UNION CARBIDE CORPORATION p.o box b3bi. south charleston, wv 25303
INVESTMENT RECOVERY DEPARTMENT
TotNe^e) Mr. L. Pierce, Or. O'viB.on Controller Locnuon Silicones and Urethane Inter. Ane, Danbury K1454
Dote March 11, 1985
Or'iQirret-inQ Dept Area
Mr. W. E. Ballard Mr. J. C. Cogar /Mr. R. L. Foster Mr. R. G. Link Mr. T. G. Swanson Mr. K. C. Watkins Mr. W. R. Yerkey
Subject. Surplus Property Declaration Asbestos Removal No. 1 Steam Plant
Dear Leonard:
. The enclosed Surplus Property Declaration is the first of a series of three for the dismantling and removal of the old Number 1 Steam Plant located within the South Charleston Plant.
This Surplus Property Declaration is for the first phase, removal of all asbestos and other insulation from the equipment and piping. Since the steam plant has been shut down for some time, the insulation has deteriorated and requires immediate attention.
The estimated cost is $147M, and the work will be performed by an outside contractor specializing in asbestos removal. It is our intent to begin the work by no later than April 1, 1985, after proper notification of the Environmental Protection Agency by the plant. We therefore would appreciate approval from the division as soon as possible.
Very truly yours,
WRY/JEK/pk/6813C Enclosure
/lamest. Knap
UCC 011566
SURPLUS PROPERTY DECLARATION
LOCATION:
57
lUNilCOOEl
514
(LOC MO I
Silicone & Urethane Intermediates
(DtVISIOi NAMEI
South Charleston
West Virginia
(CITY)
(STATE)
TO BE COMPLETED AT ORIGINATING LOCATION
Facility: No. 1 Steam Plant Building Number 4 7- 56- 78____Dept/Sys.
043100
Owning Division __SUI
Profit Center 001
Estimated Location Costs: Shutdown and cleaning; preparation for removal
(Show procedures on the back)
Engineering _____________________ Labor 10,000 includes fire watch
Date Available 1st Quarter 1985
Gross Fixed Investment___ 31,818.00
Net Book Value______
. as of
Material 15,000 include asbestos disp os
Overhead __
0- -
Total 25,000
Est By J- G- Ry
GENERAL DESCRIPTION OF FACILITY: (Attach additional sheet It needed)
HAZARDOUS MATERIALS PRODUCED OR HANDLED
Removal of insulation (asbestos) from Mainland Powerhouse
facility, buildings 47, 56 and 78 only. No mechanical
equipment to be removed at this time.
.
(List by Name)
Estimated 6200 ft.8 asbestos insulation.
REASON FOR SHUTDOWN: Steam plant idled in 1982 with no foreseeable need to operate.
ESTIMATED BY INVESTMENT RECOVERY DEPARTMENT:
Equipment Reuse {NBV) Equipment Income Other Income Dismantlement Proceeds
Total Recovery
0- -
0- 0- 0- -
0- -
Decontamination Cost
Dismantlement Cost
Invest. Recovery Dept.
Total Costs
By WRY
Date
$147M
0- 3M
$150M
3/11/85
DISTRIBUTION:
Value of Associated Stores
(e.fl . 701,703.704,720,723,740)
(See back of form)
ROUTE FOR APPROVAL AS SHOWN BELOW:
DATE
APPROVALS
1. Originator
?/*f4 f {(*>
2. Plant Surplus Equipment Coordinator
rr^-
3. Plant Manager
4. Investment Recovery Dept P.O. Bo* 8361 So. Charleston. WV 25303
5. Div. Controller obtains Div. and other approvals:
tM-V170(Ow (/Ml AC it*
6. Investment Recovery Dept distributes copies to originating plant and others as needed.
UCC 011567