Document dnL1kjnex9bDRkQz0px13LBJ6
Lftkft Charts VCM Plant
June 3, 1981
Conoco Chemicals Company A Division of Conoco Inc
P O 8ox 605
Westlake. Louisiana 70669
(318) 491-5211
W. P. Doucet, Mayor Town of Westlake P 0 Box 635 Westlake, LA 70669
Dear Mr. Doucet:
The Conoco Chemicals Company VCM Plant located in Westlake has filled the open Safety Director position at the plant. Our new Safety Director is Steven R. Ashby. I am requesting that a Mutual Aid Emergency Pass Card be issued to Mr. Ashby by your office. If you would please send the card to my attention I will issue it to Mr. Ashby.
J. A. DeBernardi Plant Manager Conoco VCM
br
CCR 000067144
Lake Charles VCM Plant
CERTIFIED MAIL #8094935 RETURN RECEIPT REQUESTED
^
Conoco Chemicals Company A Division of Conoco Inc. P O. Bo* 605 Westlake. Louisiana 70669 (318) 491-521 1
June 1, 1981
Mr. Gus VonBodungen Technical Secretary Department of Natural Resources Air Compliance Division P 0 Box 60630 New Orleans, LA 70160
Dear Mr. VonBodungen:
Conoco Chemicals Co., VCM Plant in Westlake,- Louisiana is proposing to modify the Emissions Inventory Questionnaire (EIQ) for the proposed VCM Plant Expansion (Permit No. 1424T, approved October 15, 1980, originally submitted Feb. 5, 1980). This revision will update the New Cracking Furnace (Point Source IIC) and the Vent Gas Incinerator (Point Source V-A) for the latest more definitive design data for the expansion. The previous submittals (2/5/80 and 8/21/80) were based on preliminary design data. The revised submittal reflects an increased heat duty for the New Cracking Furnace, from 51.3 MM BTU/Hr. to 62.5 MM BTU/Hr, and a decrease in the particulate matter and nitrogen dioxide emissions from the Vent Gas Incinerator. The net changes in total emissions for Furnace and Incinerator combined are minimal as shown in Table I.
Also included with this EIQ submittal are updated emissions for existing Cracking Furnaces 11A and I IB. The revisions are merely a correction in the heat duty from 51.3 to 59.4 MM BTU/Hr. to reflect actual maximum firing rates and the use of the corrected AP-42 emission factors (revised 4/77) in the computation of emissions. The emissions to be reported now show a decrease for all pollutants with the exception of SCL which increases as shown in Table I. It should be noted that no revisions nave been made to these point sources, but the increased duty is only a more accurate reflection of maximum historical operating capabilities.
Please find enclosed a check for $270.00 permitting fees. Also if there are any questions concerning these revisions please contact Gary Foshee at (318) 491-5062.
br Enc BCC:
CRH-MGH-BIR-GLF-PLF-DLD-JWW-JCL-JGC-VMF
CCR 000067145
TABLE I SUMMARY OF EMISSIONS CHANGES
CONOCO CHEMICALS CO. VCM PLANT EXPANSION ANNUAL EMISSIONS, TOWVR.
POLLUTANT PARTICULATE MATTER SULFUR DIOXIDE NITROGEN DIOXIDE HYDROCARBONS CARBON MONOXIDE VINYL CHLORIDE
CURRENT TOTAL PERMITTED FOR THE NEW CRACKING FURNACE AND VENT INCINERATOR
COMBINED
79.208
59.49
147.567
3.609
10.524
11.08
REVISED TOTAL FOR THE NEW
CRACKING FURNACE AND VENT GAS INCINERATOR
COMBINED ,
79.208
59.49
147.567
3.711
11.13
11.08
EXPANSION EMISSIONS
NET INCREASE
NET CHANGE FOR EXISTING CRACKING FURNACES
TOTAL NET CHANGE FOR
EIQ
0 0 0 +0.102 +0.606 0
-3.56 +1.90 -24.50 -0.06 -0.32
0
-3.56 +1.90 -24.feo +0.04 +0.29
0
LOUISIANA AIR C0WrR0lrC0MMIS$Z0M
P. 0. Box 60630, New Qxlean*, La. 70160 Telephone: {504} 527-5?79
EMISSION INVENTORY QUESTIONNAIRE (Revision of 11/74)
Page 1 of 9
CHECK ONE OF THE BLOCKS BELOW:
CONOCO CHEMICALS COMPANY (name of company)
This inventory includes only presently existing emissions.
f^This inventory includes both
CONOCO INC. (parent company; if above is a division)
those old emissions(expected to be still existing and those proposed additional emissions in
Submitted by company on
MAY 28. 1981 (date)
cluded In our permit request for VCM PLANT EXPANSION
(type of new facility/modification
which was submitted to the com
Please file a separate report for each of your
mission on 7/R/flfi (date) and
plants physically located in Louisiana. This
which new emissions are to be
inventory covers the following plant location:
existing bv 11/1/WP (date).
_________ CONOCO VCM PLANT___________________ WESTLAKE________________CALCASIEU
(plant's namev If any)
(nearest town)
(parish of plant site)
INSTRUCTIONS: Keep the oxiginal oi thi* ioxm; xetuxn a. photocopy to thi* agency. Vo not unite inioxmation tn the top ok te{t side maxgin* oi thi* ioxm, a* iile iold-
ex binding* may covex the inioxmation. We have txied to a*k only &ox the iniomation u)e need, please do youx best to ansmx each question* Oux authoxity to cub. iox the* inioxmation i* contained in R.S. 40:2207 et *ec. Copie* oi thi* taw axe available
upon xeque*t. Aix pollutant emi**ion data pxovided on thi* iom *halt be available to the genexal public, without exception. All othex data and incarnation pxovided
on thi* ionm and attachment* *halt al*o be available to the public, except that
upon a showing *ati*iactoxy to the Technical Secxetaxy that *uch othex data and inioAmation, ii made public, would divulge method* ox pxoce**e* entitled to pxotection
a* txade *ecxet*, the data will be kept ixom all pex&on* othex than employee*, ox othex agent*, oi the Louisiana and iedexal aix pollution agencies.
11 Confidentiality of all information, except the air pollutant emission rates, is requested, and our justification for this request is attached to the back of this form. (Check the block If this is the case.)
Ii cextain que*tion* axe not applicable, indicate "none" ox "not applicable" {N.A.J. Tenm* *uch a* "not significant", "nil", "txace", "negligible", etc. axe not accept able. Please attach additional *heet* ii moxe space is needed.
An updated report should be submitted in the future when the annual emission rate of any pollutant from any stack changes more than 10% from reported values.___________________________________________________ __ ______________
ITEM 1 . . . ORGANIZATION ACTIVITIES
A. Circle any days of the week normally not operating: M Tu W Th F Sat Sun
B. This facility, as a whole, typically operates 341
days per year.
C. The peak production season is
NA
D. The facility normally operates OI Q 2 0 3 eight hour shifts per day, or
specify the hours normally worked per day.
-
B. Approximate number of employees at this location is
110
m
--
CCS. 0000b71>7
EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)
Page 2 of 9
F. If the facility, as a whole, operates intermittently, give details on the lines below: ____
G, Ownership of facility. Please check one of the following:
XX corporation, partnership, or sole proprietorship
0 city government
Qstate government
other, specify
Cregulated utility federal government
H. Please check off, or write below, the descriptive
operation:
lumber industry
Z chemical industry
pulp & paper
O natural gas industry cement industry
petroleum industry
Dparticleboard
P sugar cane industry
Qplywood
other, specify _______
name which applies to your asphaltic concrete fertilizer metals industry fish meal brick making
Ip.ossPilbelaesesoguirvceesa ovferayirbrpieoflludteiosnc.riptRioenTerofWyo^uarcoKpledratpioronesm, swiitehscenmfptfhoansis/(pSnecafnrJyn TITI and Section III)._______ ___
ITEM 2 . . . FUEL USE BY FACILITY AS A WHOLE Check one of the blocks below, and supply information as requested:
1^ this inventoxy is &ox "presently existing" conditions {as checked fox page 1),
please give the in^oJimxtion Jiequ.csi.ed below &ox ike latest 12 month penied lox which
you have data.. Vatx ox the 12 months ending Month:
Yeax:
U,ilt -tnl
has been given.
^j.tuxe use is expected to be matexialtydi^exent [otkex than as
outlined in a cuxxent permit request) give details on a sepaxate sheet.
C9 I)$ this inventoxy is being submitted in conjunction uxith a pexmit xequest (as
checked on page 1), please give the annual consumption Kates expected &ox the total
plant ){ox the 12 months flowing the date the new fiactUty ox modification becomes
operational. This date Is listed on page 1.
CCR 000067148
Type of fuel
Natural eas Process gas No. 1 to 4 fuel oil No. 5 or 6 fuel oil Bark/ wood chips
Coal dspeclfy ash %
& anthracite/bituminous) Other Other
Annual Consumption
(M s thousands)
5? million cubic feet
RIO
million cubic feet
3173
M gallons
M gallons
tons
tons
Sulfur X
Heating value
fbv weight)
1 arain/MSCI ') 100 arain/M: OF)
MM BTU/ MM frJ MM BTU/ MM ft3
0.25
MM BTU/ M val
MM BTU/ M gal
MM BTU/ ton
* MM BTU/ ton MM BTU/
I MM BTU/
EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)
Page 3 of 9
ITEM 3 . . . MATERIALS USED, PRODUCED, STORED, OR TRANSPORTED BY TOTAL PLANT
A. Raw materials or materials being trans ported
Name of material Ft.hvl ene Chlorine Oxvaen
Quantity used or transported
Annual
Hourly Hourly
average average maximum
(give
units) lb/hr
lb/hr
492 MM l b 59.767 62,682
750 MM Lb 91 .108 95.552
13,125 MM
1.709
1 .792
Lb
How stored (Be specific floating roof tank, fixed roof, etc.) Not Stored Pressure Tank Not Stored
How moved (Pipeline,
tanktruck, etc.)
Pipeline Pipeline/Railc
Pipeline
B. Products or byproducts
Intermediate Products: . 1- Hvdroaen Chloride
?. 1.? Dichloroethane
Final Product 1. Vinvl Chloride
528 MM Lb 1 .663 MM
Lb
1 ,000 MM Lb
64.140 202.038
121,477
67.269 211 .894
127,403
Pressure Tank Nitrogen Padded Fixed Roof Tanks
Pipeline Ship and Railcar.
Pressure Spheres Ship, railcar, or pipel
ITEM 4 . . . EMISSION INFORMATION ON THE ENTIRE PLANT AS A WHOLE Tfit State* given
should co*uie*pond, in mo*t ca&eA, to the. *um o\j the, individual average, xatzA othe point toutice* lifted in the Item 5 page* Iok. eacJi type, o{, aix pollutant.
A. PARTICULATE SOLIDS OR LIQUIDS soot from combustion mineral dust other, specify: other, specify: other, specify:
Material name Emission rate
(if must specify)
lbs/hr
19.13
Emission rate tons/vr 83.27
B. ORGANIC GASES OR VAPORS
alkanes/ Paraffins
Methane and Ethane
alkenes/ olefins, specify:
alkynes/ acetylenes
aromatics, specify:
alcohols, specify:
other, specify: Haloaenated
1.2 Dichloroethane
other, specify: Haloaenated
Vinyl Chloride
other. soecifv:0ther Haloaenated Ma :eriais
1. 1 b
03
1.61 2.bb 05
-------- 7TTT5-------------
--ms------
------- OS------------
C. INORGANIC GASES OR VAPORS sulfur dioxide
hydrogen sulfide carbon monoxide nitrogen oxides ammonia halogens, specify: organic sulfides (except HoS) other, specify:
S0o
CO N0
HC1 and Cl,,
T77T5
4.3b 51.83
1 705
ro2
-----------
"434.69
CCR 000067149
-EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)Page 4 of 9
NOTES TO ITEM 5 Please read all notes before attempting to fill out page(s) 6.
1. Use any number you wish, but please be consistent in identifying this point by the same number on calculations, maps, future correspondence, computer printouts, etc.
2. If the emission point is not a vertically discharging stack, or if there is no clear-cut point of emission (e.g., dust from moving equipment, multiple leaking valves, evaporation from storage tanks, etc.), put a zero in this column.
3. Give the inside diameter at the top. For non-round exits, use the equivalent di ameter, equal to 1.128 times the square root of the cross-sectional area at the point of discharge. Diameter, volume flow rate, and exit velocity must be consistent^
4. A "boiler", for purposes of this form, is to be understood to be any combustion
device which heats a fluid and is separated from such fluid by a partition. TheKe^OKe oil keatZKS, Vowthexm keateXS, etc* ace. included* Internal combustion engines
and incinerators are not included. Direct fired kilns are not included.
5. Enter the proper code number, taken from the list below:
000 No control equipment 010 Electrostatic Precip. 040 Alkalized aluminia
001 Wet scrubber,
above 95% efficiency 041 Dry limestone injection
above 95% efficiency 011 Electrostatic Precip. 042 Wet limestone Injection
002 Wet scrubber,
80% - 95% efficient
043 Sulfuric acid plant,
80% - 95% efficient
012 Electrostatic Precip.
contact process
003 Wet scrubber,
below 60% efficient
044 Sulfuric acid plant, double
below 80% efficiency 013 Gas scrubber, general
contact process
004 Gravity collector,
014 Mist eliminator
045 Sulfur recovery plant use
above 95% efficiency 017 Fabric filter
046 Reduced emissions by
005 Gravity collector,
019 Catalytic afterburner
changing process
80% - 95% efficient
020 Catalytic afterburner, 047 Vapor recovery system
006 Gravity collector,
with heat exchanger
048 Activated carbon adsorp
below 80% efficiency 021 Direct flame after
tion
007 Centrifugal collector
burner
050 Gas absorption column,
above 95% efficiency 022 Direct flame after
packed.
008 Centrifugal collector
burner with exchanger 052 Spray tower for gases
80% - 95% efficient
023 Flaring
053 Venturi scrubber for gases
009 Centrifugal collector 039 Catalytic oxidation - 049 Liquid filtration system
below 80% efficiency
flue gas desulfuriza 051 Gas absorption column,
tion
tray-type
6. Give the percent by weight of uncontrolled emission removed. If unknown, leave blank; if there is no effective removal, enter a zero in the column.
7* Enter the number of the method used, as follows:
(1) By actual stack test
(2) By material balance. provided that this method is applicable. {i, e*, itlii method obviously cannot be used whexe the inaccuracies in measurement are equal to ok greater than the absolute magnitude oi the losses* An example o& pKopeK use would be whexe solvent emissions axe not dixectly measuxed, but all solvent puxchased is eventually lost to the atmosphexe, and thexe^oxe matexial bought divided by oper ating hours equals loss Kate. ]
(3) By the use of E.P.A. emission factors. (See the "Compilation of Air
Pollution Emission Factors", E.P.A. publication AP-42)
(4) By making a conservative estimate.
(5) By the use of emission factors other than those supplied by the E.P.A.
CCR 000067150
-- EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)
Page 5 of 9
NOTES TO ITEM 5. CONTINUED (-continuing with note 7;) (6) Use this number if and only if you are submitting this form in connection
with a permit request, and the emissions referred to have no present existence, but are simply the result of design calculations.
(7) Sources ceasing emissions must be reported on one inventory document after they cease operation (see note S). Emissions will be zero, and a number 7 should be placed in the "emission estimation method" column.
8. If this particular pollutant, from this particular stack (point source), was not included in the stack or point source information submitted on your last Emissions
Inventory Questionnaire, or if this is the first Emissions Inventory Questionnaire you are submitting, write "add" in this column.
If this particular pollutant, from this particular point, was included on the last Emissions Inventory Questionnaire (EIQ) submitted, but the amount has been in creased or decreased (to other than zero), write "change" in this column.
If a point source has ceased operation since your last EIQ, the pollutants from that point should be reported as having zero emission rates on next submitted EIQj
and you should write "delete" in this column. AFTER A DELETION HAS BEEN ONCE REPORTED, VO NOT REPORT THE POINT AT ALL ON ANV FUTURE Eld'S AND VO NOT USE THAT POINT'S IDENTIFICATION (10) NUMBER IN THE FUTURE FOR ANY OTHER POINT.
9. Report the concentration of particulate matter only for incinerator flue gases, in grains per standard cubic foot of dry flue gas. (See Regulation 20.6.1). If this point is not an Incinerator flue, write "N.A." in the column. Report SO2 concentra tions for any stack in which it is found. In PPM by volume at standard conditions. Stack exit concentrations need not be reported for other pollutants*
10. If the hydrocarbons being emitted are of unknown type or have been obtained from emission factors which do not Indicate the hydrocarbon type, simply report the data requested on the line marked "hydrocarbons". If, however, you know more about the specific hydrocarbons being emitted (for example - that they are non-methane hydro carbons , or that they are paraffinic hydrocarbons, or that they are, say, 20 weight
Z alkenes with remainder paraffins, or If you know the specific name of the hydro-'
carbon being emitted, say, benzene or methanol or methylethylketone or whatever) please leave the line marked hydrocarbons blank, write in the name or partial iden tification of your specific hydrocarbons in one of the blank lines below, and give the data requested on that line.
11* Report the fuel charging rate, if any, in units of MM ft^ (million cubic feet) for gases, M gal for fuel oil, and tons for coal, bagasse, sawdust, etc. Report the process materials charging rate, if any, in units such as M Bbl. (thousand barrels), tons (of material processed or produced), tons (air dried unbleached pulp), M gal (storage capacity of tanks; breathing losses), etc. Please telephone us and ask if unsure of what units to use. Do not list air or water as "process materials". In determining rates, do not Include any recycle amount unless asked to do so, in general the rates should be determined on a "fresh feed" basis. For storage tanks, list separately under "Name of fuel/ process material" the two categories of breaching losses and working losses. The "rate" of the breathing loss determinant Is M gal (storage capacity) and, of the working loss, is also M gal (throughput).
If any one pollutant type (l.e., SO2, particulate matter, etc.) is emitted from more than one stack (or other emission point) serving the same piece of equip ment, please explain briefly on the reverse side of the page 6 subsheet, and write "See reverse side" prominently at the bottom of the form side.
CCR 000067151
ITEM NO. 5EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)Page 6 of 9 (SUBPAGE NO. 1 OF 8 ) This page is to be used to record the data from one stack (or other emission point) only> Photocopy this page
as many times as there are individual emission points, and use one page for each point. Note that the subscripted numbers indicate explanatory notes on pages 4 and 5.
Point source ID numberi
11A
Descriptive name of the equipment served by this stack
CRACKING FURNACE STACK
Height of stack
above grade2
119.97
ft
Stack diameter^
4.50
ft
Stack gas exit temperature
550 F
Stack gas flow rate at process conditions, not at standard
Stack gas exit velocity
17.607 ft /min L8, 5 ft/sec
If this stack serves a "boiler"^, give X of annual throughput of
the type(s) of fuel used and the heat pollutants through this emis-
input (i.e., fuel rate x heating value) sion point (totals 100X)
Refinerv Fuel Gas
type(s) of fuel Dec- Mar-
June-
Sept-
59.4 x (2)
10fe BTU/hr 1st fuel
Feb
May
10& BTU/hr 2nd fuel, if any 25 7. 25 %
Aug 25 X
Nov 25 X
(2) Natural Gas to be used as back-up fi el
Normal operat-
ing time of
this point
hrs days wks
day week yr
24 7
49
Name of pollutant
particulate matter sulfur dioxide nitrogen dioxide hydrocarbons -|n carbon monoxide
Pollution Control
Average Maximum Annual
control equipment emission emission emission
equipment efficiency rate
rate
rate
code ;
fi lbs/hr lbs/hr . tons/vr
959596
~~m---------
--TOT)------
--000---------
Q
8
0
0
U
0.4^3 1.32
05
07T47 0.83b
0.493 1.32
"06
0.147
0.836
2.03 5.43 "505
0.607
3.44
Emission estimation method 7
(3 (2 (3
3)
(3)
Add, change or delete code g
Concentration in gases exiting the stack 9
NA 10.8
gr/std ftd PPM (VOL)
Fill in this column only as required by
1
note 9.
CCR 0 0 0 0 6 7 1 5 2
If this stack is from equipment which burns fuel, give the X of the total fuel used by the equipment which is used, either directly or indirectly, for space heating (or cooling) at the plant, (i.e., to heat or cool the air in a room) If this stack is not from a fuel burning equipment, or if fuel is burned but none of the heat is intended to heat or cool air in a room, enter a zero below!
0.0 X "space heat"
Give below the fuel or process materials charging rate to the unit served by this stack.^
Name of fuel/ process material
Refinery Fuel Gas4Q5MMSCF /vr
Annual rate
Maximum hourily rate 49.2 M5CF /hr
ihr
in
in in
i!VL.
ihr
Iht
ihr
ITEM NO, 5EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)Page 6 of 9 (SUBPAGE NO, ? OF ft ) This page Is to be used to record the data from one stack (or other emission point) only. Photocopy this page
as many times as there are individual emission points, and use one page for each point. Note that the subscripted numbers indicate explanatory notes on pages 4 and 5.
Point source ID numberj
1 IB
Descriptive name of the equipment served by this stack
CRACKING FURNACE STACK
Height of stack
above grade2
119.97
ft
Stack diameter^
4.50
ft
Stack gas exit temperature
550 F
Stack gas flow rate at process conditions, not at standard
Stack gas exit velocity
17.607 ftJ/min L8.5ft/sec
If this stack serves a "boiler"^, give % of annual throughput of
the type(s) of fuel used and the heat pollutants through this emis-
Input (i.e., fuel rate x heating value) sion point (totals 1007.)
Refinerv Fuel Gas
type(s) of fuel
59.4 x
I0b BTU/hr 1st fuel
(2) 106 BTU/hr 2nd fuel, if any
DecFeb 25 7.
MarMay 25 ?
JuneAug 25 7.
SeptNov 25 7.
(2) Natural Gas to be used as back-up fi el
Normal operat-
ing time of
this point
hrs days wks
day week yr
24 7
49
Name of pollutant
particulate matter sulfur dioxide nitrogen dioxide hydrocarbons m carbon monoxide
Pollution Control
Average Maximum Annual
control equipment emission emission emission
equipment efficiency rate
rate
rate
code r
f, Ibs/hr lbs/hr tons/vr
000 000
Q
0.493 . 0.493
2.03
0
1.32
1.32
5.43
~m---------
0
OB
786
36.45
--non---------
0
"031
0.147
0.607
UUU---------
U
U.836
O.S36
3.44
Emission estimation
method j
(3)
(2) (3) (3) (3)
Add, change or delete code g
Concentration in gases exiting the stack g
NA 10.R
gr/std ft3 PPM (VOL)
Fill in this column only as required by note 9.
1
CCR 0 0 0 0 6 7 1 5 3
If this stack is from equipment which burns fuel, give the 7. of the total fuel used by the equipment which is used, either directly or indirectly, for space heating (or cooling) at the plant, (i.e., to heat or cool the air in a room) If this stack is not from a fuel burning equipment, or if fuel is burned but none of the heat is intended to heat or cool air in a room, enter a zero below:
0.0 X "apace heat"
4
Give below the fuel or process materials charging rate to the unit served by thl s stack,n
Annual
Maximum
Name of fuel/ process material
rate
hourly rate
Refinery Fuel Gas
405MMSCF /vr 49.2 MSCF /hr
/yr
/yr
/vr
/y^ 1XL
/hr /hr /hr /hr /hr
ITEM NO. 5
EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)
Page 6 of 9 (SUBPAGE NO. 1 OFfl1' )
Tills page Is Co be used to record the data from one stack (or other emission point) only. Photocopy this page
as maany times ns there are individual emission points, and use one page for each point. Note that the subscripted
numbers Indicate explanatory notes on pages 4 and 5.
Point source ID number}
- 1V-A
Descriptive name of the equipment served by this stack 0500 (Main Plant Vent Stack)
Height of stack
above grade2
148
ft
Stack diameter^ 3.0 ft
Stack gns exit
temperature oF
Stack ga6 flow rate at process conditions, not at standard
Stack gas e'xit velocity
0 ft'Vmin 0 ft/sec
If this stack serves a "boiler "a, give the Lype(s) of fuel .used and the heat
input (l.e., fuel rate x heating value)
NA
type(s) of fuel
10<> BTlI/hr 1st fuel
106 BTU/hr 2nd fuel , if any
% of annual throughput of
pollutants through this emis-
n ion point (totale 1007.)
De c- Mar-
June-
Sept-
Feb
May
Aug
Nov
7. 7.
7.
7.
Normal operati ng t i rno of tills point hrs uk s
day week yr 0 00
Name of pollutont
particulate matter sulfur dioxide nitrogen dioxide hydrocarbons i rs carbon monoxide
Pollution control equipment code q
Control equipment ef f icienc)
f\
Average Maximum Annual
emission emission emission
rate
rate
rate
lbs/hr 1bs/hr tons/yr
00 . 00
Emission estimation method y
Add, change or rdelete code g
De 1 e te Delete
Concentration in gases exiting the stack
rr/std f 13 mi (voi.)
Fill in this column only as required by
1
note 9* .-
CCR 0 0 0 0 6 7 1 5 4
If this 6tack is from equipment which burns fuel,
give the X of the total fuel used by the equipment
which 18 used, either directly or indirectly, for space heating (or cooling) at the plant. (i.e., to heat or cool the air in a room) If this stack is not from a fuel burning equipment, or ifi fuel is burned but none of the heat is intended to heat or cool air in a room, enter a zero below:
0 7* "apace heat"
Give below the fuel or process materials charging rate to
the unit served by this stack.}}
Annual
Maximum
Name of fuel/ process material
rate
hourly rate
____ N- A
_________________________
/ yr _________
/hr
/yr
llJL hr hr
lilL
hs.
_____________ /hr
/hr
ivr
/hr
to
ITEM NO. 5
EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)
Page 6 of 9 (SURPAGF. NO. 4 OF81 )
This page ts to be used to record the data from one stack (or other emission point) only. Photocopy tills page
as many times as there are Individual emission points, and use one page for each point. Note that the subscripted
numbers Indicate explanatory notes on pages 4 and 5.
Point source ID number^ IV-C
Descriptive name of the equipment served by this stack Propylene Vent (GL-501)
Height of stack
above grade2
148
ft
Stack diameter3
0.666
ft
Stock gas exit temperature
F
Stack gas flow rate at process conditions, not at standard
0 ftJ/min
Stack gas e'xi t velocity
0 ft/sec
If this stack serves a "boiler "a, give
the type(s) of fuel .used and the heat
input (i.e., fuel rate x heating value)
N. A.
tvne(s) of fuel
106 BTU/hr 1st fuel
106 BTU/hr 2nd fuel , if any
% of ahnual throughput of
pollutants through this emis-
a ion point (t ota Is 1007.)
Dec- Mar-
June-
Sept-
Feb
May
Aug
Nov
7. 7.
7.
7.
Normal ope rot-
ing t imo of
thi 2 point
Mrs Wk S
day v'cek yr
00
0
Name of pollutant
particulate nia11er sulfur dioxide n 11 rogert dioxide hydrocarbons in carbon monoxide
Pollution control cquipme nt code q
Control equipment efficiency
A
Average emission rate lbs/hr
Maximum Annual
emissi.on emission
rate
rate
lbs/hr tons/vr
00 ,
Emission
estimation
method -j
Add, change or .delete code g
(7) Delete
*-
Concentration in gases exiting the stack g
pr / s 11! f 13 PHI (VOL)
Fill In this column only as required by note 9.
1
CCR 0 0 0 0 6 7 1 5 5
If this stack is from equipment which burns fuel, give the 7. of the total fuel used by the equipment which is used, either directly or indirectly, for space heating (or cooling) at the plant. (i.e., to heat or cool the air in a room) If this stack is not from a fuel burning equipment, or if fuel is burned but none of the heat is intended to heat or cool air In a room, enter a zero below:
n X "space heat"
Give below the fuel or process materials chargirig rote to
the unit served by this stack.^
Name of fuel/ process material
Annual rate
Max1mum hourly rate
-N.fl
to
/hr
___ to ____________ to
___ to
/hr
_to to
to
/hr
to
/hr
JJ/
ITEM NO. 5
EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)
Page 6 of 9 (SUBPAGE NO.5 OF ^8 )
This \>ngc Is to he used Co record the data from one stack (or other emission point) only. Photocopy this pngc
as many times as there are individual emission points, and use one page for each point. Note that the subscripted
numbers indicate explanatory notes on pages 4 and 5.
Point source Descriptive name of the equipment served
ID number^
by this stack
IV-J
Dock EDC Tank (T-415)
Height of stack above gradej
35 ft
Stack diamete^
0.83
ft
Stock gas exit temperature
84 F
Stack gas flow rate at process conditions, not at standard
Stack gas /dxlt velocity
5.28 ft^/min
ft/aec
If this stack serves a "boiler"^, give 7. of Annual throughput of
the type(s) of fuel, used and the heat pollutants through this emls-
input (i.e., fuel rate x heating value) a ion point (totals 1C07.)
N.A.
type(s) of fuel Dec- Mar-
June-
Sept-
I0b BTU/hr 1st fuel
Feb
May
Aug
Nov
lt>6 BTU/hr 2nd fuel, if anv 2SJ* 25_7*
2S-7'
ZL*
Normal operating t ime of tlii j point hrs v k s day week yr
54-
52_
1v: 1>* C1
LS.
CCR 0 0 0 0 6 7 1 5 6
Name of pollutant
particulate matter sulfur dioxide nitrogen dioxide hydrocarbons mTHT carbon monoxide 1,2 Dichloroethane Other Chlorinated Hydrocarbons IIC1
Pollution Control
Average Maximum Annual
control equipment emission emission emission
equipment efficiency rate
rate
rate
code q *
A Ibs/hr Ibs/hr tons/vr
non
0
1.67
11-9
7.33
000
0
1.61
11.4
7.05
000
0
0.06
0.45
0.28
000
0
0.04
0.31
0.19
Emission estimation
method j
Add, change or delete code g
(4) (4) d4i)______
Concentration in gases exiting the stack q
r.r/std ft-* PI'M (VOL)
Fill in this column only as required by note 9.
1
If this stack is from equipment which burns fuel,
Give below the fuel or process materials charging rate to
give the 7. of the total fuel used by the equipment the unit served by this stack,
which is used, either directly or indirectly, for
Annual
Maximum
space beating (or cooling) at the plant. (i.e.. | Name of fuel/ process material
rote
hourly rate
to heat or cool the air in a room) If this stack Oreathinq Losses
6.66 Tons /vr
/hr
1 9 not from a fuel burning equipment, or ifi fuel ! Workinn Losses
0.67 Tons /vr
/hr
1 S burned but none of the heat is intended to heat
/vr /hr
or cool air in a room,, enter a zero below:
*
/vr /hr
/vr /hr
/! 0
7. "space heat"
111 nn
O ''
'^LJ>
ITEM NO. 5EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)Parc 6 of 9 (SUBPAGE HO, 6 opBl ) This page is to be need to record the data from one stack (or other emission point) only. Photocopy this pnp.e
as many times os there are individual emission points, and use one page for each point. Note that the subscripted numbers indicate explanatory notes on pages 4 and 5.
Point source ID number^ IV-K
Descriptive name of the equipment served by this stack Dock VCM Vent Recovery
Height of stack
above grade2
148
ft
Stack diameter^
1.0
ft
Stock gas exit temperature
75 F
Stack gas flow rate at process conditions, not at standard
Stack gas ftkf t velocity
316 ft /min 6-7ft/sec
If this stack serves a "boiler "a Give the type(s) of fuel .used and the heat
input (i.e., fuel rate x heating value)
N.A.
tvne(s) of fuel
10b UTU/hr 1st fuel
10b BTU/hr 2nd fuel , If any
X of annual throughput of
pollutants through this cmis-
s ion point (totals 1007.)
Dec- Mar-
June-
Sept-
Feb
May
Aug
Nov
25 7. 25 7.
25 7.
25 7.
Normal operati ng t i nv? of this point hrs days wl< s dny vc e k yr
_L 52
Name oE pollutant
parficulnte matter r, u 1 f nr d i ox i de nltrogen dioxide hydrocarbons i *)__ carbon monoxide
Vinyl Chloride
Pollution Control
control equipment
equipment efficiency
c--o~ de ik
_________
Average emission rate lbs/hr
Maximum emission rate lbs/hr
Annual emission rate i: ons/y r
(below) 048
<0.01
Emission estimation method ?
m
Add, change or , delete code g
Concentration In gases exiting the stack n
T.r/std ft^ pi n (voi.)
Fill in tills column only as required by note 9.
CCR 0 0 0 0 6 7 1 5 7
If tli 1 o 6tack is from equipment which burns fuel, give the 7. of the total fuel used by the equipment which is used, either directly or indirectly, for space heating (or cooling) at the plant. (i.e., to heat or cool the air in a room) If this stack is not from a fuel burning equipment, or ifi fuel is burned but none of the heat is intended to heat or cool air In a room, enter a zero below:
0 7, "space heat"
Give below the fuel or process materials charging rote to
the unit served by this stack.^
Name of fuel/ process material
Annua 1 rate
Mak1mum hourly rate
/yr /vr /vr /yr /vr /yr
/hr /hr /hr /hr /hr
________ lir
ITEM NO, 5EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)Page 6 of 9 (SUBPAGE NO. 7 OF 8 ) This page is to be used to record the data from one stack (or other emission point) only. Photocopy this page
as many times as there are individual emission points, and use one page for each point. Note that the subscripted numbers indicate explanatory notes on pages 4 and 5.
Point source ID numberi
11-C
Descriptive name of the equipment served by this stack
Crackinq Furnace
Height of stack
above grade2
119.97
ft
Stack diameter^
6.0
ft
Stack gas exit temperature
550 F
Stack gas flow rate at process conditions, not at standard
Stack gas exi t velocity
29,270 ftJ/min L7.3ft/sec
If this stack serves a "boiler"^, give % of annual throughput of
the type(s) of fuel used and the heat pollutants through this emis-
input (i.e., fuel rate x heating value) sion point (totals 100%)
No. 2 Fuel Oiltype(s) of fuel
Dec- Mar-
June-
Sept-
62.5 x 106 BTU/hr 1st fuel
Feb
May
Aug
Nov
fl) 106 BTU/hr 2nd fuel, if any 25%
_2S_%
25 %
(1) Natural Gas or Refinery off gas may be US'(d as a i ackup fu Si.
Normal operat ing time of this point hrs days wks day vreek yr
-24. JZ_ JiL 69
Name of pollutant
particulate matter sulfur dioxide nitrogen dioxide hydrocarbons m carbon monoxide
Pollution Control
Average Maximum Annual
control equipment emission emission emission
equipment efficiency rate
rate
rate
code ;
lbs/hr lbs/hr . tons/vr
000
0
0.886
0.886
3.622
000
0
14.05
14.05
57.47
000
0
6.303
6.303
25.778
000
0
.421
.421
1.721
000
0
2.127
2.127
8.700
Emission estimation method 7
f 3) f 3) (5) (3) (3)
Add, change or delete code g
Add Add Add Add Add
Concentration in gases exiting the stack 9
NA gr/std ft3
1 23 PPM (VOL)
Fill in this column only as required by note 9.
CCR 0 0 0 0 6 7 1 5 8
If this stack is from equipment which burns fuel,
give the X of the total fuel used by the equipment
which is used, either directly or indirectly, for space heating (or cooling) at the plant, (i.e., to heat or cool the air in a room) If this stack is not from a fuel burning equipment, or if fuel Is burned but none of the heat is intended to heat or cool air in a room, enter a zero below:
0 X "space heat"
4
Give below the fuel or process materials charging rate to the unit served by this stack.^
Annual
Name of fuel/ process material
rate
0.1/0 pin oafvr
Refinery Fuel Gas
/yr
/vr
/vr
/vr
/yr
Maximum hourly rate
ua 1 /nr /hr /hr /hr /hr
... --/hr
ITEM NO. 5EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)Page 6 of 9 (SUBPAGE NO. 8 OF 8 ) This page is to be used to record the data from one stack (or other emission point) only. Photocopy this page
as many times as there are individual emission points, and use one page for each point. Note that the subscripted if numbers indicate explanatory notes on pages 4 and 5.
Point source ID number^
V-A
Descriptive name of the equipment served by this stack
VENT INCINERATOR
Height of stack above grade2
75 ft
Stack diameter^ 3.0 ft
Stack gas exit temperature
125 oF
!i ;
Stack gas flow Stack gas If this stack serves a "boiler"^, give % of annual throughput of
Normal operat-
rate at process exi t
the type(s) of fuel used and the heat pollutants through this emis- ing time of
conditionst not velocity input (l.e., fuel rate x heating value) sion point (totals 100%)
this point
at standard
NA
type(s) of fuel Dec- Mar-
June-
Sept- hrs davs wks
106 BTU/hr 1st fuel
Feb
May
Aug
Nov
day week yr
28,817 ft^/min >7.9 ft/sec
10& BTU/hr 2nd fuel, if any 25 7. 25 7. 25 %
25 7. 24 7
52
Name of pollutant
particulate matter sulfur dioxide nitrogen dioxide hydrocarbons m TOT carbon monoxide
Pollution control equipment code *
022
~m-- ~U72
022
Control equipment efficiency
A
Average emission
rate
lbs/hr 1 7.26
0.46 27.81
OS
U. bb
04
Maximum Annual
emission emission
rate
rate
lbs/hr * tons/vr
"17. 2 b ~ 75.586
0.46
21. SI 2M
0.55
2.54
2.02 121.789
T3 70 7
OS
11.08
Emission estimation
method j
(4) 4)
4
4
(4)
(4)
Add, change or delete code g
Chanqe Chanqe Chanqe Chanqe Chanqe Chanqe
Concentration in gases exiting the stack g
0.079 1.78
er/std ft^ PPM (VOL)
Fill in this column only as required by
i
note 9.
CCR 0 0 0 0 6 7 X 5 9
If this stack is from equipment which burns fuel,
Give below the fuel or process materials charging rate to
give the X of the total fuel used by the equipment the unit served by this stack. n
which is used, either directly or indirectly, for
Annual
Maximum
space heating (or cooling) at the plant, (i.e.. | Name of fuel/ process material
rate
hourly rate
to heat or cool the air in a room) If this stack i is not from a fuel burning equipment, or if fuel r
/yr /vr
/hr /hr
is burned but none of the heat is intended to heat
/yr
/hr
or cool air in a room, enter a zero below:
i
/yt /hr
/yr
/hr
X "apace heat"
JUL
IhL
4*.
I
EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)_______________________
Page 7 of 9
ITEM 6 , , PLANT LOCATION FOR AIR POLLUTION DISPERSION MODELING
Give below the Universal Transverse Mercator zone number and Universal Transverse Mercator (UTM) coordinates, to the nearest one-tenth kilometer, of your facility. We must have this information since we are required to report it to the U, S, Environ mental Protection Agency for wide area dispersion modeling purposes.
The coordinates can be obtained from most U. S. Geological Survey maps, scale 1:24,000 or 1:62,000 for your particular area. These maps, if not already in your possession, may be found in your local library, or can be purchased from the U. S. Geological Survey (USGS) at the address shown below for 75C each (1974 price). An index of all the maps available for Louisiana, together with prices and detailed instructions for ordering, may be'obtained free by addressing a request to:
U. S, Geological Survey, Distribution-Cenfeec, Denver Federal Center, Bldg. 41 Denver, Colorado 80225
If the map has the Universal Transverse Mercator (UTM) coordinates listed, it will have the UTM zone number mentioned among the writing along the bottom of the map. This zone number will be either 15 or 16 for Louisiana.
Please note, that latitude and longitude axe np^t what we need, and that the USGS
maps do not show UTM grid lines as they do latitude and longitude; however, tick marks along the edges of the maps do indicate the UTM grid locations. A straight edge must be used to connect tick marks at the opposite sides of USGS maps when interpolating between UTM tick marks because the map grid is drawn on the latitudelongitude system and, therefore, the UTM grid may appear quite skewed. For the scales mentioned, tick marks appear for every 1000 meters (1 kilometer), with every fifth tick mark and the tick marks nearest the southeast and northwest corners of the map giving the value in meters. The 1:24,000 scale is preferred to accurately locate the facility, but the 1:62,000 scale may be used if the 1:24,000 scale map is un available for your area.
For example:
The state capltol building in Baton Rouge would be:
UTM zone No. 1 5
horizontal coordinate: 6 7 4.1 Km.
vertical coordinate: 3 3 7 0.6 Km.
Your facility: UTM zone No. 1___5
horizontal coordinate: A 12-2 Km.
vertical coordinate: 3 3AA-2 Km.
ITEM 7 . . . COMPLIANCE STATUS
Cheak one o& the blocks below, xegaxdlng youx facility's "Compliance Schedule"'*
0(Such a d ocument has not been requested of us, so far as we know. Such a document was requested, or submitted, but we haven't yet received noti fication that it was accepted at a public hearing by the Commission. 0 We were notified that the document was accepted at a public hearing; no schedule
of actions to achieve compliance was necessary. D We were notified that the document was accepted at a public hearing; our sched
ule of actions to achieve compliance by ____ (month), 197 _ (year) was approved. The most recent "increment of progress" date in our schedule of actions was achieved rr, ____ (month)______(day) 7 _ (year) . yOU MUST FILL IN THE DATE BLANKS IF YOU HAVE CHECKED THIS PARAGRAPH])
OCR 000067160
-EMISSION INVENTORY QUESTIONNAIRE (Revised 11/74)
Page 8 of 9
ITEM 8 . . . REFUSE COLLECTION AND DISPOSAL
A. Amount of combustible refuse disposed of per year:___
5915 Tons
(give the applicable units)
B. Description of refuse; check off applicable catagories:
CS Paper scrap
Cl Rubber scrap
Wood scraps cc sawdust G Wet garbage or animal wastes dJ Other, specify:_______Rubbish_____________________________ _________
C. Method of refuse disposal; check off applicable catagories:
City pickup
G On-site dump
O On-site incineration
dS Contractor pickup
Q On-site outdoor burning O On-site landfill
Other, specify:_____________________
D. If disposal is by eontvacto Browning-Ferns Industries o Highway - Maplewood, LA 70663
n
ste Division-Cities service
E. The on-site incinerator, if any. nas cha following design features:
0 No on-site incinerator Ll Afterburners
D Water scruober installed
O Single chamber
Primary 6 secondary D Waste material disposed of
Multiple chamber
Q burners installed
by burning in a boiler
F. Incinerator equipment data (if applicable):
Manufacturer:
NA
Model:
Capacity:Installation date:
Auxiliary fuel used: (type, how used, rate of use)
ITEM 9 . . . SUPPLEMENTARY INFORMATION
A. Please supply a unit plot plan on. map which 4how the location* stack* [on. othen soun.ee*), together with the bounce idcutL$irjxtion number* finom Item 5. the plant boundanle*, a distance scale, and the dUiecxion Month. Please also snow, on a separate dtagnam necessary. the .location o& the plant in relation to nearest highway*, residential, area*, and town*. Attack the map* to the back the* orm.
B. Approximately how much money have you spent on air oollution control equipment and operation in the past 10 years? Equipment $15,5QQ,0QQQperafc^Qri $ 2,93d ,000
ITEM 10 , . TOXIC GASES a HAZARDOUS MATERIALS
A. Are there any substances used or produced in your facility whi:h could cause im mediate injury to life or property, i_f they were emitted to the atmosphere, which are not already listed in this form as one which is presently being emitted to the atmosphere? (e.g., chlorine for water treatment, toxic gases, gases used as cata lysts, etc., which ordinarily do not escape) Please list such substances below. If none, please so state. __________
B. Does your facility use or produce asbestos, mercury (other than laboratory use),
or beryllium in any amount whatsoever? If answer is yes, give rietaiio be lev' <'"r cn
separate sheet. If answer is no, please write "no" below:
ND
CCR 000067161
EMISSION INVENTORY OVTSTIONNATF.E (Revised 11/7C)
ITEM 1\
. FFESOSNBI. fi CERTIFICATION
Pace Q of 9
A. The manager of the facility, on locatlorv at the plant site, is as follows:
Name : Title: Name of Company: Business street address/ P. 0. Box: City or town, parish, Zip code: Business area code/ telephone No.:
James A. OeBernardi , Plant Manager - VCM Plant Conoco Chemicals Company, A Division of
Conoco. Inc.______________________________________________ P. 0. Box 605 Westlake. LA 70669 318/491-5064
B. Person to contact at the site of the facility about air pollution control, if different from the above:
Name : Title:
Business telephone No./ extension:
Gary L. Foshee Chief Process Enoineer 318/491-5062
C. Ir the company's air pollution control correspondence and documents are prepared
at a headquarters office, at a different site, give the information on the person to
be contacted below:
Name:
Mike Hayes_____
Title:
Director of Environmental Control_
Name of company; or parent company: Conoco Chemicals Company_
Business street address/ P. 0. Box: P. 0. Box 727
T^ty, state, Zip code:
__W___e_s__tl_a_k__e, LA70669
Business area code; telephone No.:
318/491-5435"
D. Person who prepared this report:
Name: Title: Firm: (if prepared by a consultant) Company: (if prepared in-house) Street address/ P. 0, Box: City, state, Zip code: Area code, telephone #, extension:
(T one o& ike above., jn&t check appropriate. block.:)
PA. OB.
DC.
Virgil M. Fisher
Process Engineer
Conoco Cnemicals Company P. 0. Box 605 Westlake, LA 70669
318/491-5057
E. certification, i ces~ii{a, arider ike. piovi&ionA in Loaibiana and United States
Zayj which provide. ciiniraJ. per^ilties far &aise statements, that tiiis Emission
Inventory Qllcsticnnaire, ir.alu.dinQ alt attachments thereto, contains information
which is true and correct to the beJ^t oknowledge
belief.
.
ature of manager, or other company agent)
. A. DeBernardi, Plant Manager - VCM Plant (printed or typed name & title of person above)