Document deey3orb0GVYMppgX67d4Rr0
PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING SEPTEMBER 28, 1983
were
G.W. Bostick for G.W. Daues A.H. Conrad G.A. Danner R.T. Hammann R.L. Hammond B.C. Lancaster D.W. Metten
S.G. Pappas M.A. Riddle (Guest) G.T. Ryan J.G. Trafton G.L. Tromblee G.L. Wofford W.D. Walker for J.S. Hagood
I. REVIEW OF STATISTICS--R.T. Hammann A. Texas City Plant Safety Performance Summary - July/August
(A) INJURIES WITHOUT LOST WORKDAYS (medical treatment only)
(B) LOST WORKDAYS CASES **B, RESTRICTED ACTIVITY **B2 DAYS /WAY FROM WORK CASES
(C) FATALITIES
*TOTAL RECORDABLE CASES
1982 JUL AUG YTD
12 9
01 00 01 00
4 0 4 0
__ 1 _ 3_ 13_
1983 JUL AUG YTD
22 8
00 00 00 00
0 0 0 0
22 8
1983 TARGETS
11 2
--
13
TIR TRR TLWR DAWR
JUL
8.53 0.71 0.00 0.00
INJURY RATES PER 200,000 MANHOURS
1982 AUG
YTD JUL
1983 AUG
1983 YTD TARGETS
1983 MFI
JUL TARGET YTD
9.09 0.00 0.00 0.00
8.76 1.05 0.35 0.35
14.68 1.73 0.00 0.00
13.92 1.64 0.00 0.00
11.83 0.82 0.00 0.00
___
0.87 0.13 --
___ ____
1.02 1.04 ----- 0.27 ----- 0.20
B. Comments on Statistics--R.T. Hammann
There were two Recordable Injuries In July. A pipefitter fractured his left thumb when It was caught between the handwheel on a valve handle extension and a support bracket on the handrail. A PT Tech nician sustained 1st and 2nd degree burns on the left foot when sprayed with hot PEB while sampling 14D4 feed.
SC 13886
srs 2430692 LAM015676
I
PMSB Meeting Minutes--September 28, 1983
f'
Page 2
In August there were two Recordable Injuries. A pipefitter cut his left thumb while cutting a plastic "ty-rap" and a machinist sustained a broken finger when it was caught in the safety catch of a crane hook.
There have been no Recordable Injuries so far in September.
Areas having a high cumulative monthly injury rate are:
Power 2 Insulators Carpenters
Areas showing much improvement in getting their injury rate under control are:
Machinists Electricians Instrument Analysts Dept. 50 Shops Pumper Gaugers
Areas having excellent safety records are:
Dept. 513 - 12 months without an injury Stores - 19 months without an injury
C. Contractor Safety--R.L. Hammond
There was one Recordable Injury in August bringing the total to five for the year. This year's TRR is 6.6 vs. 5.1 for last year. We have had fewer recordable injuries, but also have fewer contractors in the plant.
B.C. Lancaster will issue the report for Contractor Safety next month.
D. CEP Safety--B.C. Lancaster
There were six Recordable Injuries in July and four Recordable Injuries in August; two of which were lost-work-day cases. The statistics have not been updated as there have been three Safety men since the 1st of August. Since Brooks Contruction Co. seems to have the majority of these recordable injuries, G.L. Tromblee requested additional infor mation concerning their safety record.
II. REPORT OF THE SAFETY ADVISORY COMMITTEE (SAC)--G.A. Danner
No activity to report on.
SC 13887
STG 2430693
LAM015677
I PHSB Meeting Minutes--September 28, 1983
Page 3
HI. _RE_P_OR_T_O_F_T_HE__PLANT SAFETY AND HOUSEKEEPING ACTION COMMITTEE (SHAC)--
A. Hourly Safety Committee
Only three members were present due to illness, vacation and shift coverage. The Chairman, Duffey O'Briant, is recovering from heart surgery and, therefore, will not return before the end of his term.
Waldo Hughes was elected as the new Chairman and Bubba Bean has been appointed to replace Duffey O'Briant on the Committee.
1. Status Report on Previous Concerns
a. NSI's concerns
Safety meetings were held for all Zone 1 craftsmen.
Dennis Kos met with HSC on 9/27/83 and discussed
Plans are to discuss with all craftsmen throughout the plant.
b. Resuscitators - It is the feeling of LP&S that mouth-to-mouth resuscitation is more effective and requires less refresher training than resuscitators. Therefore, the number of resuscita tors in the plant will not be Increased.
c. Rig Permitting - Discussed procedure with Maintenance and relayed information on proper permitting to the Committee.
d. Aerosol spray for Fit Test Booth - Currently the chemical DOP is used in an aerosol spray for the Fit Test Booth. The con centration is so low that the risk of using DOP is negligible. However, LP&S is looking for a substitute and will change to a new aerosol whenever a suitable one is found.
2. Hew concerns:
a. First aid training on hazardous chemicals - The HCN Complex, AN-5, and Lactic Acid units all have first aid procedures for HCM poisoning. These procedures are readily available in the the Operating Manual. These units also have repetitive training in HCN first aid procedures. LP&S is also developing a program to conduct refresher training for the MIECA personnel in the plant.
b. Onit/craft representative training - The present practice is to conduct training about mid-way through the term in order to avoid conflicts with vacation periods, hunting season, holidays, etc. SHAC will review this practice and make recommendation as to any changes which would allow training to be conducted earlier in the term.
SC 13888
STG 2430694
LAM015678
PMSB Meeting Minutes--September 1983
Page 4
c. Asbestos Pick-Up - After Hurricane Alicia there was much pick-up of materials throughout the plant. Almost all of the asbestos was confined to the East plant. Contractors and Monsanto insu lators wearing proper protective equipment were used to pick up the asbestos in this area. Industrial Hygiene personnel monitored areas throughout the plant and found no significant problems.
d. Methanol compressor installation job - Working conditions around 44C201 were almost unbearable due to extreme heat as steam was lined up to this compressor before insulation was complete. The action taken to start up the compressor was a conscious one and a practice normally followed in the plant. It had been partially insulated to eliminate any burn hazard. This is an appropriate task for the Unit/Craft Safety Team to review procedures and make recommendations for minimizing heat under similar circumstances.
B. Plans for Annual Safety & Housekeeping Inspection
1. Theme - SAFETY AWARENESS PREVENTS ACCIDENTS
2. Schedule
a. Expanded Staff Meeting - 1500 hours on October 10.
b. Inspection - October 24-27
c. Inspection feedback - 1330 hours on October 28
3. Inspection will be competitive. The Inspection Team will use checklists similar to those used in the Quarterly Inspections. In addition to knowledge, condition of equipment, hazards, and housekeeping, the Inspectors will also review partici pation in the STOP Program.
4. Inspectors:
D.A. Barfoot 6.A. Danner Ren Gore W.M. Haynes Leonard Schwab G.L. Tromblee, Chairman
C. Bicycle Safety
Several comments were made concerning changes to the proposed proce dure. These changes will be incorporated by Harry Conrad and recir culated for comments. If no major comments are received this proce dure will be Issued as plant policy.
SC 13889
SrG **30695 i /VM015679
PMSB Meeting Minutes--September 28, 1983
Page 5
D. Contractor Safety
Research has been completed comparing the Texas City plant to the Queeny, Pensacola, Krummrich and Chocolate Bayou plants.
An action plan for reviewing and revising our procedures will be developed by SHAC at their next meeting.
E. Drug and Alcohol Abuse Program
1. The program will consist of supervisory training to be modeled after the Shell Oil Company program.
2. The expected start of this program is January 1984.
3. Recommended action committee to implement this program:
Chairman Technology Manufacturing Maintenance
Personnel Training
- Bill Latimer - Gene Wofford - Harold Lacy - Paul Siems - Don Kaldenberg - Ebert Steele
This program will be previewed with PMSB at a special session prior to implementing.
F. SHAC Alert Issued
a. Responsibilities of boleman
b. Use of flexible hose
IV. REVIEW OF INCIDENTS Monsanto Incidents Date Incident No. 07/12/83 83-09 (Issued)
Sc
13890
Description
Recordable Injury--Dept. 16; pipe fitter suffered a fractured left thumb while removing a 10" valve from a pipeline that runs parallel to the 16D3 structure. His thumb was pinched between the handwheel of a valve handle extension and a support bracket on the handrail. (Mata)
STG 2430696
LAM015680
PMSB Meeting Minutes--September 28, 1983
Date
Incident Mo.
07/18/83 83-10 (Issued)
07/22/83 83-11 (Not Issued)
08/12/82 83-12 (Issued)
08/15/83 83-13 (Issued)
07/27/83 83-14 (Issued)
Contractor Incidents 06/21/83 C 83-03
(Not Issued)
06/30/83 C 83-04 (Issued)
06/21/83 C 83-05 (Issued)
sc 13891
Page 6
Description
Near-Miss Incident--Dept. 16; Three pipefitters sustained contusions to the arms and legs when the load chain of a chain fall they were using came loose and struck them. The contu sions were minor but the incident raised serious concerns on chain fall usage. (Mata)
Recordable Injury--Dept. 14; PT Tech nician was sprayed with hot PEB while sampling 14D4 feed. Sustained 1st and 2nd degree burns to left foot. (Wise)
Recordable Injury--Dept. 15/16; Pipe fitter cut his left thumb while cut ting a plastic "ty-rap". The "ty-rap" was securing 1/2 inch O.D. SS tubing to a 2-1/2" carbon steel pipe. (Wills)
Recordable Injury--Dept. 15; Machinist sustained a broken bone on the end of his left ring finger when caught by the safety latch of a crane hook. (Richards)
Tank Overflow--Dept. 51; NO INJURIES. AN storage tank, 51T17-1, overflowed. (McClellan)
Recordable Injury/Days-Away-FromWork--Brooks Construction; Old Dept. 10 area; man was struck by pallet when unloading packing for styrene shutdown. Suffered contusions and sprain to left ankle. (Wright)
Recordable Injury--Opel Construction; Dept. 15 Fin Fans; mashed and cut little finger of right hand; crack fracture, four sutures. (Supak)
Recordable Injury/Days-Away-FromWork--Cleveland Construction; Old Dept. 35F; Sprained ankle sliding down rope. (Vornkahl)
$rG e*3*9?
LAM015681
PMSB Meeting Minutes--September 28, 1983
Page 7
08/27/83 C 83-06 (Issued)
Recordable Injury--Hartnet Construc tion; Dept. 51; Finger caught between bracing and brick while removing bracing. Three stitches required on ring finger. (Supak)
V. STATUS OF S-T-O-P PROGRAM--M.A. Riddle for G.W. Daues
Plans for training the hourly (700 people) and non-exempt (150 people) personnel have been completed. Both courses will be 3 book modified courses. The hourly program will parallel the chiefs/leadmen program with special sessions being held for 70 people at a time. The non exempt program will parallel the supervisory program.
The target for initiating this training is the latter part of October or first part of November.
Concern was raised as to the effectiveness of the chief/leadmen training. It seems to have been a good educational tool, but we have not had much response from them. The Hourly Safety Committee will be asked to consider the program and recommend ways to increase hourly participation.
VI. MISCELLANEOPS--R.T. Hammann
A. Hurricane Procedures/Hurricane Alicia
1. Comments have not been received from everyone concerning the critique of procedures as followed during Hurricane Alicia. A formal memo has been Issued requesting these comments.
The Emergency Procedure Plan still needs to be reviewed and rewritten for all areas. Comments from the Hurricane Alicia critique may result in additional changes.
B. Incident Report Followup
There is some concern that not all recommendations from Accidents/ Incidents Reports have been completed. Each General Superintendent is to have a program in place for assuring completion of the recom mendations. SHAC will check on the effectiveness of this system.
C. Hearing Protection Program
All PMSB members were given a copy of the Plant Hearing Protection Program. PMSB approved the posting of hearing protection signs around those areas having noise levels greater than 85 DB. These signs shall be posted at all entrances or approximately every 50 ft. around the area. Units will be notified when the signs are avail able from Stores.
sc 13892
STG 2430698
LAM015682
\
PMSB Meeting Minutes--September 28, 1983
Page 8
D. OSHA Inspection
Following an informal conference with the OSHA Area Director one possible citation was dropped. The final result of the OSHA inspec tion on asbestos exposure was that we received one "other" type cita tion with $0 value for failure to conduct personnel sampling on a periodic basis (every six months).
VII. PLANT MANAGER'S COMMENTS
After a period in which there was some decrease in the number of STOP cards turned in, this number seems to be increasing again, tfe need to ensure that safety awareness is at a high level, especially after all the recent occurrences.
Personnel from Mitsubishi Rayon will be visiting the plant with Earl Brasfield on October 19 and our Annual Safety & Housekeeping Inspection will be held the week of October 24. Start now to assure the readiness of our plant for these visit.
RTH:js
R. T. Hammann
sc
13893
STG 2430699
LAM015675