Document dn5ee5nd8rbVorr5900xnoR6q

SENT VIA ELECTRONIC MAIL Tracy Hawkins Sr. Director Bessemer Fresh DC Dollar General Corporation 4101 Lakeshore Parkway Bessemer, Alabama 35022 trhawkin@dollargeneral.com Dear Tracy Hawkins: Enclosed is a copy of the final Inspection Report (Enclosure A) generated by the Environmental Protection Agency Region 4 Air Enforcement Branch for the June 25, 2024, partial compliance inspection of the inspection of the Bessemer Fresh DC - Dollar General facility, located at 4101 Lakeshore Parkway in Bessemer, Alabama. The EPA previously sent a copy of the draft inspection report in an email on July 16, 2024, allowing Bessemer Fresh DC - Dollar General, to make any comments regarding the report and to claim any information contained in the report as confidential business information (CBI). In an email dated July 22, 2024, Bessemer Fresh DC - Dollar General notified EPA that no comments were being made and that no information was being claimed as CBI. Should you have any questions regarding this inspection report, please contact me at (404) 562-9198, or by email at warrilow.phyllis@epa.gov. Sincerely, PHYLLIS Digitally signed by PHYLLIS WARRILOW WARRILOW Date: 2024.08.14 16:32:01 -04'00' Phyllis Warrilow, PE Environmental Engineer South Air Enforcement Section Enclosure ENCLOSURE A INSPECTION REPORT United States Environmental Protection Agency (EPA) Region 4 Air Enforcement Branch Inspection Report I. GENERAL INFORMATION Facility Name: Bessemer Fresh DC Dollar General Location (Address): 4101 Lakeshore Parkway, Bessemer, Alabama 35022 Inspection Date: June 25, 2024 Type of Inspection (Full or Partial Compliance Evaluation): Partial Compliance Evaluation focused on the Clean Air Act (CAA) 112 (r)(1) General Duty Clause requirements of the ammonia refrigeration system. ICIS-Air Number: EPA Region 4 Investigator(s)/Inspector(s): 1. Phyllis Warrilow, Environmental Engineer State/Local Investigator(s)/Inspector(s): Person(s) Contacted at Facility (Name and Title): 1. Tracy Hawkins, Sr. Director 2. Cedric Brown, Sr. Maintenance Manager 3. Steven Ezell, Maintenance Supervisor Report Prepared by: Phyllis Warrilow Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 1 of 14 II. FACILITY INFORMATION A. Facility and Permit Information Facility and Permit Information Comments 1. Type of facility (e.g., chemical plant, refinery, cement manufacturer, etc.). 2. Air permit number(s) and type of permit (e.g., Title V, PSD, Synthetic Minor, etc.). 3. Air permit issuance date. NAICS 493120 - Refrigerated Warehouse and Storage. N/A N/A 4. Air permit expiration date. N/A 5. Facility classification (Major, Synthetic Minor/Conditional Major, Minor). 6. Major source pollutants (if applicable). 7. Applicable regulations (e.g., State Implementation Plan, MACT Subpart FFFF, NSPS Subpart EEEE, etc.). 8. Types of air emission points (e.g., tanks, process vents, boilers, etc.). 9. Types of air pollution control equipment (e.g., baghouse, scrubber, afterburner, etc.). N/A N/A Clean Air Act 112(r)(1) Ammonia refrigeration system N/A B. Process Description Bessemer Fresh DC Dollar General (Facility) located in Bessemer, Alabama is classified under NAICS Code 493120, refrigerated warehousing and storage. The facility is owned by Dollar Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 2 of 14 General Corporation. The Bessemer location was commissioned in 2012 and is comprised of a large one million square foot dry storage building which includes a freezer of approximately 950 square feet. Ice packs are kept in the freezer for later use in shipping containers that transport candy. The ice packs are needed to keep candy from melting in tractor trailers while in transit. The facility's ammonia refrigeration system has the capacity to hold approximately 7,400 lbs of ammonia, however at the time of the inspection the facility had 6,900 lbs of ammonia on site. The facility operates on 5-day week, 12 hour per day schedule all year except for Christmas and Thanksgiving. The Bessemer location employs 675 workers. III. INSPECTION ACTIVITIES Activity Opening Meeting 1. Date and time entered the facility. 2. Credentials presented to facility personnel (include name and title). Yes No NA Y Y Comments The EPA Region 4 (R4) inspector arrived at the Facility on June 25, 2024, at approximately 3:10 PM EDT The EPA Inspector presented credentials to: Tracy Hawkins, Sr. Director, Cedric Brown, Sr. Maintenance Manager, and Steven Ezell, Maintenance Supervisor . Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 3 of 14 Activity Yes No NA 3. Conducted an opening meeting Y to explain the purpose and objectives of the inspection. Comments The opening conference began at 3:25 PM EDT during which the purpose and objectives of the inspection were explained. The opening conference was led by EPA inspector Phyllis Warrilow as well as members of Dollar General management. The inspector explained that they were conducting a Clean Air Act inspection specifically focused on the General Duty Clause requirements of the ammonia refrigerant system. 4. Discussed safety issues. Y The inspector discussed Facility-specific safety and emergency procedures. Ear plugs, safety glasses, coats, gloves, shoe, and hair coverings were provided as needed. Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 4 of 14 Activity 5. Discussed which records to be reviewed. Yes No NA Y 6. Discussed the facility walk- Y through and the areas to be observed in the facility. 7. Discussed facility policy N/A regarding photographs or video (if applicable). 8. Discussed the use of the N/A infrared camera, TVA, PID, and any other equipment. 9. Discussed CBI. Y Comments The EPA inspector requested to review the following records: - Piping and instrumentation diagrams for the ammonia refrigeration system - Hazard assessment for the ammonia refrigeration system - Standard operating procedures relating to the ammonia refrigeration system - Documentation of the preventive maintenance/mechanical integrity program for the ammonia refrigeration system - Records of the most recent calibration or testing of any ammonia sensors/alarms - Pressure Relief Valve recertifications - Facility's emergency response plan or emergency action plan - Documentation of the total amount of ammonia in the refrigeration system EPA inspectors indicated that any documents claimed to be Confidential Business Information (CBI) would be treated in accordance with regulations. Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 5 of 14 Records Reviewed at the Y Facility 10. The types of records reviewed, and the time period reviewed. EPA inspectors requested the following records during the inspection: - Documentation of the total amount of ammonia in the refrigeration system. -Piping and instrumentation diagrams for the ammonia refrigeration system. -Documentation of the preventive maintenance/mechanical integrity program for the ammonia refrigeration system. -Standard operating procedures relating to the ammonia refrigeration system -Conformation of the most recent calibration or testing of any ammonia sensors/alarms, - Records of Pressure Relief Valve recertifications. (Required every 5 years), -Facility's emergency response plan or emergency action plan. Records of the Hazard assessment for the ammonia refrigeration system were not presented to EPA as the facility uses a contractor to maintain the records for the facility plus key personnel were not present at the time of the inspection. Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 6 of 14 Activity Yes No NA Comments Facility Walk-Through Observations 11. The process equipment Y observed and the associated operational rate observed (e.g., Furnace 1 production rate was 5 lbs/hr on 1/1/15, at 2:00 pm - permit requires max rate at 6 lbs/hr). Provide the date and time the information was recorded by the inspector. Identify the permit limit (if applicable). An attachment may be used for a large amount of information. The facility has three compressors. Compressor Number 1,2 and 3 were operating at time of the inspection. Compressor Number 1 was observed to be operating at a discharge pressure of 181 PSIG and a suction pressure of 44.7 PSIG at approximately 4:35 PM on June 25, 2024. Compressor Number 2 was observed to be operating at a discharge pressure of 188.1 PSIG and a suction pressure of 51.1 PSIG at approximately 4:35 PM on June 25, 2024. Compressor Number 3 was observed to be operating at a discharge pressure of 184.4 PSIG and a suction pressure of 2.4 PSIG at approximately 4:35 PM on June 25, 2024. Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 7 of 14 Activity 12. The type of process parametric monitoring observed, and the associated value observed (e.g., Furnace 1 flux injection rate was 200 lbs/batch at 1/1/15, at 2:00 pm - permit requires max rate at 225 lbs/batch). Provide the date and time the information was recorded by the inspector. 13. Provide the date and time the information was recorded by the inspector. Identify the permit limit (if applicable). An attachment may be used for a large amount of information. Yes No NA N/A 14. If process equipment or N/A parametric monitoring equipment was not operating, state the reason by facility personnel why the equipment was not operating. Comments Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 8 of 14 Activity 15. The type of air pollution control equipment, the process equipment it is controlling, and the associated parametric monitoring value observed (e.g., baghouse pressure drop, temperature, scrubber flow rate, etc.). (For example - RTO 1 controlling furnace 1, 1,500 degrees F on 1/1/15, at 2:00 pm - permit requires 1,400 degree F or higher). Provide the date and time the information was recorded by the inspector. Identify the permit limit (if applicable). An attachment may be used for a large amount of information. Yes No NA N/A 16. Continuous emissions N/A monitoring devices and values observed. (e.g., CEMS, COMs, etc.). Provide the date and time the information was recorded by the inspector. Identify the permit limit (if applicable). An attachment may be used for a large amount of information. Comments As part of the walk through at approximately 4:45 pm on June 25, 2024, the EPA inspector observed ammonia detectors in the machine room and throughout the facility. The facility operates 4 ammonia detectors. The last calibration of the ammonia sensors occurred on 2/8/2024. The pressure safety relief valves in the machine room were current and will expire in March of 2025. Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 9 of 14 Activity 17. If air pollution control equipment was not operating, state the reason by facility personnel why the equipment was not operating. Yes No NA N/A 18. Capture and collection system N/A (enclosures and hoods) observations, if applicable (e.g., the magnitude and duration of emission escaping capture from the hood). 19. Ductwork transferring the N/A emissions to the air pollution control device observations, if applicable (e.g., the magnitude and duration of emission escaping from the ductwork, holes or deterioration in ductwork, no deterioration observed, etc.). 20. Any existing unpermitted N/A emission points, new unpermitted emission points, or non-permitted construction activities observed. (if yes, describe in the comments field). Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 10 of 14 Comments Activity 21. Were any visible emissions observed? (if yes, identify the location and equipment). Yes No NA N/A 22. Was a Method 9 reading N/A performed? (if yes, identify the location and equipment). 23. Was the cause of the visible N/A emissions investigated and the information documented? 24. Was a Method 22 performed N/A for visible emissions? (if yes, identify the location and equipment). 25. Identify the cause of the visible N/A emissions as explained by facility personnel, if applicable. 26. Was the infrared camera used? N/A If so, attach the video log (which includes the equipment ID, and the date and time the video was recorded) and videos to this report. Comments Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 11 of 14 Activity 27. Was the TVA used? If so, identify the equipment monitored and the results. Yes No NA N Provide the date and time the information was recorded by the inspector. Include actual instrument readings for each piece of equipment monitored above the leak definition and/or where the infrared camera identified a release. An attachment may be used for a large amount of information. 28. Was the PID used? If so, N/A identify how the PID was used and the results. Provide the date and time the information was recorded by the inspector. An attachment may be used for a large amount of information. Comments Closing Meeting 29. Conducted a closing meeting. Y 30. Summarize any additional N information needed, if applicable? The closing meeting was conducted starting at 5:37 PM on June 25, 2024. Attendees were the same as were present for the opening meeting. Facility had all requested documents except for the Process Hazard Analysis. Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 12 of 14 Activity 31. Accept a declaration of CBI, if applicable? 32. Discussed observations. Yes No NA N/A N Comments The facility's mechanical equipment and mechanical integrity program was implemented by maintenance personnel. Some records were computerized and easily retrievable. The Facility was able to verify the following records for the ammonia refrigerant system: - Documentation of the total amount of ammonia in the refrigeration system - Pressure safety valve certifications. - Dates of the most recent calibration or testing of any ammonia sensors/alarms. - Process & Instrumentation Diagram - Preventative Maintenance records - Facility Emergency Response Plan Mechanical Integrity and Preventative maintenance were kept on schedule by maintenance personnel and ammonia refrigeration contractors. Process Hazard Analysis was to be retrieved from the facility's ammonia refrigeration contractor. Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 13 of 14 Activity Yes Comments No NA 33. Discussed next steps, if Y A final inspection report from EPA Region 4 applicable? will be sent to the company within a 70- day timeframe. Document requests were discussed. 34. Date and time inspection On June 25, 2024, at approximately 6:07 concluded. PM the Region 4 inspector left the Facility and concluded the inspection. Miscellaneous 34. Include any additional N/A Process hazard assessment for the observations, if applicable. ammonia refrigeration system is to be received from the facility as acknowledged above. Digitally signed by PHYLLIS PHYLLIS WARRILOW WARRILOW EPA Investigator/Inspector Signature:_______________________D_at_e:_20_2_4.0_8_.1_5 0_8_:2_1:5_0 -04'00' EPA Supervisor Signature & Title Digitally signed by _T__O__D__D___________T_O_D_D__G_R_O_E_N_D_Y_K_E____ _G__R__O__E__N__D__Y__K_E__0_8_:3_9_:0_5_-_0_4_'0_0_' ______ Date: 2024.08.15 Date Report Finalized: ______________________________ Project Name: Bessemer Fresh DC Dollar General ICIS/Project No. 3601684268 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019 Page 14 of 14 APPENDICES AND ATTACHMENTS Appendix A: Document Receipt Log No documents were obtained from Facility representatives during the on-site inspection.