UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
*REGION 1
ENVIRONMENTAL
AGENCY5 POST OFFICEB OSSTQOUN,A RMAE ,0 21S0U9-I3T9E12
100
PROTEC
Finalized Date:Dated as shown on electronic signature
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination
System (" NPDES ")
Wuxi Biologics Construction
From:Andrew Spejewski, Inspector
Digitally signed by Spejewski,
Spejewski, Andrew Andrew
Date: 2022.07.22 10:04:09 -04'00 '
Thru:David Turin, Environmental Scientist
To:File
I. Facility Information
A. Facility Name:Wuxi Biologics Construction
B. Facility Location:305 Belmont St
Worcester, MA 01605
C. Facility Contacts: Bob Kelly, The Cardinal Group
120 Presidential Way
Woburn, MA 01801
617-595-8946, bkelly@cardinalgroupusa.com
D. NPDES ID No (s).: MAR1002MZ
II. Background Information
A. Date(s) of inspection: May 26, 2022
B. Weather Conditions: Clear, Dry
C. US EPA Representative(s):
Andrew Spejewski
D. State / Local Representative(s): Eric Flint, City of Worcester Conservation Agent
ED_019088A_00019864-00001
E. Federally Enforceable Requirements Covered During the Inspection:
EPA construction stormwater general permit
F. Previous Enforcement Actions: No federal actions known
III. Type and Purpose of Inspection
Unannounced evaluation of compliance with EPA's construction stormwater general
permit
IV. Facility Description
The site is a commercial building under construction that encompasses approximately
8acres. The site is on the corner north of Belmont Street and west of Hospital Drive. The
site slopes generally down toward the south, and down towards both the east and west
sides. The west side discharges towards Belmont Street; according to Mr. Flint, the
catchbasins in this area drain to the Worcester combined sewerage system (and thence to
the municipal sewage treatment plan). The east side drains to Hospital Drive and Belmont
Street; according to Mr. Flint, the catchbasins in this area are a separate storm sewer that
drains to Lake Quinsigamond.
At the time of the inspection, construction was active. Nearly all of the site had been
cleared and graded and the building foundation in the center of the site was partly
complete.
Several construction office trailers are situated just north and uphill of the main site.
V. Inspection
Mr. Spejewski and Mr. Flint arrived at the site unannounced at about 12:15 PM. A site
worker directed them to the construction office trailers at the north side of the site.
A. Opening Conference / Records Review
At the trailers, they found Gerard Koferl, Superintendent for The Cardinal Group. Mr.
Spejewski presented his credentials.
Mr. Koferl was able to show on a computer the SWPPP and copies of operator site
inspection reports. At Mr. Spejewski's request, a copy of one inspection report was
emailed to him that day (a copy is saved in the inspection file).
B. Facility Tour
The area around the trailers was fairly flat and either covered with grass or a wooden
walkway. A short slope down from the trailer area to the main site was stabilized.
2
ED_019088A_00019864-00002
Along the north side of the main site was a line of stockpiles. The western ones were
partially covered with clear plastic sheeting. They all appeared to have been recently
worked.
The northern half of the west edge of the site was slightly below the surrounding terrain.
The slope was protected with rip - rap where it was steep. Drainage running south along
the border was protected generally with rip - rap; there were several storm drain inlets
along the drainage that discharge to Worchester's Combined Sewerage System. Belmons
Street, which receives discharge from the site, has storm drains; along the western half of
the site they drain to the combined system, while those further east drain to Lake
Quinsigamond.
The southern edge of the site had silt fence just inside a chain - link fence along Belmont
Street. There was a five - yard wide area of recently disturbed bare dirt next to the fence;
otherwise there was either rip - rap or a couple - yard wide strip of well - established grass
immediately inside the fence. Along much of the western part of the south edge, newly
graded dirt sloped steeply down to the grass. There was no sign of significant sediment
deposits against the fence. This area sloped down to the southwest corner of the site.
According to Mr. Koferl, an underground infiltration chamber had been completed in this
area, but was not yet connected.
To the east, the site sloped down to the southeast corner. Belmont street was at or above
the level of the site. An informal basin with rip - rap sides was located partly down the
slope. Drainage ran down the slope to the east, through rip - rap / gravel, over a section of
pre - existing pavement, and to a shallow informal basin in the southeast corner. The basin
had silt fence along its outside border.
Along the east side of the site, the southern half was sloped down to the east. A section
had fiber netting with new grass growing through; the rest was covered by well-
established grass. A catchbasin inlet at the foot of this slope was surrounded by silt
fence; the surrounding area was established grass.
Farther north, a large temporary detention basin was in place. A portable pump was next
to the basin, with hoses leading to the southeast basin.
The active site entrance was in the northeast corner. The entrance had a gravel and stone
base. A truck was parked near the exit (facing out) and a worker was hosing it off. Mr.
Koferl said trucks were washed off before leaving. The wash area drained to the
temporary basin.
D. Closing Conference
Mr Spejewski and Mr. Fox thanked Mr. Koferl for his time and left the site.
Picture List:
3
ED_019088A_00019864-00003
IMG 2641.JPGFacing west along north side of stockpiles north side of site
IMG 2642.JPGFacing west over northwest corner of site
IMG 2643.JPGFacing south from northwest corner of the site
IMG 2644.JPGCenter of west edge of site
IMG 2645.JPGFacing south edge of site, near western end
IMG 2646.JPGFacing east along south edge of site, from near west end
IMG 2647.JPGConcrete waste, center of south part
IMG 2648.JPGFacing east over temp basin, center of south edge
IMG 2649.JPGFacing east to southeast corner
IMG 2650.JPGDrainage to southeast corner
IMG 2651.JPGSlope at east end of site
IMG 2652.JPGInlet near center of east edge
IMG 2653.JPGFacing south and east to southeast corner
IMG 2654.JPGEntrance center of east edge
IMG 2655.JPGTemporary basin, north - center of east side of site
IMG 2656.JPGFacing northeast over temp basin to northeast corner
IMG 2657.JPGFacing west over temp basin
IMG 2658.JPGFilter system at temp basin west end of site
IMG 2659.JPGTruck at truckwash area northeast entrance
IMG 2660.JPGDetail at northeast entrance
IMG 2661.JPGFacing west along stockpile near north of site
** END **
Mr. Spejewski and Mr. Flint departed at approximately 1:00 PM
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
4
ED_019088A_00019864-00004