Document e1zLgGXovXVgZ3dxon9qzjeq9
f BPvaooancn
The BFGoodrich Company Chemical Group 6100 Oak Tree Boulevard Cleveland, Ohio 44131 216-447-6000
66570 OEC 783 o.c.
November 30, 1983
Mr. Jim Wallace Esso Chemical P.0. Box 69 Sarnia, Ontario Canada NIT 2P1
Dear Mr. Wallace:
Enclosed for your information are the results of the responses I requested during the recent VCSA meeting. I hope that you will find it useful for the next meeting.
I hope to see you in Phoenix.
Sincerely
THE BFGOODRICH COMPANY Chemical Group
HW/kp 4087q
Enclosures
H. Waltemate
OCC 4504
VCSA MEETING FEEDBACK
Useful Presentations 1. Anglo Sarcoma Update 2. Plant Evacuation - Planning and Training 3. PVC Dust 4. Safety Awareness and Assessment 5. Pump Adapter Failure 6. Sphere Release (Automatic Isolation Valves) 7. Monitoring Equipment 8. Environmental/Litigation Update 9. Current Case Histories 10. Safety Program 11. Controlling Runaway Reactions 12. Current Case Histories 13. EPA Court Action Update 14. Plant Evacuation - Planning and Training 15. PVC Dust - I.C.I. 16. Safety Equipment - Dow 17. High Pressure Water Fatality 18. Livingston, Louisiana Derailment 19. Anglo Sarcoma Update - Similarities of Plants with
Multiple Cases 20. Solray VCM Tank Car Rupture
Least Useful Presentations 1. Bursting of a Resin Hopper Truck 2. Similarities of Plants with Multiple Angio Sarcoma Cases
4087q/kp 11/30/83
OCC 4505
-3-
Least Useful Presentations (Continued) 3. Runaway Reaction Questionnaire 4. Angio Sarcoma Update 5. Valve Position Indicator Questionnaire 6. PVC Dust - Health Affects 7. Safety Performance Assessment 8. Plant Evacuation 9. Waste From Small Pilot Plants 10. Conoco's Tank Car Derailment 11. Hopper Truck Failure 12. Hooker Explosion 13. Goodyear Plaquemine Fire
Suggested Future Topics 1. Process Sampling Procedure 2. New Advances in Area Monitoring 3. Minor VCM Users 4. More on Reactor Runaway Control
5. Poly Peroxide Incidents - How to Prevent 6. Safety Committees and How to Make Them Effective 7. Is Safety a "Line" or "Staff" Role and How to get the Line
to Accept Responsibility 8. Incident/Accident Investigation Techniques 9. Incentive/Reward Systems and Their Role in Promotion of
Safety
10. DuPont STOP Program
4087q/kp 11/30/83
OCC 4506
-4 -
Comments
1. Keep open mind relative to interfacing with the Vinyl Institute
2. It was really very interesting to attend this meeting. Maybe the only problem was that we did not receive information on time.
3. Companies must be open and present accident case histories. Borden should have presented their fatality.
4. Use different formats, i.e. panel/workshop/small group discussion.
5. Encourage speakers/presenters to have copies of material available for all group.
6. Program chairman should not use platform/mike as a vehicle to convey own thoughts, but should be facilitating comments from others.
7. Announce vendor hospitality suites for all members.
8. Send questionnaires earlier so results are ready for meeting or allow ways/means and time to collate at meeting so the results which are shared are meaningful, current and able to be discussed.
4087q/kp 11/30/83
OCC 4507