Document dzDZ8yq8B6rakj8wG4N6L9BG
A/C Pipe Producers Association Ad Hoc Review Committee
TO'
J. C^Jackssii, President
FROM
isubject; Val ue Engineering Project
Internal Correspondence
January 11, 1977
DATE.
As you know,early completion of the value engineering program
is a pressing priority item for AACPP. Based on the presentation made by
Smith, Hinchman and Grylls (SH&G) at the Fall Meeting, it is acknowledged
that there are deficiencies in th.e work done to date. I have met with
SHAG and voiced these concerns. It was decided SH&G should consolidate
what work had been done to date in a draft bulletin to enable a construc
tive critique to be made by AACPP1s Ad Hoc Review Committee. This draft
bulletin is enclosed.
^
N-The bulletin is not total/ly^wesentative of what AACPP staff
considers satisfactory for the purpose of identifying where we Naf
needs. It is forwarded for the we want to be, how we might best
revise/expand the document to sat^^industry's needs and aspirations. I would ask each of you to constructively critique the document, identify
deficiencies, and develop an itemized list of information which should be added to supplement that already proposed by SH&G. So that the time
required to bring this exercise to completion can be minimized, I have
set up a review meeting with SH&G at 9:00 a.m., January 26, 1977 at AACPP's office in Arlington, Virginia. I would hope each of you would be in a
position to attend, or at the very least provide a written summary of your critique and suggestions prior to the meeting date. Should any of you have questions, please give either me or John Welch a call.
JCJ:mcm Enclosure
cc: A. Kahn
Ad Hoc Review Coirmittee:
U
i'
CAPCO JEN 0023647