APPENDUM TO S.P.C.C. PLAN RCRA HAZARDOUS WASTE CONTINGENCY PLAN
July 21, 1986
A
S *t 1
PREPARED BY:
R. A. Frohrelch Director of Environmental Control
CERTIFIED BY:
Theodore F. Ly6n P. E. MS No. 9680
i
-i
VAB.0001174907
'A --
I-
.- .,i <
APPENDUM TO S.P.C.C. PLAN RCRA HAZARDOUS WASTE CONTINGENCY PLAN
Contents
I. INTRODUCTION II. EMERGENCY COORDINATOR III. EMERGENCY PROCEDURES IV. ARRANGEMENTS WITH LOCAL AUTHORITIES
V. AREAS COVERED BY CONTINGENCY PLAN VI. REPORTING VII. AMENDING EMERGENCY PROCEDURES VIII. EQUIPMENT
A
r
tf " r-
t
lr : s
VAB.0001174908
RCRA HAZARDOUS WASTE CONTINGENCY PLAN
4
I. INTRODUCTION
Section F, Subpart D (402.7-50 to 402.7-56) of the Mississippi Hazardous Waste Management Regulations require an owner or operator of a hazardous waste management facility to have a contingency plan for his facility. The Contingency Plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned release of hazardous wastes to the air, soil, or surface waters. The plan Includes provisions for an emergency coordinator who will assess the possible hazards of any spill, fire or explosion of hazardous waste. The Emergency Coordinator will implement the Contingency Plan if he deems the emergency situation threatens human health or the environment.
Hazardous wastes which are managed at the Aberdeen Plant phthalic anhydride, API sludge, waste barium, cadlum or lead stabilizers, and any waste mixtures containing significant amounts of barium, cadmium, or lead stabilizers. The areas of the plant which are covered under the Contingency Plan are the hazardous waste drum storage area, the API separator and slop oil tank.
II. EMERGENCY COORDINATOR
At all times, there must be at least one employee on the facility premises or available to respond within a short period of time to an emergency situation involving hazardous wastes. This person has the responsibility for coordinating hazardous waste emergency response measures.
The Emergency Coordinator must be:
1. Familiar with the plant layout.
2. Familiar with the location and characteristics of the hazardous wastes handled.
3. Familiar with hazardous waste related operations and activities at the plant.
4. Familiar with hazardous waste related records within the plant.
5. Familiar with all aspects of the plant's Contingency Plan.
6. Have the authority to commit the resources necessary to implement the Contingency Plan.
VAB.0001174909
HAZARDOUS WASTE CONTINGENCY PLAN
II. EMERGENCY COORDINATOR - Continued
The following people will serve as emergency coordinator for the area affected by a hazardous waste emergency.
DRUM STORAGE AREA AND COMPOUND AREA
PLANT EXTENSION
HOME PHONE
Paul Kober - Primary Charles Worlow - Alternate Dick Frohreich - Alternate John Friend - Alternate Joe Ware - Alternate
API SEPARATOR
3616 2292 3609 3606,3607 3610
369-7096 369-2269 1-328-3628 369-7377 1-327-5018
Ted Lyon - Primary Jerry Horstman - Alternate Dick Frohreich - Alternate John Friend - Alternate Joe Ware - Alternate
3622 3625 3609 3606,3607 3610
1-329-2721 369-6005
1-328-3628 369-7377
1-327-5018
In the absence of the department heads, the department head will designate another person to perform his duties. This designee will become the primary Emergency Coordinator for the area affected by a hazardous waste emergency.
III. EMERGENCY PROCEDURES
The plant has an emergency plan which is implemented in the event of any plant emergency. The plan is included in Section 1.23 of the Plant Safety and Health Manual. In addition to this plan, the Emergency Coordinator must evaluate any emergency situation involving hazardous wastes and determine if the RCRA Hazardous Waste Contingency Plan is to be implemented. If the plant is implemented, the Emergency Coordinator has the following responsibilities:
A. Take all reasonable measures necessary to ensure that fires, explosions, and releases do not occur, recur, or spread to other hazardous waste. These measures include, where applicable, stopping processes and operations, collecting and containing released waste, and removing or isolating containers.
B. Monitor for leaks, pressure buildup, gas generation, or ruptures in valves, pipes, or other equipment, wherever this is appropriate, if the facility stops operation in response to the emergency.
C. Provide for treating, storing, or disposing of recovered waste, contaminated soil or surface water, immediately after the emergency.
D. Ensure that in the affected area(s) no waste which may be Incompatible with the released material is treated, stored, or disposed of until cleanup procedures are completed.
If there are any questions concerning the proper handling of hazardous wastes or the means by which a hazardous waste spill should be cleaned up, contact the Director of Environmental Control.
VAB.0001174910
RCRA HAZARDOUS WASTE CONTINGENCY PLAN
4
IV. ARRANGEMENT WITH LOCAL AUTHORITIES
The following verbal agreement has been made with the local fire department: If outside assistance is required and requested, the firemen who come Into the plant will operate under the guidance and leadership of the Shift Supervisor involved with the emergency.
V. AREAS COVERED BY THE CONTINGENCY PLAN
A. Hazardous Waste Drum Storage Area
The hazardous waste drum storage area is the diked and fenced in area south of the east warehouse. This area is used for the storage of drummed hazardous wastes and other drummed materials.
B. API Separator A Slop Oil Tank
The API separator which Is located east of the plasticizer tank farm is used to reclaim oils from the waste water generated during the plasticizer operation. Waste oils which cannot be reclaimed are stored in the slop oil tank just south of the API. Waste oil from the slop oil tank is periodically shipped to Stauffer Chemical Company who burn the oil for heat recovery.
VI. REPORTING
If the Emergency Coordinator determines that the plant has had a spill or fire that could threaten human health or the environment outside of the Plant, the National Response Center (1-800-424-8802) should be contacted immediately. The following personnel are authorized to contact the National Response Center:
Director of Environmental Control Chief Process Engineer Senior Process Engineer Plant Superintendent Plant Manager Vinyl Operations Superintendent Compound Operations Superintendent Mechanical Superintendent
Dick Frohreich Veldon Messick John Cole Joe Ware John Friend Dave Hollis Paul Kober Ted Lyon
1-328-3628 1-327-0741 1-323-5135 1-327-5018
369-7377 369-6422 369-7096 1-329-2721
In the event that the Hazardous Waste Contingency Plan is implemented, the time, date, and details of the incident are to be recorded in operating records of the unit affected. Within 15 days of the incident, a written report of the incident must be submitted to the State Solid Waste Division. The report is to include the following information:
1. Name, address, and telephone number of the plant.
** I HI '
:t
VAB.0001174911
I
RCRA HAZARDOUS WASTE CONTINGENCY PLAN
VI. REPORTING - Continued
2. Date, time and type of incident (fire or spill).
3. Name and quantity of material(s) involved.
4. The extent of injuries, if any.
5. An assessment of actual or potential hazards to human health or the
environment.
.6 Estimated quantity and disposition of recovered
laterial that
resulted from the incident.
VII. AMENDING EMERGENCY PROCEDURES
The Contingency Plan must be reviewed and amended, if necessary, whenever:
A. Applicable regulations are revised.
B. The plan fails in an emergency.
C. The plant changes in its design, construction, operations and maintenance in a way that i taterially Increases the potential for releases or hazardous wastes or hazardous waste constituents.
VIII. EQUIPMENT
A. Communications
The following communications equipment is available at the plant: (1) two-way radios, (2) five channel Gaitronlcs system, (3) public address system, and (4) telephone.
B. Fire Fighting
There are fire extinguishers located throughout the plant. Fire fighting equipment is listed in Section 1.23 of the PVC Health and Safety Manual.
C. Spill Cleanup
For a list of available spill cleanup equipment, refer to Appendix A of the S.P.C.C. Plan.