JOE 0. TANNt A Comimt'ioner
J. LEONARD lEDDETTER Division Director
^rpavimcuit r>f ^Natural ^csourn's
ENVIRONMENTAL PROTECTION DIVISION
?7D WASHINGTON STREET. S W ATLANTA. GEORGIA 30334
November 5, 1975
Mr. Paul J. Traina,.Director Enforcement Division U.S. Environmental Protection Agency
1921 Peachtree Street, N.E.
Atlanta, Georgia 30309
Dear Mr. Traina:
Re: General Electric Company Rome, Georgia NPDES Permit No. GA 0029155
This will acknowledge receipt of your letter dated October 22, 1975. In regard to the lack of limitations lor oil and grease on the above referenced permit
for discharges 001 and 003, this was omitted since construction of oil-water separators lor these discharges is just being completed. Therefore, no background
data has been collected to demonstrate whether the treatment will meet any proposed limitations or if additional treatment will be required. V/hcn the permit is reissued an oil and grease limitation will be included. In the case cf discharges
002 and 009, the limitation was omitted since there should not be any oil and grease present due to the nature ol their origin. To conlirm that there ere no housekeeping or other problems which will need to be corrected, oil and grease monitoring lor discharges 002 and 009 is being required. According to General Electric, oil process wastewater produced in the metal finishing area lias been
diverted to the sanitary sewer. The rnetal monitoring is to confirm the above. If the monitoring results demonstrate that there is an appreciable concentration of metals, limitations will be developed for the next permit along with a compliance schedule.
Monitoring of the Coosa River by the Georgia Environmental Protection Division lias already established that polychlorinated byplienyls (PCBs) exist in the
Coosa River. In the future we plan to initiate further studies to pinpoint any additional PCB sources. Any assistance that the S & A would be able to provide in this area would be appreciated. . When these studies are undertaken, one of our staff will contact the S <!r A to coordinate any possible assistance, if possible, we would appreciate being informed of the results ol General Electric's adjudicatory proceedings on their New York State plant since this will probably set a precedent concerning TCD limitations.
Sincerely,
GBtViing
Gene
. Chief