UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
WASHINGTON. O.C. 20-V60
FEB, 2 3 t97Ta
MEMORANDUM
OFFICE OF ENFORCEMENT
SUBJECT:. Relief Valve Discharges PPG Facility at Guayanilla, Puerto Rico
FROM:
Director Division of Stationary Source Enforcement
TO:
Stuart Roth, Attorney . Enforcement Division, Region. XX
This is in response to your memo of January 10, 1978, requesting guidance on enforcement options available to prevent relief valve discharges of VCM from vinyl chloride storage tanks at the Guayanilla PPG plant.
We believe that the most effective approach' to elimi nating emissions caused by relief valve discharges would be requiring' that PPG take measures designed to prevent relief valve ^ i g^v.^-prfn'5 .^nd. inct-all equipment designed" to contain" discharges, should they occur in spite of any preventative efforts. We feel that this position is justified by the preamble to the proposed standards which states, with respect to relief discharges from equipment other than reactors, "...increasing pressure due to inert gases in the system can be relieved by manual venting to a gas holder or recovery system. The conditions which lead to discharges can also be prevented in most cases by proper handling and transfer of vinyl chloride or materials containing vinyl chloride". (See 40 FR 59539, December 24, 1975).
One possible option which could satisfy the above requirements and which combines options listed in your memo, would be installation of additional refrigeration units designed to serve as backups for" the existing units in combination with a_aas hnlding tank which could contain any releases resulting from total refrigeration failure or from other equipment failures or deficiencies, including any releases which occur during the time it takes to switch over from a malfunctioning refrigeration unit to a backup unit. Of course, PPG will be responsible for developing a plan for preventing relief discharges, including any necessary operation and maintenance requirements acceptable to CPA.
GEI 1C 0 I : 1
In your memo you request clarification of what consti
tutes an "emergency relief ;discharge". As stated in our memo of December 15, 1977, the preamble to the proposed
vinyl chloride regulation describes an emergency discharge
as one whfch cannot be avoided by taxing preventative mea
sures , suctT'a'S those caused by natural disasters
0 FR *
.5December 24, 1975). Natural disasters include hurri
canes,.tidal waves, earthquakes, etc. Discharges which
could have been prevented will not be considered "emergency
""cTi s ch arg e s "
---------------------------------
~~--;------------------------
Finally, you request guidance on the enforcement
, approach to be used to require installation of equipment
designed to minimise the amount and- frequency of discharges-
As you know, an administrative order (Section 113(a) order)
is an inappropriate method to remedy a NESHAP violation
unless the order requires immediate compliance with the
standards. ' In some circumstances, a waiver of compliance
may be issued which requires the installation of equipment
necessary for compliance with the standard if the equipment
.can be operational and the source can be in compliance by
October 21, 1978. Note that the issuance of a waiver of
compliance is discretionary, and consideration should be.
given to both the source's good faith and whether we believe
' the terms of the waiver v/ill be complied with and final
compliance ultimately achieved. In addition to any require
ments designed to protect public health during the period of
the waiver (40 CFR 61.11(b)(3)) and any other requirements
generally applicable, any such waiver should include very
detailed incremental dates for design and installation of
the equipment. The waiver should be structured so that the
first increment will become due as soon after issuance as
possible. This will ensure prompt action, by the source
while still allowing EPA sufficient time to act should PPG
fail to comply.
Violation of the waiver requirements
could, of course, result in the commencement of civil or
criminal action.
However, if the source has not requested a waiver to allow installation of the required equipment, if the source has not acted in good faith, or if the Region believes it is impossible for the equipment to be installed and' the source to be in compliance by October 21, 1978, civil action should be commenced seeking injunctive relief for expeditious installation of the necessary control equipment. in light of the hazardous nature of the pollutant involved, we would urge quick preparation of any referral package (including any penalty calculations necessary to comply with the penalty policy). In addition, we can assure you that we 1 would expedite our review and referral of the package to the Department of Justice. ------
GEDC Ofid
If you require any further assistance in this natter, please feel free to contact Doug Farnsworth (755-2570) regarding any legal questions or Libby Scop ino (755-2564) regarding any technical questions.
b -Edward E. Re ch
cc: Susan-Wyatt, ESED Marcus Kantz, Region II