Document dnGmeDb0y2zr5q1JDw9DaELxB
ItBTdPjCAL FILE
ot i'frr;,'
ms
DIBECTIONS FOB APPLYING
^ USG ASBESTOS CEMENT SIDING SHINGLES
WAVY BUTT SHINGLES No. 600 CLAPBOABD No. 950
BEST RESULTS We have provided you with a most attrac tive and durable shingle, so that you and your customers will have pride and lasting satisfaction in the finished job. PLEASE OBSERVE THESE PRECAUTIONS: Store the shingles in a perfectly dry place, preferably in a building. It impossible to store inside, you must pile the shingles on edge on planks at least 4" from the ground, and protect them carefully with a waterproof covering. Moisture get ting between the shingles in bundles may cause dis coloration.
Never apply over wet, frosty, or ice covered walls, or in wet weather.
It is recommended when leaving a job at night that the top unfinished course be temporarily flashed with asphalt roofing paper to prevent rain running down behind the shwgies before the job is finished.
The special face nails furnished with the shingles should be used for all exposed nailing.
These shingles are lor application on vertical side walls only, and must not be used on root surfaces.
PREPARATION OF WALLS The wall surfaces to be covered should be made as smooth and even as possible. All warped and irregular boards must be firmly nailed in place. If old shingles or clapboards have thick butts and large exposure, it is necessary to apply bevel wood nail ing strips, running horizontally, or lath of sufficient thick ness to bring the surface out in line with the vertical of the wall. These nailing strips should be on lOVi" centers for No. GOO and 950.
Where applying Asbestos Shingles over old brick or stone walls, horizontal nailing strips should be similarly spaced.
For applying over old stucco, the best practice is to re move the old stucco, nailing the shingles to the wood sheathing. Where the stucco is in good condition, how ever, wood nailing strips may be used as for brick walls.
To assist in preventing air infiltration and to provide a suitable even surface upon which to nail the shingles, the walls should preferably jbe covered with a layer of USG Asphalt Felt before applying the shingles.
MOULDING Where the use of Asbestos Cement Siding Shingles over old siding brings the wall surface out be yond the old door and window frames, new wood moulding should be installed to cover the exposed edges of the siding shingles. Adequate flashing should be used over all window and door openings, and a suitable water table or drip edge provided along the base and under all openings. See detail No. 31.
Old wood siding USG Saturated Felt
JAMB Asbestos Siding
Flashing
New Wood Mould
Asbestos Wood Siding Moulding
HEAD
FINISHING AROUND WINDOWS
DETAIL No. 31
OUTSIDE AND INSIDE CORNERS Several methods of finish ing comer joints may be used. Shingles may be butted against existing comer boards, or new comer boards in stalled. Bull Nose comer bead, or other metal comers are sometimes used. Many outside comers are formed by weaving or "lacing" alternate courses of shingles, lining up the edges of comer shingles at each course with the faces of the two walls alternately, so a single line will not be formed. When this is done, edges should be brought down to a close fit with a rasp. See detail No. 52.
Both inside and outside comers should be flashed with heavy asphalt felt or metal flashing strips to provide a true comer and additional weather protection. See details No. 51 and No. 52.
Old wood siding
X
< '--Flashing , ^Corner Hoards '
USG Saturated Felt^ " Asphalt Felt Joint' Strip^-
Old wood siding
-Flashing ' . USG Saturated FeltJ Asphalt Felt Joint Strips)
Wavij Butt or Clapboard Asbestos Siding Shingles
APPLICATION
Wavy Butt or Clapboard, Asbestos Siding Shmglesi
cant; Strip,
R rti1 I
_L
OF FIRST COURSE
DETAIL No. SI
CAULKING All door and window frames should be ade quately caulked with USG Asbestos Caulking Cement applied with a pressure gun.
bb023 0088
CUTTIN6 AND PUNCHING USG Asbestos Cement Siding Shingles are furnished die cut, with clean, sharp edges. Where it is necessary to cut shingles on the job, both for the sake of a finished job, and because it is quicker, it is recommended that an asbestos shingle cutter be used. It is in fact almost indispensable. Such shingle cutters with a 27 Vi" or 32" blade are regularly provided with a punch for punching holes for concealed nails, and a notching device for cutting irregular shapes to fit around window sills. These cutters can be easily obtained from our dealers.
Where shingle cutters are not available, shingles may be scored with a sharp instrument, and snapped over a straight edge.
OVER GYPSUM BOARD SHEATHING When applying USG Asbestos Cement Shingles over this type of sheathing, the Speed Clinch Fastener System is recommended. See detail No. 32.
NO TOP NAILING REQUIRED
i mt mm
BEFORE
GYPSUM SHEATHING SPEED CLINCH EASTENER
mm
AS6EST0S CEMENT SIDING
AFTER
OVER FIBER BOARD SHEATHING The shingles can be attached by means of the Nailex clip system. See de
tail No. 34.
DETAIL No. 34
FIRST COURSE Apply Vi" x 1" cant strip or wood furring strip along the bottom of the wall. Snap a level chalk line ll3/*" above the bottom of this cant strip. Shingles in the first course should be laid with the top edge along this
chalk line, thus insuring a straight level base line, and permitting the shingle to overhang the cant strip Vi", forming a proper drip edge. Apply a joint strip folded vertically at the comer. See detail No. 51. Start the ap plication of the first course with a full size shingle, ex tending the butt Vi" below the cant strip to form a drip edge. Secure the shingle by nailing the first and middle galvanized nails at the head of the shingle, being careful that the top of the shingle runs true to the chalk line. Drive the nails snugly, but do not drive them home. Be fore nailing at the opposite end insert a joint strip beneath the shingle so that the strip centers under the vertical joint of this shingle and the next shingle to be laid. Se curely nail the third galvanized nail in the shingle and continue application of subsequent shingles in a similar manner, placing an asphalt joint strip under each joint.
Butts of shingles are to be secured with special face nails, driven through the holes provided. These special face nails have small heads that will not show up prom inently, and are made to the exact size of the holes.
It is important in nailing at both top and bottom that you nail across the shingle--never nail both ends and then the center.
USG Saturated Felt Flashin
^Joint Strips'
Old wood siding
Note that nails thru butt; of shingle rests upon top edge of shingle below, gwng
pJSro2p. er alignment,of"c'ou` rses
Break joints by using
Cut shingles at ends
Punch nail holes as
required,
,
USG ASBESTOS SIDINg"SHINGLES W*vy Butt or Clapboard
APPLICATION OF SUCCEEDING COURSES
DETAIL No. 52
SECOND AND SUCCEEDING COURSES Apply a folded joint strip at the corner as in the first course, providing a one inch lap of the strip over the first course shingle. See de tail No. 52. Cut a full size shingle to provide for staggered joint application. Always use two holes in the head and two holes in the butt of any piece of shingle, punching new holes if necessary. Notes Shingles can be aligned foi proper exposure by inserting two nails in the holes at the butt of the shingle allowing the inserted nails to rest upon the top of the underlying shingle. Upper nails are then driven as before being careful to insert a joint strip at each vertical joint as before described with the end com ing one inch down over the lower course. Continue appli cation with full size shingles, being careful to make tight joints.
Complete succeeding courses as described, breaking vertical joints in alternating courses.
Where galvanized nails are exposed as under win dows, apply additional wood moulding to cover same.
BB023 0089
UNITED STATES GYPSUM COMPANY <5
ACR.7 Copyright I93ft -- U. ft. Oypsum Co.
Note the remarkable improvement that has been made in the above home by covering the exterior walls with USG No. 600 Wavy Butt Siding.
A Permanent Improvement
The houses illustrated are typical examples oi what can be done with USG Asbestos Cement Siding. The shabby appearance of the old walls will disappear as if by magic, your home will have new beauty on the outside, and there will be greater comfort within. Put on right over the old siding, USG Asbestos Cement Siding will provide durable, safe walls that help to keep your home cooler in summer and warmer in winter. Lower fuel costs during the winter will result in a considerable saving on your heating bills.
Fireproof
USG Asbestos Cement Siding is made of selected asbestos fibers and Portland Cement, non-combustible materials that greatly increase the fire resisting quality of your home.
Never Requires Paint
USG Asbestos Cement Siding is practically indestructible and no expense is necessary to keep it serviceable. Its colors are non-fading and never require paint
Sign and return the card below; you'll be surprised at the low cost of this beautiful, modern siding.
RFB4 COPYRIGHT I97 U. 8. GYPSUM CO. SOM 8*S7
THIS CARD WILL BRING YOU FULL DETAILS
Please send me full information about USG Asbestos Cement Siding for my borne and an estimate of tbe cost. I understand that this places me under no obligation whatsoever.
NAME_________________________________________
ADDRESS_____________________________________
CITYSTATE.
BBO23 0114