Document e1815jY6rvNNnm2arEO45Ereq

UNION CARBIDE CORPORATION p.o box b3bi. south charleston, wv 25303 INVESTMENT RECOVERY DEPARTMENT TotNe^e) Mr. L. Pierce, Or. O'viB.on Controller Locnuon Silicones and Urethane Inter. Ane, Danbury K1454 Dote March 11, 1985 Or'iQirret-inQ Dept Area Mr. W. E. Ballard Mr. J. C. Cogar /Mr. R. L. Foster Mr. R. G. Link Mr. T. G. Swanson Mr. K. C. Watkins Mr. W. R. Yerkey Subject. Surplus Property Declaration Asbestos Removal No. 1 Steam Plant Dear Leonard: . The enclosed Surplus Property Declaration is the first of a series of three for the dismantling and removal of the old Number 1 Steam Plant located within the South Charleston Plant. This Surplus Property Declaration is for the first phase, removal of all asbestos and other insulation from the equipment and piping. Since the steam plant has been shut down for some time, the insulation has deteriorated and requires immediate attention. The estimated cost is $147M, and the work will be performed by an outside contractor specializing in asbestos removal. It is our intent to begin the work by no later than April 1, 1985, after proper notification of the Environmental Protection Agency by the plant. We therefore would appreciate approval from the division as soon as possible. Very truly yours, WRY/JEK/pk/6813C Enclosure /lamest. Knap UCC 011566 SURPLUS PROPERTY DECLARATION LOCATION: 57 lUNilCOOEl 514 (LOC MO I Silicone & Urethane Intermediates (DtVISIOi NAMEI South Charleston West Virginia (CITY) (STATE) TO BE COMPLETED AT ORIGINATING LOCATION Facility: No. 1 Steam Plant Building Number 4 7- 56- 78____Dept/Sys. 043100 Owning Division __SUI Profit Center 001 Estimated Location Costs: Shutdown and cleaning; preparation for removal (Show procedures on the back) Engineering _____________________ Labor 10,000 includes fire watch Date Available 1st Quarter 1985 Gross Fixed Investment___ 31,818.00 Net Book Value______ . as of Material 15,000 include asbestos disp os Overhead __ 0- - Total 25,000 Est By J- G- Ry GENERAL DESCRIPTION OF FACILITY: (Attach additional sheet It needed) HAZARDOUS MATERIALS PRODUCED OR HANDLED Removal of insulation (asbestos) from Mainland Powerhouse facility, buildings 47, 56 and 78 only. No mechanical equipment to be removed at this time. . (List by Name) Estimated 6200 ft.8 asbestos insulation. REASON FOR SHUTDOWN: Steam plant idled in 1982 with no foreseeable need to operate. ESTIMATED BY INVESTMENT RECOVERY DEPARTMENT: Equipment Reuse {NBV) Equipment Income Other Income Dismantlement Proceeds Total Recovery 0- - 0- 0- 0- - 0- - Decontamination Cost Dismantlement Cost Invest. Recovery Dept. Total Costs By WRY Date $147M 0- 3M $150M 3/11/85 DISTRIBUTION: Value of Associated Stores (e.fl . 701,703.704,720,723,740) (See back of form) ROUTE FOR APPROVAL AS SHOWN BELOW: DATE APPROVALS 1. Originator ?/*f4 f {(*> 2. Plant Surplus Equipment Coordinator rr^- 3. Plant Manager 4. Investment Recovery Dept P.O. Bo* 8361 So. Charleston. WV 25303 5. Div. Controller obtains Div. and other approvals: tM-V170(Ow (/Ml AC it* 6. Investment Recovery Dept distributes copies to originating plant and others as needed. UCC 011567