Document dk8xQqD4Ybgg32VdpyXMXNrQ
J. R Savage - General Ofrice
Decernbar 4, 1970
...
NOVmmER PCB REPORT
Manufacturing
Nr. V, B. Papageorge Oeneral Office
Hr. H. S. Bergen Nr P. B. Hodges
W. 0. KRUMMRXCH PLANT PCB Levels In Sewer
r-
Aroclpr losses from the Aroclor Department averaged
about 1.0 lbs/day and ranged from about 0.4 to 2.$
lbs/d*X
__
__
Looser from the Sauget Village treatment plant for the period 10/16 - 11/16 averaged 72 lbs/day (495 PPb). Range for 9 samples was 52 to 115 Ibs/diqr (220-796 ppb).
Losses from the North Area departments (258, 270, 275)
averaged 8 lbs/day based on a 15 day composite.
A sampling program to identify and monitor sources of
Aroclor losses throughout the plant is targeted to
begin I by 1/l/fl.
. '
'*
, .*
*"
Sever effluent samples are being taken at the other .
Indust rial plants to determine their contribution to
the total losses at the treatment plant, ;; r
Projects To Reduce Severed PCB*s Prom Aroclor Department
C*` .v
A. Blow tank demister (Bat. 20J1) project was successfullyZ demon! itrated. About 100 lbs/day of mist Aroclor is
being collected. Sever loss has been reduced from about
; .20 Ibei/day to about 0,
h -w-i vt' '
''
'
. 'Aj/.
- .< A...
. ;
`.
B. Project to provide paving, curbs, trenches, and catch
baslnii in the tank oar and truck loading areas has
.. . been approved as part of the Aroolor incinerator ^
. project. Jhe design package is about 75# complete. ": .
v \ ./'-. 'rv- av.-a>.-j-fiv.\ >.w.
Program T< > Eliminate Severed PCB *s Proa Pslng Departments ' C .
; ; eg
... to CT^r-
; g|'
"M'
A second meting with Don Roush 'is scheduled for 12/7/TO# " Don W .11 discuss with plant production and engineering s*. personnel design considerations for changing Therminol <' .
:cJo
units to non-Aroolor Theminols.
--
-
PAUL HODGES DEPOSITION
May 31 - June
EXHIBIT NO
WATER PCB-SD0000005631
Program To Eliminate Severed PCB*s From Using Departments (ContM)
V. 0. Krummrlch Plant
B. Status of work on Thermlnol units is as followst
Dept. 255
Switched from BR-2 to Theralnol-66 on 11/16/70.
Dept. 222 0 fc p.
Dept, Dept
?H'
Plans underway to change out these systems to Thermlnol 66, EDO for all units is 3/1/fli..-/. v
Status reports on the other Thermlnol units are attached.
ftemoval Ofj Soluble PCB*s Prom Sewer Stream (Reach 10 pph) ;;;
A test is planned for the week of 12/7/TO to determine
effect on Aroclor losses in the treatment plant effluent
by neutralising the sewer flow to the treatment plant, .
Lime will be added at Dept. 265 for about 5 days to x
hold the pH above 7.0 at the treatment plant. The . .
resulting floe is expected to improve PCB removal
.
.. based Ion Anniston work.
v*-!:
PC Levels! In The Atmosphere
W
. - - ' .
Sampling program has been eotqpleted. Only significant .
area cf loss is at the mix tanks due primarily to the./,.: *',,
nitrogen purge. Loss is in the range of 4 to 5 lbs/day.- :
Plans are to replace the nitrogenpurge with a nitrogen
blanket.,'
^>'<-' >.
,
: X: rca n.or): rro3.pt WE
W-ir;. ;
Project approved as part of the Aroolor, Incinerator;
project. Construction schedule will be determined
in Dtcesiber,
' ' ...................................
- *,* * i-`.* r'** ,* * . r ; <
ANNISTON mmI * * ** '
'f
* >.V
m ; * .
. *.
1
...4
*; ' \. * ., .*-r -
s.'v.r. *..*,
?*'it* v.. ''*r- -
* .
V*
\ * *."
1
*
*
...
? *'
- *
* /. * vS ' :
,*
/
gCBJLevelj In Beweg
-r?^*:^^...
Aroclor lbssee during Movember averaged 25#/day (4620 pdb}.
One high Value accounted for l6#/dovt neglecting this the*
November average would be 7#/day (1410 ppb). Based on
knowledge of plant operations and performance of abatement
devices in November* much of the high level .data is due to.
sample contamination, . - :
' '* " `
CONIFDENITAL92-CV-204-WOS
WATER PCB-SD0000005632
Page 5
ANNISTON PLANT (Confd)
spina
Minor leaks- were contained by use of sand and disposal in drums. Ho spills occurred*
Projects amn|qd Evaluations
1. Laboraittoory work to date Indicates the presence of minimal
amounts of PCB in the residue from Solid Aroclor distillation
(Montar 5) This eliminates 1<M pounds per year or solid
wastes from our PCB disposal plan.
.
Design work to collect spent carbon from HC1 carbon towers has been deferred to early 1971 to accomplish the Mo, 1 HC1 Limestone Pit rebuild*
Solids removal from plant effluent (part of program to
reduoe (PCB in plant effluent to 10 ppb) Is moving
forward with preliminary screening tests at Denver Equipment
Company and Bets Laboratories indicating good to moderate
success with flocculation and settling. Further laboratory
testing is scheduled for early December. A project has
been written, design is underway and equipment modifications
under study working with Monsanto Blodlze to set up one
of their clarifiers at Anniston for pilot scale testing
of the apparent best techniques recommended by Denver
and/or pets.
.
A successful test was made of removal of limestone inerts
from the 02 KC1 neutralisation pit while in operation. .
A total weight of 127*000 lbs was removed of Which ; . .
by weight was solids. Lab analysis of the total
m15altbesrialol freAvreoaolleodr.
mo1r'We thanvlimll Present
i1A-n0Wd0- i,icV0a0W0tiopWnpsbv
AAa&rreVoVoAt-hlVo-&ar'-toV-tirh-1AisC2
to
method of removal of solids while the pit Is In operation
will increase the efficient life of the pit by PjjjC.
A mechanical expense projeot for repair of the Mo. 1 MCI
neutralisation pit was written and approved. This
project, will be coordinated with the Niran pit project
to apply on asphalt lining at the same time, to
save money on materials. .
'
MEWPORT PLANE
Eeport has not town roelytd, ; ' v.
;-
x: d
*1 .* '
J. i. Savage .'* ' -. -
-ly * .
WATER PCB-SD0000005633