTF) processes combined stormwater and sewage wastewater for the Bridgeport area. The facility treats the wastewater using physical separation and biological treatment. The facility discharges treated effluent to the Long Island Sound. WWTF is owned by the City of Bridgeport Water Pollution Control Authority Bridgeport (WPCA) and operated by InfraMark, LLC. WWTF operates 24 hours a day, 7 days a week with no major shutdowns. Potentially Applicable Federal Air Regulations: The following federal air regulations may be applicable to the Facility: 40 CFR Part 60 Subpart IIII - Standards of Performance for Stationary Compression Ignition Internal Combustion Engines 40 CFR Part 63 Subpart ZZZZ - National Emissions Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines 40 CFR 63 Subpart JJJJJJ - National Emission Standards for Hazardous Air Pollutants for Industrial, Commercial, and Institutional Boilers Area Sources Previous Enforcement Actions: A Detailed Facility Report from EPA's Enforcement and Compliance History Online database indicates that there have been no informal or formal Clean Air Act enforcement actions taken by EPA against Westside Wastewater Treatment Plant with respect to this facility in the past ten years. II. Inspection EPA inspector Davianna Vasconcelos coordinated the inspection with John Marcin, of InfraMark. Ms. Vasconcelos arrived at the facility at approximately 9:30 a.m. A. Opening Conference: Ms. Vasconcelos met Mr. Marcin in the parking lot of the facility and followed him into the main building conference room where she met Lauren Mappa, of WPCA, Dan Gibran, of InfraMark, and John Pereira, of InfraMark. Ms. Vasconcelos presented her credential and explained the purpose of the inspection was to conduct a partial compliance evaluation in compliance with the Clean Air Act. Mr. Marcin said that Page 2 of 4 InfraMark is contracted to operate the facility. Facility representatives provided the information described in the Facility/Process Description, above. Ms. Mappa said the contract between WPCA and InfraMark was signed in January 2024 and expires in June 2035. Facility representatives did not know the facility's North American Industry Classification System (NAICS) code and said they would try to find it following the inspection. Mr. Marcin confirmed the facility has two generators, three boilers, and one hot water heater. Mr. Pereira said that one of the boilers has been decommissioned and the facility plans to replace the boiler within the next year. Mr. Marcin said there was no history of non-compliance in respect to these emission sources. Mr. Marcin said there was no complaints of odor in respect to these emission sources in the last 12 months. Mr. Marcin said the generators do not have an operation schedule and are tested regularly. Mr. Marcin said the generators are only used as needed and do not participate in a demand response program. Facility representatives said that the generators previously participated in a demand response program but were removed from the program approximately 10 years ago. B. Facility Tour At approximately 10:00 a.m., facility representatives led Ms. Vasconcelos on the facility tour. 1. Control Building Facility representatives led Ms. Vasconcelos to the Control Building boiler room. Ms. Vasconcelos inspected the Control Room Boiler and the Hot Water Heater. See Attachment 1 for boiler and hot water heater information. Mr. Pereira said the hot water tank was installed in 2018. Ms. Vasconcelos observed the tank of the hot water heater had the following written notes on the tank including, but not limited to, the following: - Tank installed 8/13/2018 - Replaced thermocouple 1/28/2021 - Tank flushed and T&P Relief 9/8/2021 2. Main Pump Building At approximately 10:15 a.m., facility representatives led Ms. Vasconcelos to the Main Pump Building boiler room. Ms. Vasconcelos inspected the Main Pump Boiler. See Attachment A for boiler information. Ms. Vasconcelos observed the boiler had the following written note on the outside housing including, but not limited to, "Tested 10/4/2019." 3. Generators At approximately 10:25 a.m., facility representatives led Ms. Vasconcelos to the generators. Ms. Vasconcelos inspected the two generators. See Attachment A for engine information. Mr. Pereira said the generators use heating diesel. Page 3 of 4 4. De-gritting Building At approximately 10:45 a.m., facility representatives led Ms. Vasconcelos to the De-gritting Building. Ms. Vasconcelos inspected the decommissioned boiler. See Attachment A for boiler information. C. Closing Conference At approximately 11:00 a.m., Ms. Mappa and Mr. Marcin led Ms. Vasconcelos back to the facility conference room and Ms. Vasconcelos initiated a closing conference. Ms. Vasconcelos asked for facility representatives to provide the facility's NAICS code if they find it. Ms. Vasconcelos asked for facility representatives to send a copy of a recent diesel fuel receipt to confirm diesel type. Ms. Vasconcelos provided the facility representatives with general compliance assistance including the Potentially Applicable Federal Air Regulations listed above. Ms. Marra and Mr. Marcin said no Confidential Business Information (CBI) was discussed during the inspection. Ms. Vasconcelos departed the facility at approximately 11:20 a.m. Page 4 of 4 Attachment A: Emission Source Information ID / Name Location (Building) Manufacturer Model # Serial # Manufacture Date Installation Date Max Capacity (units, hp, kW) Hour meter (Y/N; if Y, meter type & # of hrs) Fuel Type Purpose Emergency Use (Y/N) Demand-Response (Y/N) Annual Maintenance Date last tested (if at all) Generator Information #1 #2 Generator Housing Caterpillar Caterpillar unknown unknown 25Z04032 25Z04034 unknown unknown 1994 1994 2168 hp 2168 hp Y - physical - 461.2 Y - physical - 389.4 diesel diesel Entire plant - both generators come online when needed; if one of the generators does not come online, the other will carry the load of the whole plant Y Y N N Y - in-house Y - in-house Tested monthly (manual) Tested monthly (manual) ID / Name Location (Building) Manufacturer Model # Serial # Fuel Type Manufacture Date Installation Date Rating Purpose Boiler Information Control Building Boiler Main Pump Boiler Control Building Main Pump Building Bryan Smith Cast Iron RV600-W-FDG-WLX-KD-4 28A-9 75271 28A-9-090272 Natural Gas Natural Gas 1994 1994 2015 4800 MBH 2,232,000 Btu/hr Heating Heating De-gritter Boiler (decommissioned) De-gritter Building Bryan RV200-W-FDG-WLX 75285 Natural Gas 1994 1600 MBH Heating Hot Water Heater Information ID / Name Control Building Hot Water Heater Location (Building) Control Building Manufacturer Rheem Model # PRO+G75-76N RH Serial # Q161836487 Fuel Type Natural Gas Manufacture Date 04/2018 Installation Date 2018 Rating 75,000 BTUH Purpose Domestic Hot Water